{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,4,11]],"date-time":"2026-04-11T18:42:32Z","timestamp":1775932952882,"version":"3.50.1"},"reference-count":28,"publisher":"Springer Science and Business Media LLC","issue":"3","license":[{"start":{"date-parts":[[2017,4,5]],"date-time":"2017-04-05T00:00:00Z","timestamp":1491350400000},"content-version":"unspecified","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Prod. Eng. Res. Devel."],"published-print":{"date-parts":[[2017,6]]},"DOI":"10.1007\/s11740-017-0735-6","type":"journal-article","created":{"date-parts":[[2017,4,5]],"date-time":"2017-04-05T17:18:22Z","timestamp":1491412702000},"page":"331-342","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":17,"title":["Cost-benefit analysis for disruption prevention in low-volume assembly"],"prefix":"10.1007","volume":"11","author":[{"given":"Peter","family":"Burggr\u00e4f","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"ORCID":"https:\/\/orcid.org\/0000-0002-3226-2457","authenticated-orcid":false,"given":"Johannes","family":"Wagner","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Katrin","family":"L\u00fcck","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Tobias","family":"Adlon","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2017,4,5]]},"reference":[{"key":"735_CR1","volume-title":"Global production: a handbook for strategy and implementation","author":"E Abele","year":"2006","unstructured":"Abele E, Meyer T, N\u00e4her U, Strube G, Sykes R (2006) Global production: a handbook for strategy and implementation. Springer, Berlin Heidelberg"},{"key":"735_CR2","volume-title":"The machine that changed the world: the story of lean production","author":"JP Womack","year":"1991","unstructured":"Womack JP, Jones T, Roos D (1991) The machine that changed the world: the story of lean production. 1st\u00a0edn. Harper Perennial, New York","edition":"1"},{"key":"735_CR3","unstructured":"Schuh G, Potente T, Jasinski T (2013) Decentralized, Market-Driven coordination mechanism based on the monetary value of in time deliveries. Proceedings of Global Business Research Conference, Kathmandu"},{"key":"735_CR4","doi-asserted-by":"crossref","first-page":"316","DOI":"10.1108\/01443570010308077","volume":"20","author":"A Gunasekaran","year":"2000","unstructured":"Gunasekaran A, Forker L, Kobu B (2000) Improving operations performance in a small company: a case study. Int J Oper Prod Manag 20:316\u2013336","journal-title":"Int J Oper Prod Manag"},{"key":"735_CR5","volume-title":"Organisationsformen der Montage","author":"T Petersen","year":"2005","unstructured":"Petersen T (2005) Organisationsformen der Montage. Shaker, Aachen"},{"key":"735_CR6","doi-asserted-by":"crossref","unstructured":"M\u00fcnzberg B, Schmidt M, Beck S, Nyhuis P (2012) Model based logistic monitoring for supply and assembly processes. Prod Eng Res Develop 6:449\u2013458","DOI":"10.1007\/s11740-012-0403-9"},{"key":"735_CR7","volume-title":"Mechanical assemblies","author":"D Whitney","year":"2004","unstructured":"Whitney D (2004) Mechanical assemblies. Oxford University Press, New York"},{"key":"735_CR8","doi-asserted-by":"crossref","first-page":"429","DOI":"10.1016\/j.ijpe.2009.06.014","volume":"122","author":"ACA Cauvin","year":"2009","unstructured":"Cauvin ACA, Ferrarini AFA, Tranvouez, ETE (2009) Disruption management in distributed enterprises: a multi-agent modelling and simulation of cooperative recovery behaviours. Int J Prod Econ 122:429\u2013439","journal-title":"Int J Prod Econ"},{"key":"735_CR9","unstructured":"Eversheim W (1992) St\u00f6rungsmanagement in der Montage. 1st edn. Springer-VDI, D\u00fcsseldorf"},{"key":"735_CR10","doi-asserted-by":"crossref","unstructured":"Kampker A, Burggr\u00e4f P, B\u00e4umers Y (2014) Economic level of detail for assembly planning. IEEE International Conference on Industrial Engineering and Engineering Management, Selangor Darul Ehsan\/Malaysia, pp\u00a0516\u2013520","DOI":"10.1109\/IEEM.2014.7058691"},{"key":"735_CR11","unstructured":"Kampker A, Wagner J, Burggr\u00e4f P, B\u00e4umers Y (2015) Criticality-focused, pre-emptive disruption management in low-volume assembly. Proceedings of Abstract and Papers of 23rd International Conference on Production Research ICPR23\u2014Operational Excellence towards sustainable development goals (SDG) through Industry 4.0, Manila\/Philippines"},{"key":"735_CR12","doi-asserted-by":"crossref","unstructured":"Burggr\u00e4f P, Reuter C, B\u00f6ning C, Wagner J, Schmitz T, Prinzhorn H, Ebertz J (2016) Monet\u00e4re Bewertung von Montagepl\u00e4nen\u2014Bewertung von Montageplanalternativen anhand der logistischen Zielgr\u00f6\u00dfen im St\u00f6rungsfall. Werkstattstechnik online (wt online) 106:236\u2013242","DOI":"10.37544\/1436-4980-2016-04-46"},{"key":"735_CR13","doi-asserted-by":"crossref","first-page":"2065","DOI":"10.1080\/002075497195074","volume":"35","author":"RJ Abumaizar","year":"1997","unstructured":"Abumaizar RJ, Svestka JA (1997) Rescheduling job shops under random disruptions. Int J Prod Res 35:2065\u20132082","journal-title":"Int J Prod Res"},{"key":"735_CR14","doi-asserted-by":"crossref","unstructured":"Meyer G, Kn\u00fcppel K, Schmidt M, Nyhuis P. (2014) St\u00f6rgr\u00f6\u00dfenmanagement-Systematik. Zeitschrift f\u00fcr wirtschaftlichen Fabrikbetrieb (ZWF) 109:704\u2013707","DOI":"10.3139\/104.111215"},{"key":"735_CR15","unstructured":"Meyer G, Br\u00fcnig B (2014) Competence Development Measures\u2014Employee Development in Times of Demographic Change. Official Conference Proceedings of The Asian Conference on Society, Education & Technology, Osaka"},{"key":"735_CR16","doi-asserted-by":"crossref","DOI":"10.1007\/978-3-663-08460-0","volume-title":"Entst\u00f6rung betrieblicher Abl\u00e4ufe","author":"M Heil","year":"1995","unstructured":"Heil M (1995) Entst\u00f6rung betrieblicher Abl\u00e4ufe. Gabler, Wiesbaden"},{"key":"735_CR17","unstructured":"Burggr\u00e4f P (2012) Wertorientierte Fabrikplanung. Apprimus, Aachen"},{"key":"735_CR18","first-page":"3619","volume":"9","author":"A Kampker","year":"2015","unstructured":"Kampker A, Burggr\u00e4f P, B\u00e4umers Y (2015) Determination of the Economic Planning Depth for Assembly Process Planning. Int J Soc Behav Educ Econ Bus Indus Eng 9:3619\u20133624","journal-title":"Int J Soc Behav Educ Econ Bus Indus Eng"},{"key":"735_CR19","unstructured":"Br\u00e4unig D, Kohstall T (2013) Calculating the international return on prevention for companies: costs and benefits of investments in occupational safety and health. German Social Accident Insurance (DGUV), Berlin"},{"key":"735_CR20","volume-title":"DIN66001 Sinnbilder und ihre Anwendung","author":"Deutsches Institut f\u00fcr Normung e.V.","year":"1983","unstructured":"Deutsches Institut f\u00fcr Normung e.V. (1983) DIN66001 Sinnbilder und ihre Anwendung. Beuth, Berlin"},{"key":"735_CR21","unstructured":"Rochow P, Burggr\u00e4f P, Reuter C, Prinzhorn H, Wagner J, Schmitz T (2015) Identification of alternative assembly sequences for large-scale products. Proceedings of the POMS Conference, Washington"},{"key":"735_CR22","volume-title":"St\u00f6rungsmanagement in der Einzel- und Kleinserienmontage","author":"F Lehmann","year":"1992","unstructured":"Lehmann F (1992) St\u00f6rungsmanagement in der Einzel- und Kleinserienmontage. Shaker, Aachen"},{"key":"735_CR23","volume-title":"Fundamentals of total quality management","author":"J Dahlgaard","year":"2007","unstructured":"Dahlgaard J, Kristensen K, Kanji G (2007) Fundamentals of total quality management. Taylor & Francis, London"},{"key":"735_CR24","doi-asserted-by":"crossref","DOI":"10.1002\/9781118312575","volume-title":"Effective FMEAs\u2014achieving safe, reliable and economical products and processes using failure mode and effects analysis","author":"C Carlson","year":"2012","unstructured":"Carlson C (2012) Effective FMEAs\u2014achieving safe, reliable and economical products and processes using failure mode and effects analysis. Wiley, Hoboken"},{"key":"735_CR25","doi-asserted-by":"crossref","first-page":"193","DOI":"10.1016\/0272-6963(95)00023-L","volume":"13","author":"SN Kadipasaoglu","year":"1995","unstructured":"Kadipasaoglu SN, Sridharan V (1995) Alternative approaches for reducing schedule instability in multistage manufacturing under demand uncertainty. J Oper Manage 13:193\u2013211","journal-title":"J Oper Manage"},{"key":"735_CR26","doi-asserted-by":"crossref","unstructured":"Backes-Gellner U, Veen S (2013) Positive effects of ageing and age diversity in innovative companies\u2014large-scale empirical evidence on company productivity. Hum Resour Manag J 23:279\u2013295","DOI":"10.1111\/1748-8583.12011"},{"key":"735_CR27","doi-asserted-by":"crossref","unstructured":"Wagner J, Burggr\u00e4f P, B\u00e4umers Y, L\u00f6her C (2015) St\u00f6rungsrelevante Montageprozesse erkennen\u2014Eine Bewertungsmethodik f\u00fcr die Kleinserie. Zeitschrift f\u00fcr wirtschaftlichen Fabrikbetrieb (ZWF) 110:787\u2013790","DOI":"10.3139\/104.111435"},{"key":"735_CR28","doi-asserted-by":"crossref","unstructured":"Ehrgott M (2012) Vilfredo Pareto and multi-objective optimization. Documenta Mathematica\u201421st International Symposium on Mathematical Programming, Berlin, pp\u00a0447\u2013453","DOI":"10.4171\/dms\/6\/43"}],"container-title":["Production Engineering"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s11740-017-0735-6.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s11740-017-0735-6\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s11740-017-0735-6.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2023,8,23]],"date-time":"2023-08-23T00:51:51Z","timestamp":1692751911000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s11740-017-0735-6"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2017,4,5]]},"references-count":28,"journal-issue":{"issue":"3","published-print":{"date-parts":[[2017,6]]}},"alternative-id":["735"],"URL":"https:\/\/doi.org\/10.1007\/s11740-017-0735-6","relation":{},"ISSN":["0944-6524","1863-7353"],"issn-type":[{"value":"0944-6524","type":"print"},{"value":"1863-7353","type":"electronic"}],"subject":[],"published":{"date-parts":[[2017,4,5]]}}}