{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,4,23]],"date-time":"2026-04-23T20:34:21Z","timestamp":1776976461741,"version":"3.51.4"},"reference-count":31,"publisher":"Springer Science and Business Media LLC","issue":"4-5","license":[{"start":{"date-parts":[[2017,6,23]],"date-time":"2017-06-23T00:00:00Z","timestamp":1498176000000},"content-version":"unspecified","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"funder":[{"name":"Conselho Nacional de Desenvolvimento Cient\u00edfico e Tecnol\u00f3gico (CNPq)","award":["448161\/2014-1"],"award-info":[{"award-number":["448161\/2014-1"]}]},{"name":"Conselho Nacional de Desenvolvimento Cient\u00edfico e Tecnol\u00f3gico (CNPq)","award":["308047\/2014-1"],"award-info":[{"award-number":["308047\/2014-1"]}]}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Prod. Eng. Res. Devel."],"published-print":{"date-parts":[[2017,10]]},"DOI":"10.1007\/s11740-017-0747-2","type":"journal-article","created":{"date-parts":[[2017,6,23]],"date-time":"2017-06-23T02:37:31Z","timestamp":1498185451000},"page":"523-529","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":15,"title":["A new efficient heuristic method for minimizing the total tardiness in a no-idle permutation flow shop"],"prefix":"10.1007","volume":"11","author":[{"given":"Marcelo Seido","family":"Nagano","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Fernando Luis","family":"Rossi","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Caio Paziani","family":"Tomazella","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2017,6,23]]},"reference":[{"key":"747_CR1","doi-asserted-by":"crossref","first-page":"495","DOI":"10.1002\/nav.3800290311","volume":"29","author":"I Adiri","year":"1982","unstructured":"Adiri I, Pohoryles D (1982) Flowshop no-idle or no-wait scheduling to minimize the sum of completion times. Nav Res Logist 29:495\u2013504","journal-title":"Nav Res Logist"},{"key":"747_CR2","unstructured":"Baptiste P, Hguny L-K (1997) A branch and bound algorithm for the F\/no\u2009\u2212\u2009idle\/Cmax. In: Proceedings of the international conference on industrial engineering and production management (IEPM97), Lyon, France, pp\u00a0429\u2013438"},{"key":"747_CR3","doi-asserted-by":"crossref","first-page":"810","DOI":"10.1016\/j.ejor.2006.11.025","volume":"184","author":"D Baraz","year":"2008","unstructured":"Baraz D, Mosheiov G (2008) A note on a greedy heuristic for flow-shop makespan minimization with no machine idle-time. Eur J Oper Res 184:810\u2013813","journal-title":"Eur J Oper Res"},{"key":"747_CR4","doi-asserted-by":"crossref","first-page":"353","DOI":"10.1002\/(SICI)1520-6750(200006)47:4<353::AID-NAV5>3.0.CO;2-U","volume":"47","author":"O Cepek","year":"2000","unstructured":"Cepek O, Okada M, Vlach M (2000) Note: on the two-machine no-idle flowshop problem. Nav Res Logist 47:353\u2013358","journal-title":"Nav Res Logist"},{"key":"747_CR5","doi-asserted-by":"crossref","first-page":"27","DOI":"10.1016\/j.cor.2015.02.002","volume":"60","author":"V Fernandez-Viagas","year":"2015","unstructured":"Fernandez-Viagas V, Framinan JM (2015) NEH-based heuristics for the permutation fowshop scheduling problem to minimise total tardiness. Comput Oper Res 60:27\u201336","journal-title":"Comput Oper Res"},{"key":"747_CR6","doi-asserted-by":"crossref","first-page":"287","DOI":"10.1016\/S0167-5060(08)70356-X","volume":"5","author":"R-L Graham","year":"1979","unstructured":"Graham R-L, Lawler E-L, Lenstra J-K, Kan A-R (1979) Optimization and approximation in deterministic sequencing and scheduling: a survey. Ann Discret Math 5:287\u2013326","journal-title":"Ann Discret Math"},{"key":"747_CR7","doi-asserted-by":"crossref","first-page":"61","DOI":"10.1002\/nav.3800010110","volume":"1","author":"SM Johnson","year":"1954","unstructured":"Johnson SM (1954) Optimal two and three-stage production schedules with set-up times included. Nav Res Logist Q 1(1):61\u201368","journal-title":"Nav Res Logist Q"},{"issue":"3","key":"747_CR8","doi-asserted-by":"crossref","first-page":"677","DOI":"10.1016\/j.ejor.2006.01.036","volume":"178","author":"PJ Kalczynski","year":"2007","unstructured":"Kalczynski PJ, Kamburowski J (2007) On no-wait and no-idle flow shops with makespan criterion. Eur J Oper Res 178(3):677\u2013685","journal-title":"Eur J Oper Res"},{"issue":"1","key":"747_CR9","doi-asserted-by":"crossref","first-page":"146","DOI":"10.1016\/j.cie.2005.05.002","volume":"49","author":"P-J Kalczynski","year":"2005","unstructured":"Kalczynski P-J, Kamburowski J (2005) A heuristic for minimizing the makespan in no-idle permutation flowshop. Comput Ind Eng 49(1):146\u2013154","journal-title":"Comput Ind Eng"},{"issue":"5","key":"747_CR10","doi-asserted-by":"crossref","first-page":"589","DOI":"10.1109\/70.964660","volume":"17","author":"YD Kim","year":"2001","unstructured":"Kim YD, Kim JG, Choi B, Kim HU (2001) Production scheduling in a semiconductor wafer fabrication facility producing multiple product types with distinct due dates. IEEE Trans Robot Autom 17(5):589\u2013598","journal-title":"IEEE Trans Robot Autom"},{"issue":"1","key":"747_CR11","doi-asserted-by":"crossref","first-page":"19","DOI":"10.1057\/jors.1993.3","volume":"44","author":"Y-D Kim","year":"1993","unstructured":"Kim Y-D (1993) Heuristics for flowshop scheduling problems minimizing mean tardiness. J Oper Res Soc 44(1):19\u201328","journal-title":"J Oper Res Soc"},{"key":"747_CR12","doi-asserted-by":"crossref","first-page":"439","DOI":"10.1016\/S0377-2217(00)00137-5","volume":"132","author":"J Liu","year":"2001","unstructured":"Liu J, Reeves C (2001) Constructive and composite heuristic solutions to the P || scheduling problem. Eur J Oper Res 132:439\u2013452","journal-title":"Eur J Oper Res"},{"issue":"12","key":"747_CR13","doi-asserted-by":"crossref","first-page":"1296","DOI":"10.1057\/palgrave.jors.2600633","volume":"49","author":"JV Moccellin","year":"1998","unstructured":"Moccellin JV, Nagano MS (1998) Evaluating the performance of tabu search procedures for flow shop sequencing. J Oper Res Soc 49(12):1296\u20131302","journal-title":"J Oper Res Soc"},{"issue":"12","key":"747_CR14","doi-asserted-by":"crossref","first-page":"1374","DOI":"10.1057\/palgrave.jors.2601466","volume":"53","author":"MS Nagano","year":"2002","unstructured":"Nagano MS, Moccellin JV (2002) A high quality solution constructive heuristic for flow shop sequencing. J Oper Res Soc 53(12):1374\u20131379","journal-title":"J Oper Res Soc"},{"issue":"2","key":"747_CR15","doi-asserted-by":"crossref","first-page":"271","DOI":"10.4025\/actascitechnol.v35i2.12534","volume":"35","author":"MS Nagano","year":"2013","unstructured":"Nagano MS, Janu\u00e1rio JCSS (2013) Evolutionary heuristic for makespan minimization in no-idle flow shop production systems. Acta Sci Technol 35(2):271\u2013278","journal-title":"Acta Sci Technol"},{"key":"747_CR16","doi-asserted-by":"crossref","first-page":"265","DOI":"10.1017\/S1446181100010026","volume":"47","author":"L Narain","year":"2005","unstructured":"Narain L, Bagga P-C (2005) Flowshop\/no-idle scheduling to minimise the mean flowtime. Anziam J 47:265\u2013275.","journal-title":"Anziam J"},{"issue":"1","key":"747_CR17","doi-asserted-by":"crossref","first-page":"91","DOI":"10.1016\/0305-0483(83)90088-9","volume":"11","author":"IHM Nawaz","year":"1983","unstructured":"Nawaz IHM, Enscore EE, Ham I (1983) A heuristic algorithm for the m-machine, n-job flow-shop sequencing problem. Omega 11(1):91\u201395","journal-title":"Omega"},{"key":"747_CR18","doi-asserted-by":"crossref","first-page":"41","DOI":"10.1016\/j.omega.2013.10.002","volume":"44","author":"Q Pan","year":"2014","unstructured":"Pan Q, Ruiz R (2014) An effective iterated greedy algorithm for the mixed no-idle permutation flowshop scheduling problem. Omega 44:41\u201350","journal-title":"Omega"},{"key":"747_CR19","volume-title":"Symposium on the theory of scheduling","author":"S Panwalkar","year":"1973","unstructured":"Panwalkar S, Dudek R, Smith M (1973) Sequencing research and the industrial problem. In: Symposium on the theory of scheduling. Springer, Berlin"},{"key":"747_CR20","volume-title":"Scheduling theory, algorithms, and systems","author":"M Pinedo","year":"2008","unstructured":"Pinedo M (2008) Scheduling theory, algorithms, and systems, 3rd\u00a0edn. Springer, New York","edition":"3rd"},{"key":"747_CR21","doi-asserted-by":"crossref","first-page":"331","DOI":"10.1016\/j.omega.2007.02.002","volume":"37","author":"S-F Rad","year":"2009","unstructured":"Rad S-F, Ruiz R, Boroojerdian N (2009) New high performing heuristics for minimizing makespan in permutation flowshops. OMEGA Int J Manag Sci 37:331\u2013345","journal-title":"OMEGA Int J Manag Sci"},{"issue":"2","key":"747_CR22","doi-asserted-by":"crossref","first-page":"131","DOI":"10.1016\/0272-6963(94)00010-C","volume":"12","author":"N Raman","year":"1995","unstructured":"Raman N (1995) Minimum tardiness scheduling in flow shops: Construction and evaluation of alternative solution approaches. J Oper Manag 12(2):131\u2013151","journal-title":"J Oper Manag"},{"issue":"1\u20134","key":"747_CR23","doi-asserted-by":"crossref","first-page":"125","DOI":"10.1007\/s00170-016-8484-9","volume":"87","author":"FL Rossi","year":"2016","unstructured":"Rossi FL, Nagano MS, Tavares Neto RF (2016) Evaluation of high performance constructive heuristics for the flow shop with makespan minimization. Int J Adv Manuf Technol 87(1\u20134):125\u2013136","journal-title":"Int J Adv Manuf Technol"},{"issue":"1\u20134","key":"747_CR24","doi-asserted-by":"crossref","first-page":"93","DOI":"10.1007\/s00170-016-9347-0","volume":"90","author":"FL Rossi","year":"2017","unstructured":"Rossi FL, Nagano MS, Sagawa JK (2017) An effective constructive heuristic for permutation flow shop scheduling problem with total flow time criterion. Int J Adv Manuf Technol 90(1\u20134):93\u2013107","journal-title":"Int J Adv Manuf Technol"},{"key":"747_CR25","doi-asserted-by":"crossref","first-page":"21","DOI":"10.1007\/978-3-642-02836-6_2","volume-title":"Scheduling in flowshops with no-idle machines. Computational intelligence in flowshop and job shop scheduling","author":"R Ruiz","year":"2009","unstructured":"Ruiz R, Vallada E, Fernandez-Martinez C (2009) Scheduling in flowshops with no-idle machines. Computational intelligence in flowshop and job shop scheduling. Springer-Verlag, Berlin, pp\u00a021\u201351"},{"issue":"3","key":"747_CR26","doi-asserted-by":"crossref","first-page":"425","DOI":"10.1016\/S0360-8352(02)00217-6","volume":"44","author":"N Saadani","year":"2003","unstructured":"Saadani N, Guinet A, Moalla M (2003) Three stage no-idle flow-shops. Comput Ind Eng 44(3):425\u2013434","journal-title":"Comput Ind Eng"},{"issue":"1","key":"747_CR27","doi-asserted-by":"crossref","first-page":"63","DOI":"10.1016\/0305-0483(84)90011-2","volume":"12","author":"T Sen","year":"1984","unstructured":"Sen T, Gupta S (1984). A state-of-art survey of static scheduling research involving due dates. Omega 12(1):63\u201376","journal-title":"Omega"},{"key":"747_CR28","doi-asserted-by":"crossref","first-page":"6758","DOI":"10.1016\/j.apm.2013.02.011","volume":"37","author":"M-F Tasgetiren","year":"2013","unstructured":"Tasgetiren M-F, Pan Q, Suganthan P-N, Oner A (2013) A discrete artificial bee colony algorithm for the no-idle permutation flowshop scheduling problem with the total tardiness criterion. Appl Math Modell 37:6758\u20136779","journal-title":"Appl Math Modell"},{"issue":"3","key":"747_CR29","doi-asserted-by":"crossref","first-page":"255","DOI":"10.1016\/0360-8352(82)90004-3","volume":"6","author":"P Vachajitpan","year":"1982","unstructured":"Vachajitpan P (1982) Job sequencing with continuous machine operation. Comput Ind Eng 6(3):255\u2013259","journal-title":"Comput Ind Eng"},{"issue":"4","key":"747_CR30","doi-asserted-by":"crossref","first-page":"1350","DOI":"10.1016\/j.cor.2006.08.016","volume":"35","author":"E Vallada","year":"2008","unstructured":"Vallada E, Ruiz R, Minella G (2008) Minimising total tardiness in the m-machine flowshop problem: a review and evaluation of heuristics and metaheuristics. Comput Oper Res 35(4):1350\u20131373","journal-title":"Comput Oper Res"},{"issue":"1","key":"747_CR31","doi-asserted-by":"crossref","first-page":"69","DOI":"10.1016\/0360-8352(86)90028-8","volume":"10","author":"CR Woollam","year":"1986","unstructured":"Woollam CR (1986) Flowshop with no idle machine time allowed. Comput Ind Eng 10(1):69\u201376","journal-title":"Comput Ind Eng"}],"container-title":["Production Engineering"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s11740-017-0747-2\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s11740-017-0747-2.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s11740-017-0747-2.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2017,9,6]],"date-time":"2017-09-06T19:05:27Z","timestamp":1504724727000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s11740-017-0747-2"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2017,6,23]]},"references-count":31,"journal-issue":{"issue":"4-5","published-print":{"date-parts":[[2017,10]]}},"alternative-id":["747"],"URL":"https:\/\/doi.org\/10.1007\/s11740-017-0747-2","relation":{},"ISSN":["0944-6524","1863-7353"],"issn-type":[{"value":"0944-6524","type":"print"},{"value":"1863-7353","type":"electronic"}],"subject":[],"published":{"date-parts":[[2017,6,23]]}}}