{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,2,21]],"date-time":"2025-02-21T14:25:17Z","timestamp":1740147917629,"version":"3.37.3"},"reference-count":25,"publisher":"Springer Science and Business Media LLC","issue":"1","license":[{"start":{"date-parts":[[2017,11,29]],"date-time":"2017-11-29T00:00:00Z","timestamp":1511913600000},"content-version":"unspecified","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"funder":[{"name":"Gesellschaft f\u00fcr Verkehrsbetriebswirtschaft und Logistik e. V."},{"DOI":"10.13039\/501100002765","name":"Bundesministerium f\u00fcr Wirtschaft und Technologie","doi-asserted-by":"publisher","id":[{"id":"10.13039\/501100002765","id-type":"DOI","asserted-by":"publisher"}]}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Prod. Eng. Res. Devel."],"published-print":{"date-parts":[[2018,2]]},"DOI":"10.1007\/s11740-017-0777-9","type":"journal-article","created":{"date-parts":[[2017,11,29]],"date-time":"2017-11-29T14:27:11Z","timestamp":1511965631000},"page":"53-63","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":1,"title":["Lot sizing in the forging industry considering lot size dependent tool wear"],"prefix":"10.1007","volume":"12","author":[{"given":"Henrik","family":"Prinzhorn","sequence":"first","affiliation":[]},{"given":"Johannes","family":"Richter","sequence":"additional","affiliation":[]},{"given":"Jan","family":"Langner","sequence":"additional","affiliation":[]},{"given":"Malte","family":"Stonis","sequence":"additional","affiliation":[]},{"given":"Peter","family":"Nyhuis","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2017,11,29]]},"reference":[{"key":"777_CR1","doi-asserted-by":"crossref","DOI":"10.1007\/978-3-642-04249-2","volume-title":"Handburch Umformtechnik\u2014Grundlagen, Technologien, Maschinen","author":"E Doege","year":"2010","unstructured":"Doege E, Behrens B-A (2010) Handburch Umformtechnik\u2014Grundlagen, Technologien, Maschinen. Springer, Berlin"},{"key":"777_CR2","volume-title":"Forging handbook","author":"TG Byrer","year":"1985","unstructured":"Byrer TG, Semiatin SL, Vollmer DC (1985) Forging handbook. Forging Industry Association, Cleveland"},{"key":"777_CR3","doi-asserted-by":"crossref","DOI":"10.1007\/978-3-642-58857-0","volume-title":"Metal forming handbook","author":"Schuler","year":"1998","unstructured":"Schuler (1998) Metal forming handbook, Springer, Berlin"},{"key":"777_CR4","doi-asserted-by":"crossref","first-page":"1143","DOI":"10.1016\/j.engfailanal.2010.11.002","volume":"4","author":"L Lavtar","year":"2011","unstructured":"Lavtar L, Muhic T, Kugler G, Tercelj M (2011) Analysis of the main types of damage on a pair of industria dies for hot forging car steering mechanism. Eng Fail Anal 4:1143\u20131152","journal-title":"Eng Fail Anal"},{"key":"777_CR5","doi-asserted-by":"crossref","unstructured":"Behrens B-A (2008) Finite element analysis of die wear in hot forging processes. CIRP Ann Manuf Technol 57(1):305\u2013308","DOI":"10.1016\/j.cirp.2008.03.087"},{"key":"777_CR6","volume-title":"Integral logistics management","author":"P Schoensleben","year":"2012","unstructured":"Schoensleben P (2012) Integral logistics management, 4th\u00a0edn. CRC Press, Baca Raton","edition":"4"},{"key":"777_CR7","volume-title":"Production planning and control: basics and concepts","author":"JA Buzacott","year":"2012","unstructured":"Buzacott JA (2012) Production planning and control: basics and concepts, Oldenburg Verlag, Berlin"},{"key":"777_CR8","doi-asserted-by":"crossref","DOI":"10.1515\/9783486994155","volume-title":"Rationalisierung der Fabrikation und optimale Losgr\u00f6\u00dfe","author":"K Andler","year":"1929","unstructured":"Andler K (1929) Rationalisierung der Fabrikation und optimale Losgr\u00f6\u00dfe, Oldenburg Verlag, Berlin"},{"key":"777_CR9","unstructured":"Wight OW (2008) Manufacturing Ressource Pllaing: MRP II. Wight Publications, Williston"},{"key":"777_CR10","doi-asserted-by":"crossref","DOI":"10.1007\/978-3-540-34211-3","volume-title":"Fundamentals of production logistics: theory, tools and applications","author":"P Nyhuis","year":"2009","unstructured":"Nyhuis P, Wiendahl H-P (2009) Fundamentals of production logistics: theory, tools and applications. Springer, Berlin"},{"issue":"2","key":"777_CR11","first-page":"64","volume":"14","author":"EA Silver","year":"1973","unstructured":"Silver EA, Meal HC (1973) A heuristic for selecting lotsize quantities for the case of deterministic time\u2014varying demand rate and discrete opportunities for replenishment. Prod Inventory Manag 14(2):64","journal-title":"Prod Inventory Manag"},{"issue":"1","key":"777_CR12","doi-asserted-by":"crossref","first-page":"89","DOI":"10.1287\/mnsc.5.1.89","volume":"5","author":"HM Wagner","year":"1958","unstructured":"Wagner HM, Within TM (1958) Dynamic version of the economic lot size modell. Manage Sci 5(1):89","journal-title":"Manage Sci"},{"issue":"2","key":"777_CR13","first-page":"947","volume":"10","author":"FW Harris","year":"1913","unstructured":"Harris FW (1913) How many parts to make at once. Fact Mag Manag 10(2):947\u2013950","journal-title":"Fact Mag Manag"},{"key":"777_CR14","doi-asserted-by":"crossref","unstructured":"Schmidt M, M\u00fcnzberg B, Nyhuis P (2014) Determining lot sizes in production areas\u2014exact calculations vs. research based estimation. In: CIRP Global Web conference on production engineering research: advancement beyond state of the art","DOI":"10.1016\/j.procir.2015.04.024"},{"key":"777_CR15","unstructured":"M\u00fcnzberg B (2013) Multikriterielle Losgr\u00f6\u00dfenbildung, Dissertation, PZH-Verlag, Garbsen"},{"key":"777_CR16","volume-title":"The handbook of maintenance management","author":"J Levitt","year":"2009","unstructured":"Levitt J (2009) The handbook of maintenance management. Industrial Press, New York"},{"key":"777_CR17","doi-asserted-by":"crossref","DOI":"10.1201\/9781315154183","volume-title":"Maintenance costs and life cycle cost analysis","author":"D Galar","year":"2017","unstructured":"Galar D, Sandborn P, Kumar U (2017) Maintenance costs and life cycle cost analysis. CRC Press, Boca Raton"},{"key":"777_CR18","unstructured":"Richter J, Prinzhorn H, Blohm T, Langner J, Stonis M, Behrens B-A (2017) Untersuchung des losgr\u00f6\u00dfenabh\u00e4ngigen Werkzeugverschlei\u00dfes beim Gesenkschmieden von Stahlbauteilen. Umformtechnik. https:\/\/www.umformtechnik.net\/binary_data\/3282229_iph-richter-whitepaper-2017-03-15-utfscience.pdf"},{"key":"777_CR19","doi-asserted-by":"crossref","first-page":"76","DOI":"10.1016\/j.cie.2006.01.001","volume":"50","author":"C Silva","year":"2006","unstructured":"Silva C, Magalhaes JM (2006) Heuristic lot size scheduling on unrelated parallel machines with applications in the textile industry. Comput Ind Eng 50:76\u201389","journal-title":"Comput Ind Eng"},{"key":"777_CR20","doi-asserted-by":"crossref","first-page":"549","DOI":"10.1287\/mnsc.39.5.549","volume":"39","author":"AE Gray","year":"1993","unstructured":"Gray AE, Seidmann AS, Stecke KE (1993) A synthesis of decision models for tool management in automated manufacturing. Manage Sci 39:549\u2013567","journal-title":"Manage Sci"},{"key":"777_CR21","doi-asserted-by":"crossref","unstructured":"Prinzhorn H, Richter J, B\u00f6ning C, Nyhuis P (2016) Losgr\u00f6\u00dfenabh\u00e4ngiger Werkzeugverschlei\u00df. Werkstatt f\u00fcr wirtschaftlichen Fabrikbetrieb 7\u20138","DOI":"10.3139\/104.111565"},{"key":"777_CR22","doi-asserted-by":"crossref","unstructured":"Bronshtein IN, Semendyayev KA, Musiol G, Muhlig H (2015) Handbook of mathematics (6th edn)","DOI":"10.1007\/978-3-662-46221-8"},{"issue":"1","key":"777_CR23","doi-asserted-by":"crossref","first-page":"161","DOI":"10.1108\/eb054669","volume":"3","author":"U Wemmerl\u00f6v","year":"1981","unstructured":"Wemmerl\u00f6v U (1981) The Ubiquitous EOQ\u2014its relation to Discret Lot Sizing Heuristics. J Oper Prod Manag 3(1):161\u2013179","journal-title":"J Oper Prod Manag"},{"issue":"4","key":"777_CR24","doi-asserted-by":"crossref","first-page":"407","DOI":"10.1007\/s11573-007-0031-6","volume":"77","author":"H Stadtler","year":"2006","unstructured":"Stadtler H (2006) How important is to get the lot size right? Zeitschrift f\u00fcr Betriebswirtschaft 77(4):407","journal-title":"Zeitschrift f\u00fcr Betriebswirtschaft"},{"key":"777_CR25","unstructured":"Petry K (2004) Entwicklung eines Losplanungsverfahrens zur Harmonisierng des Auftragsdurchlaufes. Aachen"}],"container-title":["Production Engineering"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s11740-017-0777-9\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s11740-017-0777-9.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s11740-017-0777-9.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2023,8,29]],"date-time":"2023-08-29T14:00:08Z","timestamp":1693317608000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s11740-017-0777-9"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2017,11,29]]},"references-count":25,"journal-issue":{"issue":"1","published-print":{"date-parts":[[2018,2]]}},"alternative-id":["777"],"URL":"https:\/\/doi.org\/10.1007\/s11740-017-0777-9","relation":{},"ISSN":["0944-6524","1863-7353"],"issn-type":[{"type":"print","value":"0944-6524"},{"type":"electronic","value":"1863-7353"}],"subject":[],"published":{"date-parts":[[2017,11,29]]}}}