{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,2,18]],"date-time":"2026-02-18T04:38:31Z","timestamp":1771389511573,"version":"3.50.1"},"reference-count":34,"publisher":"Springer Science and Business Media LLC","issue":"3-4","license":[{"start":{"date-parts":[[2018,2,15]],"date-time":"2018-02-15T00:00:00Z","timestamp":1518652800000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Prod. Eng. Res. Devel."],"published-print":{"date-parts":[[2018,6]]},"DOI":"10.1007\/s11740-018-0809-0","type":"journal-article","created":{"date-parts":[[2018,2,15]],"date-time":"2018-02-15T08:06:34Z","timestamp":1518681994000},"page":"341-352","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":42,"title":["Complexity reduction in engineer-to-order industry through real-time capable production planning and control"],"prefix":"10.1007","volume":"12","author":[{"ORCID":"https:\/\/orcid.org\/0000-0002-2033-4265","authenticated-orcid":false,"given":"Erwin","family":"Rauch","sequence":"first","affiliation":[]},{"ORCID":"https:\/\/orcid.org\/0000-0001-6120-8620","authenticated-orcid":false,"given":"Patrick","family":"Dallasega","sequence":"additional","affiliation":[]},{"ORCID":"https:\/\/orcid.org\/0000-0002-2365-7529","authenticated-orcid":false,"given":"Dominik T.","family":"Matt","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2018,2,15]]},"reference":[{"key":"809_CR1","volume-title":"Production management systems. An integrated perspective","author":"J Browne","year":"1996","unstructured":"Browne J, Harren J, Shivan J (1996) Production management systems. An integrated perspective. Addison-Wesley, Harlow"},{"key":"809_CR2","unstructured":"Ballard G, Arbulu R (2004) Making prefabrication lean. In: Proceedings of 12th annual conference of the international group for lean construction, Helsing\u00f8r, pp\u00a03\u20135"},{"key":"809_CR3","doi-asserted-by":"publisher","first-page":"3","DOI":"10.1016\/0925-5273(93)90077-X","volume":"30","author":"JW Bertrand","year":"1993","unstructured":"Bertrand JW, Muntslag DR (1993) Production control in engineer-to-order firms. Int J Prod Eco 30:3\u201322. \n                    https:\/\/doi.org\/10.1016\/0925-5273(93)90077-X","journal-title":"Int J Prod Eco"},{"key":"809_CR4","doi-asserted-by":"publisher","first-page":"457","DOI":"10.1016\/j.procir.2014.01.058","volume":"17","author":"DT Matt","year":"2014","unstructured":"Matt DT, Dallasega P, Rauch E (2014) Synchronization of the manufacturing process and on-site installation in ETO companies. Procedia CIRP 17:457\u2013462. \n                    https:\/\/doi.org\/10.1016\/j.procir.2014.01.058","journal-title":"Procedia CIRP"},{"key":"809_CR5","doi-asserted-by":"publisher","first-page":"139","DOI":"10.1016\/S0007-8506(07)60023-7","volume":"54","author":"KKB Hon","year":"2005","unstructured":"Hon KKB (2005) Performance and evaluation of manufacturing systems. CIRP Ann Manuf Technol 54:139\u2013154. \n                    https:\/\/doi.org\/10.1016\/S0007-8506(07)60023-7","journal-title":"CIRP Ann Manuf Technol"},{"key":"809_CR6","doi-asserted-by":"publisher","first-page":"1025","DOI":"10.1080\/0951192X.2015.1130245","volume":"29","author":"K Efthymiou","year":"2016","unstructured":"Efthymiou K, Mourtzis D, Pagoropoulos A, Papakostas N, Chryssolouris G (2016) Manufacturing systems complexity analysis methods review. Int J Comput Integr Manuf 29:1025\u20131044. \n                    https:\/\/doi.org\/10.1080\/0951192X.2015.1130245","journal-title":"Int J Comput Integr Manuf"},{"key":"809_CR7","doi-asserted-by":"publisher","first-page":"215","DOI":"10.1016\/j.procir.2015.02.057","volume":"29","author":"P Dallasega","year":"2015","unstructured":"Dallasega P, Rauch E, Matt DT (2015) Sustainability in the supply chain through synchronization of demand and supply in ETO-companies. Procedia CIRP 29:215\u2013220. \n                    https:\/\/doi.org\/10.1016\/j.procir.2015.02.057","journal-title":"Procedia CIRP"},{"key":"809_CR8","doi-asserted-by":"publisher","first-page":"11","DOI":"10.1061\/(ASCE)0733-9364(1998)124:1(11)","volume":"124","author":"G Ballard","year":"1998","unstructured":"Ballard G, Gregory H (1998) Shielding production: essential step in production control. J Constr Eng Manag 124:11\u201317. \n                    https:\/\/doi.org\/10.1061\/(ASCE)0733-9364(1998)124:1(11)","journal-title":"J Constr Eng Manag"},{"key":"809_CR9","volume-title":"Modern construction\u2013lean project delivery and integrated practices","author":"HF Lincoln","year":"2011","unstructured":"Lincoln HF, Syed MA (2011) Modern construction\u2013lean project delivery and integrated practices. CRC Press, Boca Raton"},{"key":"809_CR10","doi-asserted-by":"publisher","first-page":"533","DOI":"10.1016\/j.procir.2016.11.092","volume":"57","author":"P Dallasega","year":"2016","unstructured":"Dallasega P, Rally P, Rauch E, Matt DT (2016) Customer-oriented Production System for Supplier Companies in CTO. Procedia CIRP 57:533\u2013538. \n                    https:\/\/doi.org\/10.1016\/j.procir.2016.11.092","journal-title":"Procedia CIRP"},{"key":"809_CR11","unstructured":"Arbulu R (2006) Application of pull and conwip in construction production systems. In: Proceedings of the International Group of Lean Construction IGLC-14, Santiago-Chile, pp\u00a0215\u2013226"},{"key":"809_CR12","unstructured":"Papadopoulou PC (2013) Application of lean scheduling and production control in non-repetitive manufacturing systems using intelligent agent decision support. Thesis submitted for the degree of Doctor of Philosophy School of Engineering & Design Brunel University, 2013, pp\u00a020\u201322"},{"key":"809_CR13","doi-asserted-by":"publisher","first-page":"74","DOI":"10.1080\/0951192X.2015.1130242","volume":"30","author":"S Ghimire","year":"2017","unstructured":"Ghimire S, Luis-Ferreira F, Nodehi T, Jardim-Goncalves R (2017) IoT based situational awareness framework for real-time project management. Int J Comput Integr Manuf 30:74\u201383. \n                    https:\/\/doi.org\/10.1080\/0951192X.2015.1130242","journal-title":"Int J Comput Integr Manuf"},{"key":"809_CR14","doi-asserted-by":"publisher","first-page":"557","DOI":"10.1007\/978-3-642-23860-4_91","volume-title":"Enabling manufacturing competitiveness and economic sustainability","author":"G Schuh","year":"2012","unstructured":"Schuh G, Brosze T, Kompa S, Meier C (2012) Real-time capable production planning and control in the order management of built-to-order companies. In: ElMaraghy H (ed) Enabling manufacturing competitiveness and economic sustainability. Springer, Berlin Heidelberg, pp\u00a0557\u2013562"},{"key":"809_CR15","doi-asserted-by":"publisher","first-page":"158","DOI":"10.1007\/s40436-014-0070-5","volume":"2","author":"E Arica","year":"2014","unstructured":"Arica E, Powell DJ (2014) A framework for ICT-enabled real-time production planning and control. Adv Manuf 2:158\u2013164. \n                    https:\/\/doi.org\/10.1007\/s40436-014-0070-5","journal-title":"Adv Manuf"},{"key":"809_CR16","volume-title":"Echtzeitsysteme","author":"D Z\u00f6bel","year":"2008","unstructured":"Z\u00f6bel D (2008) Echtzeitsysteme. Springer, Berlin"},{"key":"809_CR17","unstructured":"Cundius C, Alt R (2013) Real-time or near real-time? Towards a real-time assessment model. In: Proceedings of the 34th International Conference on Information Systems, Milan, pp\u00a01\u201318"},{"key":"809_CR18","doi-asserted-by":"publisher","first-page":"423","DOI":"10.1016\/j.cirp.2007.05.101","volume":"56","author":"K Georgoulias","year":"2007","unstructured":"Georgoulias K, Papakostas N, Makris S, Chryssolouris G (2007) A toolbox approach for flexibility measurements in diverse environments. CIRP Ann Manuf Technol 56:423\u2013426. \n                    https:\/\/doi.org\/10.1016\/j.cirp.2007.05.101","journal-title":"CIRP Ann Manuf Technol"},{"key":"809_CR19","doi-asserted-by":"publisher","first-page":"439","DOI":"10.1016\/j.cirp.2007.05.105","volume":"56","author":"G Schuh","year":"2007","unstructured":"Schuh G, Gottschalk S, H\u00f6hne T (2007) High resolution production management. Ann CIRP 56:439\u2013442. \n                    https:\/\/doi.org\/10.1016\/j.cirp.2007.05.105","journal-title":"Ann CIRP"},{"key":"809_CR20","doi-asserted-by":"publisher","unstructured":"Mourtzis D, Vlachou E, Doukas M, Kanakis N, Xanthopoulos N, Koutoupes A (2015) Cloud-based adaptive shop-floor scheduling considering machine tool availability. In: Proceedings of the International Mechanical Engineering Congress & Exposition ASME 2015, Houston, Texas. \n                    https:\/\/doi.org\/10.1115\/IMECE2015-53025","DOI":"10.1115\/IMECE2015-53025"},{"key":"809_CR21","doi-asserted-by":"crossref","unstructured":"Lanza G, Stricker N, Moser R (2013) Concept of an intelligent production control for global manufacturing in dynamic environments based on rescheduling. In: Proceedings of the IEEE International Conference on Industrial Engineering and Engineering Management, Bangkok, pp\u00a0315\u2013319","DOI":"10.1109\/IEEM.2013.6962425"},{"key":"809_CR22","doi-asserted-by":"publisher","first-page":"94","DOI":"10.1016\/j.ejor.2011.07.022","volume":"216","author":"P Georgiadis","year":"2012","unstructured":"Georgiadis P, Michaloudis C (2012) Real-time production planning and control system for job-shop manufacturing: A system dynamics analysis. Eur J Oper Res 216:94\u2013104. \n                    https:\/\/doi.org\/10.1016\/j.ejor.2011.07.022","journal-title":"Eur J Oper Res"},{"key":"809_CR23","first-page":"61","volume":"10","author":"A Vatankhah Barenji","year":"2017","unstructured":"Vatankhah Barenji A, Hashemipour M (2017) Real-time building information modeling (BIM) synchronization using radio frequency identification technology and cloud computing system. J Ind Syst Eng 10:61\u201368","journal-title":"J Ind Syst Eng"},{"key":"809_CR24","volume-title":"The principles of design","author":"NP Suh","year":"1990","unstructured":"Suh NP (1990) The principles of design. Oxford University Press, New York"},{"key":"809_CR25","volume-title":"Analytic methods for design practice","author":"GJ Park","year":"2007","unstructured":"Park GJ (2007) Analytic methods for design practice. Springer, London"},{"key":"809_CR26","doi-asserted-by":"publisher","first-page":"783","DOI":"10.4028\/www.scientific.net\/KEM.473.783","volume":"473","author":"DT Matt","year":"2011","unstructured":"Matt DT, Rauch E (2011) Continuous improvement of manufacturing systems with the concept of functional periodicity. Key Eng Mater 473:783\u2013790. \n                    https:\/\/doi.org\/10.4028\/www.scientific.net\/KEM.473.783","journal-title":"Key Eng Mater"},{"key":"809_CR27","first-page":"179","volume-title":"Future manufacturing systems","author":"DT Matt","year":"2010","unstructured":"Matt DT (2010) Axiomatic design of agile manufacturing systems. In: Aized T (ed) Future manufacturing systems. Intech, Rijeka, pp\u00a0179\u2013194"},{"key":"809_CR28","volume-title":"Complexity\u2013theory and applications","author":"NP Suh","year":"2005","unstructured":"Suh NP (2005) Complexity\u2013theory and applications. Oxford University Press, New York"},{"key":"809_CR29","doi-asserted-by":"publisher","first-page":"363","DOI":"10.1007\/s11740-010-0247-0","volume":"4","author":"DT Matt","year":"2010","unstructured":"Matt DT (2010) Functional periodicity as a concept for the (re-)design to agility of production systems. Prod Eng Res Devel 4:363\u2013369. \n                    https:\/\/doi.org\/10.1007\/s11740-010-0247-0","journal-title":"Prod Eng Res Devel"},{"key":"809_CR30","doi-asserted-by":"publisher","first-page":"865","DOI":"10.4028\/www.scientific.net\/KEM.344.865","volume":"344","author":"DT Matt","year":"2007","unstructured":"Matt DT (2007) Achieving operational excellence through systematic complexity reduction in manufacturing system design. Key Eng Mater 344:865\u2013872. \n                    https:\/\/doi.org\/10.4028\/www.scientific.net\/KEM.344.865","journal-title":"Key Eng Mater"},{"key":"809_CR31","doi-asserted-by":"publisher","first-page":"1393","DOI":"10.1016\/j.ijproman.2016.02.004","volume":"34","author":"M Arashpour","year":"2016","unstructured":"Arashpour M, Wakefield R, Lee EWM, Chan R, Reza Hosseini M (2016) Analysis of interacting uncertainties in on-site and off-site activities: Implications for hybrid construction. Int J Proj Manage 34:1393\u20131402. \n                    https:\/\/doi.org\/10.1016\/j.ijproman.2016.02.004","journal-title":"Int J Proj Manage"},{"key":"809_CR32","doi-asserted-by":"crossref","unstructured":"Dallasega P, Rauch E, Matt DT, Fronk A (2015) Increasing productivity in ETO construction projects through a lean methodology for demand predictability. In: Proceedings of the 2015 International Conference on Industrial Engineering and Operations Management, Dubai, pp\u00a01\u201311","DOI":"10.1109\/IEOM.2015.7093734"},{"key":"809_CR33","unstructured":"Dallasega P, Marcher C, Marengo E, Rauch E, Matt DT, Nutt W (2016) A Decentralized and Pull-based Control Loop for On-Demand Delivery in ETO Construction Supply Chains. In: Proceedings of the 24th Annual Conference of the International Group for Lean Construction, Boston, pp\u00a032\u201342"},{"key":"809_CR34","unstructured":"Dallasega P, Marengo E, Nutt W, Rescic L, Matt DT, Rauch E (2015) Design of a Framework for Supporting the Execution-Management of Small and Medium sized Projects in the AEC-industry. In: Proceedings of the 4th International Workshop on Design in Civil and Environmental Engineering, 2015, pp\u00a030\u201331"}],"container-title":["Production Engineering"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s11740-018-0809-0\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s11740-018-0809-0.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s11740-018-0809-0.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,2,14]],"date-time":"2019-02-14T20:36:36Z","timestamp":1550176596000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s11740-018-0809-0"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2018,2,15]]},"references-count":34,"journal-issue":{"issue":"3-4","published-print":{"date-parts":[[2018,6]]}},"alternative-id":["809"],"URL":"https:\/\/doi.org\/10.1007\/s11740-018-0809-0","relation":{},"ISSN":["0944-6524","1863-7353"],"issn-type":[{"value":"0944-6524","type":"print"},{"value":"1863-7353","type":"electronic"}],"subject":[],"published":{"date-parts":[[2018,2,15]]},"assertion":[{"value":"15 September 2017","order":1,"name":"received","label":"Received","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"12 February 2018","order":2,"name":"accepted","label":"Accepted","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"15 February 2018","order":3,"name":"first_online","label":"First Online","group":{"name":"ArticleHistory","label":"Article History"}},{"order":1,"name":"Ethics","group":{"name":"EthicsHeading","label":"Compliance with ethical standards"}},{"value":"The authors declare that there is no conflict of interest regarding the publication of this paper.","order":2,"name":"Ethics","group":{"name":"EthicsHeading","label":"Conflict of interest"}}]}}