{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,11,7]],"date-time":"2025-11-07T13:30:31Z","timestamp":1762522231994,"version":"3.37.3"},"reference-count":31,"publisher":"Springer Science and Business Media LLC","issue":"1","license":[{"start":{"date-parts":[[2018,10,31]],"date-time":"2018-10-31T00:00:00Z","timestamp":1540944000000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Prod. Eng. Res. Devel."],"published-print":{"date-parts":[[2019,2]]},"DOI":"10.1007\/s11740-018-0856-6","type":"journal-article","created":{"date-parts":[[2018,10,31]],"date-time":"2018-10-31T07:00:01Z","timestamp":1540969201000},"page":"43-52","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":7,"title":["A decision support flexible scheduling system for continuous galvanization lines using genetic algorithm"],"prefix":"10.1007","volume":"13","author":[{"ORCID":"https:\/\/orcid.org\/0000-0001-5250-1016","authenticated-orcid":false,"given":"Miri","family":"Weiss Cohen","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Hila","family":"Foxx","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Shimon","family":"Ben Alul","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2018,10,31]]},"reference":[{"key":"856_CR1","unstructured":"Abdoun O, Abouchabaka J (2012) A comparative study of adaptive crossover operators for genetic algorithms to resolve the traveling salesman problem. \n                    arXiv:1203.3097\n                    \n                   (arXiv preprint )"},{"issue":"6","key":"856_CR2","doi-asserted-by":"publisher","first-page":"621","DOI":"10.1002\/net.3230190602","volume":"19","author":"E Balas","year":"1989","unstructured":"Balas E (1989) The prize collecting traveling salesman problem. Networks 19(6):621\u2013636","journal-title":"Networks"},{"issue":"7","key":"856_CR3","doi-asserted-by":"publisher","first-page":"1955","DOI":"10.1080\/00207540600988048","volume":"46","author":"A Chen","year":"2008","unstructured":"Chen A, Yang GK, Wu ZM (2008) Production scheduling optimization algorithm for the hot rolling processes. Int J Prod Res 46(7):1955\u20131973","journal-title":"Int J Prod Res"},{"issue":"2","key":"856_CR4","doi-asserted-by":"publisher","first-page":"339","DOI":"10.1016\/j.cor.2011.04.009","volume":"39","author":"Y-W Chen","year":"2012","unstructured":"Chen Y-W, Yong-Zai L, Ge M, Yang G-K, Pan C-C (2012) Development of hybrid evolutionary algorithms for production scheduling of hot strip mill. Comput Oper Res 39(2):339\u2013349","journal-title":"Comput Oper Res"},{"issue":"2","key":"856_CR5","doi-asserted-by":"publisher","first-page":"307","DOI":"10.1016\/S0360-8352(03)00038-X","volume":"45","author":"P Cowling","year":"2003","unstructured":"Cowling P (2003) A flexible decision support system for steel hot rolling mill scheduling. Comput Ind Eng 45(2):307\u2013321","journal-title":"Comput Ind Eng"},{"key":"856_CR6","unstructured":"Eiben AE, Smith JE (2015) Evolutionary computing: the origins. In: Introduction to evolutionary computing. Springer, Berlin, pp 13\u201324"},{"key":"856_CR7","first-page":"146","volume-title":"Scheduling a galvanizing line by ant colony optimization","author":"S Fernandez","year":"2014","unstructured":"Fernandez S, Alvarez S, D\u00edaz D, Iglesias M, Ena B (2014) Scheduling a galvanizing line by ant colony optimization. Springer, Cham, pp 146\u2013157"},{"key":"856_CR8","doi-asserted-by":"crossref","unstructured":"Fern\u00e1ndez S, \u00c1lvarez S, Malatsetxebarria E, Valledor P, D\u00edaz D (2015) Performance comparison of ant colony algorithms for the scheduling of steel production lines. In: Proceedings of the companion publication of the 2015 annual conference on genetic and evolutionary computation, pp 1387\u20131388. ACM","DOI":"10.1145\/2739482.2764658"},{"key":"856_CR9","doi-asserted-by":"crossref","unstructured":"Fox H, Alul SB, Cohen MW (2017) Scheduling a continues galvanization line using genetic algorithm. In: GECCO \u201917: proceedings of the genetic and evolutionary computation conference companion, New York, NY, USA. ACM, pp 277\u2013278","DOI":"10.1145\/3067695.3076001"},{"issue":"2","key":"856_CR10","doi-asserted-by":"publisher","first-page":"95","DOI":"10.1023\/A:1022602019183","volume":"3","author":"DE Goldberg","year":"1988","unstructured":"Goldberg DE, Holland JH (1988) Genetic algorithms and machine learning. Mach Learn 3(2):95\u201399","journal-title":"Mach Learn"},{"key":"856_CR11","volume-title":"Practical genetic algorithms","author":"RL Haupt","year":"2004","unstructured":"Haupt RL, Haupt SE (2004) Practical genetic algorithms. Wiley, Oxford"},{"issue":"4","key":"856_CR12","doi-asserted-by":"publisher","first-page":"647","DOI":"10.1287\/mnsc.1100.1302","volume":"57","author":"W H\u00f6hn","year":"2011","unstructured":"H\u00f6hn W, K\u00f6nig FG, M\u00f6hring RH, L\u00fcbbecke ME (2011) Integrated sequencing and scheduling in coil coating. Manag Sci 57(4):647\u2013666","journal-title":"Manag Sci"},{"key":"856_CR13","first-page":"28","volume-title":"A multi-population parallel genetic algorithm for highly constrained continuous galvanizing line scheduling","author":"M Kapanoglu","year":"2006","unstructured":"Kapanoglu M, Koc IO (2006) A multi-population parallel genetic algorithm for highly constrained continuous galvanizing line scheduling. Springer, Berlin, pp 28\u201341"},{"issue":"2","key":"856_CR14","first-page":"252","volume":"3","author":"R Kumar","year":"2013","unstructured":"Kumar R, Gopal G, Kumar R (2013) Novel crossover operator for genetic algorithm for permutation problems. Int J Soft Comput Eng 3(2):252\u2013258","journal-title":"Int J Soft Comput Eng"},{"issue":"2\u20133","key":"856_CR15","doi-asserted-by":"publisher","first-page":"317","DOI":"10.1016\/S0377-2217(97)00277-4","volume":"106","author":"L Lopez","year":"1998","unstructured":"Lopez L, Carter MW, Gendreau M (1998) The hot strip mill production scheduling problem: a tabu search approach. Eur J Oper Res 106(2\u20133):317\u2013335","journal-title":"Eur J Oper Res"},{"issue":"2","key":"856_CR16","first-page":"39","volume":"4","author":"R Malhotra","year":"2011","unstructured":"Malhotra R, Singh N, Singh Y (2011) Genetic algorithms: concepts, design for optimization of process controllers. Comput Inf Sci 4(2):39","journal-title":"Comput Inf Sci"},{"key":"856_CR17","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1007\/s40747-017-0036-x","volume":"3","author":"S Nguyen","year":"2017","unstructured":"Nguyen S, Mei Y, Zhang M (2017) Genetic programming for production scheduling: a survey with a unified framework. Complex Intell Syst 3:1\u201326","journal-title":"Complex Intell Syst"},{"key":"856_CR18","doi-asserted-by":"crossref","unstructured":"Orta-Lozano MM, Villarreal B (2015) Achieving competitiveness through setup time reduction. In: Industrial engineering and operations management (IEOM), 2015 international conference on, pp 1\u20137. IEEE","DOI":"10.1109\/IEOM.2015.7093897"},{"key":"856_CR19","doi-asserted-by":"publisher","first-page":"197","DOI":"10.1016\/j.jclepro.2013.12.024","volume":"67","author":"F Shrouf","year":"2014","unstructured":"Shrouf F, Ordieres-Mer\u00e9 J, Garc\u00eda-S\u00e1nchez A, Ortega-Mier M (2014) Optimizing the production scheduling of a single machine to minimize total energy consumption costs. J Clean Prod 67:197\u2013207","journal-title":"J Clean Prod"},{"key":"856_CR20","volume-title":"Evolutionary optimization algorithms","author":"D Simon","year":"2013","unstructured":"Simon D (2013) Evolutionary optimization algorithms. Wiley, Oxford"},{"key":"856_CR21","volume-title":"Introduction to genetic algorithms","author":"SN Sivanandam","year":"2007","unstructured":"Sivanandam SN, Deepa SN (2007) Introduction to genetic algorithms. Springer, Berlin"},{"issue":"3","key":"856_CR22","first-page":"3792","volume":"1","author":"R Sivaraj","year":"2011","unstructured":"Sivaraj R, Ravichandran T (2011) A review of selection methods in genetic algorithm. Int J Eng Sci Technol 1(3):3792\u20133797","journal-title":"Int J Eng Sci Technol"},{"issue":"5","key":"856_CR23","doi-asserted-by":"publisher","first-page":"590","DOI":"10.1057\/palgrave.jors.2602357","volume":"59","author":"L Tang","year":"2008","unstructured":"Tang L, Wang X (2008) An iterated local search heuristic for the capacitated prize-collecting travelling salesman problem. J Oper Res Soc 59(5):590\u2013599","journal-title":"J Oper Res Soc"},{"issue":"3","key":"856_CR24","doi-asserted-by":"publisher","first-page":"375","DOI":"10.2355\/isijinternational.49.375","volume":"49","author":"L Tang","year":"2009","unstructured":"Tang L, Gao C (2009) A modelling and tabu search heuristic for a continuous galvanizing line scheduling problem. ISIJ Int 49(3):375\u2013384","journal-title":"ISIJ Int"},{"issue":"2","key":"856_CR25","doi-asserted-by":"publisher","first-page":"267","DOI":"10.1016\/S0377-2217(99)00380-X","volume":"124","author":"L Tang","year":"2000","unstructured":"Tang L, Liu J, Rong A, Yang Z (2000) A multiple traveling salesman problem model for hot rolling scheduling in shanghai baoshan iron & steel complex. Eur J Operl Res 124(2):267\u2013282","journal-title":"Eur J Operl Res"},{"issue":"7","key":"856_CR26","doi-asserted-by":"publisher","first-page":"633","DOI":"10.1007\/s00170-006-0740-y","volume":"35","author":"L Tang","year":"2008","unstructured":"Tang L, Wang X (2008) A predictive reactive scheduling method for color-coating production in steel industry. Int J Adv Manuf Technol 35(7):633\u2013645","journal-title":"Int J Adv Manuf Technol"},{"issue":"3","key":"856_CR27","doi-asserted-by":"publisher","first-page":"715","DOI":"10.1016\/j.ejor.2008.09.025","volume":"198","author":"L Tang","year":"2009","unstructured":"Tang L, Wang X (2009) Simultaneously scheduling multiple turns for steel color-coating production. Eur J Oper Res 198(3):715\u2013725","journal-title":"Eur J Oper Res"},{"issue":"10","key":"856_CR28","doi-asserted-by":"publisher","first-page":"1780","DOI":"10.1016\/j.cor.2010.01.009","volume":"37","author":"L Tang","year":"2010","unstructured":"Tang L, Yang Y, Liu J (2010) An efficient optimal solution to the coil sequencing problem in electro-galvanizing line. Comput Oper Res 37(10):1780\u20131796","journal-title":"Comput Oper Res"},{"key":"856_CR29","first-page":"64","volume":"13","author":"F Tanhaei","year":"2013","unstructured":"Tanhaei F, Nahavandi N (2013) Algorithm for solving product mix problem in two-constraint resources environment. Int J Adv Manuf Technol 13:64","journal-title":"Int J Adv Manuf Technol"},{"issue":"1","key":"856_CR30","doi-asserted-by":"publisher","first-page":"280","DOI":"10.1016\/j.cor.2007.09.006","volume":"36","author":"VV Verdejo","year":"2009","unstructured":"Verdejo VV, Alarc MAP, Sorl MPL (2009) Scheduling in a continuous galvanizing line. Part special issue: operations research approaches for disaster recovery planning. Comput Oper Res 36(1):280\u2013296","journal-title":"Comput Oper Res"},{"issue":"11","key":"856_CR31","doi-asserted-by":"publisher","first-page":"1215","DOI":"10.1007\/s00170-009-2058-z","volume":"45","author":"MR Yadollahpour","year":"2009","unstructured":"Yadollahpour MR, Bijari M, Kavosh S, Mahnam M (2009) Guided local search algorithm for hot strip mill scheduling problem with considering hot charge rolling. Int J Adv Manuf Technol 45(11):1215\u20131231","journal-title":"Int J Adv Manuf Technol"}],"container-title":["Production Engineering"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s11740-018-0856-6\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s11740-018-0856-6.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s11740-018-0856-6.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,10,30]],"date-time":"2019-10-30T20:25:07Z","timestamp":1572467107000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s11740-018-0856-6"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2018,10,31]]},"references-count":31,"journal-issue":{"issue":"1","published-print":{"date-parts":[[2019,2]]}},"alternative-id":["856"],"URL":"https:\/\/doi.org\/10.1007\/s11740-018-0856-6","relation":{},"ISSN":["0944-6524","1863-7353"],"issn-type":[{"type":"print","value":"0944-6524"},{"type":"electronic","value":"1863-7353"}],"subject":[],"published":{"date-parts":[[2018,10,31]]},"assertion":[{"value":"22 May 2018","order":1,"name":"received","label":"Received","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"26 October 2018","order":2,"name":"accepted","label":"Accepted","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"31 October 2018","order":3,"name":"first_online","label":"First Online","group":{"name":"ArticleHistory","label":"Article History"}}]}}