{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,3,16]],"date-time":"2026-03-16T11:02:22Z","timestamp":1773658942653,"version":"3.50.1"},"reference-count":91,"publisher":"Springer Science and Business Media LLC","issue":"1","license":[{"start":{"date-parts":[[2026,2,1]],"date-time":"2026-02-01T00:00:00Z","timestamp":1769904000000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"},{"start":{"date-parts":[[2026,2,1]],"date-time":"2026-02-01T00:00:00Z","timestamp":1769904000000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Evol. Intel."],"published-print":{"date-parts":[[2026,2]]},"DOI":"10.1007\/s12065-026-01144-z","type":"journal-article","created":{"date-parts":[[2026,2,2]],"date-time":"2026-02-02T05:20:19Z","timestamp":1770009619000},"update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":0,"title":["A multi-objective variable-speed flexible job-shop scheduling model and enhanced NSGA-II algorithm considering carbon policies"],"prefix":"10.1007","volume":"19","author":[{"given":"Yi","family":"Wang","sequence":"first","affiliation":[]},{"given":"Yong","family":"Liu","sequence":"additional","affiliation":[]},{"given":"Liang","family":"Ma","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2026,2,2]]},"reference":[{"key":"1144_CR1","volume":"233","author":"XL Chen","year":"2023","unstructured":"Chen XL, Li JQ, Du Y (2023) A hybrid evolutionary immune algorithm for fuzzy flexible job shop scheduling problem with variable processing speeds. Expert Syst Appl 233:120891","journal-title":"Expert Syst Appl"},{"issue":"6","key":"1144_CR2","doi-asserted-by":"crossref","first-page":"1539","DOI":"10.1016\/j.apm.2009.09.002","volume":"34","author":"C \u00d6zg\u00fcven","year":"2010","unstructured":"\u00d6zg\u00fcven C, \u00d6zbak\u0131r L, Yavuz Y (2010) Mathematical models for job-shop scheduling problems with routing and process plan flexibility. Appl Math Model 34(6):1539\u20131548","journal-title":"Appl Math Model"},{"key":"1144_CR3","doi-asserted-by":"crossref","DOI":"10.1016\/j.cor.2023.106508","volume":"163","author":"E Ghaedy-Heidary","year":"2024","unstructured":"Ghaedy-Heidary E, Nejati E, Ghasemi A, Torabi SA (2024) A simulation optimization framework to solve stochastic flexible job-shop scheduling problems\u2014case: semiconductor manufacturing. Comput Oper Res 163:106508","journal-title":"Comput Oper Res"},{"key":"1144_CR4","doi-asserted-by":"crossref","first-page":"21147","DOI":"10.1109\/ACCESS.2019.2897603","volume":"7","author":"Y Zhou","year":"2019","unstructured":"Zhou Y, Yang JJ, Zheng LY (2019) Multi-agent based hyper-heuristics for multi-objective flexible job shop scheduling: a case study in an aero-engine blade manufacturing plant. IEEE Access 7:21147\u201321176","journal-title":"IEEE Access"},{"key":"1144_CR5","doi-asserted-by":"publisher","DOI":"10.1007\/bf02238804","author":"P Brucker","year":"1990","unstructured":"Brucker P, Schlie R (1990) Job-shop scheduling with multipurpose machines. Computing. https:\/\/doi.org\/10.1007\/bf02238804","journal-title":"Computing"},{"issue":"10","key":"1144_CR6","doi-asserted-by":"crossref","first-page":"3202","DOI":"10.1016\/j.cor.2007.02.014","volume":"35","author":"F Pezzella","year":"2008","unstructured":"Pezzella F, Morganti G, Ciaschetti G (2008) A genetic algorithm for the flexible job-shop scheduling problem. Comput Oper Res 35(10):3202\u20133212","journal-title":"Comput Oper Res"},{"issue":"4","key":"1144_CR7","doi-asserted-by":"crossref","first-page":"1309","DOI":"10.1016\/j.cie.2008.07.021","volume":"56","author":"G Zhang","year":"2009","unstructured":"Zhang G, Shao X, Li P, Gao L (2009) An effective hybrid particle swarm optimization algorithm for multi-objective flexible job-shop scheduling problem. Comput Ind Eng 56(4):1309\u20131318","journal-title":"Comput Ind Eng"},{"key":"1144_CR8","doi-asserted-by":"crossref","DOI":"10.1016\/j.asoc.2021.107890","volume":"113","author":"D Delikta\u015f","year":"2021","unstructured":"Delikta\u015f D, \u00d6zcan E, Ustun O, Torkul O (2021) Evolutionary algorithms for multi-objective flexible job shop cell scheduling. Appl Soft Comput 113:107890","journal-title":"Appl Soft Comput"},{"key":"1144_CR9","doi-asserted-by":"crossref","DOI":"10.1016\/j.jclepro.2023.136370","volume":"394","author":"M Ullah","year":"2023","unstructured":"Ullah M (2023) Impact of transportation and carbon emissions on reverse channel selection in closed-loop supply chain management. J Clean Prod 394:136370","journal-title":"J Clean Prod"},{"key":"1144_CR10","doi-asserted-by":"crossref","DOI":"10.1016\/j.jclepro.2020.125609","volume":"290","author":"M Ullah","year":"2021","unstructured":"Ullah M, Asghar I, Zahid M, Omair M, AlArjani A, Sarkar B (2021) Ramification of remanufacturing in a sustainable three-echelon closed-loop supply chain management for returnable products. J Clean Prod 290:125609","journal-title":"J Clean Prod"},{"key":"1144_CR11","doi-asserted-by":"crossref","first-page":"148","DOI":"10.1016\/j.cie.2017.07.003","volume":"111","author":"B Sarkar","year":"2017","unstructured":"Sarkar B, Ullah M, Kim N (2017) Environmental and economic assessment of closed-loop supply chain with remanufacturing and returnable transport items. Comput Ind Eng 111:148\u2013163","journal-title":"Comput Ind Eng"},{"issue":"10\u201311","key":"1144_CR12","doi-asserted-by":"crossref","first-page":"1246","DOI":"10.1080\/0951192X.2022.2025618","volume":"35","author":"J Chen","year":"2022","unstructured":"Chen J, Ning T, Xu G, Liu Y (2022) A memetic algorithm for energy-efficient scheduling of integrated production and shipping. Int J Comput Integr Manuf 35(10\u201311):1246\u20131268","journal-title":"Int J Comput Integr Manuf"},{"issue":"18\u201319","key":"1144_CR13","doi-asserted-by":"crossref","first-page":"4247","DOI":"10.1080\/00207540701450013","volume":"45","author":"G Mouzon","year":"2007","unstructured":"Mouzon G, Yildirim MB, Twomey J (2007) Operational methods for minimization of energy consumption of manufacturing equipment. Int J Prod Res 45(18\u201319):4247\u20134271","journal-title":"Int J Prod Res"},{"key":"1144_CR14","doi-asserted-by":"crossref","first-page":"3249","DOI":"10.1016\/j.jclepro.2017.10.342","volume":"172","author":"X Wu","year":"2018","unstructured":"Wu X, Sun Y (2018) A green scheduling algorithm for flexible job shop with energy-saving measures. J Clean Prod 172:3249\u20133264","journal-title":"J Clean Prod"},{"issue":"11","key":"1144_CR15","doi-asserted-by":"crossref","DOI":"10.3390\/math6110220","volume":"6","author":"T Jiang","year":"2018","unstructured":"Jiang T, Zhang C, Zhu H, Gu J, Deng G (2018) Energy-efficient scheduling for a job shop using an improved whale optimization algorithm. Mathematics 6(11):220","journal-title":"Mathematics"},{"key":"1144_CR16","doi-asserted-by":"crossref","first-page":"3361","DOI":"10.1016\/j.jclepro.2015.09.097","volume":"112","author":"R Zhang","year":"2016","unstructured":"Zhang R, Chiong R (2016) Solving the energy-efficient job shop scheduling problem: a multi-objective genetic algorithm with enhanced local search for minimizing the total weighted tardiness and total energy consumption. J Clean Prod 112:3361\u20133375","journal-title":"J Clean Prod"},{"key":"1144_CR17","volume":"174","author":"X Li","year":"2022","unstructured":"Li X, Guo X, Tang H, Wu R, Wang L, Pang S, Li X (2022) Survey of integrated flexible job shop scheduling problems. Comput Ind Eng 174:108786","journal-title":"Comput Ind Eng"},{"key":"1144_CR18","doi-asserted-by":"crossref","DOI":"10.1016\/j.asoc.2020.106416","volume":"94","author":"M Mahmoodjanloo","year":"2020","unstructured":"Mahmoodjanloo M, Tavakkoli-Moghaddam R, Baboli A, Bozorgi-Amiri A (2020) Flexible job shop scheduling problem with reconfigurable machine tools: an improved differential evolution algorithm. Appl Soft Comput 94:106416","journal-title":"Appl Soft Comput"},{"issue":"12","key":"1144_CR19","doi-asserted-by":"crossref","first-page":"3476","DOI":"10.1080\/00207543.2012.746480","volume":"51","author":"M Mousakhani","year":"2013","unstructured":"Mousakhani M (2013) Sequence-dependent setup time flexible job shop scheduling problem to minimise total tardiness. Int J Prod Res 51(12):3476\u20133487","journal-title":"Int J Prod Res"},{"key":"1144_CR20","doi-asserted-by":"crossref","DOI":"10.1016\/j.swevo.2023.101421","volume":"84","author":"G Gong","year":"2024","unstructured":"Gong G, Tang J, Huang D, Luo Q, Zhu K, Peng N (2024) Energy-efficient flexible job shop scheduling problem considering discrete operation sequence flexibility. Swarm Evol Comput 84:101421","journal-title":"Swarm Evol Comput"},{"key":"1144_CR21","doi-asserted-by":"crossref","first-page":"1167","DOI":"10.1016\/j.promfg.2020.01.353","volume":"39","author":"Q Liu","year":"2019","unstructured":"Liu Q, Pan QK, Gao L, Li X (2019) Multi-objective flexible job shop scheduling problem considering machine switching off-on operation. Proc Manufact 39:1167\u20131176","journal-title":"Proc Manufact"},{"key":"1144_CR22","volume":"126","author":"G Xu","year":"2023","unstructured":"Xu G, Bao Q, Zhang H (2023) Multi-objective green scheduling of integrated flexible job shop and automated guided vehicles. Eng Appl Artif Intell 126:106864","journal-title":"Eng Appl Artif Intell"},{"issue":"8","key":"1144_CR23","doi-asserted-by":"crossref","first-page":"5295","DOI":"10.1109\/TSMC.2021.3120702","volume":"52","author":"Z Pan","year":"2021","unstructured":"Pan Z, Lei D, Wang L (2021) A bi-population evolutionary algorithm with feedback for energy-efficient fuzzy flexible job shop scheduling. IEEE Trans Syst Man Cybern Syst 52(8):5295\u20135307","journal-title":"IEEE Trans Syst Man Cybern Syst"},{"key":"1144_CR24","doi-asserted-by":"crossref","unstructured":"Li J, Han Y, Gao K, Xiao X, Duan P (2023) Bi-population balancing multi-objective algorithm for fuzzy flexible job shop with energy and transportation. IEEE Trans Autom Sci Eng","DOI":"10.1109\/TASE.2023.3300922"},{"issue":"2","key":"1144_CR25","doi-asserted-by":"crossref","first-page":"409","DOI":"10.1016\/j.ejor.2023.05.017","volume":"314","author":"S Dauz\u00e8re-P\u00e9r\u00e8s","year":"2024","unstructured":"Dauz\u00e8re-P\u00e9r\u00e8s S, Ding J, Shen L, Tamssaouet K (2024) The flexible job shop scheduling problem: a review. Eur J Oper Res 314(2):409\u2013432","journal-title":"Eur J Oper Res"},{"key":"1144_CR26","volume":"248","author":"MJ Park","year":"2022","unstructured":"Park MJ, Ham A (2022) Energy-aware flexible job shop scheduling under time-of-use pricing. Int J Prod Econ 248:108507","journal-title":"Int J Prod Econ"},{"key":"1144_CR27","doi-asserted-by":"crossref","DOI":"10.1016\/j.swevo.2019.100632","volume":"53","author":"C Soto","year":"2020","unstructured":"Soto C, Dorronsoro B, Fraire H, Cruz-Reyes L, Gomez-Santillan C, Rangel N (2020) Solving the multi-objective flexible job shop scheduling problem with a novel parallel branch and bound algorithm. Swarm Evol Comput 53:100632","journal-title":"Swarm Evol Comput"},{"issue":"7","key":"1144_CR28","doi-asserted-by":"crossref","first-page":"2322","DOI":"10.1111\/poms.13977","volume":"32","author":"GA Kasapidis","year":"2023","unstructured":"Kasapidis GA, Dauz\u00e8re-P\u00e9r\u00e8s S, Paraskevopoulos DC, Repoussis PP, Tarantilis CD (2023) On the multiresource flexible job-shop scheduling problem with arbitrary precedence graphs. Prod Oper Manag 32(7):2322\u20132330","journal-title":"Prod Oper Manag"},{"key":"1144_CR29","doi-asserted-by":"crossref","first-page":"334","DOI":"10.1016\/j.jmsy.2024.02.007","volume":"73","author":"Y Xu","year":"2024","unstructured":"Xu Y, Zhang M, Yang M, Wang D (2024) Hybrid quantum particle swarm optimization and variable neighborhood search for flexible job-shop scheduling problem. J Manuf Syst 73:334\u2013348","journal-title":"J Manuf Syst"},{"issue":"3","key":"1144_CR30","volume":"15","author":"B Ji","year":"2023","unstructured":"Ji B, Zhang S, Yu SS, Zhang B (2023) Mathematical modeling and a novel heuristic method for flexible job-shop batch scheduling problem with incompatible jobs. Sustainability 15(3):1954","journal-title":"Sustainability"},{"key":"1144_CR31","volume":"130","author":"K Huang","year":"2024","unstructured":"Huang K, Gong W, Lu C (2024) An enhanced memetic algorithm with hierarchical heuristic neighborhood search for type-2 green fuzzy flexible job shop scheduling. Eng Appl Artif Intell 130:107762","journal-title":"Eng Appl Artif Intell"},{"key":"1144_CR32","doi-asserted-by":"crossref","first-page":"1028","DOI":"10.1016\/j.procs.2022.12.301","volume":"217","author":"M Schlenkrich","year":"2023","unstructured":"Schlenkrich M, Parragh SN (2023) Solving large scale industrial production scheduling problems with complex constraints: an overview of the state-of-the-art. Procedia Comput Sci 217:1028\u20131037","journal-title":"Procedia Comput Sci"},{"key":"1144_CR33","doi-asserted-by":"crossref","first-page":"158","DOI":"10.1016\/j.jmsy.2023.09.006","volume":"71","author":"M Zhang","year":"2023","unstructured":"Zhang M, Tao F, Zuo Y, Xiang F, Wang L, Nee AYC (2023) Top ten intelligent algorithms towards smart manufacturing. J Manuf Syst 71:158\u2013171","journal-title":"J Manuf Syst"},{"key":"1144_CR34","doi-asserted-by":"crossref","unstructured":"Deb AK (2011) Introduction to soft computing techniques: artificial neural networks, fuzzy logic and genetic algorithms. In: Soft computing in textile engineering (pp. 3\u201324). Woodhead Publishing","DOI":"10.1533\/9780857090812.1.3"},{"key":"1144_CR35","doi-asserted-by":"crossref","unstructured":"Chen H, Ihlow J, Lehmann C (1999) A genetic algorithm for flexible job-shop scheduling. In: Proceedings 1999 IEEE International Conference on Robotics and Automation (Cat. No. 99CH36288C) (Vol. 2, pp. 1120\u20131125). IEEE","DOI":"10.1109\/ROBOT.1999.772512"},{"key":"1144_CR36","volume":"131","author":"N Chen","year":"2022","unstructured":"Chen N, Xie N, Wang Y (2022) An elite genetic algorithm for flexible job shop scheduling problem with extracted grey processing time. Appl Soft Comput 131:109783","journal-title":"Appl Soft Comput"},{"issue":"7","key":"1144_CR37","doi-asserted-by":"crossref","first-page":"2331","DOI":"10.1016\/j.cor.2006.11.007","volume":"35","author":"A Caumond","year":"2008","unstructured":"Caumond A, Lacomme P, Tchernev N (2008) A memetic algorithm for the job-shop with time-lags. Comput Oper Res 35(7):2331\u20132356","journal-title":"Comput Oper Res"},{"key":"1144_CR38","doi-asserted-by":"crossref","DOI":"10.1016\/j.eswa.2020.113348","volume":"157","author":"M Abedi","year":"2020","unstructured":"Abedi M, Chiong R, Noman N, Zhang R (2020) A multi-population, multi-objective memetic algorithm for energy-efficient job-shop scheduling with deteriorating machines. Expert Syst Appl 157:113348","journal-title":"Expert Syst Appl"},{"issue":"2","key":"1144_CR39","first-page":"406","volume":"194","author":"JT Tsai","year":"2007","unstructured":"Tsai JT, Ho WH, Liu TK, Chou JH (2007) Improved immune algorithm for global numerical optimization and job-shop scheduling problems. Appl Math Comput 194(2):406\u2013424","journal-title":"Appl Math Comput"},{"key":"1144_CR40","doi-asserted-by":"crossref","first-page":"161","DOI":"10.1016\/j.asoc.2015.06.022","volume":"35","author":"Z Liang","year":"2015","unstructured":"Liang Z, Song R, Lin Q, Du Z, Chen J, Ming Z, Yu J (2015) A double-module immune algorithm for multi-objective optimization problems. Appl Soft Comput 35:161\u2013174","journal-title":"Appl Soft Comput"},{"key":"1144_CR41","doi-asserted-by":"crossref","first-page":"333","DOI":"10.1016\/j.cie.2014.08.001","volume":"76","author":"F Zammori","year":"2014","unstructured":"Zammori F, Braglia M, Castellano D (2014) Harmony search algorithm for single-machine scheduling problem with planned maintenance. Comput Ind Eng 76:333\u2013346","journal-title":"Comput Ind Eng"},{"key":"1144_CR42","doi-asserted-by":"crossref","first-page":"178","DOI":"10.1016\/j.engappai.2017.07.023","volume":"65","author":"F Zhao","year":"2017","unstructured":"Zhao F, Liu Y, Zhang Y, Ma W, Zhang C (2017) A hybrid harmony search algorithm with efficient job sequence scheme and variable neighborhood search for the permutation flow shop scheduling problems. Eng Appl Artif Intell 65:178\u2013199","journal-title":"Eng Appl Artif Intell"},{"issue":"4","key":"1144_CR43","doi-asserted-by":"crossref","first-page":"1329","DOI":"10.1016\/j.cor.2006.08.013","volume":"35","author":"AC Nearchou","year":"2008","unstructured":"Nearchou AC (2008) A differential evolution approach for the common due date early\/tardy job scheduling problem. Comput Oper Res 35(4):1329\u20131343","journal-title":"Comput Oper Res"},{"key":"1144_CR44","volume":"118","author":"L He","year":"2022","unstructured":"He L, Cao Y, Li W, Cao J, Zhong L (2022) Optimization of energy-efficient open shop scheduling with an adaptive multi-objective differential evolution algorithm. Appl Soft Comput 118:108459","journal-title":"Appl Soft Comput"},{"issue":"5","key":"1144_CR45","doi-asserted-by":"crossref","first-page":"503","DOI":"10.1016\/j.rcim.2006.06.004","volume":"23","author":"A Rossi","year":"2007","unstructured":"Rossi A, Dini G (2007) Flexible job-shop scheduling with routing flexibility and separable setup times using ant colony optimisation method. Robot Comput Integr Manuf 23(5):503\u2013516","journal-title":"Robot Comput Integr Manuf"},{"key":"1144_CR46","doi-asserted-by":"crossref","unstructured":"He N, Zhang D, Bettayeb B (2025) A hybrid approach using ant colony optimisation for integrated scheduling of production and transportation tasks within flexible manufacturing systems. In: M'hammed and Zhang, David and Bettayeb, Belgacem (eds) A hybrid approach using ant colony optimisation for integrated scheduling of production and transportation tasks within flexible manufacturing systems","DOI":"10.1016\/j.cor.2025.107059"},{"key":"1144_CR47","doi-asserted-by":"crossref","first-page":"1030","DOI":"10.1016\/j.protcy.2016.08.203","volume":"25","author":"A Scaria","year":"2016","unstructured":"Scaria A, George K, Sebastian J (2016) An artificial bee colony approach for multi-objective job shop scheduling. Procedia Technol 25:1030\u20131037","journal-title":"Procedia Technol"},{"key":"1144_CR48","doi-asserted-by":"crossref","first-page":"94","DOI":"10.1016\/j.jmsy.2024.10.019","volume":"78","author":"J Wang","year":"2025","unstructured":"Wang J, Lei D, Li D, Li X, Tang H (2025) A dynamic artificial bee colony for fuzzy distributed energy-efficient hybrid flow shop scheduling with batch processing machines. J Manuf Syst 78:94\u2013108","journal-title":"J Manuf Syst"},{"key":"1144_CR49","doi-asserted-by":"crossref","first-page":"36","DOI":"10.1016\/j.cie.2015.12.004","volume":"93","author":"MR Singh","year":"2016","unstructured":"Singh MR, Mahapatra SS (2016) A quantum behaved particle swarm optimization for flexible job shop scheduling. Comput Ind Eng 93:36\u201344","journal-title":"Comput Ind Eng"},{"key":"1144_CR50","volume":"93","author":"Y Xu","year":"2025","unstructured":"Xu Y, Wang D, Zhang M, Yang M, Liang C (2025) Quantum particle swarm optimization with chaotic encoding schemes for flexible job-shop scheduling problem. Swarm Evol Comput 93:101836","journal-title":"Swarm Evol Comput"},{"key":"1144_CR51","volume":"125","author":"Z Zhu","year":"2022","unstructured":"Zhu Z, Zhou X, Cao D, Li M (2022) A shuffled cellular evolutionary grey wolf optimizer for flexible job shop scheduling problem with tree-structure job precedence constraints. Appl Soft Comput 125:109235","journal-title":"Appl Soft Comput"},{"key":"1144_CR52","doi-asserted-by":"crossref","unstructured":"Shao S, Xu G, Li J, Meng X, Xu X, Wang H, Jin Z (2025) A lot streaming scheduling algorithm with variable sub-lots for solving a multi-objective flexible job shop scheduling problem. Appl Soft Comput: 113184","DOI":"10.1016\/j.asoc.2025.113184"},{"key":"1144_CR53","doi-asserted-by":"crossref","first-page":"69","DOI":"10.1016\/j.procs.2011.08.015","volume":"6","author":"W Teekeng","year":"2011","unstructured":"Teekeng W, Thammano A (2011) A combination of shuffled frog leaping and fuzzy logic for flexible job-shop scheduling problems. Procedia Comput Sci 6:69\u201375","journal-title":"Procedia Comput Sci"},{"key":"1144_CR54","volume":"111","author":"L He","year":"2021","unstructured":"He L, Li W, Chiong R, Abedi M, Cao Y, Zhang Y (2021) Optimising the job-shop scheduling problem using a multi-objective Jaya algorithm. Appl Soft Comput 111:107654","journal-title":"Appl Soft Comput"},{"key":"1144_CR55","volume":"200","author":"L Hao","year":"2025","unstructured":"Hao L, Zou Z, Liang X (2025) Solving multi-objective energy-saving flexible job shop scheduling problem by hybrid search genetic algorithm. Comput Ind Eng 200:110829","journal-title":"Comput Ind Eng"},{"key":"1144_CR56","volume":"87","author":"M Liu","year":"2020","unstructured":"Liu M, Yao X, Li Y (2020) Hybrid whale optimization algorithm enhanced with L\u00e9vy flight and differential evolution for job shop scheduling problems. Appl Soft Comput 87:105954","journal-title":"Appl Soft Comput"},{"key":"1144_CR57","doi-asserted-by":"crossref","first-page":"457","DOI":"10.1016\/j.jmsy.2025.03.013","volume":"80","author":"W Wang","year":"2025","unstructured":"Wang W, Zhao J (2025) An enhanced memetic algorithm for energy-efficient and low-carbon flexible job shop scheduling problem considering machine restart. J Manuf Syst 80:457\u2013478","journal-title":"J Manuf Syst"},{"key":"1144_CR58","doi-asserted-by":"crossref","DOI":"10.1016\/j.knosys.2021.107430","volume":"231","author":"G Gong","year":"2021","unstructured":"Gong G, Deng Q, Gong X, Huang D (2021) A non-dominated ensemble fitness ranking algorithm for multi-objective flexible job-shop scheduling problem considering worker flexibility and green factors. Knowl Based Syst 231:107430","journal-title":"Knowl Based Syst"},{"key":"1144_CR59","doi-asserted-by":"crossref","first-page":"298","DOI":"10.1016\/j.jmsy.2021.05.018","volume":"60","author":"J Fan","year":"2021","unstructured":"Fan J, Shen W, Gao L, Zhang C, Zhang Z (2021) A hybrid Jaya algorithm for solving flexible job shop scheduling problem considering multiple critical paths. J Manuf Syst 60:298\u2013311","journal-title":"J Manuf Syst"},{"key":"1144_CR60","volume":"188","author":"Z Wang","year":"2024","unstructured":"Wang Z, He M, Wu J, Chen H, Cao Y (2024) An improved MOEA\/D for low-carbon many-objective flexible job shop scheduling problem. Comput Ind Eng 188:109926","journal-title":"Comput Ind Eng"},{"key":"1144_CR61","doi-asserted-by":"crossref","DOI":"10.1016\/j.cor.2023.106222","volume":"155","author":"B Tutumlu","year":"2023","unstructured":"Tutumlu B, Sara\u00e7 T (2023) A MIP model and a hybrid genetic algorithm for flexible job-shop scheduling problem with job-splitting. Comput Oper Res 155:106222","journal-title":"Comput Oper Res"},{"key":"1144_CR62","volume":"167","author":"J Wang","year":"2024","unstructured":"Wang J, Wu C, Peng Y (2024) Multi-objective scheduling for an energy-efficient flexible job shop problem with peak power constraint. Appl Soft Comput 167:112330","journal-title":"Appl Soft Comput"},{"issue":"4","key":"1144_CR63","doi-asserted-by":"crossref","first-page":"234","DOI":"10.1016\/j.jmsy.2011.08.004","volume":"30","author":"K Fang","year":"2011","unstructured":"Fang K, Uhan N, Zhao F, Sutherland JW (2011) A new approach to scheduling in manufacturing for power consumption and carbon footprint reduction. J Manuf Syst 30(4):234\u2013240","journal-title":"J Manuf Syst"},{"key":"1144_CR64","doi-asserted-by":"crossref","first-page":"1365","DOI":"10.1016\/j.jclepro.2019.06.151","volume":"234","author":"S Luo","year":"2019","unstructured":"Luo S, Zhang L, Fan Y (2019) Energy-efficient scheduling for multi-objective flexible job shops with variable processing speeds by grey wolf optimization. J Clean Prod 234:1365\u20131384","journal-title":"J Clean Prod"},{"key":"1144_CR65","volume":"95","author":"Y Li","year":"2020","unstructured":"Li Y, Huang W, Wu R, Guo K (2020) An improved artificial bee colony algorithm for solving multi-objective low-carbon flexible job shop scheduling problem. Appl Soft Comput 95:106544","journal-title":"Appl Soft Comput"},{"issue":"1","key":"1144_CR66","doi-asserted-by":"crossref","first-page":"844","DOI":"10.1109\/JSYST.2021.3076481","volume":"16","author":"C Lu","year":"2021","unstructured":"Lu C, Zhang B, Gao L, Yi J, Mou J (2021) A knowledge-based multiobjective memetic algorithm for green job shop scheduling with variable machining speeds. IEEE Syst J 16(1):844\u2013855","journal-title":"IEEE Syst J"},{"key":"1144_CR67","doi-asserted-by":"crossref","DOI":"10.1016\/j.cie.2021.107677","volume":"161","author":"J Duan","year":"2021","unstructured":"Duan J, Wang J (2021) Energy-efficient scheduling for a flexible job shop with machine breakdowns considering machine idle time arrangement and machine speed level selection. Comput Ind Eng 161:107677","journal-title":"Comput Ind Eng"},{"key":"1144_CR68","volume":"197","author":"Z Wei","year":"2022","unstructured":"Wei Z, Liao W, Zhang L (2022) Hybrid energy-efficient scheduling measures for flexible job-shop problem with variable machining speeds. Expert Syst Appl 197:116785","journal-title":"Expert Syst Appl"},{"key":"1144_CR69","doi-asserted-by":"crossref","first-page":"886","DOI":"10.1016\/j.jclepro.2017.01.054","volume":"149","author":"Y Zhang","year":"2017","unstructured":"Zhang Y, Liu Q, Zhou Y, Ying B (2017) Integrated optimization of cutting parameters and scheduling for reducing carbon emissions. J Clean Prod 149:886\u2013895","journal-title":"J Clean Prod"},{"key":"1144_CR70","volume":"412","author":"B He","year":"2023","unstructured":"He B, Liu R, Li T (2023) Integrated carbon footprint with cutting parameters for production scheduling. J Clean Prod 412:137307","journal-title":"J Clean Prod"},{"key":"1144_CR71","volume":"256","author":"H Qu","year":"2024","unstructured":"Qu H, Tong X, Cai M, Shi Y, Lan X (2024) Energy-saving scheduling strategy for variable-speed flexible job-shop problem considering operation-dependent energy consumption. Expert Syst Appl 256:124952","journal-title":"Expert Syst Appl"},{"key":"1144_CR72","doi-asserted-by":"crossref","DOI":"10.1016\/j.cor.2020.104951","volume":"121","author":"H Ding","year":"2020","unstructured":"Ding H, Gu X (2020) Improved particle swarm optimization algorithm based novel encoding and decoding schemes for flexible job shop scheduling problem. Comput Oper Res 121:104951","journal-title":"Comput Oper Res"},{"key":"1144_CR73","doi-asserted-by":"crossref","first-page":"185","DOI":"10.1016\/j.cie.2017.09.009","volume":"113","author":"H Wang","year":"2017","unstructured":"Wang H, Fu Y, Huang M, Huang GQ, Wang J (2017) A NSGA-II based memetic algorithm for multiobjective parallel flowshop scheduling problem. Comput Ind Eng 113:185\u2013194","journal-title":"Comput Ind Eng"},{"key":"1144_CR74","volume":"190","author":"S Shi","year":"2024","unstructured":"Shi S, Xiong H (2024) Solving the multi-objective job shop scheduling problems with overtime consideration by an enhanced NSGA-\u2161. Comput Ind Eng 190:110001","journal-title":"Comput Ind Eng"},{"key":"1144_CR75","volume":"160","author":"W Tan","year":"2021","unstructured":"Tan W, Yuan X, Wang J, Zhang X (2021) A fatigue-conscious dual resource constrained flexible job shop scheduling problem by enhanced NSGA-II: an application from casting workshop. Comput Ind Eng 160:107557","journal-title":"Comput Ind Eng"},{"key":"1144_CR76","doi-asserted-by":"crossref","first-page":"57757","DOI":"10.1109\/ACCESS.2021.3070634","volume":"9","author":"S Verma","year":"2021","unstructured":"Verma S, Pant M, Snasel V (2021) A comprehensive review on NSGA-II for multi-objective combinatorial optimization problems. IEEE Access 9:57757\u201357791","journal-title":"IEEE Access"},{"key":"1144_CR77","doi-asserted-by":"crossref","DOI":"10.1016\/j.eswa.2023.121221","volume":"236","author":"Z Zhang","year":"2024","unstructured":"Zhang Z, Chica M, Tang Q, Li Z, Zhang L (2024) A multi-objective co-evolutionary algorithm for energy and cost-oriented mixed-model assembly line balancing with multi-skilled workers. Expert Syst Appl 236:121221","journal-title":"Expert Syst Appl"},{"issue":"2","key":"1144_CR78","doi-asserted-by":"crossref","first-page":"182","DOI":"10.1109\/4235.996017","volume":"6","author":"K Deb","year":"2002","unstructured":"Deb K, Pratap A, Agarwal S, Meyarivan TAMT (2002) A fast and elitist multiobjective genetic algorithm: NSGA-II. IEEE Trans Evol Comput 6(2):182\u2013197","journal-title":"IEEE Trans Evol Comput"},{"key":"1144_CR79","doi-asserted-by":"crossref","first-page":"757","DOI":"10.1007\/s00170-010-2642-2","volume":"51","author":"X Wang","year":"2010","unstructured":"Wang X, Gao L, Zhang C, Shao X (2010) A multi-objective genetic algorithm based on immune and entropy principle for flexible job-shop scheduling problem. Int J Adv Manuf Technol 51:757\u2013767","journal-title":"Int J Adv Manuf Technol"},{"issue":"4","key":"1144_CR80","doi-asserted-by":"crossref","first-page":"3563","DOI":"10.1016\/j.eswa.2010.08.145","volume":"38","author":"G Zhang","year":"2011","unstructured":"Zhang G, Gao L, Shi Y (2011) An effective genetic algorithm for the flexible job-shop scheduling problem. Expert Syst Appl 38(4):3563\u20133573","journal-title":"Expert Syst Appl"},{"key":"1144_CR81","volume":"401","author":"X Zhao","year":"2025","unstructured":"Zhao X (2025) Carbon pricing policies trade-offs between environment and economics. Appl Energy 401:126822","journal-title":"Appl Energy"},{"key":"1144_CR82","doi-asserted-by":"crossref","DOI":"10.1016\/j.cor.2023.106456","volume":"162","author":"S Usman","year":"2024","unstructured":"Usman S, Lu C (2024) Job-shop scheduling with limited flexible workers considering ergonomic factors using an improved multi-objective discrete Jaya algorithm. Comput Oper Res 162:106456","journal-title":"Comput Oper Res"},{"key":"1144_CR83","doi-asserted-by":"crossref","DOI":"10.1016\/j.cie.2019.106064","volume":"137","author":"RH Caldeira","year":"2019","unstructured":"Caldeira RH, Gnanavelbabu A (2019) Solving the flexible job shop scheduling problem using an improved Jaya algorithm. Comput Ind Eng 137:106064","journal-title":"Comput Ind Eng"},{"key":"1144_CR84","volume":"200","author":"JQ Li","year":"2020","unstructured":"Li JQ, Deng JW, Li CY, Han YY, Tian J, Zhang B, Wang CG (2020) An improved Jaya algorithm for solving the flexible job shop scheduling problem with transportation and setup times. Knowledge-Based Syst 200:106032","journal-title":"Knowledge-Based Syst"},{"key":"1144_CR85","doi-asserted-by":"crossref","DOI":"10.1016\/j.eswa.2021.114567","volume":"170","author":"RH Caldeira","year":"2021","unstructured":"Caldeira RH, Gnanavelbabu A (2021) A Pareto based discrete Jaya algorithm for multi-objective flexible job shop scheduling problem. Expert Syst Appl 170:114567","journal-title":"Expert Syst Appl"},{"key":"1144_CR86","doi-asserted-by":"crossref","DOI":"10.1016\/j.cor.2024.106674","volume":"167","author":"B Xiao","year":"2024","unstructured":"Xiao B, Zhao Z, Wu Y, Zhu X, Peng S, Su H (2024) An improved MOEA\/D for multi-objective flexible job shop scheduling by considering efficiency and cost. Comput Oper Res 167:106674","journal-title":"Comput Oper Res"},{"issue":"9","key":"1144_CR87","doi-asserted-by":"crossref","first-page":"2353","DOI":"10.1007\/s00170-015-8075-1","volume":"85","author":"MR Singh","year":"2016","unstructured":"Singh MR, Singh M, Mahapatra SS, Jagadev N (2016) Particle swarm optimization algorithm embedded with maximum deviation theory for solving multi-objective flexible job shop scheduling problem. Int J Adv Manuf Technol 85(9):2353\u20132366","journal-title":"Int J Adv Manuf Technol"},{"key":"1144_CR88","volume":"99","author":"D Wang","year":"2025","unstructured":"Wang D, Qian L, Zhang K, Li D, Zhao S, Li J (2025) A self-learning classification-based multi-objective evolutionary algorithm for machine multi-state energy-efficient flexible job shop scheduling under time-of-use pricing. Swarm Evol Comput 99:102142","journal-title":"Swarm Evol Comput"},{"key":"1144_CR89","doi-asserted-by":"crossref","DOI":"10.1016\/j.engappai.2023.106249","volume":"123","author":"M Abdel-Basset","year":"2023","unstructured":"Abdel-Basset M, Mohamed R, El-Shahat D, Sallam KM (2023) An efficient hybrid optimization method for fuzzy flexible job-shop scheduling problem: steady-state performance and analysis. Eng Appl Artif Intell 123:106249","journal-title":"Eng Appl Artif Intell"},{"key":"1144_CR90","volume":"39","author":"F Luan","year":"2023","unstructured":"Luan F, Zhao H, Liu SQ, He Y, Tang B (2023) Enhanced NSGA-II for multi-objective energy-saving flexible job shop scheduling. Sustain Comput Inform Syst 39:100901","journal-title":"Sustain Comput Inform Syst"},{"key":"1144_CR91","volume":"11","author":"S Nessari","year":"2024","unstructured":"Nessari S, Tavakkoli-Moghaddam R, Bakhshi-Khaniki H, Bozorgi-Amiri A (2024) A hybrid simheuristic algorithm for solving bi-objective stochastic flexible job shop scheduling problems. Decis Anal J 11:100485","journal-title":"Decis Anal J"}],"container-title":["Evolutionary Intelligence"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s12065-026-01144-z.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/article\/10.1007\/s12065-026-01144-z","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s12065-026-01144-z.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2026,3,16]],"date-time":"2026-03-16T10:08:53Z","timestamp":1773655733000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/s12065-026-01144-z"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2026,2]]},"references-count":91,"journal-issue":{"issue":"1","published-print":{"date-parts":[[2026,2]]}},"alternative-id":["1144"],"URL":"https:\/\/doi.org\/10.1007\/s12065-026-01144-z","relation":{},"ISSN":["1864-5909","1864-5917"],"issn-type":[{"value":"1864-5909","type":"print"},{"value":"1864-5917","type":"electronic"}],"subject":[],"published":{"date-parts":[[2026,2]]},"assertion":[{"value":"4 January 2025","order":1,"name":"received","label":"Received","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"17 October 2025","order":2,"name":"revised","label":"Revised","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"2 January 2026","order":3,"name":"accepted","label":"Accepted","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"2 February 2026","order":4,"name":"first_online","label":"First Online","group":{"name":"ArticleHistory","label":"Article History"}},{"order":1,"name":"Ethics","group":{"name":"EthicsHeading","label":"Declarations"}},{"value":"The authors declare no competing interests.","order":2,"name":"Ethics","group":{"name":"EthicsHeading","label":"Conflict of interest"}}],"article-number":"24"}}