{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,9,11]],"date-time":"2025-09-11T18:54:38Z","timestamp":1757616878455,"version":"3.44.0"},"reference-count":47,"publisher":"Emerald","issue":"4","license":[{"start":{"date-parts":[[2011,8,19]],"date-time":"2011-08-19T00:00:00Z","timestamp":1313712000000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["Logist. Res."],"published-print":{"date-parts":[[2011,10]]},"DOI":"10.1007\/s12159-011-0058-5","type":"journal-article","created":{"date-parts":[[2011,8,18]],"date-time":"2011-08-18T04:38:55Z","timestamp":1313642335000},"page":"207-219","source":"Crossref","is-referenced-by-count":20,"title":["Applying multidisciplinary logistic techniques to improve operations productivity at a mine"],"prefix":"10.1108","volume":"3","author":[{"given":"Kenneth David","family":"Strang","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"140","published-online":{"date-parts":[[2011,8,19]]},"reference":[{"issue":"3","key":"58_CR1","doi-asserted-by":"crossref","first-page":"121","DOI":"10.1007\/s12159-010-0040-7","volume":"2","author":"P Klaus","year":"2010","unstructured":"Klaus P (2010) What\u2019s interesting? Logist Res 2(3):121\u2013122","journal-title":"Logist Res"},{"issue":"2","key":"58_CR2","doi-asserted-by":"crossref","first-page":"448","DOI":"10.1016\/j.ejor.2008.11.050","volume":"199","author":"B Bettonvil","year":"2009","unstructured":"Bettonvil B, del Castillo E, Kleijnen JPC (2009) Statistical testing of optimality conditions in multiresponse simulation-based optimization. Eur J Oper Res 199(2):448\u2013458","journal-title":"Eur J Oper Res"},{"issue":"2","key":"58_CR3","doi-asserted-by":"crossref","first-page":"497","DOI":"10.1016\/j.ejor.2004.03.008","volume":"166","author":"M Gamache","year":"2005","unstructured":"Gamache M, Grimard R, Cohen P (2005) A shortest-path algorithm for solving the fleet management problem in underground mines. Eur J Oper Res 166(2):497\u2013506","journal-title":"Eur J Oper Res"},{"key":"58_CR4","first-page":"409","volume-title":"Handbook of research on electronic collaboration and organizational synergy","author":"KD Strang","year":"2008","unstructured":"Strang KD (2008) Collaborative synergy and leadership in e-business. In: Salmons J, Wilson L (eds) Handbook of research on electronic collaboration and organizational synergy. IGI Global, Hershey, pp 409\u2013429"},{"issue":"3","key":"58_CR5","doi-asserted-by":"crossref","first-page":"411","DOI":"10.1016\/S0377-2217(98)00080-0","volume":"110","author":"WC Benton","year":"1998","unstructured":"Benton WC, Shin H (1998) Manufacturing planning and control: the evolution of MRP and JIT integration. Eur J Oper Res 110(3):411\u2013440","journal-title":"Eur J Oper Res"},{"key":"58_CR6","doi-asserted-by":"crossref","first-page":"548","DOI":"10.1016\/j.compind.2007.12.001","volume":"59","author":"EWT Ngai","year":"2008","unstructured":"Ngai EWT, Law CCH, Wat FKT (2008) Examining the critical success factors in the adoption of enterprise resource planning. Comput Ind 59:548\u2013564","journal-title":"Comput Ind"},{"issue":"1","key":"58_CR7","doi-asserted-by":"crossref","first-page":"37","DOI":"10.1080\/09208119908944207","volume":"13","author":"JR Sturgul","year":"1999","unstructured":"Sturgul JR (1999) Discrete mine system simulation in the United States. Int J Surf Min Reclam Environ 13(1):37\u201341","journal-title":"Int J Surf Min Reclam Environ"},{"issue":"2","key":"58_CR8","doi-asserted-by":"crossref","first-page":"55","DOI":"10.1007\/s12159-010-0033-6","volume":"2","author":"P Klaus","year":"2010","unstructured":"Klaus P (2010) Logistics as a science of networks and flows. Logist Res 2(2):55\u201356","journal-title":"Logist Res"},{"key":"58_CR9","unstructured":"Cochran JJ et al (eds) (2011) Wiley encyclopedia of operations research and management science, vol 8. Wiley, Hoboken, pp 1\u20136408"},{"issue":"3\u20134","key":"58_CR10","doi-asserted-by":"crossref","first-page":"131","DOI":"10.1007\/s12159-009-0015-8","volume":"1","author":"A Otto","year":"2009","unstructured":"Otto A, Obermaier R (2009) How can supply networks increase firm value? A causal framework to structure the answer. Logist Res 1(3\u20134):131\u2013148","journal-title":"Logist Res"},{"issue":"2","key":"58_CR11","doi-asserted-by":"crossref","first-page":"524","DOI":"10.1016\/j.ijpe.2006.02.013","volume":"105","author":"O Ngwenyama","year":"2007","unstructured":"Ngwenyama O, Guergachi A, McLaren T (2007) Using the learing curve to maximize IT productivity: a decision analysis model for timing software upgrades. Int J Prod Econ 105(2):524\u2013535","journal-title":"Int J Prod Econ"},{"issue":"1","key":"58_CR12","doi-asserted-by":"crossref","first-page":"59","DOI":"10.1142\/S0950609898000092","volume":"7","author":"VA Temeng","year":"1998","unstructured":"Temeng VA, Otuonye FO, Frendewey JO (1998) A nonpreemptive goal programming approach to truck dispatching in open pit mines. Mineral Resour Eng 7(1):59\u201367","journal-title":"Mineral Resour Eng"},{"key":"58_CR13","unstructured":"Argus (2011) Argus coal daily international. Argus Media Ltd. (Argus), London. http:\/\/www.argusmedia.com . Retrieved 8 Aug 2011"},{"issue":"3","key":"58_CR14","first-page":"101","volume":"2","author":"KD Strang","year":"2011","unstructured":"Strang KD (2011) Logistic planning with nonlinear goal programming models in spreadsheets. Int J Appl Logist 2(3):101\u2013121","journal-title":"Int J Appl Logist"},{"issue":"1","key":"58_CR15","doi-asserted-by":"crossref","first-page":"193","DOI":"10.1016\/j.ejor.2005.06.062","volume":"176","author":"S Shakeri","year":"2007","unstructured":"Shakeri S, Logendran R (2007) A mathematical programming-based scheduling framework for multitasking environments. Eur J Oper Res 176(1):193\u2013209","journal-title":"Eur J Oper Res"},{"issue":"1","key":"58_CR16","doi-asserted-by":"crossref","first-page":"54","DOI":"10.1016\/0377-2217(92)90054-D","volume":"63","author":"KE Stecke","year":"1992","unstructured":"Stecke KE, Toczylowski E (1992) Profit-based FMS dynamic part type selection over time for mid-term production planning. Eur J Oper Res 63(1):54\u201365","journal-title":"Eur J Oper Res"},{"issue":"3","key":"58_CR17","doi-asserted-by":"crossref","first-page":"671","DOI":"10.1016\/j.ejor.2009.01.043","volume":"200","author":"J Zhang","year":"2010","unstructured":"Zhang J, Xu C (2010) Inverse optimization for linearly constrained convex separable programming problems. Eur J Oper Res 200(3):671\u2013679","journal-title":"Eur J Oper Res"},{"issue":"3\u20134","key":"58_CR18","doi-asserted-by":"crossref","first-page":"185","DOI":"10.1007\/s12159-009-0018-5","volume":"1","author":"A Mendoza","year":"2009","unstructured":"Mendoza A, Ventura JA (2009) Estimating freight rates in inventory replenishment and supplier selection decisions. Logist Res 1(3\u20134):185\u2013196","journal-title":"Logist Res"},{"issue":"1","key":"58_CR19","doi-asserted-by":"crossref","first-page":"23","DOI":"10.1016\/j.ejor.2007.10.040","volume":"193","author":"J Chen","year":"2009","unstructured":"Chen J, Askin RG (2009) Project selection scheduling and resource allocation with time dependent returns. Eur J Oper Res 193(1):23\u201334","journal-title":"Eur J Oper Res"},{"key":"58_CR20","doi-asserted-by":"crossref","unstructured":"Souza MJF et al (2010) A hybrid heuristic algorithm for the open-pit-mining operational planning problem. Eur J Oper Res 207(2):1041\u20131051","DOI":"10.1016\/j.ejor.2010.05.031"},{"issue":"3","key":"58_CR21","doi-asserted-by":"crossref","first-page":"340","DOI":"10.1016\/0377-2217(92)90123-Q","volume":"62","author":"A Gupta","year":"1992","unstructured":"Gupta A, Albright SC (1992) Steady-state approximations for a multi-echelon multi-indentured repairable-item inventory system. Eur J Oper Res 62(3):340\u2013353","journal-title":"Eur J Oper Res"},{"issue":"2","key":"58_CR22","doi-asserted-by":"crossref","first-page":"248","DOI":"10.1016\/S0377-2217(96)00077-X","volume":"96","author":"RH Yeh","year":"1997","unstructured":"Yeh RH (1997) Optimal inspection and replacement policies for multi-state deteriorating systems. Eur J Oper Res 96(2):248\u2013259","journal-title":"Eur J Oper Res"},{"issue":"1","key":"58_CR23","doi-asserted-by":"crossref","first-page":"33","DOI":"10.1016\/j.ejor.2011.01.046","volume":"212","author":"Y Mati","year":"2011","unstructured":"Mati Y, Dauz\u00e8re-P\u00e9r\u00e8s S, Lahlou C (2011) A general approach for optimizing regular criteria in the job-shop scheduling problem. Eur J Oper Res 212(1):33\u201342","journal-title":"Eur J Oper Res"},{"issue":"1","key":"58_CR24","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1016\/j.ejor.2006.12.006","volume":"185","author":"M Patriksson","year":"2008","unstructured":"Patriksson M (2008) A survey on the continuous nonlinear resource allocation problem. Eur J Oper Res 185(1):1\u201346","journal-title":"Eur J Oper Res"},{"issue":"1","key":"58_CR25","doi-asserted-by":"crossref","first-page":"40","DOI":"10.1016\/j.ejor.2006.06.033","volume":"181","author":"L Chen","year":"2007","unstructured":"Chen L et al (2007) A tabu search algorithm for the integrated scheduling problem of container handling systems in a maritime terminal. Eur J Oper Res 181(1):40\u201358","journal-title":"Eur J Oper Res"},{"issue":"2","key":"58_CR26","doi-asserted-by":"crossref","first-page":"267","DOI":"10.1016\/S0377-2217(95)00380-0","volume":"99","author":"MN Davies","year":"1997","unstructured":"Davies MN (1997) A generic model for simulating office process flows. Eur J Oper Res 99(2):267\u2013277","journal-title":"Eur J Oper Res"},{"issue":"1","key":"58_CR27","doi-asserted-by":"crossref","first-page":"45","DOI":"10.1016\/S0377-2217(98)00273-2","volume":"106","author":"J-M Proth","year":"1998","unstructured":"Proth J-M, Sauer N (1998) Scheduling of piecewise constant product flows: a Petri net approach. Eur J Oper Res 106(1):45\u201356","journal-title":"Eur J Oper Res"},{"issue":"1","key":"58_CR28","doi-asserted-by":"crossref","first-page":"152","DOI":"10.1016\/j.ejor.2007.10.049","volume":"193","author":"M Fukunari","year":"2009","unstructured":"Fukunari M, Malmborg CJ (2009) A network queuing approach for evaluation of performance measures in autonomous vehicle storage and retrieval systems. Eur J Oper Res 193(1):152\u2013167","journal-title":"Eur J Oper Res"},{"issue":"5","key":"58_CR29","first-page":"536","volume":"4","author":"A Azadeh","year":"2009","unstructured":"Azadeh A, Haghnevis M, Khodadadegan Y (2009) An improved model for production systems with mixed queuing priorities: an integrated simulation. AHP and value engineering approach. Int J Ind Syst Eng 4(5):536\u2013553","journal-title":"Int J Ind Syst Eng"},{"issue":"1","key":"58_CR30","doi-asserted-by":"crossref","first-page":"145","DOI":"10.1016\/0377-2217(94)00016-6","volume":"82","author":"JPC Kleijnen","year":"1995","unstructured":"Kleijnen JPC (1995) Verification and validation of simulation models. Eur J Oper Res 82(1):145\u2013162","journal-title":"Eur J Oper Res"},{"issue":"1","key":"58_CR31","doi-asserted-by":"crossref","first-page":"14","DOI":"10.1016\/S0377-2217(98)00392-0","volume":"120","author":"JPC Kleijnen","year":"2000","unstructured":"Kleijnen JPC, Sargent RG (2000) A methodology for fitting and validating metamodels in simulation. Eur J Oper Res 120(1):14\u201329","journal-title":"Eur J Oper Res"},{"issue":"2","key":"58_CR32","doi-asserted-by":"crossref","first-page":"81","DOI":"10.1002\/pmj.20212","volume":"42","author":"KD Strang","year":"2011","unstructured":"Strang KD (2011) Portfolio selection methodology for a nuclear project. Project Manag J 42(2):81\u201393","journal-title":"Project Manag J"},{"issue":"3","key":"58_CR33","first-page":"94","volume":"11","author":"KD Strang","year":"2010","unstructured":"Strang KD (2010) Radiology manufacturing projects and politics: scientist and politician normalized risk decision processes. Int J Manag Decision Making 11(3):94\u2013106","journal-title":"Int J Manag Decision Making"},{"issue":"1","key":"58_CR34","doi-asserted-by":"crossref","first-page":"22","DOI":"10.4018\/jeei.2010010102","volume":"1","author":"KD Strang","year":"2010","unstructured":"Strang KD, Chan CEL (2010) Simulating e-business innovation process improvement with virtual teams across Europe and Asia. Int J E-Entrepreneurship Innov 1(1):22\u201341","journal-title":"Int J E-Entrepreneurship Innov"},{"issue":"3","key":"58_CR35","doi-asserted-by":"crossref","first-page":"1217","DOI":"10.1016\/j.ejor.2006.06.075","volume":"189","author":"AB Dragut","year":"2008","unstructured":"Dragut AB, Bertrand JWM (2008) A representation model for the solving-time distribution of a set of design tasks in new product development (NPD). Eur J Oper Res 189(3):1217\u20131233","journal-title":"Eur J Oper Res"},{"key":"58_CR36","doi-asserted-by":"crossref","first-page":"S83","DOI":"10.1057\/jors.2008.178","volume":"60","author":"D Worthington","year":"2009","unstructured":"Worthington D (2009) Reflections on queue modelling from the last 50\u00a0years. J Oper Res Soc 60:S83\u2013S92","journal-title":"J Oper Res Soc"},{"issue":"4","key":"58_CR37","doi-asserted-by":"crossref","first-page":"283","DOI":"10.1016\/0377-2217(79)90224-8","volume":"3","author":"RG Sharp","year":"1979","unstructured":"Sharp RG, Dando MR (1979) Decision resource management and practical intervention in conflicts\u2013a model and its implications. Eur J Oper Res 3(4):283\u2013295","journal-title":"Eur J Oper Res"},{"issue":"6","key":"58_CR38","doi-asserted-by":"crossref","first-page":"352","DOI":"10.1016\/0377-2217(77)90043-1","volume":"1","author":"A Mercer","year":"1977","unstructured":"Mercer A (1977) An education in operational research: a personal viewpoint. Eur J Oper Res 1(6):352\u2013360","journal-title":"Eur J Oper Res"},{"issue":"7","key":"58_CR39","doi-asserted-by":"crossref","first-page":"565","DOI":"10.1108\/09600030410552258","volume":"34","author":"J Mangan","year":"2004","unstructured":"Mangan J, Lalwani C, Gardner B (2004) Combining quantitative and qualitative methodologies in logistics research. Int J Phys Distrib Logist Manag 34(7):565\u2013578","journal-title":"Int J Phys Distrib Logist Manag"},{"issue":"12","key":"58_CR40","doi-asserted-by":"crossref","first-page":"1841","DOI":"10.1287\/mnsc.1040.0267","volume":"50","author":"JDC Little","year":"2004","unstructured":"Little JDC (2004) Models and managers: the concept of a decision calculus. Manag Sci J 50(12):1841\u20131853","journal-title":"Manag Sci J"},{"issue":"2","key":"58_CR41","first-page":"93","volume":"17","author":"LM Ellram","year":"1996","unstructured":"Ellram LM (1996) The use of the case study method in logistics research. J Bus Logist 17(2):93\u2013138","journal-title":"J Bus Logist"},{"issue":"3","key":"58_CR42","doi-asserted-by":"crossref","first-page":"383","DOI":"10.1287\/opre.9.3.383","volume":"9","author":"JDC Little","year":"1961","unstructured":"Little JDC (1961) A proof of the queuing formula: L\u00a0=\u00a0AW. Oper Res 9(3):383\u2013387","journal-title":"Oper Res"},{"key":"58_CR43","volume-title":"Case study research: design and methods","author":"RK Yin","year":"2003","unstructured":"Yin RK (2003) Case study research: design and methods, 3rd edn. Sage, London","edition":"3"},{"issue":"4","key":"58_CR44","doi-asserted-by":"crossref","first-page":"303","DOI":"10.1177\/1558689807306132","volume":"1","author":"JW Creswell","year":"2007","unstructured":"Creswell JW, Tashakkori A (2007) Differing perspectives on mixed methods research. J Mixed Methods Res 1(4):303\u2013308","journal-title":"J Mixed Methods Res"},{"key":"58_CR45","unstructured":"Dorell O et al (2010) W.Va. mine blast disaster kills at least 25, in USA today, McLean, p1"},{"issue":"3","key":"58_CR46","first-page":"1","volume":"14","author":"KD Strang","year":"2009","unstructured":"Strang KD (2009) Using recursive regression to explore nonlinear relationships and interactions: a tutorial applied to a multicultural education study. Pract Assess Res Eval 14(3):1\u201313","journal-title":"Pract Assess Res Eval"},{"key":"58_CR47","volume-title":"Multivariate data analysis","author":"JF Hair","year":"2006","unstructured":"Hair JF et al (2006) Multivariate data analysis, 6th edn. Prentice-Hall, Upper Saddle River","edition":"6"}],"container-title":["Logistics Research"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s12159-011-0058-5.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s12159-011-0058-5\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s12159-011-0058-5","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,9,5]],"date-time":"2025-09-05T20:32:42Z","timestamp":1757104362000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s12159-011-0058-5"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2011,8,19]]},"references-count":47,"journal-issue":{"issue":"4","published-print":{"date-parts":[[2011,10]]}},"alternative-id":["58"],"URL":"https:\/\/doi.org\/10.1007\/s12159-011-0058-5","relation":{},"ISSN":["1865-035X","1865-0368"],"issn-type":[{"type":"print","value":"1865-035X"},{"type":"electronic","value":"1865-0368"}],"subject":[],"published":{"date-parts":[[2011,8,19]]}}}