{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,2,7]],"date-time":"2026-02-07T18:00:30Z","timestamp":1770487230656,"version":"3.49.0"},"reference-count":56,"publisher":"Emerald","issue":"1","license":[{"start":{"date-parts":[[2016,1,8]],"date-time":"2016-01-08T00:00:00Z","timestamp":1452211200000},"content-version":"unspecified","delay-in-days":0,"URL":"http:\/\/creativecommons.org\/licenses\/by\/4.0"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Logist. Res."],"published-print":{"date-parts":[[2016,12]]},"DOI":"10.1007\/s12159-015-0130-7","type":"journal-article","created":{"date-parts":[[2016,1,8]],"date-time":"2016-01-08T00:45:19Z","timestamp":1452213919000},"update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":11,"title":["A mobile application for knowledge-enriched short-term scheduling of complex products"],"prefix":"10.1108","volume":"9","author":[{"given":"D.","family":"Mourtzis","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"M.","family":"Doukas","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"E.","family":"Vlachou","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"140","published-online":{"date-parts":[[2016,1,8]]},"reference":[{"key":"130_CR1","doi-asserted-by":"crossref","first-page":"451","DOI":"10.1243\/09544054JEM1241","volume":"223","author":"G Chryssolouris","year":"2009","unstructured":"Chryssolouris G, Mavrikios D, Papakostas N, Mourtzis D, Michalos G, Georgoulias K (2009) Digital manufacturing: history, perspectives, and outlook. Proc Inst Mech Eng Part B J Eng Manuf 223:451\u2013462","journal-title":"Proc Inst Mech Eng Part B J Eng Manuf"},{"key":"130_CR2","doi-asserted-by":"crossref","first-page":"287","DOI":"10.1016\/S0927-0507(05)80186-0","volume":"4","author":"US Karmarkar","year":"1993","unstructured":"Karmarkar US (1993) Manufacturing lead times, order release and capacity loading. Handb Oper Res Manag Sci 4:287\u2013329","journal-title":"Handb Oper Res Manag Sci"},{"issue":"2","key":"130_CR3","first-page":"30","volume":"30","author":"A Lowe","year":"2004","unstructured":"Lowe A, McMahon C, Culley S (2004) Information access, storage and use by engineering designers. J Eng Des 30(2):30\u201332","journal-title":"J Eng Des"},{"key":"130_CR4","doi-asserted-by":"crossref","first-page":"121","DOI":"10.1016\/j.procir.2013.06.179","volume":"9","author":"K Efthymiou","year":"2013","unstructured":"Efthymiou K, Sipsas K, Mourtzis D, Chryssolouris G (2013) On an integrated knowledge based framework for manufacturing systems early design phase. Proc CIRP 9:121\u2013126","journal-title":"Proc CIRP"},{"key":"130_CR5","unstructured":"Takahashi D (2014) Mobile apps could hit $70B in revenues by 2017. http:\/\/venturebeat.com\/2014\/04\/29\/mobile-apps-could-hit-70b-in-revenues-by-2017-as-non-game-categories-take-off\/"},{"key":"130_CR6","unstructured":"Kubach U (2012) Manufacturing business web: enabling flexible and mobile business processes for the manufacturing industry. Industrial technologies 2012. http:\/\/www.industrialtechnologies2012.eu\/sites\/default\/files\/presentations_session\/4_Uwe_Kubach.pdf"},{"key":"130_CR7","doi-asserted-by":"crossref","first-page":"1105","DOI":"10.1016\/j.im.2005.01.001","volume":"42","author":"AE Akgun","year":"2005","unstructured":"Akgun AE, Byrne JC, Keskin H, Lynn GS, Imamoglu SZ (2005) Knowledge networks in new product development projects: a transactive memory perspective. Inf Manag 42:1105\u20131120","journal-title":"Inf Manag"},{"key":"130_CR8","doi-asserted-by":"crossref","first-page":"39","DOI":"10.3233\/AIC-1994-7104","volume":"7","author":"A Aamodt","year":"1994","unstructured":"Aamodt A, Plaza E (1994) Case-based reasoning: foundational issues, methodological variations, and system approaches. AI Commun 7:39\u201359","journal-title":"AI Commun"},{"key":"130_CR9","first-page":"3","volume":"6","author":"JL Kolodner","year":"1992","unstructured":"Kolodner JL (1992) An introduction to CBR. AI Rev 6:3\u201334","journal-title":"AI Rev"},{"key":"130_CR10","doi-asserted-by":"crossref","first-page":"1108","DOI":"10.1016\/j.knosys.2011.05.005","volume":"24","author":"BM Li","year":"2011","unstructured":"Li BM, Xie SQ, Xu X (2011) Recent development of knowledge-based systems, methods and tools for one-of-a-kind production. Knowl Based Syst 24:1108\u20131119","journal-title":"Knowl Based Syst"},{"key":"130_CR11","doi-asserted-by":"crossref","first-page":"683","DOI":"10.1080\/0740817X.2013.778709","volume":"45","author":"LH Lee","year":"2013","unstructured":"Lee LH, Chew EP, Frazier PI, Jia QS, Chen CH (2013) Advances in simulation optimisation and its applications. IEE Trans 45:683\u2013684","journal-title":"IEE Trans"},{"key":"130_CR12","doi-asserted-by":"crossref","first-page":"253","DOI":"10.1016\/S0378-4371(97)00349-X","volume":"246","author":"GI Watson","year":"1997","unstructured":"Watson GI (1997) Repulsine particles on two-dimensional lattice. Phys Stat Mech Appl 246:253\u2013274","journal-title":"Phys Stat Mech Appl"},{"issue":"1","key":"130_CR13","doi-asserted-by":"crossref","first-page":"453","DOI":"10.1016\/j.cirp.2011.03.037","volume":"60","author":"G Michalos","year":"2011","unstructured":"Michalos G, Makris S, Mourtzis D (2011) A web based tool for dynamic job rotation scheduling using multiple criteria. CIRP Ann Manuf Tech 60(1):453\u2013456","journal-title":"CIRP Ann Manuf Tech"},{"issue":"2","key":"130_CR14","doi-asserted-by":"crossref","first-page":"390","DOI":"10.1016\/S0377-2217(98)00113-1","volume":"113","author":"AS Jain","year":"1999","unstructured":"Jain AS, Meeran S (1999) Deterministic job-shop scheduling: past, present and future. Eur J Oper Res 113(2):390\u2013434","journal-title":"Eur J Oper Res"},{"key":"130_CR15","doi-asserted-by":"crossref","first-page":"332","DOI":"10.1007\/978-3-642-21402-8_54","volume":"152","author":"JF Wang","year":"2011","unstructured":"Wang JF, Du BQ, Ding HM (2011) A genetic algorithm for the flexible job-shop scheduling problem. Adv Res Comput Sci Inf Eng 152:332\u2013339","journal-title":"Adv Res Comput Sci Inf Eng"},{"issue":"4","key":"130_CR16","doi-asserted-by":"crossref","first-page":"417","DOI":"10.1007\/s10951-008-0090-8","volume":"12","author":"D Ouelhadj","year":"2009","unstructured":"Ouelhadj D, Petrovic S (2009) Asurvey of dynamic scheduling in manufacturing systems. J Sched 12(4):417\u2013431","journal-title":"J Sched"},{"key":"130_CR17","doi-asserted-by":"crossref","first-page":"283","DOI":"10.1007\/s10845-008-0216-z","volume":"20","author":"LN Xing","year":"2009","unstructured":"Xing LN, Chen YW, Yang KW (2009) An efficient search method for multi-objective flexible job shop scheduling problems. J Int Manuf 20:283\u2013293","journal-title":"J Int Manuf"},{"key":"130_CR18","doi-asserted-by":"crossref","first-page":"515","DOI":"10.1007\/s10951-005-4781-0","volume":"8","author":"X Li","year":"2005","unstructured":"Li X, Olafsson S (2005) Discovering dispatching rules using data mining. J Sched 8:515\u2013527","journal-title":"J Sched"},{"key":"130_CR19","doi-asserted-by":"crossref","first-page":"57","DOI":"10.1016\/S0377-2217(02)00205-9","volume":"145","author":"R Varela","year":"2003","unstructured":"Varela R, Vela CR, Puente J, Gomez A (2003) A knowledge-based evolutionary strategy for scheduling problems with bottlenecks. Eur J Oper Res 145:57\u201371","journal-title":"Eur J Oper Res"},{"key":"130_CR20","doi-asserted-by":"crossref","first-page":"1164","DOI":"10.1007\/s00170-003-1937-y","volume":"25","author":"DH Sha","year":"2005","unstructured":"Sha DH, Liu CH (2005) Using data mining for due date assignment in a dynamic job shop environment. Int J Adv Manuf Technol 25:1164\u20131174","journal-title":"Int J Adv Manuf Technol"},{"key":"130_CR21","doi-asserted-by":"crossref","first-page":"236","DOI":"10.1016\/j.knosys.2012.04.001","volume":"36","author":"H Karimia","year":"2012","unstructured":"Karimia H, Seyed H, Rahmatia A, Zandiehb M (2012) An efficient knowledge-based algorithm for the flexible job shop scheduling problem. Knowl Based Syst 36:236\u2013244","journal-title":"Knowl Based Syst"},{"issue":"7","key":"130_CR22","first-page":"1319","volume":"26","author":"H Yong","year":"2015","unstructured":"Yong H, Li S (2015) One-machine scheduling problems with deteriorating jobs and position-dependent learning effects under group technology considerations. Int J Syst Sci 26(7):1319\u20131326","journal-title":"Int J Syst Sci"},{"issue":"3","key":"130_CR23","doi-asserted-by":"crossref","first-page":"1345","DOI":"10.1016\/j.destud.2010.10.002","volume":"32","author":"N Reed","year":"2011","unstructured":"Reed N, Scanlan J, Wills G, Halliday ST (2011) Knowledge use in an advanced manufacturing environment. Des Stud 32(3):1345\u20131351","journal-title":"Des Stud"},{"key":"130_CR24","unstructured":"Accenture. Mobile Web Watch Survey; 2012"},{"key":"130_CR25","unstructured":"Enterprise mobile application Report, Kony; 2015. http:\/\/forms.kony.com\/rs\/656-WNA-414\/images\/Kony-Enterprise-Mobile-App-Report.pdf"},{"key":"130_CR26","doi-asserted-by":"crossref","first-page":"664","DOI":"10.1016\/j.procir.2013.06.050","volume":"7","author":"C Gr\u00f6ger","year":"2013","unstructured":"Gr\u00f6ger C, Silcher S, Westk\u00e4mper E, Mitschang B (2013) Leveraging apps in manufacturing. A framework for app technology in the enterprise. Proc CIRP 7:664\u2013669","journal-title":"Proc CIRP"},{"key":"130_CR27","unstructured":"Lunani M Role-based mobile applications can help manufacturing companies dramatically boost productivity and growth. http:\/\/www.cognizant.com\/insights\/perspectives\/role-based-mobile-apps-transform-manufacturing . Accessed 08 Aug 2013"},{"issue":"1","key":"130_CR28","doi-asserted-by":"publisher","first-page":"75","DOI":"10.1016\/j.rcim.2011.07.002","volume":"28","author":"X Xu","year":"2012","unstructured":"Xu X (2012) From cloud computing to cloud manufacturing. Robot Comput Integr Manuf 28(1):75\u201386. doi: 10.1016\/j.rcim.2011.07.002","journal-title":"Robot Comput Integr Manuf"},{"issue":"2","key":"130_CR29","doi-asserted-by":"crossref","first-page":"715","DOI":"10.1016\/j.cirp.2011.05.004","volume":"60","author":"SJ Hu","year":"2011","unstructured":"Hu SJ, Ko J, Weyand L, Elmaraghy HA, Kien TK, Koren Y, Bley H, Chryssolouris G, Nasr N, Shpitalni M (2011) Assembly system design and operations for product variety. CIRP Ann Manuf Technol 60(2):715\u2013733","journal-title":"CIRP Ann Manuf Technol"},{"key":"130_CR30","doi-asserted-by":"crossref","first-page":"93","DOI":"10.1016\/j.chb.2014.03.055","volume":"42","author":"S Chung","year":"2015","unstructured":"Chung S, Lee KY, Choi J (2015) Exploring digital creativity in the workspace: the role of enterprise mobile applications on perceived job performance and creativity. Comput Hum Behav 42:93\u2013109","journal-title":"Comput Hum Behav"},{"key":"130_CR31","doi-asserted-by":"publisher","DOI":"10.1016\/j.mfglet.2014.01.002","author":"D Mourtzis","year":"2014","unstructured":"Mourtzis D, Doukas M, Vandera C (2014) Mobile applications for product customisation and design of manufacturing networks. Manuf Lett. doi: 10.1016\/j.mfglet.2014.01.002","journal-title":"Manuf Lett"},{"key":"130_CR32","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1016\/j.cyto.2012.02.014","volume":"59","author":"HA Young","year":"2012","unstructured":"Young HA (2012) Scientific apps are here (and more will be coming). Cytokine 59:1\u20132","journal-title":"Cytokine"},{"key":"130_CR33","doi-asserted-by":"publisher","unstructured":"(2012) Mobile \u2018\u2018apps\u2019\u2019 provide parts data and calculate O-ring dimensions. Seal Technol 2012(2):3. doi: 10.1016\/S1350-4789(12)70037-5","DOI":"10.1016\/S1350-4789(12)70037-5"},{"issue":"2","key":"130_CR34","doi-asserted-by":"crossref","first-page":"683","DOI":"10.1016\/j.ejor.2005.03.015","volume":"173","author":"A Ozturk","year":"2006","unstructured":"Ozturk A, Kaya S, Ozdemirel NE (2006) Manufacturing lead time estimation using data mining. Eur J Oper Res 173(2):683\u2013700","journal-title":"Eur J Oper Res"},{"issue":"7","key":"130_CR35","doi-asserted-by":"crossref","first-page":"1108","DOI":"10.1016\/j.knosys.2011.05.005","volume":"24","author":"BM Li","year":"2011","unstructured":"Li BM, Xie SQ, Xu X (2011) Recent development of knowledge-based systems, methods and tools for one-of-a-kind production. Knowl Based Syst 24(7):1108\u20131119","journal-title":"Knowl Based Syst"},{"key":"130_CR36","doi-asserted-by":"crossref","first-page":"281","DOI":"10.1023\/A:1011253011638","volume":"12","author":"G Chryssolouris","year":"2001","unstructured":"Chryssolouris G, Subramaniam V (2001) Dynamic scheduling of manufacturing job shops using genetic algorithms. J Int Manuf 12:281\u2013293","journal-title":"J Int Manuf"},{"key":"130_CR37","doi-asserted-by":"publisher","DOI":"10.1080\/0951192X.2014.900867","author":"D Mourtzis","year":"2014","unstructured":"Mourtzis D, Doukas M, Psarommatis F (2014) Design of manufacturing networks for mass customisation using an intelligent search method. Int J Comput Int Manuf. doi: 10.1080\/0951192X.2014.900867","journal-title":"Int J Comput Int Manuf"},{"key":"130_CR38","doi-asserted-by":"crossref","first-page":"499","DOI":"10.1016\/j.procir.2014.01.087","volume":"17","author":"D Mourtzis","year":"2014","unstructured":"Mourtzis D, Doukas M, Fragou K, Efthymiou K, Matzorou V (2014) Knowledge-based estimation of manufacturing lead time for complex engineered-to-order products. Proc CIRP 17:499\u2013504","journal-title":"Proc CIRP"},{"issue":"12","key":"130_CR39","doi-asserted-by":"crossref","first-page":"2773","DOI":"10.1080\/00207549208948190","volume":"30","author":"G Chryssolouris","year":"1992","unstructured":"Chryssolouris G, Dicke K, Lee M (1992) On the resources allocation problem. Int J Prod Res 30(12):2773\u20132795","journal-title":"Int J Prod Res"},{"issue":"8","key":"130_CR40","doi-asserted-by":"crossref","first-page":"762","DOI":"10.1080\/09511920600678827","volume":"19","author":"C Lalas","year":"2006","unstructured":"Lalas C, Mourtzis D, Papakostas N, Chryssolouris G (2006) A simulation-based hybrid backwards scheduling framework for manufacturing systems. Int J Comput Int Manuf 19(8):762\u2013774","journal-title":"Int J Comput Int Manuf"},{"issue":"4","key":"130_CR41","doi-asserted-by":"crossref","first-page":"297","DOI":"10.1016\/S0278-6125(98)80077-0","volume":"17","author":"A Baker","year":"1998","unstructured":"Baker A (1998) A survey of factory control algorithms which can be implemented in a multi-agent hierarchy: dispatching, scheduling, and pull. J Manuf Syst 17(4):297\u2013320","journal-title":"J Manuf Syst"},{"key":"130_CR42","doi-asserted-by":"publisher","first-page":"60","DOI":"10.1016\/j.cor.2013.12.012","volume":"45","author":"F-V Viagas","year":"2014","unstructured":"Viagas F-V, Framinan JM (2014) On insertion tie-breaking rules in heuristics for the permutation flowshop scheduling problem. Comput Oper Res 45:60\u201367. doi: 10.1016\/j.cor.2013.12.012","journal-title":"Comput Oper Res"},{"issue":"1","key":"130_CR43","doi-asserted-by":"crossref","first-page":"427","DOI":"10.1016\/j.cirp.2012.03.035","volume":"61","author":"D Mourtzis","year":"2012","unstructured":"Mourtzis D, Doukas M, Psarommatis F (2012) A multi-criteria evaluation of centralised and decentralised production networks in a highly customer-driven environment. CIRP Ann Manuf Technol 61(1):427\u2013430","journal-title":"CIRP Ann Manuf Technol"},{"key":"130_CR44","volume-title":"Quality engineering using robust design","author":"MS Phadke","year":"1989","unstructured":"Phadke MS (1989) Quality engineering using robust design, 1st edn. Prentice Hall, Englewood Cliffs","edition":"1"},{"key":"130_CR45","volume-title":"Manufacturing systems: theory and practice","author":"G Chryssolouris","year":"2006","unstructured":"Chryssolouris G (2006) Manufacturing systems: theory and practice, 2nd edn. Springer, New York","edition":"2"},{"key":"130_CR46","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1016\/S0377-2217(01)00181-3","volume":"139","author":"V Gordon","year":"2002","unstructured":"Gordon V, Proth JM, Chu C (2002) A survey of the state-of-the-art of common due date assignment and scheduling research. Eur J Oper Res 139:1\u201325","journal-title":"Eur J Oper Res"},{"key":"130_CR47","unstructured":"Jackson JR (1955) Scheduling a production line to minimize maximum tardiness. Management Science Research Project, UCLA"},{"key":"130_CR48","doi-asserted-by":"crossref","first-page":"156","DOI":"10.1016\/0377-2217(89)90100-8","volume":"38","author":"TCE Cheng","year":"1989","unstructured":"Cheng TCE, Gupta MC (1989) Survey of scheduling research involving due date determination decisions. Eur J Oper Res 38:156\u2013166","journal-title":"Eur J Oper Res"},{"issue":"1","key":"130_CR49","doi-asserted-by":"crossref","first-page":"67","DOI":"10.1016\/0272-6963(93)90034-M","volume":"11","author":"MM Vig","year":"1993","unstructured":"Vig MM, Dooley KJ (1993) Mixing static and dynamic flowtime estimates for due-date assignment. J Oper Manag 11(1):67\u201379","journal-title":"J Oper Manag"},{"issue":"4","key":"130_CR50","doi-asserted-by":"crossref","first-page":"393","DOI":"10.1080\/00207548108956667","volume":"19","author":"A Seidmann","year":"1981","unstructured":"Seidmann A, Panwalkar SS, Smith ML (1981) Optimal assignment of due-dates for a single processor scheduling problem. Int J Prod Res 19(4):393\u2013399","journal-title":"Int J Prod Res"},{"issue":"2","key":"130_CR51","doi-asserted-by":"crossref","first-page":"391","DOI":"10.1287\/opre.30.2.391","volume":"30","author":"SS Panwalkar","year":"1982","unstructured":"Panwalkar SS, Smith ML, Seidmann A (1982) Common due date assignment to minimize total penalty for the one machine scheduling problem. Oper Res 30(2):391\u2013399","journal-title":"Oper Res"},{"issue":"2","key":"130_CR52","doi-asserted-by":"crossref","first-page":"387","DOI":"10.1111\/j.1540-5915.1990.tb01692.x","volume":"21","author":"DB Bock","year":"1990","unstructured":"Bock DB, Patterson JH (1990) A comparison of due date setting, resource assignment, and job pre-emption heuristics for the multiproject scheduling problem. Decis Sci 21(2):387\u2013402","journal-title":"Decis Sci"},{"issue":"4","key":"130_CR53","doi-asserted-by":"crossref","first-page":"447","DOI":"10.1007\/s10951-011-0240-2","volume":"15","author":"V Gordon","year":"2012","unstructured":"Gordon V, Strusevich V, Dolgui A (2012) Scheduling with due date assignment under special conditions on job processing. J Sched 15(4):447\u2013456","journal-title":"J Sched"},{"key":"130_CR54","doi-asserted-by":"crossref","first-page":"127","DOI":"10.1016\/j.ijpe.2010.08.017","volume":"129","author":"V Vinod","year":"2011","unstructured":"Vinod V, Sridharan R (2011) Simulation modeling and analysis of due-date assignment methods and scheduling decision rules in a dynamic job shop production system. Int J Prod Econ 129:127\u2013146","journal-title":"Int J Prod Econ"},{"key":"130_CR55","doi-asserted-by":"crossref","first-page":"277","DOI":"10.1007\/s11740-011-0351-9","volume":"6","author":"B Denkena","year":"2012","unstructured":"Denkena B, Bluemel P, Kroening S, Roebbing J (2012) Condition based maintenance planning of highly productive machine tools. Prod Eng Res Dev 6:277\u2013285","journal-title":"Prod Eng Res Dev"},{"key":"130_CR56","unstructured":"Pecas P, Henriques E (2003) The need for agile manufacturing implementation in mould making business. In: Proceedings of the business excellence I\u2014performance measures, benchmarking and best practices in new economy. pp 321\u2013332"}],"container-title":["Logistics Research"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s12159-015-0130-7.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s12159-015-0130-7\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s12159-015-0130-7","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s12159-015-0130-7.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,9,5]],"date-time":"2025-09-05T20:32:52Z","timestamp":1757104372000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s12159-015-0130-7"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2016,1,8]]},"references-count":56,"journal-issue":{"issue":"1","published-print":{"date-parts":[[2016,12]]}},"alternative-id":["130"],"URL":"https:\/\/doi.org\/10.1007\/s12159-015-0130-7","relation":{},"ISSN":["1865-035X","1865-0368"],"issn-type":[{"value":"1865-035X","type":"print"},{"value":"1865-0368","type":"electronic"}],"subject":[],"published":{"date-parts":[[2016,1,8]]},"article-number":"3"}}