{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,5,12]],"date-time":"2026-05-12T12:17:31Z","timestamp":1778588251978,"version":"3.51.4"},"reference-count":35,"publisher":"Emerald","issue":"1","license":[{"start":{"date-parts":[[2016,8,25]],"date-time":"2016-08-25T00:00:00Z","timestamp":1472083200000},"content-version":"unspecified","delay-in-days":0,"URL":"http:\/\/creativecommons.org\/licenses\/by\/4.0"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Logist. Res."],"published-print":{"date-parts":[[2016,12]]},"DOI":"10.1007\/s12159-016-0145-8","type":"journal-article","created":{"date-parts":[[2016,8,24]],"date-time":"2016-08-24T23:47:39Z","timestamp":1472082459000},"update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":5,"title":["A coordinated scheduling of delivery and inventory in a multi-location hospital supplied with a central pharmacy"],"prefix":"10.1108","volume":"9","author":[{"given":"Zakaria","family":"Hammoudan","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Olivier","family":"Grunder","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Toufik","family":"Boudouh","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Abdellah","family":"El Moudni","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"140","published-online":{"date-parts":[[2016,8,25]]},"reference":[{"issue":"1","key":"145_CR1","doi-asserted-by":"crossref","first-page":"65","DOI":"10.1016\/S0020-7063(01)00086-3","volume":"36","author":"O Aptel","year":"2001","unstructured":"Aptel O, Pourjalali H (2001) Improving activities and decreasing costs of logistics in hospitals: a comparison of US and French hospitals. Int J Account 36(1):65\u201390","journal-title":"Int J Account"},{"issue":"3","key":"145_CR2","doi-asserted-by":"crossref","first-page":"382","DOI":"10.1287\/trsc.1060.0188","volume":"41","author":"C Archetti","year":"2007","unstructured":"Archetti C, Bertazzi L, Laporte G, Speranza MG (2007) A branch-and-cut algorithm for a vendor-managed inventory-routing problem. Transp Sci 41(3):382\u2013391","journal-title":"Transp Sci"},{"issue":"12","key":"145_CR3","doi-asserted-by":"crossref","first-page":"1731","DOI":"10.1016\/j.cor.2011.03.002","volume":"38","author":"C Archetti","year":"2011","unstructured":"Archetti C, Bertazzi L, Paletta G, Speranza MG (2011) Analysis of the maximum level policy in a production\u2013distribution system. Comput Oper Res 38(12):1731\u20131746","journal-title":"Comput Oper Res"},{"issue":"1","key":"145_CR4","doi-asserted-by":"crossref","first-page":"101","DOI":"10.1287\/ijoc.1100.0439","volume":"24","author":"C Archetti","year":"2012","unstructured":"Archetti C, Bertazzi L, Hertz A, Speranza MG (2012) A hybrid heuristic for an inventory routing problem. INFORMS J Comput 24(1):101\u2013116","journal-title":"INFORMS J Comput"},{"issue":"2","key":"145_CR5","doi-asserted-by":"crossref","first-page":"477","DOI":"10.1080\/00207540903174981","volume":"48","author":"D Battini","year":"2010","unstructured":"Battini D, Gunasekaran A, Faccio M, Persona A, Sgarbossa F (2010) Consignment stock inventory model in an integrated supply chain. Int J Prod Res 48(2):477\u2013500","journal-title":"Int J Prod Res"},{"issue":"4","key":"145_CR6","doi-asserted-by":"crossref","first-page":"327","DOI":"10.1016\/S0191-2615(96)00029-X","volume":"31","author":"L Bertazzi","year":"1997","unstructured":"Bertazzi L, Speranza MG, Ukovich W (1997) Minimization of logistic costs with given frequencies. Transp Res B Methodol 31(4):327\u2013340","journal-title":"Transp Res B Methodol"},{"issue":"16","key":"145_CR7","doi-asserted-by":"crossref","first-page":"4789","DOI":"10.1080\/00207543.2014.993047","volume":"53","author":"AB Borade","year":"2015","unstructured":"Borade AB, Sweeney E (2015) Decision support system for vendor managed inventory supply chain: a case study. Int J Prod Res 53(16):4789\u20134818","journal-title":"Int J Prod Res"},{"issue":"1","key":"145_CR8","doi-asserted-by":"crossref","first-page":"130","DOI":"10.1287\/opre.1080.0688","volume":"58","author":"Z-L Chen","year":"2010","unstructured":"Chen Z-L (2010) Integrated production and outbound distribution scheduling: review and extensions. Oper Res 58(1):130\u2013148","journal-title":"Oper Res"},{"issue":"3","key":"145_CR9","doi-asserted-by":"crossref","first-page":"1592","DOI":"10.1016\/j.ejor.2005.10.036","volume":"176","author":"K Ertogral","year":"2007","unstructured":"Ertogral K, Darwish M, Ben-Daya M (2007) Production and shipment lot sizing in a vendor\u2013buyer supply chain with transportation cost. Eur J Oper Res 176(3):1592\u20131606","journal-title":"Eur J Oper Res"},{"key":"145_CR10","doi-asserted-by":"crossref","unstructured":"Fu B, Huo Y, Zhao H (2010) Coordinated scheduling of production and delivery with production window and delivery capacity constraints. In: Chen B (ed) Algorithmic aspects in information and management. Springer, New York, pp 141\u2013149","DOI":"10.1007\/978-3-642-14355-7_15"},{"issue":"8","key":"145_CR11","first-page":"3657","volume":"6","author":"O Grunder","year":"2010","unstructured":"Grunder O (2010) Lot sizing, delivery and scheduling of identical jobs in a single-stage supply chain. Int J Innov Comput Inf Control 6(8):3657\u20133668","journal-title":"Int J Innov Comput Inf Control"},{"issue":"1","key":"145_CR12","doi-asserted-by":"crossref","first-page":"22","DOI":"10.1287\/moor.17.1.22","volume":"17","author":"LA Hall","year":"1992","unstructured":"Hall LA, Shmoys DB (1992) Jackson\u2019s rule for single-machine scheduling: making a good heuristic better. Math Oper Res 17(1):22\u201335","journal-title":"Math Oper Res"},{"key":"145_CR13","doi-asserted-by":"crossref","first-page":"313","DOI":"10.1016\/j.ijpe.2013.07.018","volume":"154","author":"M Hariga","year":"2013","unstructured":"Hariga M, Hassini E, Ben-Daya M (2013) A note on generalized single-vendor multi-buyer integrated inventory supply chain models with better synchronization. Int J Prod Econ 154:313\u2013316","journal-title":"Int J Prod Econ"},{"issue":"1","key":"145_CR14","doi-asserted-by":"crossref","first-page":"69","DOI":"10.1016\/S0925-5273(97)00059-5","volume":"51","author":"YT Herer","year":"1997","unstructured":"Herer YT, Levy R (1997) The metered inventory routing problem, an integrative heuristic algorithm. Int J Prod Econ 51(1):69\u201381","journal-title":"Int J Prod Econ"},{"issue":"3","key":"145_CR15","doi-asserted-by":"crossref","first-page":"811","DOI":"10.1016\/j.ejor.2007.05.019","volume":"188","author":"M Hoque","year":"2008","unstructured":"Hoque M (2008) Synchronization in the single-manufacturer multi-buyer integrated inventory supply chain. Eur J Oper Res 188(3):811\u2013825","journal-title":"Eur J Oper Res"},{"issue":"2","key":"145_CR16","doi-asserted-by":"crossref","first-page":"463","DOI":"10.1016\/j.ijpe.2011.01.006","volume":"131","author":"M Hoque","year":"2011","unstructured":"Hoque M (2011a) Generalized single-vendor multi-buyer integrated inventory supply chain models with a better synchronization. Int J Prod Econ 131(2):463\u2013472","journal-title":"Int J Prod Econ"},{"issue":"1","key":"145_CR17","doi-asserted-by":"crossref","first-page":"80","DOI":"10.1016\/j.ejor.2011.05.036","volume":"215","author":"M Hoque","year":"2011","unstructured":"Hoque M (2011b) An optimal solution technique to the single-vendor multi-buyer integrated inventory supply chain by incorporating some realistic factors. Eur J Oper Res 215(1):80\u201388","journal-title":"Eur J Oper Res"},{"issue":"4","key":"145_CR18","doi-asserted-by":"crossref","first-page":"1753","DOI":"10.1016\/j.apm.2012.04.042","volume":"37","author":"J Jha","year":"2012","unstructured":"Jha J, Shanker K (2012) Single-vendor multi-buyer integrated production-inventory model with controllable lead time and service level constraints. Appl Math Model 37(4):1753\u20131767","journal-title":"Appl Math Model"},{"issue":"5","key":"145_CR19","doi-asserted-by":"crossref","first-page":"698","DOI":"10.1287\/mnsc.44.5.698","volume":"44","author":"C Jordan","year":"1998","unstructured":"Jordan C, Drexl A (1998) Discrete lotsizing and scheduling by batch sequencing. Manag Sci 44(5):698\u2013713","journal-title":"Manag Sci"},{"issue":"3","key":"145_CR20","doi-asserted-by":"crossref","first-page":"219","DOI":"10.1007\/s00291-002-0101-7","volume":"24","author":"J Kallrath","year":"2002","unstructured":"Kallrath J (2002) Planning and scheduling in the process industry. OR Spectrum 24(3):219\u2013250","journal-title":"OR Spectrum"},{"issue":"8","key":"145_CR21","doi-asserted-by":"crossref","first-page":"2279","DOI":"10.1080\/00207549608905025","volume":"34","author":"A Kimms","year":"1996","unstructured":"Kimms A (1996) Competitive methods for multi-level lot sizing and scheduling: Tabu search and randomized regrets. Int J Prod Res 34(8):2279\u20132298","journal-title":"Int J Prod Res"},{"issue":"8","key":"145_CR22","doi-asserted-by":"crossref","first-page":"829","DOI":"10.1016\/S0305-0548(98)00089-6","volume":"26","author":"A Kimms","year":"1999","unstructured":"Kimms A (1999) A genetic algorithm for multi-level, multi-machine lot sizing and scheduling. Comput Oper Res 26(8):829\u2013848","journal-title":"Comput Oper Res"},{"issue":"2","key":"145_CR23","doi-asserted-by":"crossref","first-page":"312","DOI":"10.1016\/0377-2217(93)E0253-T","volume":"81","author":"L Lu","year":"1995","unstructured":"Lu L (1995) A one-vendor multi-buyer integrated inventory model. Eur J Oper Res 81(2):312\u2013323","journal-title":"Eur J Oper Res"},{"key":"145_CR24","doi-asserted-by":"crossref","DOI":"10.1007\/978-1-4614-2361-4","volume-title":"Scheduling: theory, algorithms, and systems","author":"ML Pinedo","year":"2012","unstructured":"Pinedo ML (2012) Scheduling: theory, algorithms, and systems. Springer, New York"},{"issue":"11","key":"145_CR25","first-page":"1075","volume":"31","author":"GR Parija","year":"1999","unstructured":"Parija GR, Sarker BR (1999) Operations planning in a supply chain system with fixed-interval deliveries of finished goods to multiple customers. IIE Trans 31(11):1075\u20131082","journal-title":"IIE Trans"},{"issue":"6","key":"145_CR26","doi-asserted-by":"crossref","first-page":"1436","DOI":"10.1287\/opre.28.6.1436","volume":"28","author":"CN Potts","year":"1980","unstructured":"Potts CN (1980) Technical analysis of a heuristic for one machine sequencing with release dates and delivery times. Oper Res 28(6):1436\u20131441","journal-title":"Oper Res"},{"issue":"3","key":"145_CR27","doi-asserted-by":"crossref","first-page":"593","DOI":"10.1016\/0377-2217(94)00277-0","volume":"89","author":"BR Sarker","year":"1996","unstructured":"Sarker BR, Parija GR (1996) Optimal batch size and raw material ordering policy for a production system with a fixed-interval, lumpy demand delivery system. Eur J Oper Res 89(3):593\u2013608","journal-title":"Eur J Oper Res"},{"issue":"6","key":"145_CR28","doi-asserted-by":"crossref","first-page":"929","DOI":"10.1016\/j.compchemeng.2003.09.022","volume":"28","author":"N Shah","year":"2004","unstructured":"Shah N (2004) Pharmaceutical supply chains: key issues and strategies for optimisation. Comput Chem Eng 28(6):929\u2013941","journal-title":"Comput Chem Eng"},{"issue":"1","key":"145_CR29","doi-asserted-by":"crossref","first-page":"93","DOI":"10.1007\/s10898-004-5908-0","volume":"32","author":"S Sindhuchao","year":"2005","unstructured":"Sindhuchao S, Romeijn HE, Akali E, Boondiskulchok R (2005) An integrated inventory-routing system for multi-item joint replenishment with limited vehicle capacity. J Glob Optim 32(1):93\u2013118","journal-title":"J Glob Optim"},{"issue":"2","key":"145_CR30","doi-asserted-by":"crossref","first-page":"383","DOI":"10.1016\/j.ejor.2011.06.021","volume":"215","author":"H Stefansson","year":"2011","unstructured":"Stefansson H, Sigmarsdottir S, Jensson P, Shah N (2011) Discrete and continuous time representations and mathematical models for large production scheduling problems: a case study from the pharmaceutical industry. Eur J Oper Res 215(2):383\u2013392","journal-title":"Eur J Oper Res"},{"issue":"3","key":"145_CR31","doi-asserted-by":"crossref","first-page":"294","DOI":"10.1287\/mnsc.43.3.294","volume":"43","author":"S Viswanathan","year":"1997","unstructured":"Viswanathan S, Mathur K (1997) Integrating routing and inventory decisions in one-warehouse multiretailer multiproduct distribution systems. Manag Sci 43(3):294\u2013312","journal-title":"Manag Sci"},{"issue":"2","key":"145_CR32","doi-asserted-by":"crossref","first-page":"277","DOI":"10.1016\/S0377-2217(00)00225-3","volume":"129","author":"S Viswanathan","year":"2001","unstructured":"Viswanathan S, Piplani R (2001) Coordinating supply chain inventories through common replenishment epochs. Eur J Oper Res 129(2):277\u2013286","journal-title":"Eur J Oper Res"},{"issue":"3","key":"145_CR33","doi-asserted-by":"crossref","first-page":"828","DOI":"10.1080\/00207543.2012.676681","volume":"51","author":"D Wang","year":"2013","unstructured":"Wang D, Grunder O, El Moudni A (2013) Single-item production-delivery scheduling problem with stage-dependent inventory costs and due date considerations. Int J Prod Res 51(3):828\u2013846","journal-title":"Int J Prod Res"},{"issue":"1","key":"145_CR34","doi-asserted-by":"crossref","first-page":"225","DOI":"10.1016\/j.ijpe.2008.08.044","volume":"118","author":"L Zavanella","year":"2009","unstructured":"Zavanella L, Zanoni S (2009) A one-vendor multi-buyer integrated production-inventory model: the consignment stock case. Int J Prod Econ 118(1):225\u2013232","journal-title":"Int J Prod Econ"},{"issue":"2","key":"145_CR35","doi-asserted-by":"crossref","first-page":"119","DOI":"10.1007\/s10878-007-9128-7","volume":"16","author":"Y Zhang","year":"2008","unstructured":"Zhang Y, Cao Z (2008) An asymptotic PTAS for batch scheduling with nonidentical job sizes to minimize makespan. J Comb Optim 16(2):119\u2013126","journal-title":"J Comb Optim"}],"container-title":["Logistics Research"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s12159-016-0145-8.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s12159-016-0145-8\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s12159-016-0145-8","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s12159-016-0145-8.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,9,5]],"date-time":"2025-09-05T20:32:51Z","timestamp":1757104371000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s12159-016-0145-8"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2016,8,25]]},"references-count":35,"journal-issue":{"issue":"1","published-print":{"date-parts":[[2016,12]]}},"alternative-id":["145"],"URL":"https:\/\/doi.org\/10.1007\/s12159-016-0145-8","relation":{},"ISSN":["1865-035X","1865-0368"],"issn-type":[{"value":"1865-035X","type":"print"},{"value":"1865-0368","type":"electronic"}],"subject":[],"published":{"date-parts":[[2016,8,25]]},"article-number":"18"}}