{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,5,11]],"date-time":"2026-05-11T19:16:22Z","timestamp":1778526982129,"version":"3.51.4"},"reference-count":11,"publisher":"Springer Science and Business Media LLC","issue":"1-2","license":[{"start":{"date-parts":[[2018,11,8]],"date-time":"2018-11-08T00:00:00Z","timestamp":1541635200000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["J. Appl. Math. Comput."],"published-print":{"date-parts":[[2019,6]]},"DOI":"10.1007\/s12190-018-01222-1","type":"journal-article","created":{"date-parts":[[2018,11,8]],"date-time":"2018-11-08T09:52:43Z","timestamp":1541670763000},"page":"455-464","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":43,"title":["Bicriterion scheduling with group technology and deterioration effect"],"prefix":"10.1007","volume":"60","author":[{"given":"Xue","family":"Huang","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2018,11,8]]},"reference":[{"key":"1222_CR1","doi-asserted-by":"publisher","DOI":"10.1007\/978-3-540-69446-5_5","volume-title":"Time-dependent Scheduling","author":"S Gawiejnowicz","year":"2008","unstructured":"Gawiejnowicz, S.: Time-dependent Scheduling. Springer, Berlin (2008)"},{"key":"1222_CR2","doi-asserted-by":"publisher","first-page":"3642","DOI":"10.1016\/j.apm.2010.03.014","volume":"34","author":"C-M Wei","year":"2010","unstructured":"Wei, C.-M., Wang, J.-B.: Single machine quadratic penalty function scheduling with deteriorating jobs and group technology. Appl. Math. Model. 34, 3642\u20133647 (2010)","journal-title":"Appl. Math. Model."},{"key":"1222_CR3","doi-asserted-by":"crossref","first-page":"286","DOI":"10.1016\/j.amc.2014.01.168","volume":"234","author":"Y-Y Lu","year":"2014","unstructured":"Lu, Y.-Y., Wang, J.-J., Wang, J.-B.: Single machine group scheduling with decreasing time-dependent processing times subject to release dates. Appl. Math. Comput. 234, 286\u2013292 (2014)","journal-title":"Appl. Math. Comput."},{"key":"1222_CR4","doi-asserted-by":"publisher","first-page":"226","DOI":"10.1016\/j.ins.2014.02.034","volume":"275","author":"J-B Wang","year":"2014","unstructured":"Wang, J.-B., Wang, J.-J.: Single machine group scheduling with time dependent processing times and ready times. Inf. Sci. 275, 226\u2013231 (2014)","journal-title":"Inf. Sci."},{"key":"1222_CR5","doi-asserted-by":"publisher","first-page":"1172","DOI":"10.1016\/j.apm.2014.07.028","volume":"39","author":"J-B Wang","year":"2015","unstructured":"Wang, J.-B., Wang, J.-J.: Single-machine scheduling problems with precedence constraints and simple linear deterioration. Appl. Math. Model. 39, 1172\u20131182 (2015)","journal-title":"Appl. Math. Model."},{"key":"1222_CR6","doi-asserted-by":"publisher","first-page":"3551","DOI":"10.1080\/00207543.2015.1083628","volume":"54","author":"L-H Sun","year":"2016","unstructured":"Sun, L.-H., Cui, K., Chen, J.-H., Wang, J.: Due-date assignment and convex resource allocation scheduling with variable job processing times. Int. J. Prod. Res. 54, 3551\u20133560 (2016)","journal-title":"Int. J. Prod. Res."},{"key":"1222_CR7","doi-asserted-by":"crossref","first-page":"1025","DOI":"10.3934\/jimo.2016060","volume":"13","author":"J-B Wang","year":"2017","unstructured":"Wang, J.-B., Liu, M., Yin, N., Ji, P.: Scheduling jobs with controllable processing time, truncated job-dependent learning and deterioration effects. J. Ind. Manag. Optim. 13, 1025\u20131039 (2017)","journal-title":"J. Ind. Manag. Optim."},{"key":"1222_CR8","doi-asserted-by":"crossref","first-page":"309","DOI":"10.1016\/j.amc.2014.05.048","volume":"242","author":"J-J Wang","year":"2014","unstructured":"Wang, J.-J., Liu, Y.-J.: Single-machine bicriterion group scheduling with deteriorating setup times and job processing times. Appl. Math. Comput. 242, 309\u2013314 (2014)","journal-title":"Appl. Math. Comput."},{"key":"1222_CR9","doi-asserted-by":"publisher","first-page":"315","DOI":"10.1057\/jors.1996.27","volume":"47","author":"TCE Cheng","year":"1996","unstructured":"Cheng, T.C.E., Kovalyov, M.Y., Tuzikov, A.: Single machine group scheduling with two ordered criteria. J. Oper. Res. Soc. 47, 315\u2013320 (1996)","journal-title":"J. Oper. Res. Soc."},{"key":"1222_CR10","doi-asserted-by":"publisher","first-page":"287","DOI":"10.1016\/S0167-5060(08)70356-X","volume":"5","author":"RL Graham","year":"1979","unstructured":"Graham, R.L., Lawler, E.L., Lenstra, J.K., Rinnooy Kan, A.H.G.: Optimization and approximation in deterministic sequencing and scheduling: a survey. Ann. Discret. Math. 5, 287\u2013326 (1979)","journal-title":"Ann. Discret. Math."},{"key":"1222_CR11","doi-asserted-by":"publisher","first-page":"544","DOI":"10.1287\/mnsc.19.5.544","volume":"19","author":"EL Lawer","year":"1973","unstructured":"Lawer, E.L.: Optimal sequencing of a single machine subject to precedence constraint. Manag. Sci. 19, 544\u2013546 (1973)","journal-title":"Manag. Sci."}],"container-title":["Journal of Applied Mathematics and Computing"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s12190-018-01222-1.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s12190-018-01222-1\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s12190-018-01222-1.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2022,9,5]],"date-time":"2022-09-05T15:53:07Z","timestamp":1662393187000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s12190-018-01222-1"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2018,11,8]]},"references-count":11,"journal-issue":{"issue":"1-2","published-print":{"date-parts":[[2019,6]]}},"alternative-id":["1222"],"URL":"https:\/\/doi.org\/10.1007\/s12190-018-01222-1","relation":{},"ISSN":["1598-5865","1865-2085"],"issn-type":[{"value":"1598-5865","type":"print"},{"value":"1865-2085","type":"electronic"}],"subject":[],"published":{"date-parts":[[2018,11,8]]},"assertion":[{"value":"24 April 2018","order":1,"name":"received","label":"Received","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"8 November 2018","order":2,"name":"first_online","label":"First Online","group":{"name":"ArticleHistory","label":"Article History"}}]}}