{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,5,16]],"date-time":"2026-05-16T00:37:31Z","timestamp":1778891851952,"version":"3.51.4"},"reference-count":54,"publisher":"Springer Science and Business Media LLC","issue":"2","license":[{"start":{"date-parts":[[2016,9,26]],"date-time":"2016-09-26T00:00:00Z","timestamp":1474848000000},"content-version":"unspecified","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Oper Res Int J"],"published-print":{"date-parts":[[2018,7]]},"DOI":"10.1007\/s12351-016-0266-5","type":"journal-article","created":{"date-parts":[[2016,9,26]],"date-time":"2016-09-26T02:57:46Z","timestamp":1474858666000},"page":"315-342","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":14,"title":["Integration of resource investment problem with quantity discount problem in material ordering for minimizing resource costs of projects"],"prefix":"10.1007","volume":"18","author":[{"ORCID":"https:\/\/orcid.org\/0000-0001-7300-4078","authenticated-orcid":false,"given":"Aria","family":"Shahsavar","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Nima","family":"Zoraghi","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Babak","family":"Abbasi","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2016,9,26]]},"reference":[{"key":"266_CR1","doi-asserted-by":"publisher","DOI":"10.1155\/2014\/740670","author":"B Afshar-Nadjafi","year":"2014","unstructured":"Afshar-Nadjafi B, Arani M (2014) Multimode preemptive resource investment problem subject to due dates for activities: formulation and solution procedure. Adv Oper Res. doi:\n                        10.1155\/2014\/740670","journal-title":"Adv Oper Res"},{"issue":"5","key":"266_CR2","doi-asserted-by":"crossref","first-page":"390","DOI":"10.1016\/j.orl.2012.05.003","volume":"40","author":"A Akbalik","year":"2012","unstructured":"Akbalik A, Rapine C (2012) Polynomial time algorithms for the constant capacitated single-item lot sizing problem with stepwise production cost. Oper Res Lett 40(5):390\u2013397","journal-title":"Oper Res Lett"},{"issue":"2","key":"266_CR3","doi-asserted-by":"crossref","first-page":"353","DOI":"10.1016\/j.ejor.2013.02.052","volume":"229","author":"A Akbalik","year":"2013","unstructured":"Akbalik A, Rapine C (2013) The single item uncapacitated lot-sizing problem with time-dependent batch sizes: NP-hard and polynomial cases. Eur J Oper Res 229(2):353\u2013363","journal-title":"Eur J Oper Res"},{"issue":"2","key":"266_CR4","doi-asserted-by":"crossref","first-page":"57","DOI":"10.1016\/0272-6963(80)90013-3","volume":"1","author":"NJ Aquilano","year":"1980","unstructured":"Aquilano NJ, Smith DE (1980) A formal set of algorithms for project scheduling with critical path method material requirements planning. J Oper Manag 1(2):57\u201367","journal-title":"J Oper Manag"},{"issue":"2015","key":"266_CR5","doi-asserted-by":"publisher","first-page":"41","DOI":"10.5899\/2015\/acte-00195","volume":"1","author":"M Arjmand","year":"2015","unstructured":"Arjmand M, Najafi AA (2015) Solving a multi-mode bi-objective resource investment problem using meta-heuristic algorithms. Adv Comput Tech Electromagn 1(2015):41\u201358. doi:\n                        10.5899\/2015\/acte-00195","journal-title":"Adv Comput Tech Electromagn"},{"issue":"2","key":"266_CR6","doi-asserted-by":"crossref","first-page":"219","DOI":"10.1016\/0377-2217(95)00315-0","volume":"92","author":"WC Benton","year":"1996","unstructured":"Benton WC, Park S (1996) A classification of literature on determining the lot size under quantity discounts. Eur J Oper Res 92(2):219\u2013238","journal-title":"Eur J Oper Res"},{"issue":"1","key":"266_CR7","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1016\/j.ejor.2004.01.054","volume":"168","author":"N Brahimi","year":"2006","unstructured":"Brahimi N, Dauzere-Peres S, Najid NM, Nordli A (2006) Single item lot sizing problems. Eur J Oper Res 168(1):1\u201316","journal-title":"Eur J Oper Res"},{"key":"266_CR8","unstructured":"Callerman TE, Whybark DC (1977) Purchase quantity discounts in an MRP environment. Discussion paper, School of Business, Indiana"},{"issue":"1\u20132","key":"266_CR9","doi-asserted-by":"crossref","first-page":"165","DOI":"10.1016\/0272-6963(87)90015-5","volume":"7","author":"C Chung","year":"1987","unstructured":"Chung C, Chiang DT, Lu C (1987) An optimal algorithm for the quantity discount problem. J Oper Manag 7(1\u20132):165\u2013177","journal-title":"J Oper Manag"},{"issue":"5","key":"266_CR10","doi-asserted-by":"crossref","first-page":"777","DOI":"10.1057\/jors.2013.46","volume":"65","author":"E Colak","year":"2014","unstructured":"Colak E, Azizoglu M (2014) A resource investment problem with time\/resource trade-offs. J Oper Res Soc 65(5):777\u2013790","journal-title":"J Oper Res Soc"},{"issue":"10","key":"266_CR11","doi-asserted-by":"crossref","first-page":"1590","DOI":"10.1287\/mnsc.41.10.1590","volume":"41","author":"EL Demeulemeester","year":"1995","unstructured":"Demeulemeester EL (1995) Minimizing resource availability costs in time limited project networks. Manag Sci 41(10):1590\u20131598","journal-title":"Manag Sci"},{"issue":"11","key":"266_CR12","doi-asserted-by":"crossref","first-page":"1005","DOI":"10.1023\/A:1010994519405","volume":"33","author":"B Dodin","year":"2001","unstructured":"Dodin B, Elimam AA (2001) Integrated project scheduling and material planning with variable activity duration and rewards. IIE Trans 33(11):1005\u20131018","journal-title":"IIE Trans"},{"issue":"3","key":"266_CR13","doi-asserted-by":"crossref","first-page":"340","DOI":"10.1057\/palgrave.jors.2601099","volume":"52","author":"A Drexl","year":"2001","unstructured":"Drexl A, Kimms A (2001) Optimization guided lower and upper bounds for the resource investment problem. J Oper Res Soc 52(3):340\u2013351","journal-title":"J Oper Res Soc"},{"issue":"2","key":"266_CR14","first-page":"132","volume":"6","author":"A Erabsi","year":"1999","unstructured":"Erabsi A, Sepil C (1999) A modified heuristic procedure for materials management in project networks. Int J Ind Eng Theory 6(2):132\u2013140","journal-title":"Int J Ind Eng Theory"},{"issue":"5","key":"266_CR15","doi-asserted-by":"crossref","first-page":"707","DOI":"10.1002\/1520-6750(199010)37:5<707::AID-NAV3220370509>3.0.CO;2-5","volume":"37","author":"A Federgruen","year":"1990","unstructured":"Federgruen A, Lee CY (1990) The dynamic lot size model with quantity discount. Nav Res Logist 37(5):707\u2013713","journal-title":"Nav Res Logist"},{"issue":"2","key":"266_CR16","doi-asserted-by":"crossref","first-page":"603","DOI":"10.1016\/j.ejor.2006.03.010","volume":"178","author":"D Goossens","year":"2007","unstructured":"Goossens D, Maas A, Spieksma F, Van De Klundert J (2007) Exact algorithms for a procurement problem with total quantity discounts. Eur J Oper Res 178(2):603\u2013626","journal-title":"Eur J Oper Res"},{"issue":"8","key":"266_CR17","doi-asserted-by":"crossref","first-page":"912","DOI":"10.1080\/0740817X.2012.724187","volume":"45","author":"HC Hwanga","year":"2013","unstructured":"Hwanga HC, Heuvelb WVD, Wagelmansb APM (2013) The economic lot-sizing problem with lost sales and bounded inventory. IIE Trans 45(8):912\u2013924","journal-title":"IIE Trans"},{"issue":"5","key":"266_CR18","doi-asserted-by":"crossref","first-page":"365","DOI":"10.1016\/S0305-0483(03)00059-8","volume":"31","author":"B Karimi","year":"2003","unstructured":"Karimi B, Ghomi SF, Wilson JM (2003) The capacitated lot sizing problem: a review of models and algorithms. Omega 31(5):365\u2013378","journal-title":"Omega"},{"issue":"7","key":"266_CR19","doi-asserted-by":"crossref","first-page":"854","DOI":"10.1061\/(ASCE)CO.1943-7862.0000492","volume":"138","author":"GK Koulinas","year":"2012","unstructured":"Koulinas GK, Anagnostopoulos KP (2012) Construction resource allocation and leveling using a threshold accepting based hyper-heuristic algorithm. ASCE J Constr Eng Manag 138(7):854\u2013863","journal-title":"ASCE J Constr Eng Manag"},{"key":"266_CR20","doi-asserted-by":"crossref","first-page":"169","DOI":"10.1016\/j.autcon.2012.11.002","volume":"31","author":"GK Koulinas","year":"2013","unstructured":"Koulinas GK, Anagnostopoulos KP (2013) A new tabu search-based hyperheuristic algorithm for solving construction leveling problems with limited resource availabilities. Autom Constr 31:169\u2013175","journal-title":"Autom Constr"},{"issue":"4","key":"266_CR21","doi-asserted-by":"publisher","first-page":"760","DOI":"10.1080\/00207721.2011.618644","volume":"44","author":"AHI Lee","year":"2011","unstructured":"Lee AHI, Kang HY, Lai CM (2011) Solving lot-sizing problem with quantity discount and transportation cost. Int J Syst Sci 44(4):760\u2013774. doi:\n                        10.1080\/00207721.2011.618644","journal-title":"Int J Syst Sci"},{"issue":"7","key":"266_CR22","doi-asserted-by":"crossref","first-page":"4733","DOI":"10.1016\/j.apm.2012.09.056","volume":"37","author":"AHI Lee","year":"2013","unstructured":"Lee AHI, Kang HY, Lai CM, Wan-Yu H (2013) An integrated model for lot sizing with supplier selection and quantity discounts. Appl Math Model 37(7):4733\u20134746","journal-title":"Appl Math Model"},{"issue":"1","key":"266_CR23","doi-asserted-by":"crossref","first-page":"177","DOI":"10.1007\/s11750-009-0132-1","volume":"19","author":"YJ Lin","year":"2011","unstructured":"Lin YJ, Ho CH (2011) Integrated inventory model with quantity discount and price-sensitive demand. Top 19(1):177\u2013188","journal-title":"Top"},{"issue":"2","key":"266_CR24","doi-asserted-by":"crossref","first-page":"287","DOI":"10.1016\/j.ejor.2012.04.028","volume":"222","author":"D Manerba","year":"2012","unstructured":"Manerba D, Mansini R (2012) An exact algorithm for the capacitated total quantity discount problem. Eur J Oper Res 222(2):287\u2013300","journal-title":"Eur J Oper Res"},{"key":"266_CR25","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1016\/j.cor.2013.07.019","volume":"41","author":"D Manerba","year":"2014","unstructured":"Manerba D, Mansini R (2014) An effective metaheuristic for the capacitated total quantity discount problem. Comput Oper Res 41:1\u201311","journal-title":"Comput Oper Res"},{"issue":"2","key":"266_CR26","doi-asserted-by":"crossref","first-page":"115","DOI":"10.1287\/mnsc.4.2.115","volume":"4","author":"AS Manne","year":"1958","unstructured":"Manne AS (1958) Programming of economic lot sizes. Manag Sci 4(2):115\u2013135","journal-title":"Manag Sci"},{"issue":"2","key":"266_CR27","doi-asserted-by":"crossref","first-page":"754","DOI":"10.1016\/j.ijpe.2007.10.010","volume":"113","author":"A Mendoza","year":"2008","unstructured":"Mendoza A, Ventura JA (2008) Incorporating quantity discounts to the EOQ model with transportation costs. Int J Prod Econ 113(2):754\u2013765","journal-title":"Int J Prod Econ"},{"issue":"6","key":"266_CR28","doi-asserted-by":"crossref","first-page":"1780","DOI":"10.1016\/j.cor.2008.05.003","volume":"36","author":"SH Mirmohammadi","year":"2009","unstructured":"Mirmohammadi SH, Shadrokh S, Kianfar F (2009) An efficient optimal algorithm for the quantity discount problem in material requirement planning. Comput Oper Res 36(6):1780\u20131788","journal-title":"Comput Oper Res"},{"issue":"1","key":"266_CR29","doi-asserted-by":"crossref","first-page":"89","DOI":"10.1287\/opre.32.1.89","volume":"32","author":"RH M\u00f6hring","year":"1984","unstructured":"M\u00f6hring RH (1984) Minimizing costs of resource requirements in project networks subject to a fix completion time. Oper Res 32(1):89\u2013120","journal-title":"Oper Res"},{"issue":"2","key":"266_CR30","doi-asserted-by":"crossref","first-page":"581","DOI":"10.1016\/j.ejor.2009.03.043","volume":"201","author":"CL Munson","year":"2010","unstructured":"Munson CL, Hu J (2010) Incorporating quantity discounts and their inventory impacts into the centralized purchasing decision. Eur J Oper Res 201(2):581\u2013592","journal-title":"Eur J Oper Res"},{"issue":"1\u20132","key":"266_CR31","first-page":"1","volume":"8","author":"CL Munson","year":"2015","unstructured":"Munson CL, Jackson J (2015) Quantity discounts: an overview and practical guide for buyers and sellers. Found Trends Technol Inf Oper Manag 8(1\u20132):1\u2013130","journal-title":"Found Trends Technol Inf Oper Manag"},{"key":"266_CR32","volume-title":"Response surface methodology: process and product optimization using designed experiments","author":"RH Myers","year":"1995","unstructured":"Myers RH, Montgomery DC (1995) Response surface methodology: process and product optimization using designed experiments. Wiley, London"},{"issue":"11","key":"266_CR33","doi-asserted-by":"crossref","first-page":"2994","DOI":"10.1016\/j.cor.2009.01.016","volume":"36","author":"AA Najafi","year":"2009","unstructured":"Najafi AA, Niaki STA, Shahsavar M (2009) A parameter-tuned genetic algorithm for the resource investment problem with discounted cash flows and generalized precedence relations. Comput Oper Res 36(11):2994\u20133001","journal-title":"Comput Oper Res"},{"issue":"2","key":"266_CR34","doi-asserted-by":"crossref","first-page":"425","DOI":"10.1016\/S0377-2217(99)00498-1","volume":"127","author":"K Neumann","year":"2000","unstructured":"Neumann K, Zimmermann J (2000) Procedures for resource leveling and net present value problems in project scheduling with general temporal and resource constraints. Eur J Oper Res 127(2):425\u2013443","journal-title":"Eur J Oper Res"},{"key":"266_CR35","unstructured":"N\u00fcbel H (1999) A branch and bound procedure for the resource investment problem subject to temporal constraints. Technical Report 574, University of Karlsruhe"},{"issue":"3","key":"266_CR36","doi-asserted-by":"crossref","first-page":"574","DOI":"10.1007\/PL00013357","volume":"23","author":"H N\u00fcbel","year":"2001","unstructured":"N\u00fcbel H (2001) The resource renting problem subject to temporal constraints. OR Spektrum 23(3):574\u2013586","journal-title":"OR Spektrum"},{"key":"266_CR37","volume-title":"Production planning by mixed integer programming","author":"Y Pochet","year":"2006","unstructured":"Pochet Y, Wolsey LA (2006) Production planning by mixed integer programming. Springer, Berlin"},{"issue":"2","key":"266_CR38","first-page":"879","volume":"196","author":"M Ranjbar","year":"2008","unstructured":"Ranjbar M, Kianfar F, Shadrokh S (2008) Solving the resource availability cost problem in project scheduling by path relinking and genetic algorithm. Appl Math Comput 196(2):879\u2013888","journal-title":"Appl Math Comput"},{"issue":"7","key":"266_CR39","first-page":"3","volume":"4","author":"M Sabzehparvar","year":"2008","unstructured":"Sabzehparvar M (2008) A mathematical model for the multi-mode resource investment problem. J Ind Eng Int 4(7):3","journal-title":"J Ind Eng Int"},{"issue":"2","key":"266_CR40","first-page":"91","volume":"16","author":"MS Sajadieh","year":"2009","unstructured":"Sajadieh MS, Shadrokh S, Hassanzadeh F (2009) Concurrent project scheduling and material planning: a genetic algorithm approach. Sci Iran 16(2):91\u201399","journal-title":"Sci Iran"},{"issue":"8","key":"266_CR41","doi-asserted-by":"crossref","first-page":"1102","DOI":"10.1002\/nav.20043","volume":"51","author":"T Schmitt","year":"2004","unstructured":"Schmitt T, Faaland B (2004) Scheduling recurrent construction. Nav Res Log 51(8):1102\u20131128","journal-title":"Nav Res Log"},{"issue":"1","key":"266_CR42","doi-asserted-by":"crossref","first-page":"86","DOI":"10.1016\/j.ejor.2006.03.056","volume":"181","author":"S Shadrokh","year":"2007","unstructured":"Shadrokh S, Kianfar F (2007) A genetic algorithm for resource investment project scheduling problem, tardiness permitted with penalty. Eur J Oper Res 181(1):86\u2013101","journal-title":"Eur J Oper Res"},{"issue":"7\u20138","key":"266_CR43","first-page":"1021","volume":"41","author":"M Shahsavar","year":"2010","unstructured":"Shahsavar M, Najafi AA, Niaki STA (2010) An efficient genetic algorithm to maximize net present value of project payments under inflation and bonus\u2013penalty policy in resource investment problem. Adv Eng Softw 41(7\u20138):1021\u20131030","journal-title":"Adv Eng Softw"},{"key":"266_CR44","doi-asserted-by":"crossref","first-page":"4","DOI":"10.1016\/j.cie.2015.04.027","volume":"87","author":"M Shahsavar","year":"2015","unstructured":"Shahsavar M, Najafi AA, Niaki STA (2015) Three self-adaptive multi-objective evolutionary algorithms for a triple-objective project scheduling problem. Comput Ind Eng 87:4\u201315","journal-title":"Comput Ind Eng"},{"issue":"4","key":"266_CR45","doi-asserted-by":"crossref","first-page":"369","DOI":"10.1016\/0272-6963(84)90022-6","volume":"4","author":"DE Smith-Daniels","year":"1984","unstructured":"Smith-Daniels DE, Aquilano NJ (1984) Constrained resource project scheduling subject to material constraints. J Oper Manag 4(4):369\u2013387","journal-title":"J Oper Manag"},{"issue":"4","key":"266_CR46","doi-asserted-by":"crossref","first-page":"122","DOI":"10.1080\/07408178708975378","volume":"19","author":"DE Smith-Daniels","year":"1987","unstructured":"Smith-Daniels DE, Smith-Daniels VL (1987) Optimal project scheduling with materials ordering. IIE Trans 19(4):122\u2013129","journal-title":"IIE Trans"},{"issue":"1","key":"266_CR47","doi-asserted-by":"crossref","first-page":"27","DOI":"10.1016\/0165-0114(87)90111-4","volume":"24","author":"RN Tiwari","year":"1987","unstructured":"Tiwari RN, Dharmar S, Rao JR (1987) Fuzzy goal programming\u2014an additive model. Fuzzy Set Syst 24(1):27\u201334","journal-title":"Fuzzy Set Syst"},{"issue":"1","key":"266_CR48","doi-asserted-by":"crossref","first-page":"89","DOI":"10.1287\/mnsc.5.1.89","volume":"5","author":"HM Wagner","year":"1958","unstructured":"Wagner HM, Within TM (1958) Dynamic version of economic lot size model. Manag Sci 5(1):89\u201396","journal-title":"Manag Sci"},{"key":"266_CR49","unstructured":"www.neos-server.org"},{"issue":"2","key":"266_CR50","doi-asserted-by":"crossref","first-page":"623","DOI":"10.1016\/j.ejor.2004.08.019","volume":"169","author":"DS Yamashita","year":"2006","unstructured":"Yamashita DS, Armentano VA, Laguna M (2006) Scatter search for project scheduling with resource availability cost. Eur J Oper Res 169(2):623\u2013637","journal-title":"Eur J Oper Res"},{"key":"266_CR51","unstructured":"Zimmermann J, Engelhardt H (1998) Lower bounds and exact algorithms for resource leveling problems. Technical Report 517, University of Karlsruhe"},{"key":"266_CR52","first-page":"19","volume":"10","author":"N Zoraghi","year":"2012","unstructured":"Zoraghi N, Najafi AA, Niaki STA (2012) An integrated model of project scheduling and material ordering: a hybrid simulated annealing and genetic algorithm. J Optim Ind Eng 10:19\u201327","journal-title":"J Optim Ind Eng"},{"issue":"6","key":"266_CR53","first-page":"896","volume":"28","author":"N Zoraghi","year":"2015","unstructured":"Zoraghi N, Najafi AA, Niaki STA (2015) Resource constrained project scheduling with material ordering: two hybridized meta-heuristic approaches. IJE Trans C Asp 28(6):896\u2013902","journal-title":"IJE Trans C Asp"},{"key":"266_CR54","doi-asserted-by":"publisher","DOI":"10.1007\/s11750-016-0415-2","author":"N Zoraghi","year":"2016","unstructured":"Zoraghi N, Shahsavar A, Abbasi B, Van Peteghem V (2016) Multi-mode resource-constrained project scheduling problem with material ordering under bonus\u2013penalty policies. TOP. doi:\n                        10.1007\/s11750-016-0415-2","journal-title":"TOP"}],"container-title":["Operational Research"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s12351-016-0266-5\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s12351-016-0266-5.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s12351-016-0266-5.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2018,6,7]],"date-time":"2018-06-07T01:24:27Z","timestamp":1528334667000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s12351-016-0266-5"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2016,9,26]]},"references-count":54,"journal-issue":{"issue":"2","published-print":{"date-parts":[[2018,7]]}},"alternative-id":["266"],"URL":"https:\/\/doi.org\/10.1007\/s12351-016-0266-5","relation":{},"ISSN":["1109-2858","1866-1505"],"issn-type":[{"value":"1109-2858","type":"print"},{"value":"1866-1505","type":"electronic"}],"subject":[],"published":{"date-parts":[[2016,9,26]]}}}