{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,8,10]],"date-time":"2024-08-10T21:13:43Z","timestamp":1723324423278},"reference-count":45,"publisher":"Springer Science and Business Media LLC","issue":"1","license":[{"start":{"date-parts":[[2017,1,4]],"date-time":"2017-01-04T00:00:00Z","timestamp":1483488000000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Oper Res Int J"],"published-print":{"date-parts":[[2019,3]]},"DOI":"10.1007\/s12351-016-0286-1","type":"journal-article","created":{"date-parts":[[2017,1,4]],"date-time":"2017-01-04T15:56:57Z","timestamp":1483545417000},"page":"101-115","update-policy":"http:\/\/dx.doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":10,"title":["A fuzzy random integrated inventory model with imperfect production under optimal vendor investment"],"prefix":"10.1007","volume":"19","author":[{"given":"Oshmita","family":"Dey","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2017,1,4]]},"reference":[{"key":"286_CR2","doi-asserted-by":"publisher","first-page":"292","DOI":"10.1111\/j.1540-5915.1986.tb00228.x","volume":"17","author":"A Banerjee","year":"1986","unstructured":"Banerjee A (1986) A joint economic-lot-size model for purchaser and vendor. Decis Sci 17:292\u2013311","journal-title":"Decis Sci"},{"key":"286_CR3","doi-asserted-by":"publisher","first-page":"875","DOI":"10.1057\/palgrave.jors.2600974","volume":"51","author":"M Ben-Daya","year":"2000","unstructured":"Ben-Daya M, Hariga M (2000) Economic lot scheduling problem with imperfect production process. J Oper Res Soc 51:875\u2013881","journal-title":"J Oper Res Soc"},{"key":"286_CR4","doi-asserted-by":"publisher","first-page":"75","DOI":"10.1016\/j.ijpe.2003.09.012","volume":"92","author":"M Ben-Daya","year":"2004","unstructured":"Ben-Daya M, Hariga M (2004) Integrated single vendor single buyer model with stochastic demand and variable lead-time. Int J Prod Econ 92:75\u201380","journal-title":"Int J Prod Econ"},{"key":"286_CR5","doi-asserted-by":"publisher","first-page":"315","DOI":"10.1016\/S0165-0114(00)00043-9","volume":"122","author":"C Carlsson","year":"2001","unstructured":"Carlsson C, Fuller R (2001) On possiblistic mean value and variance of fuzzy numbers. Fuzzy Sets Syst 122:315\u2013326","journal-title":"Fuzzy Sets Syst"},{"key":"286_CR6","doi-asserted-by":"publisher","first-page":"287","DOI":"10.1016\/S0895-7177(04)90012-X","volume":"39","author":"HC Chang","year":"2004","unstructured":"Chang HC, Yao JS, Ouyang LY (2004) Fuzzy mixture inventory model with variable lead-time based on probabilistic fuzzy set and triangular fuzzy number. Math Comput Model 39:287\u2013304","journal-title":"Math Comput Model"},{"key":"286_CR7","doi-asserted-by":"publisher","first-page":"65","DOI":"10.1016\/j.ejor.2004.04.044","volume":"169","author":"HC Chang","year":"2006","unstructured":"Chang HC, Yao JS, Ouyang LY (2006) Fuzzy mixture inventory model involving fuzzy random variable lead time demand and fuzzy total demand. Eur J Oper Res 169:65\u201380","journal-title":"Eur J Oper Res"},{"key":"286_CR8","doi-asserted-by":"publisher","first-page":"166","DOI":"10.1016\/j.cie.2015.06.022","volume":"88","author":"D Chakraborty","year":"2015","unstructured":"Chakraborty D, Jana DK, Roy TK (2015) Multi-item integrated supply chain model for deteriorating items with stock dependent demand under fuzzy random and bifuzzy environments. Comput Ind Eng 88:166\u2013180","journal-title":"Comput Ind Eng"},{"key":"286_CR10","doi-asserted-by":"publisher","first-page":"453","DOI":"10.1016\/j.asoc.2014.11.057","volume":"28","author":"BC Das","year":"2015","unstructured":"Das BC, Das B, Mondal SK (2015) An integrated production inventory model under interactive fuzzy credit period for deteriorating item with several markets. Appl Soft Comput J 28:453\u2013465","journal-title":"Appl Soft Comput J"},{"key":"286_CR11","first-page":"292","volume":"17","author":"O Dey","year":"2009","unstructured":"Dey O, Chakraborty D (2009) A fuzzy random periodic review inventory system. Eur J Oper Res 17:292\u2013311","journal-title":"Eur J Oper Res"},{"key":"286_CR12","doi-asserted-by":"publisher","first-page":"101","DOI":"10.1016\/j.ijpe.2011.03.015","volume":"132","author":"O Dey","year":"2011","unstructured":"Dey O, Chakraborty D (2011) A fuzzy random continuous review inventory system. Int J Prod Econ 132:101\u2013106","journal-title":"Int J Prod Econ"},{"key":"286_CR13","doi-asserted-by":"publisher","first-page":"222","DOI":"10.1016\/j.ijpe.2014.02.004","volume":"155","author":"O Dey","year":"2014","unstructured":"Dey O, Giri BC (2014) Optimal vendor investment for reducing defect rate in a vendor\u2013buyer integrated system with imperfect production process. Int J Prod Econ 155:222\u2013228","journal-title":"Int J Prod Econ"},{"key":"286_CR14","doi-asserted-by":"publisher","first-page":"915","DOI":"10.1016\/j.mcm.2004.08.007","volume":"41","author":"P Dutta","year":"2005","unstructured":"Dutta P, Chakraborty D, Roy AR (2005) A single-period inventory model with fuzzy random variable demand. Math Comput Model 41:915\u2013922","journal-title":"Math Comput Model"},{"key":"286_CR15","doi-asserted-by":"crossref","first-page":"970","DOI":"10.1016\/j.amc.2006.10.052","volume":"188","author":"P Dutta","year":"2007","unstructured":"Dutta P, Chakraborty D, Roy AR (2007) Continuous review inventory model in mixed fuzzy and stochastic environment. Appl Math Comput 188:970\u2013980","journal-title":"Appl Math Comput"},{"key":"286_CR16","doi-asserted-by":"publisher","first-page":"2546","DOI":"10.1016\/j.fss.2006.05.002","volume":"157","author":"MA Gil","year":"2006","unstructured":"Gil MA, Lopez-Diaz M, Ralescu DA (2006) Overview on the development of fuzzy random variables. Fuzzy Sets Syst 157:2546\u20132557","journal-title":"Fuzzy Sets Syst"},{"key":"286_CR17","doi-asserted-by":"publisher","first-page":"790","DOI":"10.1016\/j.ijpe.2009.06.032","volume":"122","author":"CH Glock","year":"2009","unstructured":"Glock CH (2009) A comment: integrated single vendor\u2013single buyer model with stochastic demand and variable lead time. Int J Prod Econ 122:790\u2013792","journal-title":"Int J Prod Econ"},{"key":"286_CR18","doi-asserted-by":"publisher","first-page":"37","DOI":"10.1016\/j.ijpe.2011.09.007","volume":"136","author":"CH Glock","year":"2012","unstructured":"Glock CH (2012) Lead timer eduction strategies in a single-vendor single-buyer integrated inventory model with lot size-dependent lead times and stochastic demand. Int J Prod Econ 136:37\u201344","journal-title":"Int J Prod Econ"},{"key":"286_CR19","doi-asserted-by":"publisher","first-page":"107","DOI":"10.1080\/00207547708943107","volume":"15","author":"SK Goyal","year":"1976","unstructured":"Goyal SK (1976) An integrated inventory model for a single supplier-single customer problem. Int J Prod Res 15:107\u2013111","journal-title":"Int J Prod Res"},{"key":"286_CR20","doi-asserted-by":"publisher","first-page":"236","DOI":"10.1111\/j.1540-5915.1988.tb00264.x","volume":"19","author":"SK Goyal","year":"1988","unstructured":"Goyal SK (1988) A joint economic-lot-size model for purchaser and vendor: a comment. Decis Sci 19:236\u2013241","journal-title":"Decis Sci"},{"key":"286_CR21","doi-asserted-by":"publisher","first-page":"85","DOI":"10.1016\/S0925-5273(01)00203-1","volume":"77","author":"SK Goyal","year":"2002","unstructured":"Goyal SK, C\u00e1rdenas-Barr\u00f3n LE (2002) Note on: economic production quantity model for items with imperfect quality\u2014a practical approach. Int J Prod Econ 77:85\u201387","journal-title":"Int J Prod Econ"},{"key":"286_CR22","doi-asserted-by":"publisher","first-page":"152","DOI":"10.1080\/095372897235415","volume":"8","author":"D Ha","year":"1997","unstructured":"Ha D, Kim SL (1997) Implementation of JIT purchasing: an integrated approach. Prod Plan Control 8:152\u2013157","journal-title":"Prod Plan Control"},{"key":"286_CR25","doi-asserted-by":"publisher","first-page":"493","DOI":"10.1016\/S0377-2217(96)00267-6","volume":"97","author":"RM Hill","year":"1997","unstructured":"Hill RM (1997) The single-vendor single-buyer integrated production-inventory model with a generalized policy. Eur J Oper Res 97:493\u2013499","journal-title":"Eur J Oper Res"},{"key":"286_CR26","doi-asserted-by":"publisher","first-page":"2463","DOI":"10.1080\/002075499190617","volume":"37","author":"RM Hill","year":"1999","unstructured":"Hill RM (1999) The optimal production and shipment policy for the single-vendor single-buyer integrated production-inventory problem. Int J Prod Res 37:2463\u20132475","journal-title":"Int J Prod Res"},{"key":"286_CR27","doi-asserted-by":"publisher","first-page":"229","DOI":"10.1016\/j.ijpe.2008.06.004","volume":"115","author":"Y-C Hsiao","year":"2008","unstructured":"Hsiao Y-C (2008) Integrated logistic and inventory model for a two-stage supply chain controlled by the reorder and shipping points with sharing information. Int J Prod Econ 115:229\u2013235","journal-title":"Int J Prod Econ"},{"key":"286_CR28","doi-asserted-by":"publisher","first-page":"91","DOI":"10.1016\/S0925-5273(03)00220-2","volume":"91","author":"CK Huang","year":"2004","unstructured":"Huang CK (2004) An optimal policy for a single-vendor single-buyer integrated production-inventory problem with process unreliability consideration. Int J Prod Econ 91:91\u201398","journal-title":"Int J Prod Econ"},{"key":"286_CR29","first-page":"4707","volume":"10","author":"K Kalaiarasi","year":"2015","unstructured":"Kalaiarasi K, Rajarathnam E (2015) Optimization of multi objective fuzzy integrated inventory model with demand dependent unit cost and lead time constraints. Int J Appl Eng Res 10:4707\u20134721","journal-title":"Int J Appl Eng Res"},{"key":"286_CR31","doi-asserted-by":"publisher","DOI":"10.1007\/s10845-014-0921-8","author":"RS Kumar","year":"2014","unstructured":"Kumar RS, Tiwari MK, Goswami A (2014) Two-echelon fuzzy stochastic supply chain for the manufacturer-buyer integrated production-inventory system. J Intell Manuf. doi: 10.1007\/s10845-014-0921-8","journal-title":"J Intell Manuf"},{"key":"286_CR35","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1016\/0020-0255(78)90019-1","volume":"15","author":"H Kwakernaak","year":"1978","unstructured":"Kwakernaak H (1978) Fuzzy random variables\u2014I: definitions and theorems. Inf Sci 15:1\u201329","journal-title":"Inf Sci"},{"key":"286_CR34","doi-asserted-by":"publisher","first-page":"253","DOI":"10.1016\/0020-0255(79)90020-3","volume":"17","author":"H Kwakernaak","year":"1979","unstructured":"Kwakernaak H (1979) Fuzzy random variables\u2014II. Algorithms and examples for the discrete case. Inf Sci 17:253\u2013278","journal-title":"Inf Sci"},{"key":"286_CR36","doi-asserted-by":"publisher","first-page":"1125","DOI":"10.1287\/mnsc.33.9.1125","volume":"33","author":"HL Lee","year":"1987","unstructured":"Lee HL, Rosenblatt MJ (1987) Simultaneous determination of production cycles and inspection schedules in a production system. Manag Sci 33:1125\u20131137","journal-title":"Manag Sci"},{"key":"286_CR37","doi-asserted-by":"publisher","DOI":"10.2298\/YJOR110506019L","author":"HJ Lin","year":"2012","unstructured":"Lin HJ (2012) An integrated supply chain inventory model. Yugosl J Oper Res. doi: 10.2298\/YJOR110506019L","journal-title":"Yugosl J Oper Res"},{"key":"286_CR38","doi-asserted-by":"publisher","first-page":"666","DOI":"10.1016\/j.cie.2007.10.002","volume":"54","author":"YJ Lin","year":"2008","unstructured":"Lin YJ (2008) A periodic review inventory model involving fuzzy expected demand short and fuzzy backorder rate. Comput Ind Eng 54:666\u2013676","journal-title":"Comput Ind Eng"},{"key":"286_CR39","doi-asserted-by":"publisher","first-page":"69","DOI":"10.1504\/IJMOR.2015.065958","volume":"7","author":"GC Mahata","year":"2015","unstructured":"Mahata GC (2015) An integrated production-inventory model with backorder and lot for lot policy in fuzzy sense. Int J Math Oper Res 7:69\u2013102","journal-title":"Int J Math Oper Res"},{"key":"286_CR42","doi-asserted-by":"publisher","first-page":"873","DOI":"10.1080\/00207721.2012.742594","volume":"45","author":"L Nagar","year":"2014","unstructured":"Nagar L, Dutta P, Jain K (2014) An integrated supply chain model for new products with imprecise production and supply under scenario dependent fuzzy random demand. Int J Syst Sci 45:873\u2013887","journal-title":"Int J Syst Sci"},{"key":"286_CR45","doi-asserted-by":"publisher","first-page":"1232","DOI":"10.1007\/s00170-005-0008-y","volume":"29","author":"LY Ouyang","year":"2006","unstructured":"Ouyang LY, Wu KS, Ho CH (2006) Analysis of optimal vendor\u2013buyer integrated inventory policy involving defective items. Int J Adv Manuf Technol 29:1232\u20131245","journal-title":"Int J Adv Manuf Technol"},{"key":"286_CR46","doi-asserted-by":"publisher","first-page":"349","DOI":"10.1016\/j.ijpe.2006.12.019","volume":"108","author":"LY Ouyang","year":"2007","unstructured":"Ouyang LY, Wu KS, Ho CH (2007) Integrated vendor\u2013buyer inventory model with quality improvement and lead-time reduction. Int J Prod Econ 108:349\u2013358","journal-title":"Int J Prod Econ"},{"key":"286_CR47","doi-asserted-by":"publisher","first-page":"1263","DOI":"10.1080\/00207540110105680","volume":"40","author":"CH Pan","year":"2002","unstructured":"Pan CH, Yang JS (2002) A study of an integrated inventory with controllable lead time. Int J Prod Res 40:1263\u20131273","journal-title":"Int J Prod Res"},{"key":"286_CR48","doi-asserted-by":"publisher","first-page":"409","DOI":"10.1016\/0022-247X(86)90093-4","volume":"114","author":"ML Puri","year":"1986","unstructured":"Puri ML, Ralescu DA (1986) Fuzzy random variables. J Math Anal Appl 114:409\u2013422","journal-title":"J Math Anal Appl"},{"key":"286_CR49","doi-asserted-by":"publisher","first-page":"137","DOI":"10.1287\/opre.34.1.137","volume":"36","author":"EL Porteus","year":"1986","unstructured":"Porteus EL (1986) Optimal lot sizing, process quality improvement and setup cost reduction. Oper Res 36:137\u2013144","journal-title":"Oper Res"},{"key":"286_CR50","doi-asserted-by":"publisher","first-page":"48","DOI":"10.1080\/07408178608975329","volume":"18","author":"MJ Rosenblatt","year":"1986","unstructured":"Rosenblatt MJ, Lee HL (1986) Economic production cycles with imperfect production process. IIE Trans 18:48\u201355","journal-title":"IIE Trans"},{"key":"286_CR51","doi-asserted-by":"publisher","first-page":"59","DOI":"10.1016\/S0925-5273(99)00044-4","volume":"64","author":"MK Salameh","year":"2000","unstructured":"Salameh MK, Jaber MY (2000) Economic production quantity model with for items with imperfect quality. Int J Prod Econ 64:59\u201364","journal-title":"Int J Prod Econ"},{"key":"286_CR52","first-page":"22","volume":"29","author":"RL Schwaller","year":"1988","unstructured":"Schwaller RL (1988) EOQ under inspection costs. Prod Inventory Manag 29:22\u201324","journal-title":"Prod Inventory Manag"},{"key":"286_CR53","doi-asserted-by":"publisher","DOI":"10.1080\/00207721.2013.786155","author":"H Shu","year":"2013","unstructured":"Shu H, Zhou X (2013) An optimal policy for a single-vendor and a single-buyer integrated system with setup cost reduction and process-quality improvement. Int J Syst Sci. doi: 10.1080\/00207721.2013.786155","journal-title":"Int J Syst Sci"},{"key":"286_CR54","doi-asserted-by":"publisher","first-page":"947","DOI":"10.1007\/s00170-014-6695-5","volume":"78","author":"HN Soni","year":"2015","unstructured":"Soni HN, Patel KA (2015) Optimal policies for integrated inventory system under fuzzy random framework. Int J Adv Manuf Technol 78:947\u2013959","journal-title":"Int J Adv Manuf Technol"},{"key":"286_CR55","doi-asserted-by":"publisher","first-page":"329","DOI":"10.1007\/s10700-013-9174-9","volume":"13","author":"X Wu","year":"2014","unstructured":"Wu X (2014) Integrated inventory problem under trade credit in fuzzy random environment. Fuzzy Optim Decis Making 13:329\u2013344","journal-title":"Fuzzy Optim Decis Making"},{"key":"286_CR56","doi-asserted-by":"publisher","first-page":"41","DOI":"10.1080\/07408179008964156","volume":"22","author":"X Zhang","year":"1990","unstructured":"Zhang X, Gerchak Y (1990) Joint lot sizing and inspection policy in an EOQ model with random yield. IIE Trans 22:41\u201347","journal-title":"IIE Trans"}],"container-title":["Operational Research"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s12351-016-0286-1\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s12351-016-0286-1.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s12351-016-0286-1.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2020,9,28]],"date-time":"2020-09-28T13:33:24Z","timestamp":1601300004000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s12351-016-0286-1"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2017,1,4]]},"references-count":45,"journal-issue":{"issue":"1","published-print":{"date-parts":[[2019,3]]}},"alternative-id":["286"],"URL":"https:\/\/doi.org\/10.1007\/s12351-016-0286-1","relation":{},"ISSN":["1109-2858","1866-1505"],"issn-type":[{"value":"1109-2858","type":"print"},{"value":"1866-1505","type":"electronic"}],"subject":[],"published":{"date-parts":[[2017,1,4]]},"assertion":[{"value":"11 March 2016","order":1,"name":"received","label":"Received","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"20 November 2016","order":2,"name":"revised","label":"Revised","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"20 December 2016","order":3,"name":"accepted","label":"Accepted","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"4 January 2017","order":4,"name":"first_online","label":"First Online","group":{"name":"ArticleHistory","label":"Article History"}}]}}