{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,10,17]],"date-time":"2025-10-17T13:53:44Z","timestamp":1760709224761,"version":"3.37.3"},"reference-count":14,"publisher":"Springer Science and Business Media LLC","issue":"3","license":[{"start":{"date-parts":[[2017,1,2]],"date-time":"2017-01-02T00:00:00Z","timestamp":1483315200000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Oper Res Int J"],"published-print":{"date-parts":[[2018,10]]},"DOI":"10.1007\/s12351-016-0287-0","type":"journal-article","created":{"date-parts":[[2017,1,2]],"date-time":"2017-01-02T04:27:14Z","timestamp":1483331234000},"page":"645-670","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":13,"title":["Optimal multiple-period scheduling and sequencing of operating room and intensive care unit"],"prefix":"10.1007","volume":"18","author":[{"ORCID":"https:\/\/orcid.org\/0000-0002-3291-0805","authenticated-orcid":false,"given":"Abbas","family":"Al-Refaie","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Mays","family":"Judeh","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Toly","family":"Chen","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2017,1,2]]},"reference":[{"key":"287_CR1","doi-asserted-by":"crossref","first-page":"936","DOI":"10.1016\/j.ejor.2008.10.025","volume":"198","author":"MA Ahmed","year":"2009","unstructured":"Ahmed MA, Alkhamis TM (2009) Simulation optimization for an emergency Department Healthcare Unit in Kuwait. Eur J Oper Res 198:936\u2013942","journal-title":"Eur J Oper Res"},{"key":"287_CR3","doi-asserted-by":"publisher","DOI":"10.1007\/s12351-016-0244-y","author":"Al-Refaie","year":"2016","unstructured":"Al-Refaie et al (2016) Optimal operating room scheduling for normal and unexpected events in a smart hospital. Oper Res. doi: 10.1007\/s12351-016-0244-y","journal-title":"Oper Res"},{"issue":"38","key":"287_CR5","first-page":"1","volume":"15","author":"S Barbagallo","year":"2015","unstructured":"Barbagallo S, Corradi L, de Goyet JV, Iannucci M, Porro I, Rosso N, Tanfani E, Testi A (2015) Optimization and planning of operating theatre activities: an original definition of pathways and process modeling. BMC Med Inform Decis Mak 15(38):1\u201316","journal-title":"BMC Med Inform Decis Mak"},{"key":"287_CR6","doi-asserted-by":"crossref","first-page":"415","DOI":"10.1007\/s10916-010-9486-z","volume":"36","author":"SP Devi","year":"2012","unstructured":"Devi SP, Rao KS, Sangeetha SS (2012) Prediction of surgery times and scheduling of operation theaters in optholmology department. J Med Syst 36:415\u2013430","journal-title":"J Med Syst"},{"key":"287_CR7","doi-asserted-by":"crossref","first-page":"69","DOI":"10.1016\/S0925-5273(03)00087-2","volume":"85","author":"A Guinet","year":"2003","unstructured":"Guinet A, Chaabane S (2003) Operating Theatre Planning. Int J Prod Econ 85:69\u201381","journal-title":"Int J Prod Econ"},{"key":"287_CR8","doi-asserted-by":"crossref","first-page":"52","DOI":"10.1016\/j.ijpe.2004.12.006","volume":"99","author":"A Jebali","year":"2006","unstructured":"Jebali A, Alouane ABH, Ladet P (2006) Operating rooms scheduling. Int J Prod Econ 99:52\u201362","journal-title":"Int J Prod Econ"},{"key":"287_CR9","doi-asserted-by":"crossref","first-page":"1026","DOI":"10.1016\/j.ejor.2006.02.057","volume":"185","author":"M Lamiri","year":"2008","unstructured":"Lamiri M, Xie X, Dolgui A, Grimaud F (2008) A stochastic model for operating room planning with elective and emergency demand for surgery. Eur J Oper Res 185:1026\u20131037","journal-title":"Eur J Oper Res"},{"key":"287_CR10","doi-asserted-by":"crossref","unstructured":"Nouaouri I, Nicolas J-C, Jolly D (2009) Scheduling of stabilization surgical cares in case of a disaster. The IEEE international conference on industrial engineering and engineering management (IEEM), Hong Kong","DOI":"10.1109\/IEEM.2009.5373510"},{"key":"287_CR13","unstructured":"Persson M, Persson JA (2006) Optimization modelling of hospital OR planning: analyzing strategies and problem settings. In: Proceedings of the 2006 annual conference of OR applied to health services"},{"key":"287_CR14","doi-asserted-by":"crossref","first-page":"72","DOI":"10.1016\/j.cie.2014.11.021","volume":"80","author":"H Saadouli","year":"2015","unstructured":"Saadouli H, Jerbi B, Dammak A, Masmoudi L, Bouaziz A (2015) A stochastic optimization and simulation approach for scheduling operating rooms and recovery beds in an orthopedic surgery department. Comput Ind Eng 80:72\u201379","journal-title":"Comput Ind Eng"},{"issue":"3","key":"287_CR15","first-page":"177","volume":"3","author":"M Souki","year":"2011","unstructured":"Souki M (2011) Operating theatre scheduling with fuzzy durations. J Appl Oper Res 3(3):177\u2013191","journal-title":"J Appl Oper Res"},{"key":"287_CR16","doi-asserted-by":"crossref","first-page":"105","DOI":"10.1007\/s10479-009-0568-6","volume":"178","author":"E T\u00e0nfani","year":"2010","unstructured":"T\u00e0nfani E, Testi A (2010) A pre-assignment heuristic algorithm for the master surgical schedule problem (MSSP). Ann Oper Res 178:105\u2013119","journal-title":"Ann Oper Res"},{"key":"287_CR17","doi-asserted-by":"crossref","first-page":"163","DOI":"10.1007\/s10729-007-9011-1","volume":"10","author":"A Testi","year":"2007","unstructured":"Testi A, Tanfani E, Torre G (2007) A three-phase approach for operating theatre schedules. Health Care Manag Sci 10:163\u2013172","journal-title":"Health Care Manag Sci"},{"issue":"1","key":"287_CR18","doi-asserted-by":"crossref","first-page":"59","DOI":"10.1111\/j.1365-2753.2007.00794.x","volume":"14","author":"A Testi","year":"2008","unstructured":"Testi A, Tanfani E, Valente R, Ansaldo GL, Torre GC (2008) Prioritizing surgical waiting lists. J Eval Clin Pract 14(1):59\u201364","journal-title":"J Eval Clin Pract"}],"container-title":["Operational Research"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s12351-016-0287-0\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s12351-016-0287-0.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s12351-016-0287-0.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,9,16]],"date-time":"2019-09-16T23:17:23Z","timestamp":1568675843000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s12351-016-0287-0"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2017,1,2]]},"references-count":14,"journal-issue":{"issue":"3","published-print":{"date-parts":[[2018,10]]}},"alternative-id":["287"],"URL":"https:\/\/doi.org\/10.1007\/s12351-016-0287-0","relation":{},"ISSN":["1109-2858","1866-1505"],"issn-type":[{"type":"print","value":"1109-2858"},{"type":"electronic","value":"1866-1505"}],"subject":[],"published":{"date-parts":[[2017,1,2]]}}}