{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,3,25]],"date-time":"2026-03-25T23:52:30Z","timestamp":1774482750044,"version":"3.50.1"},"reference-count":62,"publisher":"Springer Science and Business Media LLC","issue":"1","license":[{"start":{"date-parts":[[2017,4,25]],"date-time":"2017-04-25T00:00:00Z","timestamp":1493078400000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Oper Res Int J"],"published-print":{"date-parts":[[2020,3]]},"DOI":"10.1007\/s12351-017-0316-7","type":"journal-article","created":{"date-parts":[[2017,4,25]],"date-time":"2017-04-25T03:24:02Z","timestamp":1493090642000},"page":"59-87","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":28,"title":["An integrated rescheduling model for minimizing train delays in the case of line blockage"],"prefix":"10.1007","volume":"20","author":[{"ORCID":"https:\/\/orcid.org\/0000-0002-0870-6994","authenticated-orcid":false,"given":"M.","family":"Shakibayifar","sequence":"first","affiliation":[]},{"given":"A.","family":"Sheikholeslami","sequence":"additional","affiliation":[]},{"given":"F.","family":"Corman","sequence":"additional","affiliation":[]},{"given":"E.","family":"Hassannayebi","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2017,4,25]]},"reference":[{"key":"316_CR1","doi-asserted-by":"crossref","first-page":"15","DOI":"10.1016\/j.simpat.2014.12.003","volume":"52","author":"D Abbott","year":"2015","unstructured":"Abbott D, Marinov MV (2015) An event based simulation model to evaluate the design of a rail interchange yard, which provides service to high speed and conventional railways. Simul Model Pract Theory 52:15\u201339","journal-title":"Simul Model Pract Theory"},{"key":"316_CR2","doi-asserted-by":"crossref","first-page":"227","DOI":"10.1016\/j.ejor.2011.05.047","volume":"215","author":"R Acuna-Agost","year":"2011","unstructured":"Acuna-Agost R, Michelon P, Feillet D, Gueye S (2011) SAPI: statistical Analysis of Propagation of Incidents. A new approach for rescheduling trains after disruptions. Eur J Oper Res 215:227\u2013243","journal-title":"Eur J Oper Res"},{"key":"316_CR3","doi-asserted-by":"crossref","first-page":"703","DOI":"10.1016\/j.cor.2010.09.001","volume":"40","author":"AR Albrecht","year":"2013","unstructured":"Albrecht AR, Panton D, Lee D (2013) Rescheduling rail networks with maintenance disruptions using problem space search. Comput Oper Res 40:703\u2013712","journal-title":"Comput Oper Res"},{"key":"316_CR4","doi-asserted-by":"crossref","first-page":"70","DOI":"10.1016\/j.trb.2016.01.001","volume":"85","author":"N Azad","year":"2016","unstructured":"Azad N, Hassini E, Verma M (2016) Disruption risk management in railroad networks: an optimization-based methodology and a case study. Transp Res Part B Methodol 85:70\u201388","journal-title":"Transp Res Part B Methodol"},{"key":"316_CR5","doi-asserted-by":"crossref","first-page":"78","DOI":"10.1016\/j.trc.2017.02.001","volume":"78","author":"S Binder","year":"2017","unstructured":"Binder S, Maknoon Y, Bierlaire M (2017) The multi-objective railway timetable rescheduling problem. Transp Res Part C Emerg Technol 78:78\u201394","journal-title":"Transp Res Part C Emerg Technol"},{"key":"316_CR6","first-page":"34","volume":"2","author":"T B\u00fcker","year":"2012","unstructured":"B\u00fcker T, Seybold B (2012) Stochastic modelling of delay propagation in large networks. J Rail Transp Plan Manag 2:34\u201350","journal-title":"J Rail Transp Plan Manag"},{"key":"316_CR7","doi-asserted-by":"crossref","first-page":"727","DOI":"10.1016\/j.ejor.2011.11.003","volume":"219","author":"V Cacchiani","year":"2012","unstructured":"Cacchiani V, Toth P (2012) Nominal and robust train timetabling problems. Eur J Oper Res 219:727\u2013737","journal-title":"Eur J Oper Res"},{"key":"316_CR8","first-page":"50","volume":"5","author":"AA Ceder","year":"2015","unstructured":"Ceder AA, Hassold S (2015) Applied analysis for improving rail-network operations. J Rail Transp Plan Manag 5:50\u201363","journal-title":"J Rail Transp Plan Manag"},{"key":"316_CR9","doi-asserted-by":"crossref","unstructured":"Corman F, Pacciarelli D, D\u2019ariano A, Sama M (2015) Railway traffic rescheduling with minimization of passengers\u2019 discomfort. In: Proceedings of 6th international conference on computational logistics (ICCL 2015)","DOI":"10.1007\/978-3-319-24264-4_41"},{"key":"316_CR10","doi-asserted-by":"crossref","first-page":"1274","DOI":"10.1109\/TITS.2014.2358392","volume":"16","author":"F Corman","year":"2015","unstructured":"Corman F, Meng L (2015) A review of online dynamic models and algorithms for railway traffic management. Intelligent Transportation Systems, IEEE Transactions on 16:1274\u20131284","journal-title":"Intelligent Transportation Systems, IEEE Transactions on"},{"key":"316_CR11","doi-asserted-by":"crossref","first-page":"219","DOI":"10.1007\/s12469-010-0032-7","volume":"2","author":"F Corman","year":"2010","unstructured":"Corman F, D\u2019Ariano A, Pacciarelli D, Pranzo M (2010) Centralized versus distributed systems to reschedule trains in two dispatching areas. Public Transp 2:219\u2013247","journal-title":"Public Transp"},{"key":"316_CR12","first-page":"14","volume":"1","author":"F Corman","year":"2011","unstructured":"Corman F, D\u2019Ariano A, Hansen IA, Pacciarelli D (2011) Optimal multi-class rescheduling of railway traffic. J Rail Transp Plan Manag 1:14\u201324","journal-title":"J Rail Transp Plan Manag"},{"key":"316_CR13","doi-asserted-by":"publisher","first-page":"213","DOI":"10.1016\/j.tre.2016.04.007","volume":"105","author":"Francesco Corman","year":"2017","unstructured":"Corman F, D\u2019ariano A, Marra AD, Pacciarelli D, Sam\u00e0 M (2016) Integrating train scheduling and delay management in real-time railway traffic control. Transp Res Part E Logist Transp Rev. doi: 10.1016\/j.tre.2016.04.007","journal-title":"Transportation Research Part E: Logistics and Transportation Review"},{"key":"316_CR14","doi-asserted-by":"crossref","first-page":"643","DOI":"10.1016\/j.ejor.2006.10.034","volume":"183","author":"A D\u2019Ariano","year":"2007","unstructured":"D\u2019Ariano A, Pacciarelli D, Pranzo M (2007) A branch and bound algorithm for scheduling trains in a railway network. Eur J Oper Res 183:643\u2013657","journal-title":"Eur J Oper Res"},{"key":"316_CR15","doi-asserted-by":"crossref","first-page":"8","DOI":"10.1109\/MITS.2010.935910","volume":"1","author":"A D\u2019Ariano","year":"2009","unstructured":"D\u2019Ariano A (2009) Innovative decision support system for railway traffic control. IEEE Intell Transp Syst Mag 1:8\u201316","journal-title":"IEEE Intell Transp Syst Mag"},{"key":"316_CR16","doi-asserted-by":"crossref","first-page":"405","DOI":"10.1287\/trsc.1080.0247","volume":"42","author":"A D\u2019Ariano","year":"2008","unstructured":"D\u2019Ariano A, Corman F, Pacciarelli D, Pranzo M (2008) Reordering and local rerouting strategies to manage train traffic in real time. Transp Sci 42:405\u2013419","journal-title":"Transp Sci"},{"key":"316_CR17","doi-asserted-by":"crossref","first-page":"307","DOI":"10.2495\/TDI-V1-N3-307-317","volume":"1","author":"B Davydov","year":"2017","unstructured":"Davydov B, Chebotarev V, Kablukova K (2017) Stochastic model for the real-time train rescheduling. Int J Transp Dev Integr 1:307\u2013317","journal-title":"Int J Transp Dev Integr"},{"key":"316_CR18","doi-asserted-by":"crossref","first-page":"490","DOI":"10.1007\/s10696-013-9187-2","volume":"26","author":"T Dollevoet","year":"2014","unstructured":"Dollevoet T, Corman F, D\u2019Ariano A, Huisman D (2014) An iterative optimization framework for delay management and train scheduling. Flex Serv Manuf J 26:490\u2013515","journal-title":"Flex Serv Manuf J"},{"key":"316_CR19","doi-asserted-by":"crossref","unstructured":"Dotoli M, Epicoco N, Falagario M, Turchiano B, Cavone G, Convertini A (2014) A decision support system for real-time rescheduling of railways. In: Control Conference (ECC), 2014 European, IEEE, pp 696\u2013701","DOI":"10.1109\/ECC.2014.6862177"},{"key":"316_CR20","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1016\/j.trc.2012.11.001","volume":"27","author":"S D\u00fcndar","year":"2013","unstructured":"D\u00fcndar S, \u015eahin \u0130 (2013) Train re-scheduling with genetic algorithms and artificial neural networks for single-track railways. Transportation Research Part C: Emerging Technologies 27:1\u201315","journal-title":"Transportation Research Part C: Emerging Technologies"},{"issue":"8","key":"316_CR21","doi-asserted-by":"crossref","first-page":"2951","DOI":"10.1007\/s00500-015-1924-x","volume":"20","author":"J Eaton","year":"2016","unstructured":"Eaton J, Yang S, Mavrovouniotis M (2016) Ant colony optimization with immigrants schemes for the dynamic railway junction rescheduling problem with multiple delays. Soft Comput 20(8):2951\u20132966","journal-title":"Soft Comput"},{"key":"316_CR22","doi-asserted-by":"crossref","unstructured":"Eskandari H, Rahaee MA, Memarpour M, Nayebi EH, Malek SA (2013) Evaluation of different berthing scenarios in Shahid Rajaee container terminal using discrete-event simulation. In: Proceedings of the 2013 winter simulation conference: simulation: making decisions in a complex world, IEEE Press, pp 3462\u20133474","DOI":"10.1109\/WSC.2013.6721709"},{"key":"316_CR23","first-page":"1","volume":"3","author":"JL Espinosa-Aranda","year":"2013","unstructured":"Espinosa-Aranda JL, Garc\u00eda-R\u00f3denas R (2013) A demand-based weighted train delay approach for rescheduling railway networks in real time. J Rail Transp Plan Manag 3:1\u201313","journal-title":"J Rail Transp Plan Manag"},{"key":"316_CR24","doi-asserted-by":"crossref","first-page":"179","DOI":"10.1016\/j.trb.2006.02.003","volume":"41","author":"RM Goverde","year":"2007","unstructured":"Goverde RM (2007) Railway timetable stability analysis using max-plus system theory. Transp Res Part B Methodol 41:179\u2013201","journal-title":"Transp Res Part B Methodol"},{"key":"316_CR25","volume-title":"Railway timetable and traffic: analysis, modelling, simulation","author":"I Hansen","year":"2008","unstructured":"Hansen I, Pachl J (2008) Railway timetable and traffic: analysis, modelling, simulation. Eurailpress, Hamburg"},{"key":"316_CR26","doi-asserted-by":"crossref","unstructured":"Hasannayebi E, Sajedinejad A, Mardani S, Mohammadi K (2012) An integrated simulation model and evolutionary algorithm for train timetabling problem with considering train stops for praying. In: Simulation conference (WSC), proceedings of the 2012 Winter, IEEE, pp 1\u201313","DOI":"10.1109\/WSC.2012.6465060"},{"key":"316_CR27","first-page":"235","volume":"9","author":"E Hassannayebi","year":"2012","unstructured":"Hassannayebi E, Kiaynfar F (2012) A greedy randomized adaptive search procedure to solve the train sequencing and stop scheduling problem in double track railway lines. J Transp Res 9:235\u2013257","journal-title":"J Transp Res"},{"key":"316_CR28","doi-asserted-by":"crossref","first-page":"439","DOI":"10.1016\/j.cor.2015.12.011","volume":"78","author":"E Hassannayebi","year":"2017","unstructured":"Hassannayebi E, Zegordi SH (2017) Variable and adaptive neighbourhood search algorithms for rail rapid transit timetabling problem. Comput Oper Res 78:439\u2013453","journal-title":"Comput Oper Res"},{"key":"316_CR29","doi-asserted-by":"crossref","first-page":"151","DOI":"10.1016\/j.simpat.2014.09.004","volume":"49","author":"E Hassannayebi","year":"2014","unstructured":"Hassannayebi E, Sajedinejad A, Mardani S (2014) Urban rail transit planning using a two-stage simulation-based optimization approach. Simul Model Pract Theory 49:151\u2013166","journal-title":"Simul Model Pract Theory"},{"key":"316_CR30","volume-title":"Disruption management in urban rail transit system: a simulation based optimization approach","author":"E Hassannayebi","year":"2016","unstructured":"Hassannayebi E, Sajedinejad A, Mardani S (2016a) Disruption management in urban rail transit system: a simulation based optimization approach. Handbook of Research on Emerging Innovations in Rail Transportation Engineering, IgI-Global"},{"key":"316_CR31","doi-asserted-by":"crossref","unstructured":"Hassannayebi E, Shakibayifar M, Mirzahossein H, Zohrabnia S, Shahabi A (2016b) An integrated train scheduling and infrastructure development model in railway networks. Sci Iran Trans Ind Eng (In press). http:\/\/www.scientiairanica.com\/en\/ManuscriptDetail?mid=3520","DOI":"10.24200\/sci.2017.4397"},{"key":"316_CR32","doi-asserted-by":"crossref","first-page":"9892","DOI":"10.1016\/j.apm.2016.06.040","volume":"40","author":"E Hassannayebi","year":"2016","unstructured":"Hassannayebi E, Zegordi SH, Yaghini M (2016c) Train timetabling for an urban rail transit line using a Lagrangian relaxation approach. Appl Math Model 40(23):9892\u20139913","journal-title":"Appl Math Model"},{"issue":"2","key":"316_CR33","doi-asserted-by":"publisher","first-page":"435","DOI":"10.1007\/s12351-016-0232-2","volume":"17","author":"Erfan Hassannayebi","year":"2016","unstructured":"Hassannayebi E, Zegordi SH, Amin-Naseri MR, Yaghini M (2016d). Train timetabling at rapid rail transit lines: a robust multi-objective stochastic programming approach. Oper Res. doi: 10.1007\/s12351-016-0232-2","journal-title":"Operational Research"},{"issue":"3","key":"316_CR34","doi-asserted-by":"crossref","first-page":"278","DOI":"10.1080\/03081060.2017.1283156","volume":"40","author":"E Hassannayebi","year":"2017","unstructured":"Hassannayebi E, Zegordi SH, Yaghini M, Amin-Naseri MR (2017) Timetable optimization models and methods for minimizing passenger waiting time at public transit terminals. Transportation Planning and Technology 40(3):278\u2013304","journal-title":"Transportation Planning and Technology"},{"issue":"5","key":"316_CR35","doi-asserted-by":"crossref","first-page":"04016006","DOI":"10.1061\/(ASCE)CP.1943-5487.0000559","volume":"30","author":"J Huo","year":"2016","unstructured":"Huo J, Wu J, Kang L, Wang B (2016) Railway timetable rescheduling based on priority and train order entropy. J Comput Civil Eng 30(5):04016006","journal-title":"J Comput Civil Eng"},{"key":"316_CR36","doi-asserted-by":"crossref","first-page":"243","DOI":"10.7307\/ptt.v26i3.1337","volume":"26","author":"G Ilati","year":"2014","unstructured":"Ilati G, Sheikholeslami A, Hassannayebi E (2014) A simulation-based optimization approach for integrated port resource allocation problem. PROMET-Traffic & Transp 26:243\u2013255","journal-title":"PROMET-Traffic & Transp"},{"key":"316_CR37","doi-asserted-by":"publisher","unstructured":"Jia W, Mao B, Liu H, Chen S, Ding Y (2008) Service robustness analysis of trains by a simulation method. In: Sixth International Conference of Traffic and Transportation Studies Congress (ICTTS), August 5\u20137, Nanning, China. doi: 10.1061\/40995(322)70","DOI":"10.1061\/40995(322)70"},{"key":"316_CR38","doi-asserted-by":"crossref","first-page":"44","DOI":"10.1016\/j.ejor.2016.05.013","volume":"256","author":"P Jovanovi\u0107","year":"2017","unstructured":"Jovanovi\u0107 P, Kecman P, Bojovi\u0107 N, Mandi\u0107 D (2017) Optimal allocation of buffer times to increase train schedule robustness. Eur J Oper Res 256:44\u201354","journal-title":"Eur J Oper Res"},{"key":"316_CR39","doi-asserted-by":"crossref","first-page":"466","DOI":"10.1007\/s10696-013-9172-9","volume":"26","author":"R Larsen","year":"2014","unstructured":"Larsen R, Pranzo M, D\u2019Ariano A, Corman F, Pacciarelli D (2014) Susceptibility of optimal train schedules to stochastic disturbances of process times. Flex Serv Manuf J 26:466\u2013489","journal-title":"Flex Serv Manuf J"},{"key":"316_CR40","unstructured":"Longo G, Medeossi G (2013) Approach for calibrating and validating the simulation of complex rail networks. In: Transportation Research Board 92nd Annual Meeting"},{"key":"316_CR41","doi-asserted-by":"crossref","first-page":"583","DOI":"10.1016\/j.ejor.2013.12.020","volume":"235","author":"I Louwerse","year":"2014","unstructured":"Louwerse I, Huisman D (2014) Adjusting a railway timetable in case of partial or complete blockades. Eur J Oper Res 235:583\u2013593","journal-title":"Eur J Oper Res"},{"key":"316_CR42","doi-asserted-by":"crossref","first-page":"208","DOI":"10.1016\/j.trb.2014.05.005","volume":"67","author":"L Meng","year":"2014","unstructured":"Meng L, Zhou X (2014) Simultaneous train rerouting and rescheduling on an N-track network: a model reformulation with network-based cumulative flow variables. Transp Res Part B Methodol 67:208\u2013234","journal-title":"Transp Res Part B Methodol"},{"key":"316_CR43","doi-asserted-by":"crossref","first-page":"32","DOI":"10.1002\/net.21625","volume":"67","author":"S Mladenovic","year":"2016","unstructured":"Mladenovic S, Veskovic S, Branovic I, Jankovic S, Acimovic S (2016) Heuristic based real-time train rescheduling system. Networks 67:32\u201348","journal-title":"Networks"},{"key":"316_CR44","doi-asserted-by":"crossref","first-page":"73","DOI":"10.1016\/j.simpat.2012.02.009","volume":"25","author":"A Motraghi","year":"2012","unstructured":"Motraghi A, Marinov MV (2012) Analysis of urban freight by rail using event based simulation. Simul Model Pract Theory 25:73\u201389","journal-title":"Simul Model Pract Theory"},{"key":"316_CR45","doi-asserted-by":"crossref","first-page":"2638","DOI":"10.1016\/j.eswa.2014.11.013","volume":"42","author":"S Narayanaswami","year":"2015","unstructured":"Narayanaswami S, Rangaraj N (2015) A MAS architecture for dynamic, realtime rescheduling and learning applied to railway transportation. Expert Syst Appl 42:2638\u20132656","journal-title":"Expert Syst Appl"},{"key":"316_CR46","volume-title":"Scheduling","author":"M Pinedo","year":"2015","unstructured":"Pinedo M (2015) Scheduling. Springer, Berlin"},{"key":"316_CR47","unstructured":"Ping L, Limin J, Xiong K (2001) Study on GA based train dispatching. In: Proceedings of the 5th world congress on railway research, K\u00f6ln, pp 949\u2013953"},{"key":"316_CR48","volume-title":"System reliability theory: models, statistical methods, and applications","author":"M Rausand","year":"2004","unstructured":"Rausand M, H\u00f8yland A (2004) System reliability theory: models, statistical methods, and applications. Wiley, Hoboken"},{"key":"316_CR49","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1155\/2014\/834927","volume":"2014","author":"M. Rodriguez-Molins","year":"2014","unstructured":"Rodriguez-Molins M, Salido M, Barber F (2014) Robust scheduling for berth allocation and quay crane assignment problem. Math Prob Eng 2014:834927, 17. doi: 10.1155\/2014\/834927","journal-title":"Mathematical Problems in Engineering"},{"key":"316_CR50","doi-asserted-by":"crossref","unstructured":"Sajedinejad, A., Mardani, S., Hasannayebi, E., Mir Mohammadi K, S. & Kabirian, A. Simarail: simulation based optimization software for scheduling railway network. In: Simulation conference (WSC), proceedings of the 2011 Winter. IEEE, pp 3730\u20133741","DOI":"10.1109\/WSC.2011.6148066"},{"key":"316_CR51","first-page":"146","volume":"5","author":"M Sam\u00e0","year":"2015","unstructured":"Sam\u00e0 M, Meloni C, D\u2019Ariano A, Corman F (2015) A multi-criteria decision support methodology for real-time train scheduling. J Rail Transp Plan Manag 5:146\u2013162","journal-title":"J Rail Transp Plan Manag"},{"key":"316_CR52","doi-asserted-by":"crossref","first-page":"89","DOI":"10.1016\/j.trb.2016.01.005","volume":"85","author":"M Sam\u00e0","year":"2016","unstructured":"Sam\u00e0 M, Pellegrini P, D\u2019Ariano A, Rodriguez J, Pacciarelli D (2016) Ant colony optimization for the real-time train routing selection problem. Transp Res Part B Methodol 85:89\u2013108","journal-title":"Transp Res Part B Methodol"},{"key":"316_CR53","doi-asserted-by":"crossref","first-page":"480","DOI":"10.1016\/j.cor.2016.02.008","volume":"78","author":"M Sam\u00e0","year":"2017","unstructured":"Sam\u00e0 M, Corman F, Pacciarelli D (2017a) A variable neighbourhood search for fast train scheduling and routing during disturbed railway traffic situations. Comput Oper Res 78:480\u2013499","journal-title":"Comput Oper Res"},{"key":"316_CR54","doi-asserted-by":"crossref","first-page":"81","DOI":"10.1016\/j.omega.2016.04.003","volume":"67","author":"M Sam\u00e0","year":"2017","unstructured":"Sam\u00e0 M, D\u2019Ariano A, D\u2019Ariano P, Pacciarelli D (2017b) Scheduling models for optimal aircraft traffic control at busy airports: tardiness, priorities, equity and violations considerations. Omega 67:81\u201398","journal-title":"Omega"},{"key":"316_CR55","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1016\/j.trc.2016.12.010","volume":"76","author":"M Sam\u00e0","year":"2017","unstructured":"Sam\u00e0 M, Pellegrini P, D\u2019Ariano A, Rodriguez J, Pacciarelli D (2017c) On the tactical and operational train routing selection problem. Transp Res Part C Emerg Technol 76:1\u201315","journal-title":"Transp Res Part C Emerg Technol"},{"key":"316_CR56","doi-asserted-by":"crossref","first-page":"342","DOI":"10.1016\/j.trb.2006.06.001","volume":"41","author":"J T\u00f6rnquist","year":"2007","unstructured":"T\u00f6rnquist J, Persson JA (2007) N-tracked railway traffic re-scheduling during disturbances. Transp Res Part B Methodol 41:342\u2013362","journal-title":"Transp Res Part B Methodol"},{"key":"316_CR57","doi-asserted-by":"crossref","first-page":"841","DOI":"10.1287\/trsc.2015.0618","volume":"50","author":"LP Veelenturf","year":"2016","unstructured":"Veelenturf LP, Kidd MP, Cacchiani V, Kroon LG, Toth P (2016) A railway timetable rescheduling approach for handling large-scale disruptions. Transp Sci 50:841\u2013862","journal-title":"Transp Sci"},{"key":"316_CR58","doi-asserted-by":"crossref","first-page":"3680","DOI":"10.4028\/www.scientific.net\/AMR.756-759.3680","volume":"756-759","author":"Zi Feng Wang","year":"2013","unstructured":"Wang ZF, Ruan L, Xiao LM (2013) A rescheduling algorithm of train-group for railway emergencies and its parallelization. In: Cai SZ, Zhang QF (eds) Advanced materials research, vol 756. Trans Tech Publications Inc, Zurich, Switzerland, pp 3680\u20133686","journal-title":"Advanced Materials Research"},{"key":"316_CR59","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1155\/2014\/934369","volume":"2014","author":"Li Wang","year":"2014","unstructured":"Wang L, Mo W, Qin Y, Dou F, Jia L (2014) Optimization based high-speed railway train rescheduling with speed restriction. Discret Dyn Nature Soc 2014:934369, 14. doi: 10.1155\/2014\/934369","journal-title":"Discrete Dynamics in Nature and Society"},{"key":"316_CR60","doi-asserted-by":"crossref","first-page":"605","DOI":"10.1007\/s00500-012-0934-1","volume":"17","author":"L Yang","year":"2013","unstructured":"Yang L, Zhou X, Gao Z (2013) Rescheduling trains with scenario-based fuzzy recovery time representation on two-way double-track railways. Soft Comput 17:605\u2013616","journal-title":"Soft Comput"},{"key":"316_CR61","doi-asserted-by":"crossref","first-page":"385","DOI":"10.1016\/S0925-5273(99)00074-2","volume":"64","author":"C-S Yu","year":"2000","unstructured":"Yu C-S, Li H-L (2000) A robust optimization model for stochastic logistic problems. Int J Prod Econ 64:385\u2013397","journal-title":"Int J Prod Econ"},{"key":"316_CR62","doi-asserted-by":"crossref","first-page":"182","DOI":"10.1016\/j.trb.2015.04.001","volume":"78","author":"S Zhan","year":"2015","unstructured":"Zhan S, Kroon LG, Veelenturf LP, Wagenaar JC (2015) Real-time high-speed train rescheduling in case of a complete blockage. Transp Res Part B Methodol 78:182\u2013201","journal-title":"Transp Res Part B Methodol"}],"container-title":["Operational Research"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s12351-017-0316-7.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s12351-017-0316-7\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s12351-017-0316-7.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2023,8,23]],"date-time":"2023-08-23T07:45:57Z","timestamp":1692776757000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s12351-017-0316-7"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2017,4,25]]},"references-count":62,"journal-issue":{"issue":"1","published-print":{"date-parts":[[2020,3]]}},"alternative-id":["316"],"URL":"https:\/\/doi.org\/10.1007\/s12351-017-0316-7","relation":{},"ISSN":["1109-2858","1866-1505"],"issn-type":[{"value":"1109-2858","type":"print"},{"value":"1866-1505","type":"electronic"}],"subject":[],"published":{"date-parts":[[2017,4,25]]},"assertion":[{"value":"16 October 2016","order":1,"name":"received","label":"Received","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"6 April 2017","order":2,"name":"revised","label":"Revised","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"13 April 2017","order":3,"name":"accepted","label":"Accepted","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"25 April 2017","order":4,"name":"first_online","label":"First Online","group":{"name":"ArticleHistory","label":"Article History"}}]}}