{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,10,14]],"date-time":"2025-10-14T10:45:34Z","timestamp":1760438734560},"reference-count":39,"publisher":"Springer Science and Business Media LLC","issue":"3","license":[{"start":{"date-parts":[[2018,3,26]],"date-time":"2018-03-26T00:00:00Z","timestamp":1522022400000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"},{"start":{"date-parts":[[2018,3,26]],"date-time":"2018-03-26T00:00:00Z","timestamp":1522022400000},"content-version":"vor","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Oper Res Int J"],"published-print":{"date-parts":[[2020,9]]},"DOI":"10.1007\/s12351-018-0397-y","type":"journal-article","created":{"date-parts":[[2018,3,26]],"date-time":"2018-03-26T04:55:07Z","timestamp":1522040107000},"page":"1729-1761","update-policy":"http:\/\/dx.doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":11,"title":["Multi-objective optimization of multi-item EOQ model with partial backordering and defective batches and stochastic constraints using MOWCA and MOGWO"],"prefix":"10.1007","volume":"20","author":[{"given":"Soheyl","family":"Khalilpourazari","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Seyed Hamid Reza","family":"Pasandideh","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2018,3,26]]},"reference":[{"key":"397_CR1","doi-asserted-by":"publisher","unstructured":"Balande U, Shrimankar D (2017) An oracle penalty and modified augmented Lagrangian methods\nwith firefly algorithm for constrained optimization problems. Oper Res Int J 1\u201326. \n                  https:\/\/doi.org\/10.1007\/s12351-017-0346-1","DOI":"10.1007\/s12351-017-0346-1"},{"issue":"2","key":"397_CR2","doi-asserted-by":"publisher","first-page":"260","DOI":"10.1007\/s12597-016-0283-4","volume":"54","author":"AK Bera","year":"2017","unstructured":"Bera AK, Jana DK (2017) Multi-item imperfect production inventory model in Bi-fuzzy environments. OPSEARCH 54(2):260\u2013282","journal-title":"OPSEARCH"},{"key":"397_CR3","doi-asserted-by":"publisher","first-page":"1105","DOI":"10.1016\/j.cie.2009.04.020","volume":"57","author":"LE C\u00e1rdenas-Barr\u00f3n","year":"2009","unstructured":"C\u00e1rdenas-Barr\u00f3n LE (2009) Economic production quantity with rework process at a single-stage manufacturing system with planned backorders. Comput Ind Eng 57:1105\u20131113","journal-title":"Comput Ind Eng"},{"issue":"7","key":"397_CR4","doi-asserted-by":"publisher","first-page":"588","DOI":"10.1080\/09537280310001626179","volume":"14","author":"WM Chan","year":"2003","unstructured":"Chan WM, Ibrahim RN, Lochert PB (2003) A new EPQ model: integrating lower pricing, rework and reject situations. Prod Plann Control 14(7):588\u2013595","journal-title":"Prod Plann Control"},{"key":"397_CR5","doi-asserted-by":"publisher","unstructured":"Cheng MC, Hsieh TP, Lee HM, Ouyang LY (2017) Optimal ordering policies for deteriorating items with a return period and price-dependent demand under two-phase advance sales. Oper Res Int J 1\u201320. \n                  https:\/\/doi.org\/10.1007\/s12351-017-0359-9","DOI":"10.1007\/s12351-017-0359-9"},{"issue":"4","key":"397_CR6","doi-asserted-by":"publisher","first-page":"427","DOI":"10.1080\/03052150310001597783","volume":"35","author":"YP Chiu","year":"2003","unstructured":"Chiu YP (2003) Determining the optimal lot size for the finite production model with random defective rate, the rework process, and backlogging. Eng Optim 35(4):427\u2013437","journal-title":"Eng Optim"},{"issue":"1","key":"397_CR7","doi-asserted-by":"publisher","first-page":"59","DOI":"10.1007\/s11135-005-5356-z","volume":"40","author":"KJ Chung","year":"2006","unstructured":"Chung KJ, Huang YF (2006) Retailer\u2019s optimal cycle times in the EOQ model with imperfect quality and a permissible credit period. Qual Quant 40(1):59\u201377","journal-title":"Qual Quant"},{"key":"397_CR8","doi-asserted-by":"publisher","first-page":"544","DOI":"10.1016\/j.ijpe.2006.06.015","volume":"106","author":"A Eroglu","year":"2007","unstructured":"Eroglu A, Ozdemir G (2007) An economic order quantity model with defective items and shortages. Int J Prod Econ 106:544\u2013549","journal-title":"Int J Prod Econ"},{"key":"397_CR9","doi-asserted-by":"publisher","unstructured":"Fazli-Khalaf M, Khalilpourazari S, Mohammadi M (2017) Mixed robust possibilistic flexible chance constraint optimization model for emergency blood supply chain network design. Ann Oper Res 1\u201331. \n                  https:\/\/doi.org\/10.1007\/s10479-017-2729-3","DOI":"10.1007\/s10479-017-2729-3"},{"key":"397_CR10","doi-asserted-by":"publisher","first-page":"162","DOI":"10.1016\/j.ijpe.2012.12.025","volume":"143","author":"JT Hsu","year":"2013","unstructured":"Hsu JT, Hsu LF (2013) An EOQ model with imperfect quality items, inspection errors, shortage backordering, and sales returns. Int J Prod Econ 143:162\u2013170","journal-title":"Int J Prod Econ"},{"key":"397_CR11","doi-asserted-by":"publisher","first-page":"852","DOI":"10.1080\/00207721.2014.906768","volume":"47","author":"LF Hsu","year":"2014","unstructured":"Hsu LF, Hsu JT (2014) Economic production quantity (EPQ) models under an imperfect production process with shortages backordered. Int J Syst Sci 47:852\u2013867","journal-title":"Int J Syst Sci"},{"key":"397_CR12","doi-asserted-by":"publisher","unstructured":"Khalilpourazari S, Khalilpourazary S (2016) Optimization of production time in the multi-pass milling process via a Robust Grey Wolf Optimizer. Neural Comput Appl 1\u201316. \n                  https:\/\/doi.org\/10.1007\/s00521-016-2644-6","DOI":"10.1007\/s00521-016-2644-6"},{"issue":"5","key":"397_CR13","doi-asserted-by":"publisher","first-page":"878","DOI":"10.1080\/0305215X.2016.1214437","volume":"49","author":"S Khalilpourazari","year":"2017","unstructured":"Khalilpourazari S, Khalilpourazary S (2017a) A lexicographic weighted Tchebycheff approach for multi-constrained multi-objective optimization of the surface grinding process. Eng Optim 49(5):878\u2013895","journal-title":"Eng Optim"},{"key":"397_CR14","doi-asserted-by":"publisher","unstructured":"Khalilpourazari S, Khalilpourazary S (2017b) An efficient hybrid algorithm based on water cycle and moth-flame optimization algorithms for solving numerical and constrained engineering optimization problems. Soft Comput 1\u201324. \n                  https:\/\/doi.org\/10.1007\/s00500-017-2894-y","DOI":"10.1007\/s00500-017-2894-y"},{"key":"397_CR15","doi-asserted-by":"publisher","first-page":"173","DOI":"10.1016\/j.swevo.2017.07.008","volume":"38","author":"S Khalilpourazari","year":"2018","unstructured":"Khalilpourazari S, Khalilpourazary S (2018) A Robust Stochastic Fractal Search approach for optimization of the surface grinding process. Swarm Evol Comput 38:173\u2013186","journal-title":"Swarm Evol Comput"},{"key":"397_CR16","doi-asserted-by":"publisher","unstructured":"Khalilpourazari S, Khamseh AA (2017) Bi-objective emergency blood supply chain network design in earthquake considering earthquake magnitude: a comprehensive study with real world application. Ann Oper Res 1\u201339. \n                  https:\/\/doi.org\/10.1007\/s10479-017-2588-y","DOI":"10.1007\/s10479-017-2588-y"},{"key":"397_CR17","doi-asserted-by":"crossref","unstructured":"Khalilpourazari S, Mohammadi M (2016) Optimization of closed-loop Supply chain network design: a water cycle algorithm approach. In: 12th International conference on industrial engineering (ICIE), pp 41\u201345","DOI":"10.1109\/INDUSENG.2016.7519347"},{"key":"397_CR18","doi-asserted-by":"crossref","unstructured":"Khalilpourazari S, Pasandideh SHR (2016) Bi-objective optimization of multi-product EPQ model with backorders, rework process and random defective rate. In: 12th international conference on industrial engineering (ICIE), pp 36\u201340","DOI":"10.1109\/INDUSENG.2016.7519346"},{"issue":"1","key":"397_CR19","first-page":"42","volume":"34","author":"S Khalilpourazari","year":"2017","unstructured":"Khalilpourazari S, Pasandideh SHR (2017) Multi-item EOQ model with nonlinear unit holding cost and partial backordering: moth-flame optimization algorithm. J Ind Prod Eng 34(1):42\u201351","journal-title":"J Ind Prod Eng"},{"key":"397_CR20","doi-asserted-by":"publisher","first-page":"770","DOI":"10.1016\/j.asoc.2016.08.054","volume":"49","author":"S Khalilpourazari","year":"2016","unstructured":"Khalilpourazari S, Pasandideh SHR, Niaki STA (2016) Optimization of multi-product economic production quantity model with partial backordering and physical constraints: sQP, SFS, SA, and WCA. Appl Soft Comput 49:770\u2013791","journal-title":"Appl Soft Comput"},{"issue":"1","key":"397_CR21","doi-asserted-by":"publisher","first-page":"87","DOI":"10.1016\/j.ijpe.2009.10.011","volume":"124","author":"M Khan","year":"2010","unstructured":"Khan M, Jaber MY, Wahab MJM (2010) Economic order quantity for items with imperfect quality with learning in inspection. Int J Prod Econ 124(1):87\u201396","journal-title":"Int J Prod Econ"},{"issue":"2","key":"397_CR22","doi-asserted-by":"publisher","first-page":"808","DOI":"10.1016\/j.ijpe.2007.07.003","volume":"112","author":"B Maddah","year":"2008","unstructured":"Maddah B, Jaber MY (2008) Economic order quantity for items with imperfect quality: revisited. Int J Prod Econ 112(2):808\u2013815","journal-title":"Int J Prod Econ"},{"key":"397_CR23","doi-asserted-by":"publisher","first-page":"106","DOI":"10.1016\/j.eswa.2015.10.039","volume":"47","author":"S Mirjalili","year":"2016","unstructured":"Mirjalili S, Saremi S, Mirjalili SM, Coelho LS (2016) Multi-objective grey wolf optimizer: a novel algorithm for multi-criterion optimization. Expert Syst Appl 47:106\u2013119","journal-title":"Expert Syst Appl"},{"key":"397_CR24","doi-asserted-by":"crossref","unstructured":"Mohammadi M, Khalilpourazari S (2017) Minimizing makespan in a single machine scheduling problem with deteriorating jobs and learning effects. In: Proceedings of the 6th international conference on software and computer applications. ACM, pp 310\u2013315","DOI":"10.1145\/3056662.3056715"},{"key":"397_CR25","doi-asserted-by":"publisher","unstructured":"Mokhtari H, Rezvan MT (2017) A single-supplier, multi-buyer, multi-product VMI production-inventory system under partial backordering. Oper Res Int J 1\u201321. \n                  https:\/\/doi.org\/10.1007\/s12351-017-0311-z","DOI":"10.1007\/s12351-017-0311-z"},{"key":"397_CR26","doi-asserted-by":"publisher","unstructured":"Nobil AH, Sedigh AHA, C\u00e1rdenas-Barr\u00f3n LE (2017) A multiproduct single machine economic production quantity (EPQ) inventory model with discrete delivery order, joint production policy and budget constraints. Ann Oper Res 1\u201337. \n                  https:\/\/doi.org\/10.1007\/s10479-017-2650-9","DOI":"10.1007\/s10479-017-2650-9"},{"key":"397_CR27","unstructured":"Pasandideh SHR, Khalilpourazari S (2018) Sine cosine crow search algorithm: a powerful hybrid meta heuristic for global optimization. Cornell Univer Library 1\u201315. \n                  arXiv:1801.08485"},{"issue":"5","key":"397_CR28","doi-asserted-by":"publisher","first-page":"2615","DOI":"10.1016\/j.eswa.2014.11.018","volume":"42","author":"SHR Pasandideh","year":"2015","unstructured":"Pasandideh SHR, Niaki STA, Asadi K (2015a) Optimizing a bi-objective multi-product multi-period three echelon supply chain network with warehouse reliability. Expert Syst Appl 42(5):2615\u20132623","journal-title":"Expert Syst Appl"},{"key":"397_CR29","doi-asserted-by":"publisher","first-page":"98","DOI":"10.1016\/j.knosys.2015.04.001","volume":"84","author":"SHR Pasandideh","year":"2015","unstructured":"Pasandideh SHR, Niaki STA, Gharaei A (2015b) Optimization of a multiproduct economic production quantity problem with stochastic constraints using sequential quadratic programming. Knowl Based Syst 84:98\u2013107","journal-title":"Knowl Based Syst"},{"key":"397_CR30","doi-asserted-by":"publisher","first-page":"279","DOI":"10.1016\/j.asoc.2014.10.042","volume":"27","author":"A Sadollah","year":"2015","unstructured":"Sadollah A, Eskandar H, Kim JH (2015) Water cycle algorithm for solving constrained multi-objective optimization problems. Appl Soft Comput 27:279\u2013298","journal-title":"Appl Soft Comput"},{"issue":"1\u20133","key":"397_CR31","doi-asserted-by":"publisher","first-page":"59","DOI":"10.1016\/S0925-5273(99)00044-4","volume":"64","author":"MK Salameh","year":"2000","unstructured":"Salameh MK, Jaber MY (2000) Economic production quantity model for items with imperfect quality. Int J Prod Econ 64(1\u20133):59\u201364","journal-title":"Int J Prod Econ"},{"issue":"9","key":"397_CR32","doi-asserted-by":"publisher","first-page":"2600","DOI":"10.1080\/00207543.2015.1110634","volume":"54","author":"H Salehi","year":"2016","unstructured":"Salehi H, Taleizadeh AA, Tavakkoli-Moghaddam R (2016) An EOQ model with random disruption and partial backordering. Int J Prod Res 54(9):2600\u20132609","journal-title":"Int J Prod Res"},{"key":"397_CR33","doi-asserted-by":"publisher","first-page":"148","DOI":"10.1016\/j.ijpe.2013.11.017","volume":"155","author":"K Skouri","year":"2014","unstructured":"Skouri K, Konstantaras I, Lagodimos AG, Papachristos S (2014) An EOQ model with backorders and rejection of defective supply batches. Int J Prod Econ 155:148\u2013154","journal-title":"Int J Prod Econ"},{"issue":"1","key":"397_CR34","doi-asserted-by":"publisher","first-page":"89","DOI":"10.1007\/s12351-015-0188-7","volume":"16","author":"AA Taleizadeh","year":"2016","unstructured":"Taleizadeh AA, Noori-daryan M (2016) Pricing, inventory and production policies in a supply chain of pharmacological products with rework process: a game theoretic approach. Oper Res Int J 16(1):89\u2013115","journal-title":"Oper Res Int J"},{"key":"397_CR35","unstructured":"Taleizadeh AA, Sari-Khanbaglo MP, C\u00e1rdenas-Barr\u00f3n LE (2017) Outsourcing rework of imperfect items in the economic production quantity (EPQ) inventory model with backordered demand. IEEE Trans Syst Man Cybern Syst 1\u201312"},{"issue":"2","key":"397_CR36","doi-asserted-by":"publisher","first-page":"133","DOI":"10.1007\/s12351-009-0066-2","volume":"10","author":"A Thangam","year":"2010","unstructured":"Thangam A, Uthayakumar R (2010) Optimal pricing and lot-sizing policy for a two-warehouse supply chain system with perishable items under partial trade credit financing. Oper Res Int J 10(2):133\u2013161","journal-title":"Oper Res Int J"},{"key":"397_CR37","doi-asserted-by":"publisher","unstructured":"Wang GG, Deb S, Zhao X, Cui Z (2016) A new monarch butterfly optimization with an improved crossover operator. Oper Res Int J 1\u201325. \n                  https:\/\/doi.org\/10.1007\/s12351-016-0251-z","DOI":"10.1007\/s12351-016-0251-z"},{"issue":"1","key":"397_CR38","doi-asserted-by":"publisher","first-page":"7","DOI":"10.1016\/j.omega.2005.01.019","volume":"35","author":"HM Wee","year":"2007","unstructured":"Wee HM, Yu J, Chen MC (2007) Optimal inventory model for items with imperfect quality and shortage backordering. Omega 35(1):7\u201311","journal-title":"Omega"},{"key":"397_CR39","doi-asserted-by":"publisher","first-page":"345","DOI":"10.1016\/j.ijpe.2011.08.010","volume":"135","author":"A Yassine","year":"2012","unstructured":"Yassine A, Maddah B, Salameh M (2012) Disaggregation and consolidation of imperfect quality shipments in an extended EPQ model. Int J Prod Econ 135:345\u2013352","journal-title":"Int J Prod Econ"}],"container-title":["Operational Research"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s12351-018-0397-y.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s12351-018-0397-y\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s12351-018-0397-y.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2020,7,28]],"date-time":"2020-07-28T08:27:32Z","timestamp":1595924852000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s12351-018-0397-y"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2018,3,26]]},"references-count":39,"journal-issue":{"issue":"3","published-print":{"date-parts":[[2020,9]]}},"alternative-id":["397"],"URL":"https:\/\/doi.org\/10.1007\/s12351-018-0397-y","relation":{},"ISSN":["1109-2858","1866-1505"],"issn-type":[{"value":"1109-2858","type":"print"},{"value":"1866-1505","type":"electronic"}],"subject":[],"published":{"date-parts":[[2018,3,26]]},"assertion":[{"value":"3 March 2017","order":1,"name":"received","label":"Received","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"21 March 2018","order":2,"name":"accepted","label":"Accepted","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"26 March 2018","order":3,"name":"first_online","label":"First Online","group":{"name":"ArticleHistory","label":"Article History"}}]}}