{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,9,15]],"date-time":"2024-09-15T15:37:02Z","timestamp":1726414622285},"reference-count":60,"publisher":"Springer Science and Business Media LLC","issue":"4","license":[{"start":{"date-parts":[[2018,8,23]],"date-time":"2018-08-23T00:00:00Z","timestamp":1534982400000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"},{"start":{"date-parts":[[2018,8,23]],"date-time":"2018-08-23T00:00:00Z","timestamp":1534982400000},"content-version":"vor","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Oper Res Int J"],"published-print":{"date-parts":[[2020,12]]},"DOI":"10.1007\/s12351-018-0421-2","type":"journal-article","created":{"date-parts":[[2018,8,23]],"date-time":"2018-08-23T12:51:29Z","timestamp":1535028689000},"page":"2397-2425","update-policy":"http:\/\/dx.doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":4,"title":["Vehicle routing problem in a kanban controlled supply chain system considering cross-docking strategy"],"prefix":"10.1007","volume":"20","author":[{"given":"Asefeh","family":"Hasani Goodarzi","sequence":"first","affiliation":[]},{"given":"Seyed Hessameddin","family":"Zegordi","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2018,8,23]]},"reference":[{"issue":"9","key":"421_CR1","doi-asserted-by":"crossref","first-page":"1177","DOI":"10.1007\/s00170-012-3973-y","volume":"63","author":"M Aghajani","year":"2012","unstructured":"Aghajani M, Keramati A, Javadi B (2012) Determination of number of kanban in a cellular manufacturing system with considering rework process. Int J Adv Manuf Technol 63(9):1177\u20131189","journal-title":"Int J Adv Manuf Technol"},{"issue":"17","key":"421_CR3","doi-asserted-by":"crossref","first-page":"3859","DOI":"10.1080\/002075499189808","volume":"37","author":"MS Akturk","year":"1999","unstructured":"Akturk MS, Erhun F (1999) An overview of design and operational issues of kanban systems. Int J Prod Res 37(17):3859\u20133881","journal-title":"Int J Prod Res"},{"issue":"8","key":"421_CR4","doi-asserted-by":"crossref","first-page":"907","DOI":"10.1057\/palgrave.jors.2601395","volume":"53","author":"C Alabas","year":"2002","unstructured":"Alabas C, Altiparmak F, Dengiz B (2002) A comparison of the performance of artificial intelligence techniques for optimizing the number of Kanbans. J Oper Res Soc 53(8):907\u2013914","journal-title":"J Oper Res Soc"},{"key":"421_CR5","unstructured":"Arbulu R, Ballard G, Harper N (2003) Kanban in construction. In: 11th annual conference of the international group for lean construction, Virginia, USA"},{"issue":"6","key":"421_CR6","doi-asserted-by":"crossref","first-page":"3129","DOI":"10.1016\/j.eswa.2014.11.052","volume":"42","author":"LS Belis\u00e1rio","year":"2015","unstructured":"Belis\u00e1rio LS, Pierreval H (2015) Using genetic programming and simulation to learn how to dynamically adapt the number of cards in reactive pull systems. Expert Syst Appl 42(6):3129\u20133141","journal-title":"Expert Syst Appl"},{"key":"421_CR7","doi-asserted-by":"crossref","first-page":"146","DOI":"10.1016\/S0924-0136(01)01022-6","volume":"116","author":"FTS Chan","year":"2001","unstructured":"Chan FTS (2001) Effect of kanban size on just-in-time manufacturing systems. J Mater Process Technol 116:146\u2013160","journal-title":"J Mater Process Technol"},{"key":"421_CR8","unstructured":"Chuah KH (2004) Optimization and simulation of just-in-time supply pickup and delivery systems. University of Kentucky Doctoral Dissertations, p 384"},{"issue":"2","key":"421_CR9","doi-asserted-by":"crossref","first-page":"568","DOI":"10.1080\/00207543.2012.656331","volume":"51","author":"DD Ciemnoczolowski","year":"2013","unstructured":"Ciemnoczolowski DD, Bozer YA (2013) Performance evaluation of small-batch container delivery systems used in lean manufacturing\u2014part 2: number of Kanban and workstation starvation. Int J Prod Res 51(2):568\u2013581","journal-title":"Int J Prod Res"},{"issue":"5","key":"421_CR10","first-page":"409","volume":"29","author":"C Co Henry","year":"1997","unstructured":"Co Henry C, Sharafali M (1997) Overlapping factor in Toyota\u2019s formula for computing the number of Kanbans. IIE Trans 29(5):409\u2013415","journal-title":"IIE Trans"},{"issue":"1","key":"421_CR11","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1287\/trsc.2013.0472","volume":"48","author":"LC Coelho","year":"2013","unstructured":"Coelho LC, Cordeau JF, Laporte G (2013) Thirty years of inventory-routing. Trans Sci 48(1):1\u201319","journal-title":"Trans Sci"},{"key":"421_CR12","unstructured":"Ebrahimi DS, David P, Alpan G (2012) A model based specification for a decision support tool for supply chain risk management. In: CIE42 Proceedings, Cape Town, South Africa 2012 CIE & SAIIE"},{"issue":"10","key":"421_CR13","doi-asserted-by":"crossref","first-page":"2997","DOI":"10.1080\/00207543.2012.751516","volume":"5","author":"M Faccio","year":"2013","unstructured":"Faccio M, Gamberi M, Persona A (2013a) Kanban number optimisation in a supermarket warehouse feeding a mixed-model assembly system. Int J Prod Res 5(10):2997\u20133017","journal-title":"Int J Prod Res"},{"issue":"2","key":"421_CR14","doi-asserted-by":"crossref","first-page":"187","DOI":"10.1007\/s00187-013-0175-1","volume":"24","author":"M Faccio","year":"2013","unstructured":"Faccio M, Gamberi M, Persona A, Regattieri A, Sgarbossa F (2013b) Design and simulation of assembly line feeding systems in the automotive sector using supermarket, kanbans and tow trains: a general framework. J Manag Control 24(2):187\u2013208","journal-title":"J Manag Control"},{"key":"421_CR15","doi-asserted-by":"crossref","first-page":"5","DOI":"10.1007\/s10845-011-0534-4","volume":"23","author":"PL Gonz\u00e1lez-R","year":"2012","unstructured":"Gonz\u00e1lez-R PL, Framinan JM, Pierreval H (2012) Token-based pull production control systems: an introductory overview. J Intell Manuf 23:5\u201322","journal-title":"J Intell Manuf"},{"key":"421_CR16","first-page":"629","volume-title":"Handbooks in OR & MS","author":"H Groenevelt","year":"1993","unstructured":"Groenevelt H (1993) The just-in-time system. In: Graves SC, Rinnooy Kan AHG, Zipkin PH (eds) Handbooks in OR & MS, vol 4. Elsevier, Amsterdam, pp 629\u2013670"},{"key":"421_CR17","unstructured":"Guerra L, Murino T, Romano E (2010) A system dynamics model for a single-stage multi-product kanban production system. In: ICAI\u201910 proceedings of the 11th WSEAS international conference on Automation & information, pp 171\u2013176"},{"issue":"2","key":"421_CR18","doi-asserted-by":"crossref","first-page":"117","DOI":"10.1016\/0167-188X(89)90030-X","volume":"18","author":"YP Gupta","year":"1989","unstructured":"Gupta YP, Gupta M (1989) A system dynamics model of a JIT-kanban system. Eng Costs Prod Econ 18(2):117\u2013130","journal-title":"Eng Costs Prod Econ"},{"issue":"2","key":"421_CR19","doi-asserted-by":"crossref","first-page":"260","DOI":"10.1016\/S0377-2217(99)00155-1","volume":"120","author":"YT Herer","year":"2000","unstructured":"Herer YT, Shalom L (2000) The Kanban assignment problem\u2013A non-integral approach. Eur J Oper Res 120(2):260\u2013276","journal-title":"Eur J Oper Res"},{"key":"421_CR20","doi-asserted-by":"crossref","first-page":"567","DOI":"10.1016\/j.jmsy.2014.05.004","volume":"33","author":"SD Hosseini","year":"2014","unstructured":"Hosseini SD, Akbarpour Shirazi M, Karimi B (2014) Cross-docking and milk run logistics in a consolidation network: a hybrid of harmony search and simulated annealing approach. J Manuf Syst 33:567\u2013577","journal-title":"J Manuf Syst"},{"key":"421_CR21","doi-asserted-by":"crossref","first-page":"5912","DOI":"10.1016\/j.eswa.2010.11.032","volume":"38","author":"TH Hou","year":"2011","unstructured":"Hou TH, Hu WC (2011) An integrated MOGA approach to determine the Pareto-optimal kanban number and size for a JIT system. Expert Syst Appl 38:5912\u20135918","journal-title":"Expert Syst Appl"},{"issue":"3","key":"421_CR22","doi-asserted-by":"crossref","first-page":"169","DOI":"10.1080\/095119296131643","volume":"9","author":"CC Huang","year":"1996","unstructured":"Huang CC, Kusiak A (1996) Overview of Kanban systems. Int J Comput Integr Manuf 9(3):169\u2013189","journal-title":"Int J Comput Integr Manuf"},{"key":"421_CR23","doi-asserted-by":"publisher","DOI":"10.1080\/00207543.2017.1380325","author":"Y Jaegler","year":"2017","unstructured":"Jaegler Y, Jaegler A, Burlat P, Lamouri S, Trentesaux D (2017) The ConWip production control system: a systematic review and classification. Int J Prod Res. \nhttps:\/\/doi.org\/10.1080\/00207543.2017.1380325","journal-title":"Int J Prod Res"},{"issue":"2","key":"421_CR24","first-page":"275","volume":"28","author":"FF Jahantigh","year":"2018","unstructured":"Jahantigh FF, Noroozian A, Daneshi A (2018) Using the knowledge base and fuzzy inference system to estimate the safety factor in calculating the number of the kanban card. Int J Ind Syst Eng 28(2):275\u2013287","journal-title":"Int J Ind Syst Eng"},{"key":"421_CR25","doi-asserted-by":"crossref","first-page":"13","DOI":"10.1016\/j.ijpe.2010.01.009","volume":"125","author":"ML Junior","year":"2010","unstructured":"Junior ML, Filho MG (2010) Variations of the kanban system: literature review and classification. Int J Prod Econ 125:13\u201321","journal-title":"Int J Prod Econ"},{"key":"421_CR26","doi-asserted-by":"crossref","first-page":"155","DOI":"10.1016\/j.jtrangeo.2007.06.001","volume":"16","author":"J Kaneko","year":"2008","unstructured":"Kaneko J, Nojiri W (2008) The logistics of just-in-time between parts suppliers and car assemblers in Japan. J Transp Geogr 16:155\u2013173","journal-title":"J Transp Geogr"},{"issue":"24","key":"421_CR27","doi-asserted-by":"crossref","first-page":"5789","DOI":"10.1080\/00207540601096940","volume":"45","author":"S Kotani","year":"2007","unstructured":"Kotani S (2007) Optimal Method for Changing the Number of Kanbans in the E -Kanban System and Its Applications. Int J Prod Res 45(24):5789\u20135809","journal-title":"Int J Prod Res"},{"issue":"7","key":"421_CR28","first-page":"613","volume":"34","author":"GN Krieg","year":"2002","unstructured":"Krieg GN, Kuhn H (2002) A decomposition method for multiproduct kanban systems with setup times and lost sales. IIE Trans 34(7):613\u2013625","journal-title":"IIE Trans"},{"issue":"1","key":"421_CR29","first-page":"265","volume":"138","author":"CL Lai","year":"2003","unstructured":"Lai CL, Lee WB, Ip WH (2003) A study of system dynamics in just-in-time logistics. J Mater Process Technol 138(1):265\u2013269","journal-title":"J Mater Process Technol"},{"issue":"21","key":"421_CR30","doi-asserted-by":"crossref","first-page":"6037","DOI":"10.1080\/00207540802192134","volume":"47","author":"Q Liu","year":"2009","unstructured":"Liu Q, Huang D (2009) Dynamic card number adjusting strategy in card-based production system. Int J Prod Res 47(21):6037\u20136050","journal-title":"Int J Prod Res"},{"issue":"14","key":"421_CR31","doi-asserted-by":"crossref","first-page":"4228","DOI":"10.1080\/00207543.2015.1117675","volume":"54","author":"F Lolli","year":"2016","unstructured":"Lolli F, Gamberini R, Giberti C, Rimini B, Bondi F (2016) A Simulative Approach for Evaluating Alternative Feeding Scenarios in a Kanban System. Int J Prod Res 54(14):4228\u20134239","journal-title":"Int J Prod Res"},{"issue":"2","key":"421_CR32","doi-asserted-by":"crossref","first-page":"310","DOI":"10.1016\/j.ejor.2003.09.035","volume":"166","author":"A Matta","year":"2005","unstructured":"Matta A, Dallery Y, Mascolo MD (2005) Analysis of assembly systems controlled with kanbans. Eur J Oper Res 166(2):310\u2013336","journal-title":"Eur J Oper Res"},{"issue":"8","key":"421_CR33","doi-asserted-by":"crossref","first-page":"1605","DOI":"10.1080\/00207548808947973","volume":"26","author":"S Miyazaki","year":"1988","unstructured":"Miyazaki S, Ohta H, Nishiyama N (1988) The optimal operation planning of kanban to minimize the total operation cost. Int J Product Res 26(8):1605\u20131611","journal-title":"Int J Product Res"},{"issue":"2","key":"421_CR34","doi-asserted-by":"crossref","first-page":"653","DOI":"10.1016\/j.ijpe.2005.05.025","volume":"104","author":"SM Moattar Husseini","year":"2006","unstructured":"Moattar Husseini SM, O\u2019Brien C, Hosseini ST (2006) A method to enhance volume flexibility in JIT production control. Int J Prod Econ 104(2):653\u2013665","journal-title":"Int J Prod Econ"},{"key":"421_CR35","volume-title":"The Toyota production system","author":"Y Monden","year":"1983","unstructured":"Monden Y (1983) The Toyota production system. Industrial Engineering and Management Press, Norcross"},{"key":"421_CR36","doi-asserted-by":"crossref","first-page":"1721","DOI":"10.1016\/j.proeng.2012.07.374","volume":"41","author":"A Naufal","year":"2012","unstructured":"Naufal A, Jaffar A, Yusoff N, Hayati N (2012) Development of kanban system at local manufacturing company in Malaysia\u2014case study. Procedia Eng 41:1721\u20131726","journal-title":"Procedia Eng"},{"key":"421_CR37","doi-asserted-by":"crossref","first-page":"930","DOI":"10.1057\/jors.1996.118","volume":"47","author":"VS Nori","year":"1996","unstructured":"Nori VS, Sarker BR (1996) Cyclic scheduling for a multi-product, single-facility production system operating under a just-in-time delivery policy. J Oper Res Soc 47:930\u2013935","journal-title":"J Oper Res Soc"},{"key":"421_CR38","doi-asserted-by":"crossref","first-page":"60","DOI":"10.1080\/095372898234523","volume":"9","author":"VS Nori","year":"1998","unstructured":"Nori VS, Sarker BR (1998) Optimum number of kanbans between two adjacent stations. Prod Plan Control 9:60\u201365","journal-title":"Prod Plan Control"},{"key":"421_CR39","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1016\/0377-2217(94)90182-1","volume":"75","author":"W Price","year":"1994","unstructured":"Price W, Gravel M, Nsakanda AL (1994) Review of optimization models of kanban-based production systems. Eur J Oper Res 75:1\u201312","journal-title":"Eur J Oper Res"},{"key":"421_CR40","doi-asserted-by":"crossref","first-page":"431","DOI":"10.1016\/j.advengsoft.2008.07.001","volume":"40","author":"M Rabbani","year":"2009","unstructured":"Rabbani M, Layegh J, Mohammad Ebrahim R (2009) Determination of number of kanbans in a supply chain system via Memetic algorithm. Adv Eng Softw 40:431\u2013437","journal-title":"Adv Eng Softw"},{"issue":"2","key":"421_CR41","first-page":"188","volume":"20","author":"P Renna","year":"2015","unstructured":"Renna P (2015) A fuzzy control system to adjust the number of cards in a CONWIP-based manufacturing system. Int J Serv Oper Manag 20(2):188\u2013206","journal-title":"Int J Serv Oper Manag"},{"issue":"9","key":"421_CR42","doi-asserted-by":"crossref","first-page":"881","DOI":"10.1080\/0951192X.2013.799783","volume":"26","author":"P Renna","year":"2013","unstructured":"Renna P, Magrino L, Zaffina R (2013) Dynamic card control strategy in pull manufacturing systems. Int J Comput Integr Manuf 26(9):881\u2013894","journal-title":"Int J Comput Integr Manuf"},{"key":"421_CR43","doi-asserted-by":"crossref","unstructured":"Roser C, Meier H, Nakano M (2017) Relationship between variants and inventory under consideration of the replenishment time. Published by Springer International Publishing AG 2017, Part II, IFIP AICT, vol 514, pp 382\u2013389","DOI":"10.1007\/978-3-319-66926-7_44"},{"key":"421_CR44","volume-title":"Proceedings of the 19th international conference on computers and industrial","author":"BR Sarker","year":"1996","unstructured":"Sarker BR, Balan CV (1996) Operations planning for kanbans between two adjacent workstations. In: Randhawa Sabah U (ed) Proceedings of the 19th international conference on computers and industrial. Elsevier Science Ltd., Miami"},{"issue":"2","key":"421_CR45","doi-asserted-by":"crossref","first-page":"357","DOI":"10.1080\/002075498193787","volume":"36","author":"BR Sarker","year":"1998","unstructured":"Sarker BR, Balan CV (1998) Operations planning for a single-stage kanban system operating under linear demand. Int J Prod Res 36(2):357\u2013375","journal-title":"Int J Prod Res"},{"key":"421_CR46","doi-asserted-by":"crossref","first-page":"284","DOI":"10.1016\/S0377-2217(97)00432-3","volume":"112","author":"BR Sarker","year":"1999","unstructured":"Sarker BR, Balan CV (1999) Operations planning for a multi-stage kanban system. Eur J Oper Res 112:284\u2013303","journal-title":"Eur J Oper Res"},{"key":"421_CR47","doi-asserted-by":"crossref","first-page":"227","DOI":"10.1016\/S0925-5273(96)00107-7","volume":"48","author":"BR Sarker","year":"1996","unstructured":"Sarker BR, Mukherjee S, Balan CV (1996) An order-level lot size inventory model with inventory-level dependent demand and deterioration. Int J Prod Econ 48:227\u2013236","journal-title":"Int J Prod Econ"},{"key":"421_CR48","doi-asserted-by":"crossref","first-page":"355","DOI":"10.1016\/S0360-8352(01)00060-2","volume":"41","author":"P Shahabudeen","year":"2002","unstructured":"Shahabudeen P, Gopinath R, Krishnaiah K (2002) Design of bi-criteria Kanban system using simulates annealing technique. Comput Ind Eng 41:355\u2013370","journal-title":"Comput Ind Eng"},{"issue":"6","key":"421_CR49","doi-asserted-by":"crossref","first-page":"553","DOI":"10.1080\/00207547708943149","volume":"15","author":"Y Sugimori","year":"1977","unstructured":"Sugimori Y, Kusunoki K, Oho F, Uchikawa S (1977) Toyota production system and kanban system materialization of just-in-time and respect-for-human system. Int J Prod Res 15(6):553\u2013564","journal-title":"Int J Prod Res"},{"key":"421_CR50","doi-asserted-by":"crossref","first-page":"15","DOI":"10.5267\/j.uscm.2013.10.006","volume":"2","author":"I Sultana","year":"2014","unstructured":"Sultana I, Ahmed I (2014) A state of art review on optimization techniques in just in time. Uncertain Supply Chain Manag 2:15\u201326","journal-title":"Uncertain Supply Chain Manag"},{"key":"421_CR51","doi-asserted-by":"crossref","first-page":"411","DOI":"10.1016\/S0377-2217(00)00119-3","volume":"132","author":"V Tardif","year":"2001","unstructured":"Tardif V, Maaseidvaag L (2001) An adaptive approach to controlling kanban systems. Eur J Oper Res 132:411\u2013424","journal-title":"Eur J Oper Res"},{"issue":"2","key":"421_CR52","first-page":"119","volume":"3","author":"R Tavakkoli-Moghaddam","year":"2008","unstructured":"Tavakkoli-Moghaddam R, Gholipour-Kanani Y, Cheraghalizadeh R (2008) A genetic algorithm and memetic algorithm to sequencing and scheduling of cellular manufacturing systems. Int J Manag Sci Eng Manag 3(2):119\u2013130","journal-title":"Int J Manag Sci Eng Manag"},{"key":"421_CR53","doi-asserted-by":"publisher","DOI":"10.1080\/00207543.2018.1425018","author":"M Th\u00fcrer","year":"2018","unstructured":"Th\u00fcrer M, Fernandes NO, Stevenson M, Qu T, Li CD (2018) Centralised vs. decentralised control decision in card-based control systems: comparing kanban systems and COBACABANA. Int J Prod Res. \nhttps:\/\/doi.org\/10.1080\/00207543.2018.1425018","journal-title":"Int J Prod Res"},{"key":"421_CR55","doi-asserted-by":"crossref","first-page":"153","DOI":"10.1016\/j.ejor.2003.10.038","volume":"162","author":"S Wang","year":"2005","unstructured":"Wang S, Sarker BR (2005) An assembly-type supply chain system controlled by kanbans under a just-in time delivery policy. Eur J Oper Res 162:153\u2013172","journal-title":"Eur J Oper Res"},{"issue":"1","key":"421_CR56","doi-asserted-by":"crossref","first-page":"179","DOI":"10.1016\/j.ejor.2004.10.001","volume":"172","author":"S Wang","year":"2006","unstructured":"Wang S, Sarker BR (2006) Optimal models for a multi-stage supply chain system controlled by kanban under just-in-time philosophy. Eur J Oper Res 172(1):179\u2013200","journal-title":"Eur J Oper Res"},{"key":"421_CR57","doi-asserted-by":"crossref","first-page":"179","DOI":"10.1016\/0925-5273(91)90093-9","volume":"22","author":"H Wang","year":"1991","unstructured":"Wang H, Wang H (1991) Optimum number of kanbans between two adjacent workstations in a JIT system. Int J Prod Econ 22:179\u2013188","journal-title":"Int J Prod Econ"},{"key":"421_CR58","first-page":"1","volume":"40","author":"RE Woolsey","year":"1999","unstructured":"Woolsey RE, Bowden RO, Hall JD, Hadley WH (1999) A closed form solution to a kanban sizing problem. Prod Invent Manag J 40:1\u20133","journal-title":"Prod Invent Manag J"},{"key":"421_CR59","doi-asserted-by":"crossref","first-page":"111","DOI":"10.1016\/j.ress.2015.05.008","volume":"142","author":"AS Xanthopoulos","year":"2015","unstructured":"Xanthopoulos AS, Koulouriotis DE, Botsaris PN (2015) Single-stage kanban system with deterioration failures and condition-based preventive maintenance. Reliab Eng Syst Saf 142:111\u2013122","journal-title":"Reliab Eng Syst Saf"},{"key":"421_CR60","doi-asserted-by":"crossref","first-page":"131","DOI":"10.1016\/j.cie.2016.11.019","volume":"103","author":"AS Xanthopoulos","year":"2017","unstructured":"Xanthopoulos AS, Koulouriotis DE, Gasteratos A (2017) Adaptive card-based production control policies. Comput Ind Eng 103:131\u2013144","journal-title":"Comput Ind Eng"},{"issue":"9","key":"421_CR61","doi-asserted-by":"crossref","first-page":"64","DOI":"10.1016\/S1874-8651(10)60070-1","volume":"29","author":"L Yang","year":"2009","unstructured":"Yang L, Zhang X (2009) Design and application of kanban control system in a multi-stage, mixed-model assembly line. Syst Eng Theory Pract 29(9):64\u201372","journal-title":"Syst Eng Theory Pract"},{"issue":"2","key":"421_CR62","first-page":"118","volume":"35","author":"MJ Yao","year":"2018","unstructured":"Yao MJ, Hsu TC (2018) An efficient search algorithm for obtaining the optimal replenishment strategies in assembly-type just-in-time supply chain systems. J Ind Prod Eng 35(2):118\u2013128","journal-title":"J Ind Prod Eng"}],"container-title":["Operational Research"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s12351-018-0421-2.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s12351-018-0421-2\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s12351-018-0421-2.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2020,10,9]],"date-time":"2020-10-09T18:38:56Z","timestamp":1602268736000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s12351-018-0421-2"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2018,8,23]]},"references-count":60,"journal-issue":{"issue":"4","published-print":{"date-parts":[[2020,12]]}},"alternative-id":["421"],"URL":"https:\/\/doi.org\/10.1007\/s12351-018-0421-2","relation":{},"ISSN":["1109-2858","1866-1505"],"issn-type":[{"type":"print","value":"1109-2858"},{"type":"electronic","value":"1866-1505"}],"subject":[],"published":{"date-parts":[[2018,8,23]]},"assertion":[{"value":"23 September 2017","order":1,"name":"received","label":"Received","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"19 July 2018","order":2,"name":"revised","label":"Revised","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"16 August 2018","order":3,"name":"accepted","label":"Accepted","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"23 August 2018","order":4,"name":"first_online","label":"First Online","group":{"name":"ArticleHistory","label":"Article History"}}]}}