{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,1,30]],"date-time":"2026-01-30T02:46:51Z","timestamp":1769741211339,"version":"3.49.0"},"reference-count":58,"publisher":"Springer Science and Business Media LLC","issue":"4","license":[{"start":{"date-parts":[[2018,9,15]],"date-time":"2018-09-15T00:00:00Z","timestamp":1536969600000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"},{"start":{"date-parts":[[2018,9,15]],"date-time":"2018-09-15T00:00:00Z","timestamp":1536969600000},"content-version":"vor","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"funder":[{"DOI":"10.13039\/501100000038","name":"Natural Sciences and Engineering Research Council of Canada","doi-asserted-by":"crossref","id":[{"id":"10.13039\/501100000038","id-type":"DOI","asserted-by":"crossref"}]}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Oper Res Int J"],"published-print":{"date-parts":[[2020,12]]},"DOI":"10.1007\/s12351-018-0424-z","type":"journal-article","created":{"date-parts":[[2018,9,16]],"date-time":"2018-09-16T08:43:03Z","timestamp":1537087383000},"page":"2519-2536","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":5,"title":["Effects of non-normal quality data on the integrated model of imperfect maintenance, early replacement, and economic design of $${\\bar{X}}$$-control charts"],"prefix":"10.1007","volume":"20","author":[{"given":"M. A.","family":"Pasha","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"M.","family":"Bameni Moghadam","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"M. A.","family":"Rahim","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2018,9,15]]},"reference":[{"issue":"4","key":"424_CR1","first-page":"397","volume":"30","author":"HA Al-Oraini","year":"2003","unstructured":"Al-Oraini HA, Rahim MA (2003) Economic statistical design of $$\\bar{x}$$-control charts for systems with Gamma($$\\lambda$$,2) in-control times. J Appl Stat 30(4):397\u2013409","journal-title":"J Appl Stat"},{"key":"424_CR2","doi-asserted-by":"publisher","DOI":"10.1080\/03610918.2017.1335406","author":"M Bameni Moghadam","year":"2017","unstructured":"Bameni Moghadam M, Khadem Y, Fani S, Pasha MA (2017) Effects of non-normality on economic and economic statistical designs of-control charts with multiple assignable causes and Weibull in-control times. Simul Comput Commun Stat. \nhttps:\/\/doi.org\/10.1080\/03610918.2017.1335406","journal-title":"Simul Comput Commun Stat"},{"issue":"4","key":"424_CR3","first-page":"407","volume":"30","author":"PK Banerjee","year":"1988","unstructured":"Banerjee PK, Rahim MA (1988) Economic design of $${\\bar{X}}$$-control charts under Weibull shock models. Technometrics 30(4):407\u2013414","journal-title":"Technometrics"},{"issue":"6","key":"424_CR4","first-page":"491","volume":"31","author":"M Ben-Daya","year":"1999","unstructured":"Ben-Daya M (1999) Integrated production maintenance and quality model for imperfect processes. IIE Trans 31(6):491\u2013501","journal-title":"IIE Trans"},{"issue":"1","key":"424_CR5","doi-asserted-by":"crossref","first-page":"131","DOI":"10.1016\/S0377-2217(98)00379-8","volume":"120","author":"M Ben-Daya","year":"2000","unstructured":"Ben-Daya M, Rahim MA (2000) Effect of maintenance on the economic design of $$\\bar{x}$$-control chart. Eur J Oper Res 120(1):131\u2013143","journal-title":"Eur J Oper Res"},{"issue":"2","key":"424_CR6","doi-asserted-by":"crossref","first-page":"215","DOI":"10.1214\/aoms\/1177731607","volume":"13","author":"IW Burr","year":"1942","unstructured":"Burr IW (1942) Cumulative frequency functions. Ann Math Stat 13(2):215\u2013232","journal-title":"Ann Math Stat"},{"issue":"6","key":"424_CR7","doi-asserted-by":"crossref","first-page":"471","DOI":"10.1023\/A:1007693017671","volume":"32","author":"CR Cassady","year":"2000","unstructured":"Cassady CR, Bowden RO, Liew L, Pohl EA (2000) Combining preventive maintenance and statistical process control: a preliminary investigation. IIE Trans 32(6):471\u2013478","journal-title":"IIE Trans"},{"key":"424_CR8","doi-asserted-by":"crossref","first-page":"61","DOI":"10.1016\/j.ijpe.2003.09.011","volume":"92","author":"YK Chen","year":"2004","unstructured":"Chen YK (2004) Economic design of $${\\bar{X}}$$ control charts for non-normal data using variable sampling policy. Int J Prod Econ 92:61\u201374","journal-title":"Int J Prod Econ"},{"issue":"2","key":"424_CR9","doi-asserted-by":"crossref","first-page":"986","DOI":"10.1016\/j.ejor.2005.08.022","volume":"176","author":"H Chen","year":"2007","unstructured":"Chen H, Cheng Y (2007) Non-normality effects on the economic-statistical design of $${\\bar{X}}$$ charts with Weibull in-control time. Eur J Oper Res 176(2):986\u2013998","journal-title":"Eur J Oper Res"},{"key":"424_CR10","doi-asserted-by":"crossref","first-page":"17","DOI":"10.1016\/S0925-5273(01)00196-7","volume":"77","author":"YS Chen","year":"2002","unstructured":"Chen YS, Yang YM (2002) Economic design of $${\\bar{x}}$$-control charts with Weibull in-control times when there are multiple assignable causes. Int J Prod Econ 77:17\u201323","journal-title":"Int J Prod Econ"},{"issue":"3","key":"424_CR11","first-page":"200","volume":"23","author":"FL Chen","year":"2006","unstructured":"Chen FL, Yeh CH (2006) Economic design of control charts with Burr distribution for non-normal data under Weibull failure mechanism. J Chin Inst Ind Eng 23(3):200\u2013206","journal-title":"J Chin Inst Ind Eng"},{"issue":"5","key":"424_CR12","doi-asserted-by":"crossref","first-page":"9488","DOI":"10.1016\/j.eswa.2009.01.018","volume":"36","author":"FL Chen","year":"2009","unstructured":"Chen FL, Yeh CH (2009) Economic statistical design of non-uniform sampling scheme Xbar control charts under non-normality and Gamma shock using genetic algorithm. Expert Syst Appl 36(5):9488\u20139497","journal-title":"Expert Syst Appl"},{"key":"424_CR13","doi-asserted-by":"crossref","first-page":"1743","DOI":"10.1080\/03610920902898480","volume":"39","author":"FL Chen","year":"2010","unstructured":"Chen FL, Yeh CH (2010) Economic design of VSI $${\\bar{X}}$$ control charts for non normally distributed data under Gamma ($$\\lambda$$,2) failure models. Commun Stat Theory Methods 39:1743\u20131760","journal-title":"Commun Stat Theory Methods"},{"issue":"4","key":"424_CR14","doi-asserted-by":"crossref","first-page":"750","DOI":"10.1057\/jors.2010.36","volume":"62","author":"FL Chen","year":"2011","unstructured":"Chen FL, Yeh CH (2011) Economic statistical design for x-bar control charts under non-normal distributed data with Weibull in-control time. J Oper Res Soc 62(4):750\u2013759","journal-title":"J Oper Res Soc"},{"issue":"2","key":"424_CR15","first-page":"103","volume":"3","author":"W Chen","year":"2011","unstructured":"Chen W, Yu F, Guh R, Lin Y (2011) Economic design of $$\\bar{x}$$ control charts under preventive maintenance and Taguchi loss function. J Appl Oper Res 3(2):103\u2013109","journal-title":"J Appl Oper Res"},{"key":"424_CR16","doi-asserted-by":"crossref","first-page":"61","DOI":"10.1108\/02656719610108323","volume":"13","author":"H Chiu","year":"1996","unstructured":"Chiu H, Huang B (1996) The economic design of $${\\bar{x}}$$ control charts under a preventive maintenance policy. Int J Qual Reliab Manag 13:61\u201371","journal-title":"Int J Qual Reliab Manag"},{"key":"424_CR17","doi-asserted-by":"crossref","first-page":"939","DOI":"10.1080\/02664760050173274","volume":"27","author":"CY Chou","year":"2000","unstructured":"Chou CY, Chen CH, Liu HR (2000a) Economic-statistical design of $${\\bar{x}}$$ for non-normal data by considering quality loss. J Appl Stat 27:939\u2013951","journal-title":"J Appl Stat"},{"key":"424_CR18","first-page":"472","volume":"24","author":"CY Chou","year":"2000","unstructured":"Chou CY, Chen CH, Liu HR, Wang PH (2000b) Statistically minimum-loss design of averages control charts for non-normal data. Proc Natl Sci Counc ROC (A) 24:472\u2013479","journal-title":"Proc Natl Sci Counc ROC (A)"},{"key":"424_CR19","doi-asserted-by":"crossref","first-page":"1931","DOI":"10.1080\/00207540110034913","volume":"39","author":"CY Chou","year":"2001","unstructured":"Chou CY, Chen CH, Liu HR (2001) Economic design of $${\\bar{X}}$$ charts for non-normally correlated data. Int J Prod Res 39:1931\u20131941","journal-title":"Int J Prod Res"},{"key":"424_CR20","doi-asserted-by":"crossref","first-page":"567","DOI":"10.1081\/QEN-120038018","volume":"16","author":"CY Chou","year":"2004","unstructured":"Chou CY, Chen CH, Liu HR (2004) Effect of non-normality on the economic design of warning limit $${\\bar{X}}$$ charts. Qual Eng 16:567\u2013575","journal-title":"Qual Eng"},{"issue":"274","key":"424_CR21","first-page":"228","volume":"51","author":"AJ Duncan","year":"1956","unstructured":"Duncan AJ (1956) The economic design of $${\\bar{X}}$$ charts used to maintain current control of a process. J Am Stat Assoc 51(274):228\u2013242","journal-title":"J Am Stat Assoc"},{"key":"424_CR22","first-page":"85","volume":"7","author":"P Frahm","year":"1992","unstructured":"Frahm P (1992) $${\\bar{x}}$$-control charts and age replacement policies. Econ Qual Control 7:85\u201396","journal-title":"Econ Qual Control"},{"key":"424_CR23","doi-asserted-by":"crossref","first-page":"39","DOI":"10.1080\/00224065.1994.11979497","volume":"26","author":"C Ho","year":"1994","unstructured":"Ho C, Case KE (1994) Economic design of control charts, a literature review for 1981\u20131991. J Qual Technol 26:39\u201353","journal-title":"J Qual Technol"},{"key":"424_CR24","doi-asserted-by":"crossref","first-page":"149","DOI":"10.1093\/biomet\/36.1-2.149","volume":"36","author":"NL Johnson","year":"1949","unstructured":"Johnson NL (1949) Systems of frequency curves generated by methods of translation. Biometrika 36:149\u2013176","journal-title":"Biometrika"},{"issue":"1","key":"424_CR25","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1016\/0360-8352(82)90021-3","volume":"6","author":"RS Lashkari","year":"1986","unstructured":"Lashkari RS, Rahim MA (1986) An economic design of cumulative sum charts to control non-normal process means. Comput Ind Eng 6(1):1\u201318","journal-title":"Comput Ind Eng"},{"key":"424_CR26","doi-asserted-by":"crossref","first-page":"249","DOI":"10.1016\/j.ijpe.2004.05.001","volume":"96","author":"YC Lin","year":"2005","unstructured":"Lin YC, Chou CY (2005) On the design of variable sample size and sampling intervals $${\\bar{X}}$$ charts under non-normality. Int J Prod Econ 96:249\u2013261","journal-title":"Int J Prod Econ"},{"issue":"1","key":"424_CR27","doi-asserted-by":"crossref","first-page":"361","DOI":"10.1016\/j.ejor.2005.06.051","volume":"176","author":"YC Lin","year":"2007","unstructured":"Lin YC, Chou CY (2007) Non-normality and the variable parameters $${\\bar{X}}$$ control charts. Eur J Oper Res 176(1):361\u2013373","journal-title":"Eur J Oper Res"},{"issue":"2","key":"424_CR28","doi-asserted-by":"crossref","first-page":"324","DOI":"10.1016\/j.ejor.2003.11.026","volume":"164","author":"K Linderman","year":"2005","unstructured":"Linderman K, McKone-Sweet KE, Anderson JC (2005) An integrated systems approach to process control and maintenance. Eur J Oper Res 164(2):324\u2013340","journal-title":"Eur J Oper Res"},{"issue":"1","key":"424_CR29","doi-asserted-by":"crossref","first-page":"3","DOI":"10.1080\/00401706.1986.10488092","volume":"28","author":"TJ Lorenzen","year":"1986","unstructured":"Lorenzen TJ, Vance LC (1986) The economic design of control charts: a unified approach. Technometrics 28(1):3\u201310","journal-title":"Technometrics"},{"issue":"2","key":"424_CR30","doi-asserted-by":"crossref","first-page":"75","DOI":"10.1080\/00224065.1980.11980940","volume":"12","author":"DC Montgomery","year":"1980","unstructured":"Montgomery DC (1980) The economic design of control charts: a review and literature survey. J Qual Technol 12(2):75\u201387","journal-title":"J Qual Technol"},{"issue":"3","key":"424_CR31","doi-asserted-by":"crossref","first-page":"295","DOI":"10.1109\/24.3758","volume":"37","author":"T Nakagawa","year":"1988","unstructured":"Nakagawa T (1988) Sequential imperfect preventive maintenance policies. IEEE Trans Reliab 37(3):295\u2013298","journal-title":"IEEE Trans Reliab"},{"issue":"6","key":"424_CR32","first-page":"481","volume":"29","author":"H Ohta","year":"1997","unstructured":"Ohta H, Rahim MA (1997) A dynamic economic model for an $$\\bar{x}$$-control chart design. IIE Trans 29(6):481\u2013486","journal-title":"IIE Trans"},{"issue":"9","key":"424_CR33","doi-asserted-by":"crossref","first-page":"2098","DOI":"10.1080\/03610926.2017.1295159","volume":"47","author":"MA Pasha","year":"2017","unstructured":"Pasha MA, Bameni Moghadam M (2017) An extension of BenDaya\u2013Rahim (2000) and Rahim\u2013Banerjee (1993) cost models for economic design of T2-control charts for multivariate deteriorating processes with preventive maintenance and early replacement. Commun Stat Theory Methods 47(9):2098\u20132109","journal-title":"Commun Stat Theory Methods"},{"key":"424_CR34","doi-asserted-by":"crossref","unstructured":"Pasha MA, Bameni Moghadam M (2018) A generalized version of Ben-Daya-Rahim (2000) and Rahim-Banerjee (1993) cost models in economic design of $${\\bar{X}}$$-control charts for systems with early replacement and preventive maintenance under decreasing integrated hazard. Commun Stat Simul Comput (Accepted)","DOI":"10.1080\/03610918.2018.1478097"},{"issue":"21","key":"424_CR35","doi-asserted-by":"crossref","first-page":"10495","DOI":"10.1080\/03610926.2016.1236963","volume":"46","author":"MA Pasha","year":"2016","unstructured":"Pasha MA, Bameni Moghadam M, Fani S (2016a) A generalized approach to economic design of control charts: a discussion on implementing. Commun Stat Theory Methods 46(21):10495\u201310506","journal-title":"Commun Stat Theory Methods"},{"issue":"21","key":"424_CR36","doi-asserted-by":"crossref","first-page":"10481","DOI":"10.1080\/03610926.2016.1236962","volume":"46","author":"MA Pasha","year":"2016","unstructured":"Pasha MA, Khadem Y, Bameni Moghadam M (2016b) Application of decreasing integrated hazard in Rahim and Banerjee model on economic design of $${\\bar{X}}$$-control charts for systems with increasing failure rate and early replacement. Commun Stat Theory Methods 46(21):10481\u201310494","journal-title":"Commun Stat Theory Methods"},{"key":"424_CR37","doi-asserted-by":"publisher","DOI":"10.1080\/03610918.2017.1327071","author":"MA Pasha","year":"2017","unstructured":"Pasha MA, Bameni Moghadam M, Nematollahi N, Fani S (2017a) A generalized model for multiplicity-cause economic and economic statistical design of $${\\bar{X}}$$-control charts with proportional hazards shock model. Commun Stat Simul Comput. \nhttps:\/\/doi.org\/10.1080\/03610918.2017.1327071","journal-title":"Commun Stat Simul Comput"},{"issue":"24","key":"424_CR38","doi-asserted-by":"crossref","first-page":"12113","DOI":"10.1080\/03610926.2017.1291975","volume":"46","author":"MA Pasha","year":"2017","unstructured":"Pasha MA, Bameni Moghadam M, Khadem Y, Fani S (2017b) An integration of Taguchis loss function in Banerjee\u2013Rahim model for the economic and economic statistical design of $${\\bar{X}}$$-control charts under multiple assignable causes and Weibull shock model. Commun Stat Theory Methods 46(24):12113\u201312129","journal-title":"Commun Stat Theory Methods"},{"issue":"24","key":"424_CR39","doi-asserted-by":"crossref","first-page":"12113","DOI":"10.1080\/03610926.2017.1291975","volume":"46","author":"MA Pasha","year":"2017","unstructured":"Pasha MA, Bameni Moghadam M, Fani S, Khadem Y (2017c) Effects of quality characteristic distributions on the integrated model of Taguchi\u2019s loss function and economic statistical design of $${\\bar{X}}$$-control charts by modifying the Banerjee and Rahim economic model. Commun Stat Theory Methods 46(24):12113\u201312129","journal-title":"Commun Stat Theory Methods"},{"key":"424_CR40","unstructured":"Rahim MA (1981) Economic design of $$\\bar{x}$$ and Cusum charts as applied to non-normal processes. Ph.D. Thesis, Department of Industrial Engineering, University of Windsor, Canada"},{"key":"424_CR41","doi-asserted-by":"crossref","first-page":"193","DOI":"10.1080\/03052158508902513","volume":"9","author":"MA Rahim","year":"1985","unstructured":"Rahim MA (1985) An investigation of economic design of $${\\bar{X}}$$ charts to control non-normal process means. Eng Optim 9:193\u2013208","journal-title":"Eng Optim"},{"issue":"4","key":"424_CR42","doi-asserted-by":"crossref","first-page":"296","DOI":"10.1080\/00224065.1993.11979475","volume":"25","author":"MA Rahim","year":"1993","unstructured":"Rahim MA (1993) Economic design of $${\\bar{X}}$$ control charts assuming Weibull distribution in-control times. J Qual Technol 25(4):296\u2013305","journal-title":"J Qual Technol"},{"issue":"6","key":"424_CR43","doi-asserted-by":"crossref","first-page":"2","DOI":"10.1080\/07408179408966632","volume":"26","author":"MA Rahim","year":"1994","unstructured":"Rahim MA (1994) Joint determination of production quantity inspection schedule, and control chart design. IIE Trans 26(6):2\u201311","journal-title":"IIE Trans"},{"issue":"6","key":"424_CR44","doi-asserted-by":"crossref","first-page":"787","DOI":"10.1002\/1520-6750(199310)40:6<787::AID-NAV3220400605>3.0.CO;2-4","volume":"40","author":"MA Rahim","year":"1993","unstructured":"Rahim MA, Banerjee PK (1993) A generalized model for economic design of $$\\bar{x}$$-control charts for production systems with increasing failure rate and early replacement. Nav Res Logist 40(6):787\u2013809","journal-title":"Nav Res Logist"},{"issue":"1","key":"424_CR45","doi-asserted-by":"crossref","first-page":"277","DOI":"10.1080\/002075498194047","volume":"36","author":"MA Rahim","year":"1998","unstructured":"Rahim MA, Ben-Daya M (1998) A generalized economic model for joint determination of production run, inspection schedule, and control chart design. Int J Prod Res 36(1):277\u2013289","journal-title":"Int J Prod Res"},{"key":"424_CR46","volume-title":"Applied probability models with optimization applications","author":"SM Ross","year":"1970","unstructured":"Ross SM (1970) Applied probability models with optimization applications. Dover Publications, Mineola"},{"key":"424_CR47","first-page":"257","volume":"104","author":"B Samanta","year":"2004","unstructured":"Samanta B, Bhattacherjee A (2004) Problem of non-normality in statistical quality control: a case study in a surface mine. J S Afr Inst Min Metall 104:257\u2013264","journal-title":"J S Afr Inst Min Metall"},{"key":"424_CR48","first-page":"313","volume":"31","author":"EM Saniga","year":"1989","unstructured":"Saniga EM (1989) Economic statistical control chart designs with an application to $${\\bar{x}}$$ and R charts. Technometrics 31:313\u2013320","journal-title":"Technometrics"},{"key":"424_CR49","volume-title":"Statistical process control in manufacturing","author":"L Savoboda","year":"1991","unstructured":"Savoboda L (1991) Economic design of control chart: a review and literature survey (1924\u20131989). In: Keats JB, Montgomery DC (eds) Statistical process control in manufacturing. Marcel Dekker, New York"},{"issue":"12","key":"424_CR50","doi-asserted-by":"crossref","first-page":"2442","DOI":"10.1080\/00949655.2014.931404","volume":"85","author":"A Seif","year":"2015","unstructured":"Seif A, Faraz A, Sadeghifar M (2015a) Evaluation of the economic statistical design of the multivariate T2 control chart with multiple variable sampling intervals scheme: NSGA-II approach. J Stat Comput Simul 85(12):2442\u20132455","journal-title":"J Stat Comput Simul"},{"issue":"14","key":"424_CR51","doi-asserted-by":"crossref","first-page":"4218","DOI":"10.1080\/00207543.2014.986298","volume":"53","author":"A Seif","year":"2015","unstructured":"Seif A, Faraz A, Saniga E (2015b) Economic statistical design of the VP control charts for monitoring a process under non-normality. Int J Prod Res 53(14):4218\u20134230","journal-title":"Int J Prod Res"},{"issue":"8","key":"424_CR52","doi-asserted-by":"crossref","first-page":"757","DOI":"10.1057\/jors.1988.131","volume":"39","author":"G Tagaras","year":"1986","unstructured":"Tagaras G (1986) An integrated cost model for the joint optimization of process control and maintenance. J Oper Res Soc 39(8):757\u2013766","journal-title":"J Oper Res Soc"},{"issue":"2","key":"424_CR53","doi-asserted-by":"crossref","first-page":"59","DOI":"10.1080\/00224065.1983.11978845","volume":"15","author":"L Vance","year":"1983","unstructured":"Vance L (1983) A bibliography of statistical quality control chart techniques. J Qual Technol 15(2):59\u201362","journal-title":"J Qual Technol"},{"key":"424_CR54","first-page":"217","volume":"40","author":"L Xue","year":"2010","unstructured":"Xue L, Liu Y, Xu J (2010) Economic design of EWMA charts with variable sampling intervals under non-normality. IEEE 40:217\u2013222","journal-title":"IEEE"},{"key":"424_CR55","doi-asserted-by":"crossref","first-page":"994","DOI":"10.1080\/03610911003734815","volume":"39","author":"LL Yeh","year":"2010","unstructured":"Yeh LL, Chen FL (2010) An extension of Banerjee and Rahim\u2019s model for an economic $${\\bar{X}}$$ control chart for non-normally distributed dara under Gamma failure models. Commun Stat Simul Comput 39:994\u20131015","journal-title":"Commun Stat Simul Comput"},{"issue":"3","key":"424_CR56","doi-asserted-by":"crossref","first-page":"575","DOI":"10.1016\/S0360-8352(96)00314-2","volume":"32","author":"G Zhang","year":"1997","unstructured":"Zhang G, Berardi V (1997) Economic statistical design of $${\\bar{X}}$$ control charts for systems with Weibull in-control times. Comput Ind Eng 32(3):575\u2013586","journal-title":"Comput Ind Eng"},{"issue":"1","key":"424_CR57","doi-asserted-by":"publisher","first-page":"17","DOI":"10.1007\/s12351-015-0214-9","volume":"17","author":"M Zhou","year":"2017","unstructured":"Zhou M (2017) Variable sample size and variable sampling interval Shewhart control chart with estimated parameters. Oper Res Int J 17(1):17\u201337. \nhttps:\/\/doi.org\/10.1007\/s12351-015-0214-9","journal-title":"Oper Res Int J"},{"issue":"11\u201312","key":"424_CR58","doi-asserted-by":"crossref","first-page":"1389","DOI":"10.1016\/j.mcm.2007.09.008","volume":"47","author":"W Zhou","year":"2008","unstructured":"Zhou W, Zhu G (2008) Economic design of integrated model of control chart and maintenance management. Math Comput Model 47(11\u201312):1389\u20131395","journal-title":"Math Comput Model"}],"container-title":["Operational Research"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s12351-018-0424-z.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s12351-018-0424-z\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s12351-018-0424-z.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2020,10,9]],"date-time":"2020-10-09T18:38:20Z","timestamp":1602268700000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s12351-018-0424-z"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2018,9,15]]},"references-count":58,"journal-issue":{"issue":"4","published-print":{"date-parts":[[2020,12]]}},"alternative-id":["424"],"URL":"https:\/\/doi.org\/10.1007\/s12351-018-0424-z","relation":{},"ISSN":["1109-2858","1866-1505"],"issn-type":[{"value":"1109-2858","type":"print"},{"value":"1866-1505","type":"electronic"}],"subject":[],"published":{"date-parts":[[2018,9,15]]},"assertion":[{"value":"7 May 2017","order":1,"name":"received","label":"Received","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"23 June 2018","order":2,"name":"revised","label":"Revised","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"7 September 2018","order":3,"name":"accepted","label":"Accepted","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"15 September 2018","order":4,"name":"first_online","label":"First Online","group":{"name":"ArticleHistory","label":"Article History"}}]}}