{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,4,30]],"date-time":"2026-04-30T08:39:32Z","timestamp":1777538372867,"version":"3.51.4"},"reference-count":47,"publisher":"Springer Science and Business Media LLC","issue":"1","license":[{"start":{"date-parts":[[2019,2,14]],"date-time":"2019-02-14T00:00:00Z","timestamp":1550102400000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"},{"start":{"date-parts":[[2019,2,14]],"date-time":"2019-02-14T00:00:00Z","timestamp":1550102400000},"content-version":"vor","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Oper Res Int J"],"published-print":{"date-parts":[[2021,3]]},"DOI":"10.1007\/s12351-019-00457-5","type":"journal-article","created":{"date-parts":[[2019,2,14]],"date-time":"2019-02-14T17:01:33Z","timestamp":1550163693000},"page":"589-620","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":12,"title":["Optimal payment time and replenishment decisions for retailer\u2019s inventory system under trade credit and carbon emission constraints"],"prefix":"10.1007","volume":"21","author":[{"given":"Armin","family":"Jabbarzadeh","sequence":"first","affiliation":[]},{"given":"Leyla","family":"Aliabadi","sequence":"additional","affiliation":[]},{"given":"Reza","family":"Yazdanparast","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2019,2,14]]},"reference":[{"key":"457_CR1","unstructured":"Aliabadi L et al. (2017) An EOQ model with holding-ordering cost reduction and partial delay in payment under credit period-dependent demand: a reversed constraint programming. In: 13th International conference on industrial engineering (IIEC 2017), Mazandaran"},{"key":"457_CR2","doi-asserted-by":"publisher","first-page":"295","DOI":"10.1016\/j.jclepro.2017.03.105","volume":"152","author":"A Azadeh","year":"2017","unstructured":"Azadeh A et al (2017a) Evolutionary multi-objective optimization of environmental indicators of integrated crude oil supply chain under uncertainty. J Clean Prod 152:295\u2013311","journal-title":"J Clean Prod"},{"issue":"19","key":"457_CR3","doi-asserted-by":"publisher","first-page":"5734","DOI":"10.1021\/acs.iecr.6b02460","volume":"56","author":"A Azadeh","year":"2017","unstructured":"Azadeh A et al (2017b) Optimum integrated design of crude oil supply chain by a unique mixed integer nonlinear programming model. Ind Eng Chem Res 56(19):5734\u20135746","journal-title":"Ind Eng Chem Res"},{"key":"457_CR4","doi-asserted-by":"publisher","first-page":"114","DOI":"10.1016\/j.ijpe.2014.01.006","volume":"155","author":"A Bozorgi","year":"2014","unstructured":"Bozorgi A et al (2014) A new inventory model for cold items that considers costs and emissions. Int J Prod Econ 155:114\u2013125","journal-title":"Int J Prod Econ"},{"key":"457_CR5","doi-asserted-by":"publisher","first-page":"50","DOI":"10.1016\/j.cie.2018.03.024","volume":"119","author":"E Cao","year":"2018","unstructured":"Cao E, Yu M (2018) Trade credit financing and coordination for an emission-dependent supply chain. Comput Ind Eng 119:50\u201362","journal-title":"Comput Ind Eng"},{"issue":"10","key":"457_CR6","doi-asserted-by":"publisher","first-page":"985","DOI":"10.1080\/00207720902974561","volume":"40","author":"C-T Chang","year":"2009","unstructured":"Chang C-T et al (2009) Optimal payment time with deteriorating items under inflation and permissible delay in payments. Int J Syst Sci 40(10):985\u2013993","journal-title":"Int J Syst Sci"},{"key":"457_CR7","doi-asserted-by":"publisher","first-page":"284","DOI":"10.1016\/j.ijpe.2013.05.032","volume":"155","author":"S-C Chen","year":"2014","unstructured":"Chen S-C et al (2014) Retailer\u2019s economic order quantity when the supplier offers conditionally permissible delay in payments link to order quantity. Int J Prod Econ 155:284\u2013291","journal-title":"Int J Prod Econ"},{"key":"457_CR8","doi-asserted-by":"publisher","DOI":"10.1007\/s12351-016-0286-1","author":"O Dey","year":"2017","unstructured":"Dey O (2017) A fuzzy random integrated inventory model with imperfect production under optimal vendor investment. Oper Res. https:\/\/doi.org\/10.1007\/s12351-016-0286-1","journal-title":"Oper Res"},{"key":"457_CR9","doi-asserted-by":"publisher","first-page":"37","DOI":"10.1016\/j.swevo.2012.03.002","volume":"5","author":"C-Y Dye","year":"2012","unstructured":"Dye C-Y (2012) A finite horizon deteriorating inventory model with two-phase pricing and time-varying demand and cost under trade credit financing using particle swarm optimization. Swarm Evolut Comput 5:37\u201353","journal-title":"Swarm Evolut Comput"},{"issue":"1","key":"457_CR10","doi-asserted-by":"publisher","first-page":"187","DOI":"10.1016\/j.ejor.2015.01.026","volume":"244","author":"C-Y Dye","year":"2015","unstructured":"Dye C-Y, Yang C-T (2015) Sustainable trade credit and replenishment decisions with credit-linked demand under carbon emission constraints. Eur J Oper Res 244(1):187\u2013200","journal-title":"Eur J Oper Res"},{"key":"457_CR11","volume-title":"Deterministic global optimization: theory, methods and applications","author":"CA Floudas","year":"2013","unstructured":"Floudas CA (2013) Deterministic global optimization: theory, methods and applications. Springer, Berlin"},{"issue":"1","key":"457_CR12","doi-asserted-by":"publisher","first-page":"221","DOI":"10.1007\/s10479-014-1739-7","volume":"226","author":"M Ghoreishi","year":"2015","unstructured":"Ghoreishi M et al (2015) An inventory model for non-instantaneous deteriorating items with partial backlogging, permissible delay in payments, inflation-and selling price-dependent demand and customer returns. Ann Oper Res 226(1):221\u2013238","journal-title":"Ann Oper Res"},{"key":"457_CR13","doi-asserted-by":"publisher","first-page":"292","DOI":"10.1016\/j.ijpe.2014.12.017","volume":"164","author":"R Hammami","year":"2015","unstructured":"Hammami R et al (2015) Carbon emissions in a multi-echelon production-inventory model with lead time constraints. Int J Prod Econ 164:292\u2013307","journal-title":"Int J Prod Econ"},{"key":"457_CR14","doi-asserted-by":"publisher","first-page":"241","DOI":"10.1016\/j.jclepro.2014.08.102","volume":"103","author":"P He","year":"2015","unstructured":"He P et al (2015) Production lot-sizing and carbon emissions under cap-and-trade and carbon tax regulations. J Clean Prod 103:241\u2013248","journal-title":"J Clean Prod"},{"key":"457_CR15","doi-asserted-by":"publisher","first-page":"285","DOI":"10.1016\/j.ijpe.2014.11.022","volume":"164","author":"V Hovelaque","year":"2015","unstructured":"Hovelaque V, Bironneau L (2015) The carbon-constrained EOQ model with carbon emission dependent demand. Int J Prod Econ 164:285\u2013291","journal-title":"Int J Prod Econ"},{"issue":"1","key":"457_CR16","doi-asserted-by":"publisher","first-page":"59","DOI":"10.1016\/S0925-5273(99)00108-5","volume":"66","author":"A Jamal","year":"2000","unstructured":"Jamal A et al (2000) Optimal payment time for a retailer under permitted delay of payment by the wholesaler. Int J Prod Econ 66(1):59\u201366","journal-title":"Int J Prod Econ"},{"issue":"1\u20132","key":"457_CR17","doi-asserted-by":"publisher","first-page":"281","DOI":"10.1007\/s10479-016-2162-z","volume":"248","author":"DK Jana","year":"2017","unstructured":"Jana DK, Das B (2017) A two-storage multi-item inventory model with hybrid number and nested price discount via hybrid heuristic algorithm. Ann Oper Res 248(1\u20132):281\u2013304","journal-title":"Ann Oper Res"},{"issue":"9","key":"457_CR18","doi-asserted-by":"publisher","first-page":"2522","DOI":"10.1016\/j.apm.2013.10.058","volume":"38","author":"M Jiangtao","year":"2014","unstructured":"Jiangtao M et al (2014) Optimal ordering policies for perishable multi-item under stock-dependent demand and two-level trade credit. Appl Math Model 38(9):2522\u20132532","journal-title":"Appl Math Model"},{"issue":"2","key":"457_CR19","first-page":"99","volume":"5","author":"N Kazemi","year":"2018","unstructured":"Kazemi N et al (2018) Economic order quantity models for items with imperfect quality and emission considerations. Int J Syst Sci Oper Logist 5(2):99\u2013115","journal-title":"Int J Syst Sci Oper Logist"},{"issue":"1\u20132","key":"457_CR20","doi-asserted-by":"publisher","first-page":"339","DOI":"10.1007\/s10107-012-0612-1","volume":"143","author":"K Lange","year":"2014","unstructured":"Lange K, Zhou H (2014) MM algorithms for geometric and signomial programming. Math Progr 143(1\u20132):339\u2013356","journal-title":"Math Progr"},{"issue":"1","key":"457_CR21","doi-asserted-by":"publisher","first-page":"17","DOI":"10.1016\/j.ejor.2011.06.046","volume":"216","author":"M-H Lin","year":"2012","unstructured":"Lin M-H, Tsai J-F (2012) Range reduction techniques for improving computational efficiency in global optimization of signomial geometric programming problems. Eur J Oper Res 216(1):17\u201325","journal-title":"Eur J Oper Res"},{"key":"457_CR22","doi-asserted-by":"publisher","first-page":"393","DOI":"10.1016\/j.jclepro.2014.12.084","volume":"103","author":"X Liu","year":"2015","unstructured":"Liu X et al (2015) An analysis of company choice preference to carbon tax policy in China. J Clean Prod 103:393\u2013400","journal-title":"J Clean Prod"},{"issue":"1","key":"457_CR23","doi-asserted-by":"publisher","first-page":"199","DOI":"10.1016\/j.ejor.2004.12.002","volume":"173","author":"NK Mandal","year":"2006","unstructured":"Mandal NK et al (2006) Inventory model of deteriorated items with a constraint: a geometric programming approach. Eur J Oper Res 173(1):199\u2013210","journal-title":"Eur J Oper Res"},{"key":"457_CR24","unstructured":"Mutapcic A et al. (2006) GGPLAB version 1.00: a Matlab toolbox for geometric programming, January"},{"issue":"5","key":"457_CR25","doi-asserted-by":"publisher","first-page":"1644","DOI":"10.1007\/s40815-017-0434-7","volume":"20","author":"N Pakhira","year":"2018","unstructured":"Pakhira N et al (2018a) Fuzzy optimization for multi-item supply chain with trade credit and two-level price discount under promotional cost sharing. Int J Fuzzy Syst 20(5):1644\u20131655","journal-title":"Int J Fuzzy Syst"},{"key":"457_CR26","doi-asserted-by":"publisher","first-page":"451","DOI":"10.1016\/j.cie.2018.02.030","volume":"118","author":"N Pakhira","year":"2018","unstructured":"Pakhira N et al (2018b) Uncertain multi-item supply chain with two level trade credit under promotional cost sharing. Comput Ind Eng 118:451\u2013463","journal-title":"Comput Ind Eng"},{"issue":"9","key":"457_CR27","doi-asserted-by":"publisher","first-page":"1733","DOI":"10.1016\/j.mcm.2008.10.019","volume":"49","author":"D Panda","year":"2009","unstructured":"Panda D, Maiti M (2009) Multi-item inventory models with price dependent demand under flexibility and reliability consideration and imprecise space constraint: a geometric programming approach. Math Comput Model 49(9):1733\u20131749","journal-title":"Math Comput Model"},{"issue":"11","key":"457_CR28","doi-asserted-by":"publisher","first-page":"2970","DOI":"10.1016\/j.camwa.2008.09.010","volume":"56","author":"D Panda","year":"2008","unstructured":"Panda D et al (2008) Multi-item EOQ model with hybrid cost parameters under fuzzy\/fuzzy-stochastic resource constraints: a geometric programming approach. Comput Math Appl 56(11):2970\u20132985","journal-title":"Comput Math Appl"},{"issue":"5","key":"457_CR29","doi-asserted-by":"publisher","first-page":"1344","DOI":"10.1137\/0115117","volume":"15","author":"U Passy","year":"1967","unstructured":"Passy U, Wilde D (1967) Generalized polynomial optimization. SIAM J Appl Math 15(5):1344\u20131356","journal-title":"SIAM J Appl Math"},{"key":"457_CR30","doi-asserted-by":"publisher","first-page":"205","DOI":"10.1016\/j.cie.2017.02.007","volume":"106","author":"P Pramanik","year":"2017","unstructured":"Pramanik P et al (2017) A supply chain with variable demand under three level trade credit policy. Comput Ind Eng 106:205\u2013221","journal-title":"Comput Ind Eng"},{"issue":"10\u201311","key":"457_CR31","doi-asserted-by":"publisher","first-page":"6683","DOI":"10.1016\/j.apm.2012.12.020","volume":"37","author":"F Samadi","year":"2013","unstructured":"Samadi F et al (2013) Fuzzy pricing, marketing and service planning in a fuzzy inventory model: a geometric programming approach. Appl Math Model 37(10\u201311):6683\u20136694","journal-title":"Appl Math Model"},{"issue":"4","key":"457_CR32","doi-asserted-by":"publisher","first-page":"380","DOI":"10.1080\/095372800232117","volume":"11","author":"BR Sarker","year":"2000","unstructured":"Sarker BR et al (2000) Optimal payment time under permissible delay in payment for products with deterioration. Prod Plan Control 11(4):380\u2013390","journal-title":"Prod Plan Control"},{"issue":"2","key":"457_CR33","doi-asserted-by":"publisher","first-page":"245","DOI":"10.1016\/j.ejor.2013.03.016","volume":"231","author":"D Seifert","year":"2013","unstructured":"Seifert D et al (2013) A review of trade credit literature: opportunities for research in operations. Eur J Oper Res 231(2):245\u2013256","journal-title":"Eur J Oper Res"},{"key":"457_CR34","doi-asserted-by":"publisher","first-page":"99","DOI":"10.1016\/j.matcom.2015.11.008","volume":"125","author":"B Sharma","year":"2016","unstructured":"Sharma B (2016) An EOQ model for retailers partial permissible delay in payment linked to order quantity with shortages. Math Comput Simul 125:99\u2013112","journal-title":"Math Comput Simul"},{"issue":"6","key":"457_CR35","doi-asserted-by":"publisher","first-page":"1141","DOI":"10.1007\/s40815-015-0129-x","volume":"18","author":"E Shekarian","year":"2016","unstructured":"Shekarian E et al (2016a) A fuzzy reverse logistics inventory system integrating economic order\/production quantity models. Int J Fuzzy Syst 18(6):1141\u20131161","journal-title":"Int J Fuzzy Syst"},{"issue":"5","key":"457_CR36","doi-asserted-by":"publisher","first-page":"2985","DOI":"10.3233\/IFS-151907","volume":"30","author":"E Shekarian","year":"2016","unstructured":"Shekarian E et al (2016b) An economic order quantity model considering different holding costs for imperfect quality items subject to fuzziness and learning. J Intell Fuzzy Syst 30(5):2985\u20132997","journal-title":"J Intell Fuzzy Syst"},{"key":"457_CR37","doi-asserted-by":"publisher","first-page":"588","DOI":"10.1016\/j.asoc.2017.01.013","volume":"55","author":"E Shekarian","year":"2017","unstructured":"Shekarian E et al (2017) Fuzzy inventory models: a comprehensive review. Appl Soft Comput 55:588\u2013621","journal-title":"Appl Soft Comput"},{"issue":"1","key":"457_CR38","doi-asserted-by":"publisher","first-page":"246","DOI":"10.1016\/j.ijpe.2005.07.002","volume":"103","author":"X Song","year":"2006","unstructured":"Song X, Cai X (2006) On optimal payment time for a retailer under permitted delay of payment by the wholesaler. Int J Prod Econ 103(1):246\u2013251","journal-title":"Int J Prod Econ"},{"issue":"1","key":"457_CR39","doi-asserted-by":"publisher","first-page":"259","DOI":"10.1016\/j.ijpe.2013.07.006","volume":"146","author":"HN Soni","year":"2013","unstructured":"Soni HN (2013) Optimal replenishment policies for non-instantaneous deteriorating items with price and stock sensitive demand under permissible delay in payment. Int J Prod Econ 146(1):259\u2013268","journal-title":"Int J Prod Econ"},{"issue":"2","key":"457_CR40","first-page":"159","volume":"4","author":"R Sundara Rajan","year":"2017","unstructured":"Sundara Rajan R, Uthayakumar R (2017) Analysis and optimization of an EOQ inventory model with promotional efforts and back ordering under delay in payments. J Manag Anal 4(2):159\u2013181","journal-title":"J Manag Anal"},{"key":"457_CR41","doi-asserted-by":"publisher","first-page":"82","DOI":"10.1016\/j.jclepro.2018.08.181","volume":"204","author":"S Tiwari","year":"2018","unstructured":"Tiwari S et al (2018a) Multi-item sustainable green production system under trade-credit and partial backordering. J Clean Prod 204:82\u201395","journal-title":"J Clean Prod"},{"key":"457_CR42","doi-asserted-by":"publisher","first-page":"281","DOI":"10.1016\/j.jclepro.2018.04.261","volume":"192","author":"S Tiwari","year":"2018","unstructured":"Tiwari S et al (2018b) Sustainable inventory management with deteriorating and imperfect quality items considering carbon emission. J Clean Prod 192:281\u2013292","journal-title":"J Clean Prod"},{"issue":"1","key":"457_CR43","doi-asserted-by":"publisher","first-page":"106","DOI":"10.1016\/j.ijpe.2010.11.013","volume":"135","author":"Y-C Tsao","year":"2012","unstructured":"Tsao Y-C, Sheen G-J (2012) A multi-item supply chain with credit periods and weight freight cost discounts. Int J Prod Econ 135(1):106\u2013115","journal-title":"Int J Prod Econ"},{"key":"457_CR44","doi-asserted-by":"publisher","first-page":"1478","DOI":"10.1016\/j.jclepro.2016.09.228","volume":"141","author":"Y-C Tsao","year":"2017","unstructured":"Tsao Y-C et al (2017) Sustainable newsvendor models under trade credit. J Clean Prod 141:1478\u20131491","journal-title":"J Clean Prod"},{"issue":"3","key":"457_CR45","doi-asserted-by":"publisher","first-page":"500","DOI":"10.1016\/j.ejor.2013.10.016","volume":"233","author":"G Xu","year":"2014","unstructured":"Xu G (2014) Global optimization of signomial geometric programming problems. Eur J Oper Res 233(3):500\u2013510","journal-title":"Eur J Oper Res"},{"key":"457_CR46","doi-asserted-by":"publisher","first-page":"4093","DOI":"10.1016\/j.jclepro.2015.08.081","volume":"112","author":"X Xu","year":"2016","unstructured":"Xu X et al (2016) Joint production and pricing decisions for multiple products with cap-and-trade and carbon tax regulations. J Clean Prod 112:4093\u20134106","journal-title":"J Clean Prod"},{"issue":"3","key":"457_CR47","first-page":"338","volume":"8","author":"LA Zadeh","year":"1965","unstructured":"Zadeh LA (1965) Information and control. Fuzzy sets 8(3):338\u2013353","journal-title":"Fuzzy sets"}],"container-title":["Operational Research"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s12351-019-00457-5\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s12351-019-00457-5.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s12351-019-00457-5.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2021,2,19]],"date-time":"2021-02-19T02:15:35Z","timestamp":1613700935000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s12351-019-00457-5"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2019,2,14]]},"references-count":47,"journal-issue":{"issue":"1","published-print":{"date-parts":[[2021,3]]}},"alternative-id":["457"],"URL":"https:\/\/doi.org\/10.1007\/s12351-019-00457-5","relation":{},"ISSN":["1109-2858","1866-1505"],"issn-type":[{"value":"1109-2858","type":"print"},{"value":"1866-1505","type":"electronic"}],"subject":[],"published":{"date-parts":[[2019,2,14]]},"assertion":[{"value":"29 December 2017","order":1,"name":"received","label":"Received","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"9 January 2019","order":2,"name":"revised","label":"Revised","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"29 January 2019","order":3,"name":"accepted","label":"Accepted","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"14 February 2019","order":4,"name":"first_online","label":"First Online","group":{"name":"ArticleHistory","label":"Article History"}}]}}