{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,3,30]],"date-time":"2026-03-30T16:33:18Z","timestamp":1774888398148,"version":"3.50.1"},"reference-count":50,"publisher":"Springer Science and Business Media LLC","issue":"4","license":[{"start":{"date-parts":[[2019,11,15]],"date-time":"2019-11-15T00:00:00Z","timestamp":1573776000000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springer.com\/tdm"},{"start":{"date-parts":[[2019,11,15]],"date-time":"2019-11-15T00:00:00Z","timestamp":1573776000000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Oper Res Int J"],"published-print":{"date-parts":[[2021,12]]},"DOI":"10.1007\/s12351-019-00531-y","type":"journal-article","created":{"date-parts":[[2019,11,15]],"date-time":"2019-11-15T18:02:18Z","timestamp":1573840938000},"page":"2433-2458","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":5,"title":["A multi-objective reliability-redundancy allocation problem with active redundancy and interval type-2 fuzzy parameters"],"prefix":"10.1007","volume":"21","author":[{"ORCID":"https:\/\/orcid.org\/0000-0001-8297-8894","authenticated-orcid":false,"given":"Pradip","family":"Kundu","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2019,11,15]]},"reference":[{"key":"531_CR1","doi-asserted-by":"publisher","first-page":"233","DOI":"10.1016\/j.chemolab.2010.08.013","volume":"104","author":"O Akalin","year":"2010","unstructured":"Akalin O, Akay KU, Sennaroglu B, Tez M (2010) Optimization of chemical admixture for concrete on mortar performance tests using mixture experiments. Chemometr Intell Lab Syst 104:233\u2013242","journal-title":"Chemometr Intell Lab Syst"},{"issue":"4","key":"531_CR2","first-page":"653","volume":"33","author":"IM Aliev","year":"2004","unstructured":"Aliev IM, Kara Z (2004) Fuzzy system reliability analysis using time dependent fuzzy set. Control Cybern 33(4):653\u2013662","journal-title":"Control Cybern"},{"key":"531_CR3","doi-asserted-by":"publisher","first-page":"225","DOI":"10.1016\/j.ress.2017.12.019","volume":"172","author":"MA Ardakan","year":"2018","unstructured":"Ardakan MA, Rezvan MT (2018) Multi-objective optimization of reliability-redundancy allocation problem with cold-standby strategy using NSGA-II. Reliab Eng Syst Saf 172:225\u2013238","journal-title":"Reliab Eng Syst Saf"},{"key":"531_CR4","doi-asserted-by":"publisher","first-page":"183","DOI":"10.1016\/0165-0114(93)90158-E","volume":"57","author":"AK Bit","year":"1993","unstructured":"Bit AK, Biswal MP, Alam SS (1993) Fuzzy programming approach to multi-objective solid transportation problem. Fuzzy Sets Syst 57:183\u2013194","journal-title":"Fuzzy Sets Syst"},{"key":"531_CR5","doi-asserted-by":"publisher","first-page":"154","DOI":"10.1016\/j.ress.2012.09.013","volume":"111","author":"D Cao","year":"2013","unstructured":"Cao D, Murat A, Chinnam RB (2013) Efficient exact optimization of multi-objective redundancy allocation problems in series-parallel systems. Reliab Eng Syst Saf 111:154\u2013163","journal-title":"Reliab Eng Syst Saf"},{"issue":"1","key":"531_CR6","doi-asserted-by":"publisher","first-page":"110","DOI":"10.1016\/j.ejor.2015.01.008","volume":"244","author":"M Caserta","year":"2015","unstructured":"Caserta M, Vo\u00df S (2015) An exact algorithm for the reliability redundancy allocation problem. Eur J Oper Res 244(1):110\u2013116","journal-title":"Eur J Oper Res"},{"key":"531_CR7","doi-asserted-by":"publisher","first-page":"31","DOI":"10.1016\/0165-0114(94)90004-3","volume":"64","author":"SM Chen","year":"1994","unstructured":"Chen SM (1994) Fuzzy system reliability analysis using fuzzy number arithmetic operations. Fuzzy Sets Syst 64:31\u201338","journal-title":"Fuzzy Sets Syst"},{"key":"531_CR8","doi-asserted-by":"publisher","first-page":"29","DOI":"10.1016\/0165-0114(93)90182-H","volume":"56","author":"CH Cheng","year":"1993","unstructured":"Cheng CH, Mon DL (1993) Fuzzy system reliability analysis by interval of confidence. Fuzzy Sets Syst 56:29\u201335","journal-title":"Fuzzy Sets Syst"},{"issue":"1","key":"531_CR9","doi-asserted-by":"publisher","first-page":"3","DOI":"10.1109\/TFUZZ.2006.889764","volume":"15","author":"S Coupland","year":"2007","unstructured":"Coupland S, John R (2007) Geometric type-1 and type-2 fuzzy logic systems. IEEE Trans Fuzzy Syst 15(1):3\u201315","journal-title":"IEEE Trans Fuzzy Syst"},{"key":"531_CR10","doi-asserted-by":"publisher","first-page":"247","DOI":"10.1016\/j.cie.2012.09.015","volume":"64","author":"H Garg","year":"2013","unstructured":"Garg H, Sharma SP (2013) Multi-objective reliability-redundancy allocation problem using particle swarm optimization. Comput Ind Eng 64:247\u2013255","journal-title":"Comput Ind Eng"},{"key":"531_CR11","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1155\/2013\/943972","volume":"943972","author":"H Garg","year":"2013","unstructured":"Garg H, Rani M, Sharma SP (2013) Reliability analysis of the engineering systems using intuitionistic fuzzy set theory. J Qual Reliab Eng 943972:1\u201310","journal-title":"J Qual Reliab Eng"},{"issue":"7","key":"531_CR12","doi-asserted-by":"publisher","first-page":"3157","DOI":"10.1016\/j.eswa.2013.11.014","volume":"41","author":"H Garg","year":"2014","unstructured":"Garg H, Rani M, Sharma SP, Vishwakarma Y (2014) Intuitionistic fuzzy optimization technique for solving multi-objective reliability optimization problems in interval environment. Expert Syst Appl 41(7):3157\u20133167","journal-title":"Expert Syst Appl"},{"issue":"4","key":"531_CR13","doi-asserted-by":"publisher","first-page":"788","DOI":"10.1109\/TFUZZ.2016.2578342","volume":"25","author":"G Hesamian","year":"2017","unstructured":"Hesamian G (2017) Measuring similarity and ordering based on interval type 2 fuzzy numbers. IEEE Trans Fuzzy Syst 25(4):788\u2013798","journal-title":"IEEE Trans Fuzzy Syst"},{"issue":"4","key":"531_CR14","doi-asserted-by":"publisher","first-page":"287","DOI":"10.1080\/07408170802322994","volume":"41","author":"H-Z Huang","year":"2009","unstructured":"Huang H-Z, Qu J, Zuo MJ (2009) Genetic-algorithm-based optimal apportionment of reliability and redundancy under multiple objectives. IIE Trans 41(4):287\u2013298","journal-title":"IIE Trans"},{"key":"531_CR15","doi-asserted-by":"publisher","first-page":"4908","DOI":"10.4028\/www.scientific.net\/AMR.433-440.4908","volume":"433\u2013440","author":"EB Jamkhaneh","year":"2012","unstructured":"Jamkhaneh EB, Nozari A (2012) Fuzzy system reliability analysis based on confidence interval. Adv Mater Res 433\u2013440:4908\u20134914","journal-title":"Adv Mater Res"},{"issue":"1\u20134","key":"531_CR16","doi-asserted-by":"publisher","first-page":"195","DOI":"10.1016\/S0020-0255(01)00069-X","volume":"132","author":"NN Karnik","year":"2001","unstructured":"Karnik NN, Mendel JM (2001) Centroid of a type-2 fuzzy set. Inf Sci 132(1\u20134):195\u2013220","journal-title":"Inf Sci"},{"key":"531_CR17","doi-asserted-by":"publisher","first-page":"58","DOI":"10.1016\/j.ress.2012.10.009","volume":"111","author":"K Khalili-Damghani","year":"2013","unstructured":"Khalili-Damghani K, Abtahi A-R, Tavana M (2013) A new multi-objective particle swarm optimization method for solving reliability redundancy allocation problems. Reliab Eng Syst Saf 111:58\u201375","journal-title":"Reliab Eng Syst Saf"},{"issue":"2","key":"531_CR18","doi-asserted-by":"publisher","first-page":"288","DOI":"10.1016\/j.isatra.2011.10.002","volume":"51","author":"M Kumar","year":"2012","unstructured":"Kumar M, Yadav SP (2012) A novel approach for analyzing fuzzy system reliability using different types of intuitionistic fuzzy failure rates of components. ISA Trans 51(2):288\u2013297","journal-title":"ISA Trans"},{"issue":"8","key":"531_CR19","doi-asserted-by":"publisher","first-page":"1668","DOI":"10.1080\/00207721.2012.748944","volume":"45","author":"P Kundu","year":"2014","unstructured":"Kundu P, Kar S, Maiti M (2014) Multi-objective solid transportation problems with budget constraint in uncertain environment. Int J Syst Sci 45(8):1668\u20131682","journal-title":"Int J Syst Sci"},{"issue":"2","key":"531_CR20","doi-asserted-by":"publisher","first-page":"176","DOI":"10.1109\/24.877336","volume":"49","author":"W Kuo","year":"2000","unstructured":"Kuo W, Prasad VR (2000) An annotated overview of system-reliability optimization. IEEE Trans Reliab 49(2):176\u2013187","journal-title":"IEEE Trans Reliab"},{"key":"531_CR21","doi-asserted-by":"publisher","first-page":"2224","DOI":"10.1016\/j.ins.2007.11.014","volume":"178","author":"F Liu","year":"2008","unstructured":"Liu F (2008) An efficient centroid type-reduction strategy for general type-2 fuzzy logic system. Inf Sci 178:2224\u20132236","journal-title":"Inf Sci"},{"issue":"6","key":"531_CR22","doi-asserted-by":"publisher","first-page":"1503","DOI":"10.1109\/TFUZZ.2008.2005002","volume":"16","author":"F Liu","year":"2008","unstructured":"Liu F, Mendel JM (2008) Encoding words into interval type-2 fuzzy sets using an interval approach. IEEE Trans Fuzzy Syst 16(6):1503\u20131521","journal-title":"IEEE Trans Fuzzy Syst"},{"key":"531_CR23","first-page":"643","volume":"174","author":"GS Mahapatra","year":"2006","unstructured":"Mahapatra GS, Roy TK (2006) Fuzzy multi-objective mathematical programming on reliability optimization model. Appl Math Comput 174:643\u2013659","journal-title":"Appl Math Comput"},{"key":"531_CR24","doi-asserted-by":"publisher","first-page":"454","DOI":"10.1016\/j.microc.2011.06.022","volume":"99","author":"A Malenovi\u0107","year":"2011","unstructured":"Malenovi\u0107 A, Dotsikas Y, Ma\u0161kovi\u0107 M, Jan\u010di\u0107-Stojanovi\u0107 B, Ivanovi\u0107 D, Medenica M (2011) Desirability-based optimization and its sensitivity analysis for the perindopril and its impurities analysis in a microemulsion LC system. Microchem J 99:454\u2013460","journal-title":"Microchem J"},{"key":"531_CR25","doi-asserted-by":"crossref","unstructured":"Mendel J M (2003). Fuzzy sets for words: a new beginning. In: Proceedings of IEEE international conference on fuzzy systems, pp 37-42, St. Louis, MO","DOI":"10.1109\/FUZZ.2003.1209334"},{"issue":"4","key":"531_CR26","doi-asserted-by":"publisher","first-page":"10","DOI":"10.1109\/MCI.2007.9066897","volume":"2","author":"JM Mendel","year":"2007","unstructured":"Mendel JM (2007a) Computing with words: zadeh, turing, popper and occam. IEEE Comput Intell Mag 2(4):10\u201317","journal-title":"IEEE Comput Intell Mag"},{"key":"531_CR27","doi-asserted-by":"publisher","first-page":"988","DOI":"10.1016\/j.ins.2006.06.008","volume":"177","author":"JM Mendel","year":"2007","unstructured":"Mendel JM (2007b) Computing with words and its relationships with fuzzistics. Inf Sci 177:988\u20131006","journal-title":"Inf Sci"},{"issue":"2","key":"531_CR28","doi-asserted-by":"publisher","first-page":"307","DOI":"10.1109\/91.995115","volume":"10","author":"JM Mendel","year":"2002","unstructured":"Mendel JM, John RI (2002) Type-2 fuzzy sets made simple. IEEE Trans Fuzzy Syst 10(2):307\u2013315","journal-title":"IEEE Trans Fuzzy Syst"},{"issue":"2","key":"531_CR29","doi-asserted-by":"publisher","first-page":"309","DOI":"10.1109\/TFUZZ.2006.882463","volume":"15","author":"JM Mendel","year":"2007","unstructured":"Mendel JM, Liu F (2007) Super-exponential convergence of the Karnik\u2013Mendel algorithms for computing the centroid of an interval type-2 fuzzy set. IEEE Trans Fuzzy Syst 15(2):309\u2013320","journal-title":"IEEE Trans Fuzzy Syst"},{"issue":"6","key":"531_CR31","doi-asserted-by":"publisher","first-page":"808","DOI":"10.1109\/TFUZZ.2006.879986","volume":"14","author":"JM Mendel","year":"2006","unstructured":"Mendel JM, John RI, Liu FL (2006) Interval type-2 fuzzy logical systems made simple. IEEE Trans Fuzzy Syst 14(6):808\u2013821","journal-title":"IEEE Trans Fuzzy Syst"},{"key":"531_CR32","volume-title":"Nonlinear multiobjective optimization","author":"K Miettinen","year":"2012","unstructured":"Miettinen K (2012) Nonlinear multiobjective optimization. Springer, New York"},{"issue":"3","key":"531_CR33","doi-asserted-by":"publisher","first-page":"909","DOI":"10.1016\/j.ejor.2004.07.052","volume":"170","author":"K Miettinen","year":"2006","unstructured":"Miettinen K, M\u00e4kel\u00e4 MM (2006) Synchronous approach in interactive multiobjective optimization. Eur J Oper Res 170(3):909\u2013922","journal-title":"Eur J Oper Res"},{"key":"531_CR34","doi-asserted-by":"publisher","first-page":"1447","DOI":"10.1007\/s00500-012-0848-y","volume":"16","author":"S Miller","year":"2012","unstructured":"Miller S, Gongora M, Garibaldi J, John R (2012) Interval type-2 fuzzy modelling and stochastic search for real-world inventory management. Soft Comput 16:1447\u20131459","journal-title":"Soft Comput"},{"issue":"3","key":"531_CR37","first-page":"1339","volume":"26","author":"PK Muhuri","year":"2018","unstructured":"Muhuri PK, Ashraf Z, Lohani QMD (2018) Multi-objective reliability-redundancy allocation problem with interval type-2 fuzzy uncertainty. IEEE Trans Fuzzy Syst 26(3):1339\u20131355","journal-title":"IEEE Trans Fuzzy Syst"},{"key":"531_CR38","unstructured":"Nie M, Tan WW (2008) Towards an efficient type-reduction method for interval type-2 fuzzy logic systems. In: IEEE international conference on fuzzy systems, pp 1425\u20131432"},{"issue":"2","key":"531_CR39","doi-asserted-by":"publisher","first-page":"230","DOI":"10.1109\/TFUZZ.2012.2209885","volume":"21","author":"M Pagola","year":"2013","unstructured":"Pagola M, Lopez-Molina C, Fernandez J, Barrenechea E, Bustince H (2013) Interval type-2 fuzzy sets constructed from several membership functions: application to the fuzzy thresholding algorithm. IEEE Trans Fuzzy Syst 21(2):230\u2013244","journal-title":"IEEE Trans Fuzzy Syst"},{"issue":"3","key":"531_CR40","doi-asserted-by":"publisher","first-page":"323","DOI":"10.1109\/24.914551","volume":"49","author":"VR Prasad","year":"2000","unstructured":"Prasad VR, Kuo W (2000) Reliability optimization of coherent systems. IEEE Trans Reliab 49(3):323\u2013330","journal-title":"IEEE Trans Reliab"},{"key":"531_CR41","doi-asserted-by":"publisher","first-page":"253","DOI":"10.1016\/0951-8320(92)90131-4","volume":"37","author":"SS Rao","year":"1992","unstructured":"Rao SS, Dhingra AK (1992) Reliability and redundancy apportionment using crisp and fuzzy multi-objective optimization approaches. Reliab Eng Syst Saf 37:253\u2013261","journal-title":"Reliab Eng Syst Saf"},{"issue":"14","key":"531_CR42","doi-asserted-by":"publisher","first-page":"6147","DOI":"10.1016\/j.eswa.2014.04.016","volume":"41","author":"P Roy","year":"2014","unstructured":"Roy P, Mahapatra BS, Mahapatra GS, Roy PK (2014) Entropy based region reducing genetic algorithm for reliability redundancy allocation in interval environment. Expert Syst Appl 41(14):6147\u20136160","journal-title":"Expert Syst Appl"},{"key":"531_CR43","doi-asserted-by":"publisher","first-page":"10","DOI":"10.1016\/j.ress.2012.06.001","volume":"108","author":"J Safari","year":"2012","unstructured":"Safari J (2012) Multi-objective reliability optimization of series-parallel systems with a choice of redundancy strategies. Reliab Eng Syst Saf 108:10\u201320","journal-title":"Reliab Eng Syst Saf"},{"key":"531_CR44","doi-asserted-by":"publisher","first-page":"152","DOI":"10.1016\/j.cie.2011.09.003","volume":"62","author":"L Sahoo","year":"2012","unstructured":"Sahoo L, Bhunia AK, Kapur PK (2012) Genetic algorithm based multi-objective reliability optimization in interval environment. Comput Ind Eng 62:152\u2013160","journal-title":"Comput Ind Eng"},{"issue":"7","key":"531_CR46","doi-asserted-by":"publisher","first-page":"3444","DOI":"10.1016\/j.eswa.2013.10.048","volume":"41","author":"V Sriramdas","year":"2014","unstructured":"Sriramdas V, Chaturvedi S, Gargama H (2014) Fuzzy arithmetic based reliability allocation approach during early design and development. Expert Syst Appl 41(7):3444\u20133449","journal-title":"Expert Syst Appl"},{"key":"531_CR48","doi-asserted-by":"crossref","unstructured":"Wang Z, Chen T, Tang K, Yao X (2009) A multi-objective approach to redundancy allocation problem in parallel-series systems. In: Proceedings of IEEE congress on evolutionary computation, pp 582\u2013589","DOI":"10.1109\/CEC.2009.4982998"},{"issue":"5","key":"531_CR49","doi-asserted-by":"publisher","first-page":"622","DOI":"10.1109\/TFUZZ.2002.803496","volume":"10","author":"D Wu","year":"2002","unstructured":"Wu D, Mendel JM (2002) Uncertainty bounds and their use in the design of intervaltype-2 fuzzy logic systems. IEEE Trans Fuzzy Syst 10(5):622\u2013639","journal-title":"IEEE Trans Fuzzy Syst"},{"issue":"2","key":"531_CR50","doi-asserted-by":"publisher","first-page":"1045","DOI":"10.1109\/TR.2015.2484064","volume":"65","author":"Y Xu","year":"2016","unstructured":"Xu Y, Liao H (2016) Reliability analysis and redundancy allocation for a one-shot system containing multifunctional components. IEEE Trans Reliab 65(2):1045\u20131057","journal-title":"IEEE Trans Reliab"},{"key":"531_CR51","first-page":"1521","volume":"24","author":"JS Yao","year":"2008","unstructured":"Yao JS, Su JS, Shih TS (2008) Fuzzy system reliability analysis using triangular fuzzy numbers based on statistical data. J Inf Sci Eng 24:1521\u20131535","journal-title":"J Inf Sci Eng"},{"key":"531_CR52","doi-asserted-by":"publisher","first-page":"89","DOI":"10.1016\/j.biortech.2012.05.088","volume":"118","author":"Y Yetilmezsoy","year":"2012","unstructured":"Yetilmezsoy Y (2012) Integration of kinetic modeling and desirability function approach for multi-objective optimization of UASB reactor treating poultry manure wastewater. Bioresour Technol 118:89\u2013101","journal-title":"Bioresour Technol"},{"key":"531_CR53","volume-title":"compromising programming, multiple criteriadecision making","author":"M Zeleny","year":"1973","unstructured":"Zeleny M (1973) compromising programming, multiple criteriadecision making. University of South Carolina Press, Columbia"},{"key":"531_CR54","doi-asserted-by":"publisher","first-page":"83","DOI":"10.1016\/j.ress.2015.09.008","volume":"145","author":"E Zhang","year":"2016","unstructured":"Zhang E, Chen Q (2016) Multi-objective reliability redundancy allocation in an interval environment using particle swarm optimization. Reliab Eng Syst Saf 145:83\u201392","journal-title":"Reliab Eng Syst Saf"},{"key":"531_CR55","doi-asserted-by":"publisher","first-page":"45","DOI":"10.1016\/0165-0114(78)90031-3","volume":"1","author":"H-J Zimmermann","year":"1978","unstructured":"Zimmermann H-J (1978) Fuzzy programming and linear programming with several objective functions. Fuzzy Sets Syst 1:45\u201355","journal-title":"Fuzzy Sets Syst"}],"container-title":["Operational Research"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s12351-019-00531-y.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/article\/10.1007\/s12351-019-00531-y\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s12351-019-00531-y.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2024,7,27]],"date-time":"2024-07-27T01:22:15Z","timestamp":1722043335000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/s12351-019-00531-y"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2019,11,15]]},"references-count":50,"journal-issue":{"issue":"4","published-print":{"date-parts":[[2021,12]]}},"alternative-id":["531"],"URL":"https:\/\/doi.org\/10.1007\/s12351-019-00531-y","relation":{},"ISSN":["1109-2858","1866-1505"],"issn-type":[{"value":"1109-2858","type":"print"},{"value":"1866-1505","type":"electronic"}],"subject":[],"published":{"date-parts":[[2019,11,15]]},"assertion":[{"value":"21 January 2019","order":1,"name":"received","label":"Received","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"25 October 2019","order":2,"name":"revised","label":"Revised","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"3 November 2019","order":3,"name":"accepted","label":"Accepted","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"15 November 2019","order":4,"name":"first_online","label":"First Online","group":{"name":"ArticleHistory","label":"Article History"}}]}}