{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,2,21]],"date-time":"2025-02-21T14:45:35Z","timestamp":1740149135279,"version":"3.37.3"},"reference-count":40,"publisher":"Springer Science and Business Media LLC","issue":"3","license":[{"start":{"date-parts":[[2020,11,1]],"date-time":"2020-11-01T00:00:00Z","timestamp":1604188800000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springer.com\/tdm"},{"start":{"date-parts":[[2020,11,1]],"date-time":"2020-11-01T00:00:00Z","timestamp":1604188800000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springer.com\/tdm"}],"funder":[{"name":"NSERC, MITACS, aiTree"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Oper Res Int J"],"published-print":{"date-parts":[[2022,7]]},"DOI":"10.1007\/s12351-020-00612-3","type":"journal-article","created":{"date-parts":[[2020,11,1]],"date-time":"2020-11-01T18:02:41Z","timestamp":1604253761000},"page":"2437-2463","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":2,"title":["Solving the integrated forest harvest scheduling model using metaheuristic algorithms"],"prefix":"10.1007","volume":"22","author":[{"ORCID":"https:\/\/orcid.org\/0000-0002-4308-6436","authenticated-orcid":false,"given":"Nader","family":"Naderializadeh","sequence":"first","affiliation":[]},{"given":"Kevin A.","family":"Crowe","sequence":"additional","affiliation":[]},{"given":"Melika","family":"Rouhafza","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2020,11,1]]},"reference":[{"key":"612_CR1","doi-asserted-by":"publisher","first-page":"613","DOI":"10.1287\/opre.51.4.613.16107","volume":"51","author":"N Andalaft","year":"2003","unstructured":"Andalaft N, Andalaft P, Guignard M, Magendzo A, Wainer A, Weintraub A (2003) A problem of forest harvesting and road building solved through model strengthening and Lagrangean relaxation. Oper Res 51:613\u2013628","journal-title":"Oper Res"},{"key":"612_CR2","doi-asserted-by":"publisher","first-page":"1444","DOI":"10.1139\/x04-030","volume":"34","author":"AE Anderson","year":"2004","unstructured":"Anderson AE, Nelson J (2004) Projecting vector-based road networks with a shortest path algorithm. Can J For Res 34:1444\u20131457","journal-title":"Can J For Res"},{"key":"612_CR3","doi-asserted-by":"publisher","first-page":"44","DOI":"10.5558\/tfc2014-009","volume":"90","author":"GW Armstrong","year":"2014","unstructured":"Armstrong GW (2014) Considerations for boreal mixedwood silviculture: a view from the dismal science. For Chron 90:44\u201349","journal-title":"For Chron"},{"key":"612_CR4","doi-asserted-by":"publisher","first-page":"1784","DOI":"10.1139\/x99-160","volume":"29","author":"P Bettinger","year":"1999","unstructured":"Bettinger P, Boston K, Sessions J (1999) Intensifying a heuristic forest harvest scheduling search procedure with 2-opt decision choices. Can J For Res 29:1784\u20131792","journal-title":"Can J For Res"},{"key":"612_CR5","first-page":"26","volume":"1","author":"P Bettinger","year":"2009","unstructured":"Bettinger P, Sessions J, Boston K (2009) A review of the status and use of validation procedures for heuristics used in forest planning. Math Comput For Nat Resour Sci 1:26\u201337","journal-title":"Math Comput For Nat Resour Sci"},{"key":"612_CR6","doi-asserted-by":"publisher","first-page":"39","DOI":"10.1111\/j.1475-3995.2010.00800.x","volume":"19","author":"T Bj\u00f8rndal","year":"2012","unstructured":"Bj\u00f8rndal T, Herrero I, Newman A, Romero C, Weintraub A (2012) Operations research in the natural resource industry. Int Trans Oper Res 19:39\u201362","journal-title":"Int Trans Oper Res"},{"key":"612_CR7","doi-asserted-by":"publisher","first-page":"700","DOI":"10.1016\/j.ejor.2013.08.039","volume":"233","author":"P Borges","year":"2014","unstructured":"Borges P, Eid T, Bergseng E (2014) Applying simulated annealing using different methods for the neighborhood search in forest planning problems. Eur J Oper Res 233:700\u2013710","journal-title":"Eur J Oper Res"},{"key":"612_CR8","first-page":"292","volume":"45","author":"K Boston","year":"1999","unstructured":"Boston K, Bettinger P (1999) An analysis of Monte Carlo integer programming, simulated annealing, and tabu search heuristics for solving spatial harvest scheduling problems. For Sci 45:292\u2013301","journal-title":"For Sci"},{"key":"612_CR9","series-title":"Managing Forest Ecosystems","doi-asserted-by":"publisher","first-page":"109","DOI":"10.1007\/978-94-017-0307-9_12","volume-title":"Systems analysis in forest resources","author":"W Chung","year":"2003","unstructured":"Chung W, Sessions J (2003) NETWORK 2000: a program for optimizing large fixed and variable cost transportation problems. In: Arthaud GJ, Barrett TM (eds) Systems analysis in forest resources. Managing Forest Ecosystems, vol 7. Springer, Dordrecht, pp 109\u2013120"},{"key":"612_CR10","doi-asserted-by":"crossref","unstructured":"Chung W, Dykstra D, Bower F, O\u2019Brien S, Abt RM, Sessions J (2012) User\u2019s guide to SNAP for ArcGIS: ArcGIS interface for scheduling and network analysis program. USDA Forest Service PNW-GTR-847, 34\u00a0pp","DOI":"10.2737\/PNW-GTR-847"},{"key":"612_CR11","first-page":"204","volume":"46","author":"MM Clark","year":"2000","unstructured":"Clark MM, Meller RD, McDonald TP (2000) A three-stage heuristic for harvest scheduling with access road network development. For Sci 46:204\u2013218","journal-title":"For Sci"},{"key":"612_CR12","doi-asserted-by":"publisher","first-page":"1804","DOI":"10.1139\/x03-101","volume":"33","author":"K Crowe","year":"2003","unstructured":"Crowe K, Nelson JD, Boyland M (2003) Solving the area-restricted harvest-scheduling model using the branch and bound algorithm. Can J For Res 33:1804\u20131814","journal-title":"Can J For Res"},{"issue":"1\u20134","key":"612_CR13","doi-asserted-by":"publisher","first-page":"281","DOI":"10.1080\/02827589309382777","volume":"8","author":"B Dahlin","year":"1993","unstructured":"Dahlin B, Salln\u00e4s O (1993) Harvest scheduling under adjacency constraints\u2014a case study from the Swedish sub-alpine region. Scand J For Res 8(1\u20134):281-290","journal-title":"Scand J For Res"},{"key":"612_CR14","doi-asserted-by":"publisher","first-page":"269","DOI":"10.1007\/BF01386390","volume":"1","author":"EW Dijkstra","year":"1959","unstructured":"Dijkstra EW (1959) A note on two problems in connection with graphs. Numer Math 1:269\u2013271","journal-title":"Numer Math"},{"key":"612_CR15","doi-asserted-by":"publisher","first-page":"655","DOI":"10.1287\/opre.51.4.655.16098","volume":"51","author":"I Ghamlouche","year":"2003","unstructured":"Ghamlouche I, Crainic TG, Gendreau M (2003) Cycle-based neighbourhoods for fixed-charge capacitated multicommodity network design. Oper Res 51:655\u2013667","journal-title":"Oper Res"},{"key":"612_CR16","first-page":"149","volume":"55","author":"M Goycoolea","year":"2009","unstructured":"Goycoolea M, Murray A, Vielma JP, Weintraub A (2009) Evaluating approaches for solving the area restriction model in harvest scheduling. For Sci 55:149\u2013165","journal-title":"For Sci"},{"key":"612_CR17","doi-asserted-by":"publisher","first-page":"448","DOI":"10.1016\/S0377-2217(97)00362-7","volume":"111","author":"M Guignard","year":"1998","unstructured":"Guignard M, Ryu C, Spielberg K (1998) Model tightening for integrated timber harvest and transportation planning. Eur J Oper Res 111:448\u2013460","journal-title":"Eur J Oper Res"},{"key":"612_CR18","unstructured":"Jones JG, Hyde JFC, Meacham ML (1986) Four analytical approaches for integrating land management and transportation planning on forest lands. Research Paper INT-36\u00a0l, USDA Forest Service, Intermountain Research Station, 32\u00a0pp"},{"key":"612_CR19","unstructured":"Kirby MW, Wong P, Hager WA, Huddleston ME (1980) Guide to the integrated resources planning model. Technical report, Berkeley, California, USA"},{"key":"612_CR20","first-page":"371","volume":"21","author":"MW Kirby","year":"1986","unstructured":"Kirby MW, Hager WA, Wong P (1986) Simultaneous planning of wildland management and transportation alternatives. TIMS Stud Manag Sci 21:371\u2013387","journal-title":"TIMS Stud Manag Sci"},{"key":"612_CR21","doi-asserted-by":"publisher","first-page":"975","DOI":"10.1007\/BF01009452","volume":"34","author":"S Kirkpatrick","year":"1984","unstructured":"Kirkpatrick S (1984) Optimization by simulated annealing: quantitative studies. J Stat Phys 34:975\u2013986","journal-title":"J Stat Phys"},{"key":"612_CR22","doi-asserted-by":"publisher","first-page":"468","DOI":"10.1139\/x93-065","volume":"23","author":"C Lockwood","year":"1993","unstructured":"Lockwood C, Moore T (1993) Harvest scheduling with spatial constraints: a simulated annealing approach. Can J For Res 23:468\u2013478","journal-title":"Can J For Res"},{"key":"612_CR23","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1287\/trsc.18.1.1","volume":"18","author":"TL Magnanti","year":"1984","unstructured":"Magnanti TL, Wong RT (1984) Network design and transportation planning: models and algorithms. Transp Sci 18:1\u201355","journal-title":"Transp Sci"},{"key":"612_CR24","unstructured":"Martin JA (1971) The relative importance of factors that determine log-hauling costs. USDA Forest Service Research Paper NE-197. Northeastern Forest Experimental Station, Upper Darby, PA, 18\u00a0pp"},{"key":"612_CR25","first-page":"631","volume":"48","author":"ME McDill","year":"2002","unstructured":"McDill ME, Rebain SA, Braze J (2002) Harvest scheduling with area-based adjacency constraints. For Sci 48:631\u2013642","journal-title":"For Sci"},{"key":"612_CR26","first-page":"45","volume":"45","author":"AT Murray","year":"1999","unstructured":"Murray AT (1999) Spatial restrictions in harvest scheduling. For Sci 45:45\u201352","journal-title":"For Sci"},{"key":"612_CR27","doi-asserted-by":"publisher","first-page":"193","DOI":"10.1007\/BF01719265","volume":"17","author":"AT Murray","year":"1995","unstructured":"Murray AT, Church RL (1995) Heuristic solution approaches to operational forest planning problems. OR-Spektrum 17:193\u2013203","journal-title":"OR-Spektrum"},{"key":"612_CR29","doi-asserted-by":"publisher","first-page":"679","DOI":"10.1139\/cjfr-2017-0176","volume":"48","author":"N Naderializadeh","year":"2018","unstructured":"Naderializadeh N, Crowe KA (2018) The effect of the density of candidate roads on solutions in tactical forest planning. Can J For Res 48:679\u2013688","journal-title":"Can J For Res"},{"key":"612_CR28","doi-asserted-by":"publisher","first-page":"2283","DOI":"10.1007\/s12351-018-0410-5","volume":"20","author":"N Naderializadeh","year":"2020","unstructured":"Naderializadeh N, Crowe KA (2020) Formulating the integrated forest harvest-scheduling model to reduce the cost of the road-networks. Oper Res Int J 20:2283\u20132306","journal-title":"Oper Res Int J"},{"key":"612_CR30","doi-asserted-by":"publisher","first-page":"934","DOI":"10.1139\/x90-126","volume":"20","author":"J Nelson","year":"1990","unstructured":"Nelson J, Brodie JD (1990) Comparison of a random search algorithm and mixed integer programming for solving area-based forest plans. Can J For Res 20:934\u2013942","journal-title":"Can J For Res"},{"key":"612_CR31","doi-asserted-by":"publisher","first-page":"1032","DOI":"10.1139\/x98-076","volume":"28","author":"K \u00d6hman","year":"1998","unstructured":"\u00d6hman K, Eriksson LO (1998) The core area concept in forming contiguous areas for long-term forest planning. Can J For Res 28:1032\u20131039","journal-title":"Can J For Res"},{"key":"612_CR32","volume-title":"Modern heuristic techniques for combinatorial problems","author":"CR Reeves","year":"1993","unstructured":"Reeves CR (1993) Modern heuristic techniques for combinatorial problems. Wiley, Hoboken"},{"key":"612_CR33","first-page":"188","volume":"46","author":"EW Richards","year":"2000","unstructured":"Richards EW, Gunn EA (2000) A model and tabu search method to optimize stand harvest and road construction schedules. For Sci 46:188\u2013203","journal-title":"For Sci"},{"key":"612_CR34","doi-asserted-by":"publisher","first-page":"1126","DOI":"10.1139\/x03-039","volume":"33","author":"EW Richards","year":"2003","unstructured":"Richards EW, Gunn EA (2003) Tabu search design for difficult forest management optimization problems. Can J For Res 33:1126\u20131133","journal-title":"Can J For Res"},{"key":"612_CR35","first-page":"460","volume":"56","author":"MG Silva","year":"2010","unstructured":"Silva MG, Weintraub A, Romero C, De la Maza C (2010) Forest harvesting and environmental protection based on the goal programming approach. For Sci 56:460\u2013472","journal-title":"For Sci"},{"key":"612_CR36","doi-asserted-by":"publisher","first-page":"390","DOI":"10.1080\/02827589709355428","volume":"12","author":"P Tarp","year":"1997","unstructured":"Tarp P, Helles F (1997) Spatial optimization by simulated annealing and linear programming. Scand J For Res 12:390\u2013402","journal-title":"Scand J For Res"},{"key":"612_CR37","doi-asserted-by":"crossref","first-page":"207","DOI":"10.14214\/sf.657","volume":"33","author":"PC Van Deusen","year":"1999","unstructured":"Van Deusen PC (1999) Multiple solution harvest scheduling. Silva Fenn 33:207\u2013216","journal-title":"Silva Fenn"},{"key":"612_CR38","doi-asserted-by":"crossref","first-page":"85","DOI":"10.14214\/sf.605","volume":"35","author":"PC Van Deusen","year":"2001","unstructured":"Van Deusen PC (2001) Scheduling spatial arrangement and harvest simultaneously. Silva Fenn 35:85\u201392","journal-title":"Silva Fenn"},{"key":"612_CR39","first-page":"259","volume":"232","author":"FB Veliz","year":"2015","unstructured":"Veliz FB, Watson JP, Weintraub A, Wets RB, Woodruff DL (2015) Stochastic optimization models in forest planning: a progressive hedging solution approach. Ann Oper Res 232:259\u2013274","journal-title":"Ann Oper Res"},{"key":"612_CR40","doi-asserted-by":"publisher","first-page":"1299","DOI":"10.1287\/mnsc.22.12.1299","volume":"22","author":"A Weintraub","year":"1976","unstructured":"Weintraub A, Navon D (1976) A forest management planning model integrating silvicultural and transportation activities. Manag Sci 22:1299\u20131309","journal-title":"Manag Sci"}],"container-title":["Operational Research"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s12351-020-00612-3.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/article\/10.1007\/s12351-020-00612-3\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s12351-020-00612-3.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2022,7,28]],"date-time":"2022-07-28T17:04:43Z","timestamp":1659027883000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/s12351-020-00612-3"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2020,11,1]]},"references-count":40,"journal-issue":{"issue":"3","published-print":{"date-parts":[[2022,7]]}},"alternative-id":["612"],"URL":"https:\/\/doi.org\/10.1007\/s12351-020-00612-3","relation":{},"ISSN":["1109-2858","1866-1505"],"issn-type":[{"type":"print","value":"1109-2858"},{"type":"electronic","value":"1866-1505"}],"subject":[],"published":{"date-parts":[[2020,11,1]]},"assertion":[{"value":"7 March 2019","order":1,"name":"received","label":"Received","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"31 July 2020","order":2,"name":"revised","label":"Revised","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"13 October 2020","order":3,"name":"accepted","label":"Accepted","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"1 November 2020","order":4,"name":"first_online","label":"First Online","group":{"name":"ArticleHistory","label":"Article History"}}]}}