{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,6,11]],"date-time":"2026-06-11T08:58:39Z","timestamp":1781168319373,"version":"3.54.1"},"reference-count":60,"publisher":"Springer Science and Business Media LLC","issue":"3","license":[{"start":{"date-parts":[[2021,3,16]],"date-time":"2021-03-16T00:00:00Z","timestamp":1615852800000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springer.com\/tdm"},{"start":{"date-parts":[[2021,3,16]],"date-time":"2021-03-16T00:00:00Z","timestamp":1615852800000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Oper Res Int J"],"published-print":{"date-parts":[[2022,7]]},"DOI":"10.1007\/s12351-021-00633-6","type":"journal-article","created":{"date-parts":[[2021,3,16]],"date-time":"2021-03-16T17:03:48Z","timestamp":1615914228000},"page":"2245-2280","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":13,"title":["A bi-objective model for scheduling of multiple projects under multi-skilled workforce for distributed load energy usage"],"prefix":"10.1007","volume":"22","author":[{"given":"Shima","family":"Javanmard","sequence":"first","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"ORCID":"https:\/\/orcid.org\/0000-0002-3391-8411","authenticated-orcid":false,"given":"Behrouz","family":"Afshar-Nadjafi","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Seyed","family":"Taghi Akhavan Niaki","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"297","published-online":{"date-parts":[[2021,3,16]]},"reference":[{"key":"633_CR1","doi-asserted-by":"publisher","DOI":"10.1016\/j.cie.2020.107004","author":"B Afshar-Nadjafi","year":"2020","unstructured":"Afshar-Nadjafi B (2020) Multi-skilling in scheduling problems: a review on models methods and applications Comput Ind Eng https:\/\/doi.org\/10.1016\/j.cie.2020.107004","journal-title":"Comput Ind Eng"},{"key":"633_CR2","doi-asserted-by":"crossref","first-page":"284","DOI":"10.1016\/j.epsr.2018.01.006","volume":"158","author":"M Alamaniotis","year":"2018","unstructured":"Alamaniotis M, Gatsis N, Tsoukalas LH (2018) Virtual Budget: Integration of electricity load and price anticipation for load morphing in price-directed energy utilization. Electric Power Syst Res 158:284\u2013296","journal-title":"Electric Power Syst Res"},{"key":"633_CR3","doi-asserted-by":"crossref","first-page":"85","DOI":"10.1007\/s10288-007-0038-4","volume":"6","author":"O Bellenguez","year":"2008","unstructured":"Bellenguez O (2008) Methods to solve multiskill project scheduling problem. 4OR Quart J Op Res 6:85\u201388","journal-title":"4OR Quart J Op Res"},{"key":"633_CR4","doi-asserted-by":"crossref","unstructured":"Bellenguez, O., N\u00e9ron, E., (2005). Lower bounds for the multi-skill project scheduling problem with hierarchical levels of skills. International Conference on the Practice and Theory of Automated Timetabling Springer Berlin Heidelberg, 229\u2013243","DOI":"10.1007\/11593577_14"},{"key":"633_CR5","doi-asserted-by":"crossref","first-page":"155","DOI":"10.1051\/ro:2007015","volume":"41","author":"O Bellenguez-Morineau","year":"2007","unstructured":"Bellenguez-Morineau O, N\u00e9ron E (2007) A branch-and-bound method for solving multi-skill project scheduling problem. RAIRO-Op Res 41:155\u2013170","journal-title":"RAIRO-Op Res"},{"key":"633_CR6","doi-asserted-by":"crossref","first-page":"796","DOI":"10.1016\/j.rser.2016.12.105","volume":"71","author":"C Bhowmik","year":"2017","unstructured":"Bhowmik C, Bhowmik S, Ray A, Murari K (2017) Pandey Optimal green energy planning for sustainable development: a review. Renew Sustain Energy Rev 71:796\u2013813","journal-title":"Renew Sustain Energy Rev"},{"key":"633_CR7","doi-asserted-by":"crossref","first-page":"212","DOI":"10.1016\/j.ijpe.2010.03.009","volume":"126","author":"TR Browning","year":"2010","unstructured":"Browning TR, Yassine AA (2010) Resource-constrained multi-project scheduling: Priority rule performance revisited. Int J Prod Econ 126:212\u2013228","journal-title":"Int J Prod Econ"},{"key":"633_CR8","doi-asserted-by":"crossref","unstructured":"Cai, Z., Li, X., (2012). A hybrid genetic algorithm for resource constrained multi project scheduling problem with resource transfer time. In: Proceeding of the 2012 IEEE International Conference on Automation Science and Engineering, (CASE 2012), Seoul, 569\u2013574.","DOI":"10.1109\/CoASE.2012.6386457"},{"issue":"8","key":"633_CR9","doi-asserted-by":"crossref","first-page":"13","DOI":"10.1016\/j.compchemeng.2016.01.004","volume":"88","author":"RK Chakrabortty","year":"2016","unstructured":"Chakrabortty RK, Sarker RA, Essam DL (2016) Multi-mode resource constrained project scheduling under resource disruptions. Comput Chem Eng 88(8):13\u201329","journal-title":"Comput Chem Eng"},{"key":"633_CR10","doi-asserted-by":"crossref","first-page":"434","DOI":"10.1016\/j.autcon.2008.10.007","volume":"18","author":"PH Chen","year":"2009","unstructured":"Chen PH, Shahandashti SM (2009) Hybrid of genetic algorithm and simulated annealing for multiple project scheduling with multiple resource constraints. Autom Constr 18:434\u2013443","journal-title":"Autom Constr"},{"key":"633_CR11","unstructured":"Chen R, Liang C, Gu D, (2016) IT project portfolio scheduling and multi-skilled staff assignment with ant colony optimization algorithm. WHICEB 2016 Proceeding. 9"},{"key":"633_CR12","doi-asserted-by":"crossref","first-page":"181","DOI":"10.1007\/s10951-007-0013-0","volume":"10","author":"I Cohen","year":"2007","unstructured":"Cohen I, Golany B, Shtub A (2007) Resource allocation in stochastic, finite-capacity, multi-project systems through the cross entropy methodology. J Sched 10:181\u2013193","journal-title":"J Sched"},{"key":"633_CR13","unstructured":"Coello CAC, Lechuga MS, (2002) MOPSO: A proposal for multiple objective particle swarm optimization. Evolutionary Computation, 2002. CEC'02. Proceedings of the 2002 Congress on 2, 1051\u20131056"},{"key":"633_CR14","unstructured":"Coello Coello CA, Lamont GB and Van Veldhuizen DA (2007) Evolutionary algorithms for solving multiobjective problems"},{"key":"633_CR15","doi-asserted-by":"crossref","unstructured":"Deb K, Agrawal S, Pratap A, Meyarivan T, (2000) A fast elitist non-dominated sorting genetic algorithm for multiobjective optimization: NSGA-II International Conference on Parallel Problem Solving From Nature Springer, Berlin","DOI":"10.1007\/3-540-45356-3_83"},{"key":"633_CR16","doi-asserted-by":"crossref","first-page":"182","DOI":"10.1109\/4235.996017","volume":"6","author":"K Deb","year":"2002","unstructured":"Deb K, Pratap A, Agarwal S, Meyarivan TAMT (2002) A fast and elitist multiobjective genetic algorithm: NSGA-II. IEEE Trans Evol Comput 6:182\u2013197","journal-title":"IEEE Trans Evol Comput"},{"key":"633_CR17","doi-asserted-by":"crossref","first-page":"101","DOI":"10.1287\/mnsc.34.1.101","volume":"34","author":"J Dumond","year":"1988","unstructured":"Dumond J, Mabert VA (1988) Evaluating project scheduling and due date assignment procedures: an experimental analysis. Manage Sci 34:101\u2013118","journal-title":"Manage Sci"},{"key":"633_CR18","doi-asserted-by":"crossref","first-page":"363","DOI":"10.1007\/s10951-011-0245-x","volume":"15","author":"M F\u0131rat","year":"2012","unstructured":"F\u0131rat M, Hurkens CAJ (2012) An improved MIP-based approach for a multi-skill workforce scheduling problem. J Sched 15:363\u2013380","journal-title":"J Sched"},{"key":"633_CR19","doi-asserted-by":"crossref","first-page":"633","DOI":"10.1007\/s12351-016-0246-9","volume":"17","author":"E Fragni\u00e8re","year":"2017","unstructured":"Fragni\u00e8re E, Kanala R, Moresino F, Reveiu A, Smeureanu I (2017) Coupling techno-economic energy models with behavioral approaches. Oper Res Int J 17:633\u2013647","journal-title":"Oper Res Int J"},{"issue":"1","key":"633_CR20","doi-asserted-by":"crossref","first-page":"17","DOI":"10.1007\/s00366-011-0241-y","volume":"29","author":"AH Gandomi","year":"2013","unstructured":"Gandomi AH, Yang XS, Alavi AH (2013) Cuckoo search algorithm: a metaheuristic approach to solve structural optimization problems. Eng Comput 29(1):17\u201335","journal-title":"Eng Comput"},{"key":"633_CR21","doi-asserted-by":"crossref","first-page":"417","DOI":"10.1080\/02331931003700699","volume":"59","author":"WJ Gutjahr","year":"2010","unstructured":"Gutjahr WJ, Reiter P (2010) Bi-objective project portfolio selection and staff assignment under uncertainty. Optimization 59:417\u2013445","journal-title":"Optimization"},{"key":"633_CR22","doi-asserted-by":"crossref","first-page":"117","DOI":"10.1016\/j.compchemeng.2015.02.004","volume":"76","author":"H Hadera","year":"2015","unstructured":"Hadera H, Harjunkoski I, Sand G, Grossmann IE, Engell S (2015) Optimization of steel production scheduling with complex time-sensitive electricity cost. Comput Chem Eng 76:117\u2013136","journal-title":"Comput Chem Eng"},{"key":"633_CR23","doi-asserted-by":"crossref","first-page":"3759","DOI":"10.1080\/00207540902852785","volume":"48","author":"C Heimerl","year":"2010","unstructured":"Heimerl C, Kolisch R (2010) Work assignment to and qualification of multi-skilled human resources under knowledge depreciation and company skill level targets. Int J Prod Res 48:3759\u20133781","journal-title":"Int J Prod Res"},{"issue":"2","key":"633_CR24","doi-asserted-by":"crossref","first-page":"159","DOI":"10.1016\/j.jcde.2018.07.001","volume":"6","author":"M Jalal","year":"2019","unstructured":"Jalal M, Goharzay M (2019) Cuckoo search algorithm for applied structural and design optimization: float system for experimental setups. J Comput Design Eng 6(2):159\u2013172","journal-title":"J Comput Design Eng"},{"key":"633_CR25","doi-asserted-by":"crossref","first-page":"55","DOI":"10.1016\/j.compchemeng.2016.11.001","volume":"96","author":"S Javanmard","year":"2017","unstructured":"Javanmard S, Afshar-Nadjafi B, Niaki STA (2017) Preemptive multi-skilled resource investment project scheduling problem: Mathematical modeling and solution approaches. Comput Chem Eng 96:55\u201368","journal-title":"Comput Chem Eng"},{"issue":"6","key":"633_CR26","doi-asserted-by":"crossref","first-page":"4024","DOI":"10.1016\/j.eswa.2009.09.005","volume":"37","author":"N Karimi","year":"2010","unstructured":"Karimi N, Zandieh M, Karamooz HR (2010) Bi-objective group scheduling in hybrid flexible flowshop: a multi-phase approach. Expert Syst Appl 37(6):4024\u20134032","journal-title":"Expert Syst Appl"},{"key":"633_CR27","doi-asserted-by":"crossref","first-page":"1099","DOI":"10.1007\/s00170-012-4045-z","volume":"64","author":"H Kazemipoor","year":"2013","unstructured":"Kazemipoor H, Tavakkoli-Moghaddam R, Shahnazari-Shahrezaei P, Azaron A (2013) A differential evolution algorithm to solve multi-skilled project portfolio scheduling problems. Int J Adv Manuf Technol 64:1099\u20131111","journal-title":"Int J Adv Manuf Technol"},{"key":"633_CR28","doi-asserted-by":"crossref","first-page":"369","DOI":"10.1007\/s00291-008-0144-5","volume":"32","author":"D Kr\u00fcger","year":"2010","unstructured":"Kr\u00fcger D, Scholl A (2010) Managing and modelling general resource transfers in (multi-) project scheduling. OR Spectrum 32:369\u2013394","journal-title":"OR Spectrum"},{"key":"633_CR29","first-page":"249","volume":"10","author":"S Kumanam","year":"2011","unstructured":"Kumanam S, Raja K (2011) Multi-project scheduling using a heuristic and memetic algorithm. J Manuf Sci Prod 10:249\u2013256","journal-title":"J Manuf Sci Prod"},{"key":"633_CR30","doi-asserted-by":"crossref","first-page":"348","DOI":"10.1016\/j.cie.2018.09.016","volume":"126","author":"D Laha","year":"2018","unstructured":"Laha D, Gupta JN (2018) An improved cuckoo search algorithm for scheduling jobs on identical parallel machines. Comput Ind Eng 126:348\u2013360","journal-title":"Comput Ind Eng"},{"key":"633_CR31","doi-asserted-by":"crossref","first-page":"412","DOI":"10.1016\/j.ins.2019.01.002","volume":"481","author":"M Laszczyk","year":"2019","unstructured":"Laszczyk M, Myszkowski PB (2019) Improved selection in evolutionary multi\u2013objective optimization of multi\u2013skill resource\u2013constrained project scheduling problem. Inf Sci 481:412\u2013431","journal-title":"Inf Sci"},{"key":"633_CR32","doi-asserted-by":"crossref","first-page":"157","DOI":"10.1016\/j.compchemeng.2016.02.018","volume":"88","author":"H Maghsoudlou","year":"2016","unstructured":"Maghsoudlou H, Afshar-Nadjafi B, Niaki STA (2016a) A multiobjective invasive weeds optimization algorithm for solving multi-skill multi-mode resource constrained project scheduling problem. Comput Chem Eng 88:157\u2013169","journal-title":"Comput Chem Eng"},{"key":"633_CR33","doi-asserted-by":"crossref","first-page":"41","DOI":"10.1016\/j.cie.2016.07.008","volume":"99","author":"H Maghsoudlou","year":"2016","unstructured":"Maghsoudlou H, Kahag MR, Niaki STA, Pourvaziri H (2016b) Bi-objective optimization of a three-echelon multi-server supply-chain problem in congested systems: modeling and solution. Comput Ind Eng 99:41\u201362","journal-title":"Comput Ind Eng"},{"key":"633_CR34","doi-asserted-by":"crossref","first-page":"46","DOI":"10.1016\/j.asoc.2017.01.024","volume":"54","author":"H Maghsoudlou","year":"2017","unstructured":"Maghsoudlou H, Afshar-Nadjafi B, Niaki STA (2017) Multi-skilled project scheduling with level-dependent rework risk; three multiobjective mechanisms based on cuckoo search. Appl Soft Comput 54:46\u201361","journal-title":"Appl Soft Comput"},{"key":"633_CR35","doi-asserted-by":"crossref","first-page":"1877","DOI":"10.1051\/ro\/2018103","volume":"53","author":"H Maghsoudlou","year":"2019","unstructured":"Maghsoudlou H, Afshar-Nadjafi B, Niaki STA (2019) Preemptive multi-skilled resource constrained project scheduling problem with hard \/ soft interval due dates. RAIRO Op Res 53:1877\u20131898","journal-title":"RAIRO Op Res"},{"key":"633_CR36","doi-asserted-by":"publisher","DOI":"10.1007\/s12667-019-00374-8","author":"H Maghsoudlou","year":"2020","unstructured":"Maghsoudlou H, Afshar-Nadjafi B, Niaki STA (2020) A framework for preemptive multi-skilled project scheduling problem with time-of-use energy tariffs. Energy Syst. https:\/\/doi.org\/10.1007\/s12667-019-00374-8","journal-title":"Energy Syst"},{"key":"633_CR37","doi-asserted-by":"crossref","first-page":"33","DOI":"10.1016\/j.rser.2018.02.035","volume":"89","author":"M Mohammadi","year":"2018","unstructured":"Mohammadi M, Noorollahi Y, Mohammadi-ivatloo B, Hosseinzadeh M, Yousefi H, Torabzadeh KS (2018) Optimal management of energy hubs and smart energy hubs \u2013 a review. Renew Sustain Energy Rev 89:33\u201350","journal-title":"Renew Sustain Energy Rev"},{"key":"633_CR38","doi-asserted-by":"crossref","first-page":"201","DOI":"10.1007\/s12351-016-0284-3","volume":"19","author":"FG Nezami","year":"2019","unstructured":"Nezami FG, Heydar M (2019) Energy-aware Economic Production Quantity model with variable energy pricing. Oper Res Int J 19:201\u2013218","journal-title":"Oper Res Int J"},{"key":"633_CR39","doi-asserted-by":"crossref","first-page":"3599","DOI":"10.1007\/s00500-014-1455-x","volume":"19","author":"PB Myszkowski","year":"2015","unstructured":"Myszkowski PB, Skowro\u0144ski ME, Olech \u0141P, O\u015bliz\u0142o K (2015) Hybrid ant colony optimization in solving multi-skill resource-constrained project scheduling problem. Soft Comput 19:3599\u20133619","journal-title":"Soft Comput"},{"key":"633_CR40","unstructured":"N\u00e9ron, E., (2002). Lower bounds for the multi-skill project scheduling problem. Proceeding of the Eighth International Workshop on Project Management and Scheduling 274\u2013277."},{"key":"633_CR41","doi-asserted-by":"crossref","first-page":"704","DOI":"10.1016\/j.ifacol.2015.06.165","volume":"48","author":"SB Othman","year":"2015","unstructured":"Othman SB, Hammadi S, Quilliot A (2015) Multiobjective evolutionary for multi-skill health care tasks scheduling. IFAC-PapersOnLine 48:704\u2013709","journal-title":"IFAC-PapersOnLine"},{"key":"633_CR42","doi-asserted-by":"crossref","first-page":"1879","DOI":"10.1007\/s00500-015-1610-z","volume":"20","author":"E P\u00e9rez","year":"2016","unstructured":"P\u00e9rez E, Posada M, Lorenzana A (2016) Taking advantage of solving the resource constrained multi-project scheduling problems using multi-modal genetic algorithms. Soft Comput 20:1879\u20131896","journal-title":"Soft Comput"},{"key":"633_CR43","doi-asserted-by":"crossref","first-page":"365","DOI":"10.1016\/j.rser.2003.12.007","volume":"8","author":"SD Pohekar","year":"2004","unstructured":"Pohekar SD, Ramachandran M (2004) Application of multi-criteria decision making to sustainable energy planning a review. Renew Sustain Energy Rev 8:365\u2013381","journal-title":"Renew Sustain Energy Rev"},{"key":"633_CR44","doi-asserted-by":"crossref","first-page":"93","DOI":"10.1287\/mnsc.16.1.93","volume":"16","author":"AAB Pritsker","year":"1969","unstructured":"Pritsker AAB, Waiters LJ, Wolfe PM (1969) Multi-project scheduling with limited resources: a zero-one programming approach. Manage Sci 16:93\u2013108","journal-title":"Manage Sci"},{"key":"633_CR45","doi-asserted-by":"crossref","first-page":"49","DOI":"10.1007\/BF00134132","volume":"31","author":"B Roy","year":"1991","unstructured":"Roy B (1991) The outranking approach and the foundations of Electre methods. Theor Decis 31:49\u201373","journal-title":"Theor Decis"},{"key":"633_CR46","doi-asserted-by":"crossref","first-page":"197","DOI":"10.1016\/j.jclepro.2013.12.024","volume":"67","author":"F Shrouf","year":"2014","unstructured":"Shrouf F, Ordieres-Mer\u00e9 J, Garc\u00eda-S\u00e1nchez A, Ortega-Mier M (2014) Optimizing the production scheduling of a single machine to minimize total energy consumption costs. J Clean Prod 67:197\u2013207","journal-title":"J Clean Prod"},{"key":"633_CR47","first-page":"1083","volume":"21","author":"BH Tabrizi","year":"2014","unstructured":"Tabrizi BH, Tavakkoli-Moghaddam R, Ghaderi SF (2014) A two-phase method for a multi-skilled project scheduling problem with discounted cash flows. Scientia Iranica Trans E, Ind Eng 21:1083\u20131095","journal-title":"Scientia Iranica Trans E, Ind Eng"},{"key":"633_CR48","unstructured":"Taguchi G (1986) Introduction to quality engineering: designing quality into products and processes."},{"key":"633_CR49","unstructured":"Taha RA, Daim T (2013) Multi-criteria applications in renewable energy analysis, a literature review. Research and Technology Management in the Electricity Industry, 17\u201330."},{"key":"633_CR50","doi-asserted-by":"crossref","first-page":"105","DOI":"10.1007\/s12351-016-0256-7","volume":"18","author":"M Tan","year":"2018","unstructured":"Tan M, Duan B, Su Y (2018) Economic batch sizing and scheduling on parallel machines under time-of-use electricity pricing. Oper Res Int J 18:105\u2013122","journal-title":"Oper Res Int J"},{"key":"633_CR51","doi-asserted-by":"crossref","first-page":"27","DOI":"10.1016\/j.epsr.2015.12.007","volume":"133","author":"H Tarish","year":"2016","unstructured":"Tarish H, See OH, Elmenreich W (2016) Dynamic residential load scheduling based on adaptive consumption level pricing scheme. Electric Power Syst Res 133:27\u201335","journal-title":"Electric Power Syst Res"},{"key":"633_CR52","doi-asserted-by":"crossref","first-page":"101980","DOI":"10.1016\/j.simpat.2019.101980","volume":"98","author":"L Tosselli","year":"2020","unstructured":"Tosselli L, Bogado V, Mart\u00ednez E (2020) A repeated-negotiation game approach to distributed (re)scheduling of multiple projects using decoupled learning. Simul Model Pract Theory 98:101980","journal-title":"Simul Model Pract Theory"},{"issue":"15","key":"633_CR53","doi-asserted-by":"crossref","first-page":"4297","DOI":"10.1007\/s00500-016-2062-9","volume":"21","author":"H Wang","year":"2017","unstructured":"Wang H, Wang W, Sun H, Cui Z, Rahnamayan S, Zeng S (2017) A new cuckoo search algorithm with hybrid strategies for flow shop scheduling problems. Soft Comput 21(15):4297\u20134307","journal-title":"Soft Comput"},{"key":"633_CR54","doi-asserted-by":"crossref","first-page":"1190","DOI":"10.1007\/s00170-004-2465-0","volume":"28","author":"MC Wu","year":"2006","unstructured":"Wu MC, Sun SH (2006) A project scheduling and staff assignment model considering learning effect. Int J Adv Manuf Technol 28:1190\u20131195","journal-title":"Int J Adv Manuf Technol"},{"key":"633_CR55","doi-asserted-by":"crossref","unstructured":"Yang, XS, Deb, S (2009) Cuckoo search via L\u00e9vy flights. Nature & Biologically Inspired Computing. NaBIC 2009. World Congress, 210\u2013214.","DOI":"10.1109\/NABIC.2009.5393690"},{"issue":"6","key":"633_CR56","doi-asserted-by":"crossref","first-page":"1616","DOI":"10.1016\/j.cor.2011.09.026","volume":"40","author":"XS Yang","year":"2013","unstructured":"Yang XS, Deb S (2013) Multiobjective cuckoo search for design optimization. Comput Oper Res 40(6):1616\u20131624","journal-title":"Comput Oper Res"},{"issue":"1","key":"633_CR57","doi-asserted-by":"crossref","first-page":"55","DOI":"10.1007\/s00170-012-4013-7","volume":"64","author":"AR Yildiz","year":"2013","unstructured":"Yildiz AR (2013) Cuckoo search algorithm for the selection of optimal machining parameters in milling operations. Int J Adv Manuf Technol 64(1):55\u201361","journal-title":"Int J Adv Manuf Technol"},{"key":"633_CR58","doi-asserted-by":"crossref","first-page":"195","DOI":"10.1016\/j.cie.2019.07.032","volume":"136","author":"S Zabihi","year":"2019","unstructured":"Zabihi S, Rashidi Kahag M, Maghsoudlou H, Afshar-Nadjafi B (2019) Multiobjective teaching-learning-based meta-heuristic algorithms to solve multi-skilled project scheduling problem. Comput Ind Eng 136:195\u2013211","journal-title":"Comput Ind Eng"},{"key":"633_CR59","doi-asserted-by":"crossref","first-page":"1537","DOI":"10.1007\/s00500-015-1866-3","volume":"21","author":"HY Zheng","year":"2017","unstructured":"Zheng HY, Wang L, Zheng XL (2017) Teaching\u2013learning-based optimization algorithm for multi-skill resource constrained project scheduling problem. Soft Comput 21:1537\u20131548","journal-title":"Soft Comput"},{"key":"633_CR60","unstructured":"Zitzler, E., (1999). Evolutionary algorithms for multiobjective optimization: Methods and applications."}],"container-title":["Operational Research"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s12351-021-00633-6.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/article\/10.1007\/s12351-021-00633-6\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s12351-021-00633-6.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2022,12,21]],"date-time":"2022-12-21T17:57:30Z","timestamp":1671645450000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/s12351-021-00633-6"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2021,3,16]]},"references-count":60,"journal-issue":{"issue":"3","published-print":{"date-parts":[[2022,7]]}},"alternative-id":["633"],"URL":"https:\/\/doi.org\/10.1007\/s12351-021-00633-6","relation":{},"ISSN":["1109-2858","1866-1505"],"issn-type":[{"value":"1109-2858","type":"print"},{"value":"1866-1505","type":"electronic"}],"subject":[],"published":{"date-parts":[[2021,3,16]]},"assertion":[{"value":"24 February 2020","order":1,"name":"received","label":"Received","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"5 February 2021","order":2,"name":"revised","label":"Revised","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"5 March 2021","order":3,"name":"accepted","label":"Accepted","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"16 March 2021","order":4,"name":"first_online","label":"First Online","group":{"name":"ArticleHistory","label":"Article History"}},{"order":1,"name":"Ethics","group":{"name":"EthicsHeading","label":"Compliance with ethical standards"}},{"value":"There is no conflict of interest regarding the publication of this article.","order":2,"name":"Ethics","group":{"name":"EthicsHeading","label":"Conflict of interest"}}]}}