{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,3,11]],"date-time":"2026-03-11T05:46:27Z","timestamp":1773207987584,"version":"3.50.1"},"reference-count":24,"publisher":"Springer Science and Business Media LLC","issue":"3","license":[{"start":{"date-parts":[[2021,5,28]],"date-time":"2021-05-28T00:00:00Z","timestamp":1622160000000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springer.com\/tdm"},{"start":{"date-parts":[[2021,5,28]],"date-time":"2021-05-28T00:00:00Z","timestamp":1622160000000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Oper Res Int J"],"published-print":{"date-parts":[[2022,7]]},"DOI":"10.1007\/s12351-021-00649-y","type":"journal-article","created":{"date-parts":[[2021,5,28]],"date-time":"2021-05-28T09:11:28Z","timestamp":1622193088000},"page":"3063-3087","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":16,"title":["Additive manufacturing scheduling problem considering assembly operations of parts"],"prefix":"10.1007","volume":"22","author":[{"ORCID":"https:\/\/orcid.org\/0000-0002-7088-2104","authenticated-orcid":false,"given":"O\u011fuzhan Ahmet","family":"Ar\u0131k","sequence":"first","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2021,5,28]]},"reference":[{"key":"649_CR1","doi-asserted-by":"publisher","first-page":"328","DOI":"10.1016\/j.jmsy.2014.07.014","volume":"37","author":"C Achillas","year":"2015","unstructured":"Achillas C, Aidonis D, Iakovou E et al (2015) A methodological framework for the inclusion of modern additive manufacturing into the production portfolio of a focused factory. J Manuf Syst 37:328\u2013339. https:\/\/doi.org\/10.1016\/j.jmsy.2014.07.014","journal-title":"J Manuf Syst"},{"key":"649_CR2","doi-asserted-by":"publisher","first-page":"292","DOI":"10.1016\/j.cie.2018.09.048","volume":"126","author":"A Chergui","year":"2018","unstructured":"Chergui A, Hadj-Hamou K, Vignat F (2018) Production scheduling and nesting in additive manufacturing. Comput Ind Eng 126:292\u2013301. https:\/\/doi.org\/10.1016\/j.cie.2018.09.048","journal-title":"Comput Ind Eng"},{"key":"649_CR3","doi-asserted-by":"publisher","first-page":"40","DOI":"10.4114\/intartif.vol21iss62pp40-52","volume":"21","author":"F Dvorak","year":"2018","unstructured":"Dvorak F, Micali M, Mathieu M (2018) Planning and scheduling in additive manufacturing. Intel Artif 21:40\u201352. https:\/\/doi.org\/10.4114\/intartif.vol21iss62pp40-52","journal-title":"Intel Artif"},{"key":"649_CR4","doi-asserted-by":"publisher","first-page":"423","DOI":"10.5267\/j.ijiec.2018.1.001","volume":"9","author":"M Fera","year":"2018","unstructured":"Fera M, Fruggiero F, Lambiase A et al (2018) A modified genetic algorithm for time and cost optimization of an additive manufacturing single-machine scheduling. Int J Ind Eng Comput 9:423\u2013438. https:\/\/doi.org\/10.5267\/j.ijiec.2018.1.001","journal-title":"Int J Ind Eng Comput"},{"key":"649_CR5","doi-asserted-by":"publisher","first-page":"620","DOI":"10.1016\/S0377-2217(03)00250-9","volume":"157","author":"MY Kovalyov","year":"2004","unstructured":"Kovalyov MY, Potts CN, Strusevich VA (2004) Batching decisions for assembly production systems. Eur J Oper Res 157:620\u2013642. https:\/\/doi.org\/10.1016\/S0377-2217(03)00250-9","journal-title":"Eur J Oper Res"},{"key":"649_CR6","doi-asserted-by":"publisher","first-page":"58","DOI":"10.1016\/j.cor.2019.01.006","volume":"105","author":"I Kucukkoc","year":"2019","unstructured":"Kucukkoc I (2019) MILP models to minimise makespan in additive manufacturing machine scheduling problems. Comput Oper Res 105:58\u201367. https:\/\/doi.org\/10.1016\/j.cor.2019.01.006","journal-title":"Comput Oper Res"},{"key":"649_CR7","first-page":"237","volume":"1","author":"I Kucukkoc","year":"2018","unstructured":"Kucukkoc I, Li Q, He N, Zhang DZ (2018) Scheduling of multiple additive manufacturing and 3D printing machines to minimise maximum lateness. Twent Int Work Semin Prod Econ 1:237\u2013247","journal-title":"Twent Int Work Semin Prod Econ"},{"key":"649_CR8","unstructured":"Li Q, Kucukkoc I, Zhang DZ (2015) No title. Prod Plan Addit Manuf 3D Print (Dataset), ORE-Repository"},{"key":"649_CR9","doi-asserted-by":"publisher","first-page":"157","DOI":"10.1016\/j.cor.2017.01.013","volume":"83","author":"Q Li","year":"2017","unstructured":"Li Q, Kucukkoc I, Zhang DZ (2017) Production planning in additive manufacturing and 3D printing. Comput Oper Res 83:157\u2013172. https:\/\/doi.org\/10.1016\/j.cor.2017.01.013","journal-title":"Comput Oper Res"},{"key":"649_CR10","first-page":"1","volume":"1","author":"Q Li","year":"2018","unstructured":"Li Q, Kucukkoc I, He N et al (2018) Order acceptance and scheduling in metal additive manufacturing: an optimal foraging approach. Twent Int Work Semin Prod Econ 1:1\u201311","journal-title":"Twent Int Work Semin Prod Econ"},{"key":"649_CR11","doi-asserted-by":"publisher","DOI":"10.1007\/s00170-019-03796-x","author":"Q Li","year":"2019","unstructured":"Li Q, Zhang D, Wang S, Kucukkoc I (2019) A dynamic order acceptance and scheduling approach for additive manufacturing on-demand production. Int J Adv Manuf Technol. https:\/\/doi.org\/10.1007\/s00170-019-03796-x","journal-title":"Int J Adv Manuf Technol"},{"key":"649_CR12","doi-asserted-by":"publisher","first-page":"113","DOI":"10.1016\/j.ijpe.2017.11.015","volume":"196","author":"X Li","year":"2018","unstructured":"Li X, Zhang K (2018) Single batch processing machine scheduling with two-dimensional bin packing constraints. Int J Prod Econ 196:113\u2013121. https:\/\/doi.org\/10.1016\/j.ijpe.2017.11.015","journal-title":"Int J Prod Econ"},{"key":"649_CR13","doi-asserted-by":"publisher","first-page":"317","DOI":"10.1016\/j.cie.2015.07.018","volume":"88","author":"C-J Liao","year":"2015","unstructured":"Liao C-J, Lee C-H, Lee H-C (2015) An efficient heuristic for a two-stage assembly scheduling problem with batch setup times to minimize makespan. Comput Ind Eng 88:317\u2013325. https:\/\/doi.org\/10.1016\/j.cie.2015.07.018","journal-title":"Comput Ind Eng"},{"key":"649_CR14","doi-asserted-by":"publisher","first-page":"1015","DOI":"10.1023\/A:1016190815843","volume":"34","author":"BMT Lin","year":"2002","unstructured":"Lin BMT, Cheng TCE (2002) Fabrication and assembly scheduling in a two-machine flowshop. IIE Trans 34:1015\u20131020. https:\/\/doi.org\/10.1023\/A:1016190815843","journal-title":"IIE Trans"},{"key":"649_CR15","doi-asserted-by":"publisher","first-page":"143","DOI":"10.1016\/j.omega.2005.04.004","volume":"35","author":"BMT Lin","year":"2006","unstructured":"Lin BMT, Cheng TCE, Chou ASC (2006) Scheduling in an assembly-type production chain with batch transfer. Omega 35:143\u2013151. https:\/\/doi.org\/10.1016\/j.omega.2005.04.004","journal-title":"Omega"},{"key":"649_CR16","doi-asserted-by":"publisher","first-page":"709","DOI":"10.1016\/j.ejor.2005.03.073","volume":"179","author":"T Loukil","year":"2007","unstructured":"Loukil T, Teghem J, Fortemps P (2007) A multi-objective production scheduling case study solved by simulated annealing. Eur J Oper Res 179:709\u2013722. https:\/\/doi.org\/10.1016\/j.ejor.2005.03.073","journal-title":"Eur J Oper Res"},{"key":"649_CR17","doi-asserted-by":"publisher","first-page":"181","DOI":"10.1080\/24725854.2018.1460518","volume":"51","author":"Y Luzon","year":"2019","unstructured":"Luzon Y, Khmelnitsky E (2019) Job sizing and sequencing in additive manufacturing to control process deterioration. IISE Trans 51:181\u2013191. https:\/\/doi.org\/10.1080\/24725854.2018.1460518","journal-title":"IISE Trans"},{"key":"649_CR18","doi-asserted-by":"publisher","first-page":"59","DOI":"10.1016\/0166-218X(90)90094-S","volume":"28","author":"S Martello","year":"1990","unstructured":"Martello S, Toth P (1990) Lower bounds and reduction procedures for the bin packing problem. Discret Appl Math 28:59\u201370. https:\/\/doi.org\/10.1016\/0166-218X(90)90094-S","journal-title":"Discret Appl Math"},{"key":"649_CR19","doi-asserted-by":"crossref","unstructured":"Oh Y, Zhou C, Behdad S (2018) Production planning for mass customization in additive manufacturing: Build orientation determination, 2D packing and scheduling. In: Proceedings of the ASME design engineering technical conference","DOI":"10.1115\/DETC2018-85639"},{"key":"649_CR20","doi-asserted-by":"publisher","first-page":"35","DOI":"10.1016\/j.jmsy.2017.02.012","volume":"43","author":"K Ransikarbum","year":"2017","unstructured":"Ransikarbum K, Ha S, Ma J, Kim N (2017) Multi-objective optimization analysis for part-to-Printer assignment in a network of 3D fused deposition modeling. J Manuf Syst 43:35\u201346. https:\/\/doi.org\/10.1016\/j.jmsy.2017.02.012","journal-title":"J Manuf Syst"},{"key":"649_CR21","unstructured":"Rudolph J-P, Emmelmann C (2017) A cloud-based platform for automated order processing in additive manufacturing. In: Procedia CIRP, pp 412\u2013417"},{"key":"649_CR22","doi-asserted-by":"publisher","first-page":"1580","DOI":"10.1057\/jors.2013.105","volume":"65","author":"Z Tajbakhsh","year":"2014","unstructured":"Tajbakhsh Z, Fattahi P, Behnamian J (2014) Multi-objective assembly permutation flow shop scheduling problem: a mathematical model and a meta-heuristic algorithm. J Oper Res Soc 65:1580\u20131592. https:\/\/doi.org\/10.1057\/jors.2013.105","journal-title":"J Oper Res Soc"},{"key":"649_CR23","doi-asserted-by":"publisher","DOI":"10.1080\/00207543.2019.1617447","author":"J Zhang","year":"2019","unstructured":"Zhang J, Yao X, Li Y (2019) Improved evolutionary algorithm for parallel batch processing machine scheduling in additive manufacturing. Int J Prod Res. https:\/\/doi.org\/10.1080\/00207543.2019.1617447","journal-title":"Int J Prod Res"},{"key":"649_CR24","doi-asserted-by":"publisher","first-page":"3003","DOI":"10.1007\/s00170-017-1543-z","volume":"96","author":"L Zhou","year":"2018","unstructured":"Zhou L, Zhang L, Laili Y et al (2018) Multi-task scheduling of distributed 3D printing services in cloud manufacturing. Int J Adv Manuf Technol 96:3003\u20133017. https:\/\/doi.org\/10.1007\/s00170-017-1543-z","journal-title":"Int J Adv Manuf Technol"}],"container-title":["Operational Research"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s12351-021-00649-y.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/article\/10.1007\/s12351-021-00649-y\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s12351-021-00649-y.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2022,12,28]],"date-time":"2022-12-28T23:12:20Z","timestamp":1672269140000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/s12351-021-00649-y"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2021,5,28]]},"references-count":24,"journal-issue":{"issue":"3","published-print":{"date-parts":[[2022,7]]}},"alternative-id":["649"],"URL":"https:\/\/doi.org\/10.1007\/s12351-021-00649-y","relation":{},"ISSN":["1109-2858","1866-1505"],"issn-type":[{"value":"1109-2858","type":"print"},{"value":"1866-1505","type":"electronic"}],"subject":[],"published":{"date-parts":[[2021,5,28]]},"assertion":[{"value":"4 April 2020","order":1,"name":"received","label":"Received","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"27 April 2021","order":2,"name":"revised","label":"Revised","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"15 May 2021","order":3,"name":"accepted","label":"Accepted","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"28 May 2021","order":4,"name":"first_online","label":"First Online","group":{"name":"ArticleHistory","label":"Article History"}},{"order":1,"name":"Ethics","group":{"name":"EthicsHeading","label":"Declarations"}},{"value":"The author declared that there is no conflict of interest.","order":2,"name":"Ethics","group":{"name":"EthicsHeading","label":"Conflict of interest"}}]}}