{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,4,23]],"date-time":"2026-04-23T20:35:05Z","timestamp":1776976505164,"version":"3.51.4"},"reference-count":35,"publisher":"Springer Science and Business Media LLC","issue":"4","license":[{"start":{"date-parts":[[2021,9,23]],"date-time":"2021-09-23T00:00:00Z","timestamp":1632355200000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springer.com\/tdm"},{"start":{"date-parts":[[2021,9,23]],"date-time":"2021-09-23T00:00:00Z","timestamp":1632355200000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springer.com\/tdm"}],"funder":[{"DOI":"10.13039\/501100001412","name":"Council of Scientific and Industrial Research, India","doi-asserted-by":"publisher","award":["09\/135(0766)\/2017-EMR-I."],"award-info":[{"award-number":["09\/135(0766)\/2017-EMR-I."]}],"id":[{"id":"10.13039\/501100001412","id-type":"DOI","asserted-by":"publisher"}]}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Oper Res Int J"],"published-print":{"date-parts":[[2022,9]]},"DOI":"10.1007\/s12351-021-00675-w","type":"journal-article","created":{"date-parts":[[2021,9,23]],"date-time":"2021-09-23T09:07:50Z","timestamp":1632388070000},"page":"4353-4396","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":6,"title":["Desert sparrow optimization algorithm for the bicriteria flow shop scheduling problem with sequence-independent setup time"],"prefix":"10.1007","volume":"22","author":[{"ORCID":"https:\/\/orcid.org\/0000-0003-0963-1856","authenticated-orcid":false,"given":"Meenakshi","family":"Sharma","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"ORCID":"https:\/\/orcid.org\/0000-0003-1551-4402","authenticated-orcid":false,"given":"Manisha","family":"Sharma","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"ORCID":"https:\/\/orcid.org\/0000-0002-7198-0371","authenticated-orcid":false,"given":"Sameer","family":"Sharma","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2021,9,23]]},"reference":[{"issue":"2","key":"675_CR1","first-page":"94","volume":"4","author":"FS Al-Anzi","year":"2001","unstructured":"Al-Anzi FS, Allahverdi A (2001) The relationship between three-tiered client-server internet database connectivity and two-machine flowshop. Int J Parall Distrib Syst Netw 4(2):94\u2013101","journal-title":"Int J Parall Distrib Syst Netw"},{"key":"675_CR2","doi-asserted-by":"publisher","first-page":"345","DOI":"10.1016\/j.ejor.2015.04.004","volume":"246","author":"A Allahverdi","year":"2015","unstructured":"Allahverdi A (2015) The third comprehensive survey on scheduling problems with setup times\/costs. Eur J Oper Res 246:345\u2013378","journal-title":"Eur J Oper Res"},{"issue":"2","key":"675_CR3","doi-asserted-by":"publisher","first-page":"135","DOI":"10.1504\/IJOR.2007.012457","volume":"2","author":"A Allahverdi","year":"2007","unstructured":"Allahverdi A, Al-Anzi FS, Chen TCE (2007) The three-machine flowshop scheduling problem to minimise maximum lateness with independent setup times. Int J Oper Res 2(2):135\u2013155","journal-title":"Int J Oper Res"},{"issue":"C","key":"675_CR4","first-page":"124688","volume":"365","author":"A Allahverdi","year":"2020","unstructured":"Allahverdi A, Aydilek H, Aydilek A (2020) No-wait flowshop scheduling problem with separate setup times to minimize total tardiness subject to makespan. Appl Math Comput 365(C):124688","journal-title":"Appl Math Comput"},{"key":"675_CR5","doi-asserted-by":"publisher","DOI":"10.1007\/s10479-019-03490-x","author":"S Aqil","year":"2019","unstructured":"Aqil S, Allali K (2019) On a bi-criteria flow shop scheduling problem under constraints of blocking and sequence dependent setup time. Ann Oper Res. https:\/\/doi.org\/10.1007\/s10479-019-03490-x","journal-title":"Ann Oper Res"},{"issue":"1\u20134","key":"675_CR6","doi-asserted-by":"publisher","first-page":"751","DOI":"10.1007\/s00170-014-6488-x","volume":"77","author":"A Azadeh","year":"2015","unstructured":"Azadeh A, Shoj BM, Sheikhalishahi M, Esmaili A, Ziaeifar A, Moradi B (2015) A simulation optimization approach for flow-shop scheduling problem: a canned fruit industry. Int J Adv Manuf Technol 77(1\u20134):751\u2013761","journal-title":"Int J Adv Manuf Technol"},{"issue":"11","key":"675_CR7","first-page":"1475","volume":"31","author":"PC Bagga","year":"2000","unstructured":"Bagga PC, Bhambani AM (2000) Bicriteria in a two-stage flow shop scheduling. Indian J Pure Appl Math 31(11):1475\u20131481","journal-title":"Indian J Pure Appl Math"},{"issue":"1","key":"675_CR8","first-page":"85","volume":"12","author":"E Dhouib","year":"2013","unstructured":"Dhouib E, Teghem J, Loukil T (2013) Minimizing the number of tardy jobs in a permutation flowshop scheduling problem with setup times and time lags constraints. J Math Model Algorit Oper Res 12(1):85\u201399","journal-title":"J Math Model Algorit Oper Res"},{"issue":"12","key":"675_CR9","doi-asserted-by":"publisher","first-page":"3962","DOI":"10.1016\/j.cor.2007.05.005","volume":"35","author":"X Dong","year":"2008","unstructured":"Dong X, Huang H, Chen P (2008) An improved NEH-based heuristic for the permutation flow shop problem. Comput Oper Res 35(12):3962\u20133968","journal-title":"Comput Oper Res"},{"issue":"1","key":"675_CR10","first-page":"1292","volume":"183","author":"T Eren","year":"2006","unstructured":"Eren T, Guner E (2006) A bicriteria flowshop scheduling problem with setup times. Appl Math Comput 183(1):1292\u20131300","journal-title":"Appl Math Comput"},{"issue":"1","key":"675_CR11","doi-asserted-by":"publisher","first-page":"60","DOI":"10.1016\/j.cor.2013.12.012","volume":"45","author":"V Fernandez","year":"2014","unstructured":"Fernandez V, Framinan JM (2014) On insertion tie-breaking rules in heuristics for the permutation flow shop scheduling problem. Comput Oper Res 45(1):60\u201367","journal-title":"Comput Oper Res"},{"key":"675_CR12","doi-asserted-by":"publisher","first-page":"400","DOI":"10.1016\/j.cor.2019.06.012","volume":"111","author":"M Khatami","year":"2019","unstructured":"Khatami M, Salehipour A, Hwang FJ (2019) Makespan minimization for the m-machine ordered flow shop scheduling problem. Comput Oper Res 111:400\u2013414","journal-title":"Comput Oper Res"},{"issue":"1","key":"675_CR13","first-page":"1","volume":"19","author":"Z Li","year":"2019","unstructured":"Li Z, Zhong RY, Barenji AV, Liu JJ, Yu CX, Huang GQ (2019) Bi-objective hybrid flow shop scheduling with common due date. Opear Res 19(1):1\u201326","journal-title":"Opear Res"},{"issue":"10","key":"675_CR14","doi-asserted-by":"publisher","first-page":"1808","DOI":"10.1080\/0305215X.2016.1141202","volume":"46","author":"W Liu","year":"2016","unstructured":"Liu W, Jin Y, Price M (2016) A new Nawaz-Enscore-Ham-based heuristic for permutation flowshop problems with bicriteria of makespan and machine idle time. Eng Optim 46(10):1808\u20131822","journal-title":"Eng Optim"},{"issue":"1","key":"675_CR15","doi-asserted-by":"publisher","first-page":"21","DOI":"10.1016\/j.ijpe.2017.06.026","volume":"193","author":"W Liu","year":"2017","unstructured":"Liu W, Jin Y, Price M (2017) A new improved NEH heuristic for permutation flowshop scheduling problems. Int J Prod Econ 193(1):21\u201330","journal-title":"Int J Prod Econ"},{"issue":"1","key":"675_CR16","doi-asserted-by":"publisher","first-page":"64","DOI":"10.1016\/j.swevo.2017.06.003","volume":"38","author":"T Meng","year":"2018","unstructured":"Meng T, Pan QK, Li JQ, Sang HY (2018) An improved migrating birds optimization for an integrated lot-streaming flow shop scheduling problem. Swarm Evolut Comp 38(1):64\u201378","journal-title":"Swarm Evolut Comp"},{"issue":"6","key":"675_CR17","first-page":"280","volume":"6","author":"L Narain","year":"2015","unstructured":"Narain L (2015) Minimizing total rental cost in scheduling problems. J Comput Math Sci 6(6):280\u2013289","journal-title":"J Comput Math Sci"},{"issue":"3","key":"675_CR18","doi-asserted-by":"publisher","first-page":"349","DOI":"10.1007\/s10898-004-1848-y","volume":"33","author":"L Narian","year":"2005","unstructured":"Narian L, Bagga PC (2005) Flowshop\/no-idle scheduling to minimize total elapsed time. J Global Optim 33(3):349\u2013367","journal-title":"J Global Optim"},{"issue":"1","key":"675_CR19","doi-asserted-by":"publisher","first-page":"91","DOI":"10.1016\/0305-0483(83)90088-9","volume":"11","author":"M Nawaz","year":"1983","unstructured":"Nawaz M, Enscore EE Jr, Ham I (1983) A heuristic algorithm for the m-machine, n-job flow-shop sequencing problem. OMEGA Int J Manag Sci 11(1):91\u201395","journal-title":"OMEGA Int J Manag Sci"},{"issue":"3","key":"675_CR20","doi-asserted-by":"publisher","first-page":"265","DOI":"10.1007\/s11518-018-5361-0","volume":"27","author":"F Pargar","year":"2018","unstructured":"Pargar F, Zandieh M, Kauppila O, Kujala J (2018) The effect of worker learning on scheduling jobs in hybrid flow shop: a bicriteria approach. J Syst Sci Syst Eng 27(3):265\u2013291","journal-title":"J Syst Sci Syst Eng"},{"key":"675_CR21","doi-asserted-by":"publisher","first-page":"2767","DOI":"10.1080\/00207543.2019.1656837","volume":"58","author":"Y Rao","year":"2020","unstructured":"Rao Y, Meng R, Zha J, Xu X (2020) Bi-objective mathematical model and improved algorithm for optimisation of welding shop scheduling problem. Int J Prod Res 58:2767\u20132783","journal-title":"Int J Prod Res"},{"issue":"1","key":"675_CR22","doi-asserted-by":"publisher","first-page":"347","DOI":"10.1016\/j.eswa.2018.12.039","volume":"121","author":"I Ribas","year":"2019","unstructured":"Ribas I, Companys R, Martorellc XT (2019) An iterated greedy algorithm for solving the total tardiness parallel blocking flow shop scheduling problem. Exp Syst Appl 121(1):347\u2013361","journal-title":"Exp Syst Appl"},{"issue":"1","key":"675_CR23","doi-asserted-by":"publisher","first-page":"34","DOI":"10.1016\/j.ejor.2004.01.022","volume":"165","author":"R Ruiz","year":"2005","unstructured":"Ruiz R, Maroto C, Alcaraz J (2005) Solving the flowshop scheduling problem with sequence dependent setup times using advanced metaheuristics. Eur J Oper Res 165(1):34\u201354","journal-title":"Eur J Oper Res"},{"issue":"18","key":"675_CR24","doi-asserted-by":"publisher","first-page":"6191","DOI":"10.1007\/s00500-017-2686-4","volume":"22","author":"V Sharma","year":"2017","unstructured":"Sharma V, Reina DG, Kumar R (2017) HMADSO: a novel hill Myna and desert Sparrow optimization algorithm for cooperative rendezvous and task allocation in FANETs. Soft Comput 22(18):6191\u20136214","journal-title":"Soft Comput"},{"issue":"1","key":"675_CR25","doi-asserted-by":"publisher","first-page":"127","DOI":"10.1504\/IJOR.2017.083186","volume":"29","author":"S Sharma","year":"2017","unstructured":"Sharma S, Gupta D, Nailwal KK (2017) Bi-criteria multistage flow shop scheduling with sequence-dependent setup times. Int J Oper Res 29(1):127\u2013147","journal-title":"Int J Oper Res"},{"issue":"2","key":"675_CR26","doi-asserted-by":"publisher","first-page":"253","DOI":"10.1504\/IJMOR.2020.109699","volume":"17","author":"M Sharma","year":"2020","unstructured":"Sharma M, Sharma M, Sharma S (2020) Desert sparrow optimisation algorithm for permutation flowshop scheduling problems. Int J Math Oper Res 17(2):253\u2013277","journal-title":"Int J Math Oper Res"},{"issue":"3","key":"675_CR27","doi-asserted-by":"publisher","first-page":"311","DOI":"10.5267\/j.dsl.2021.2.006","volume":"10","author":"M Sharma","year":"2021","unstructured":"Sharma M, Sharma M, Sharma S (2021) An improved NEH heuristic to minimize makespan for flow shop scheduling problems. Decis Sci Lett 10(3):311\u2013322","journal-title":"Decis Sci Lett"},{"key":"675_CR28","doi-asserted-by":"publisher","DOI":"10.1504\/IJOR.2021.10035760","author":"M Sharma","year":"2021","unstructured":"Sharma M, Sharma M, Sharma S (2021) A new heuristic for flow shop scheduling problems minimizing system utilization time subject to minimum makespan. Int J Oper Res. https:\/\/doi.org\/10.1504\/IJOR.2021.10035760","journal-title":"Int J Oper Res"},{"issue":"1","key":"675_CR29","doi-asserted-by":"publisher","first-page":"67","DOI":"10.1016\/0377-2217(90)90090-X","volume":"47","author":"E Taillard","year":"1990","unstructured":"Taillard E (1990) Some efficient heuristic methods for the flow shop sequencing problem. Eur J Oper Res 47(1):67\u201374","journal-title":"Eur J Oper Res"},{"issue":"2","key":"675_CR30","doi-asserted-by":"publisher","first-page":"278","DOI":"10.1016\/0377-2217(93)90182-M","volume":"64","author":"E Taillard","year":"1993","unstructured":"Taillard E (1993) Benchmarks for basic scheduling problems. Eur J Oper Res 64(2):278\u2013285","journal-title":"Eur J Oper Res"},{"issue":"1","key":"675_CR31","doi-asserted-by":"publisher","first-page":"1337","DOI":"10.1007\/s00170-012-4571-8","volume":"67","author":"R Vanchipura","year":"2013","unstructured":"Vanchipura R, Sridharan R (2013) Development and analysis of constructive heuristic algorithms for flow shop scheduling problems with sequence-dependent setup times. Int J Adv Manuf Technol 67(1):1337\u20131353","journal-title":"Int J Adv Manuf Technol"},{"issue":"4","key":"675_CR32","doi-asserted-by":"publisher","first-page":"419","DOI":"10.1504\/IJPMB.2019.103415","volume":"9","author":"A Viswanath","year":"2019","unstructured":"Viswanath A, Sridharan R, Ram Kumar PN (2019) Hybrid genetic algorithm for multi-objective flow shop scheduling problem with sequence dependent setup time: parameter design using Taguchis robust design method. Int J Process Manag Benchmark 9(4):419","journal-title":"Int J Process Manag Benchmark"},{"issue":"1","key":"675_CR33","doi-asserted-by":"publisher","first-page":"152","DOI":"10.1016\/j.cie.2018.01.011","volume":"117","author":"CC Wu","year":"2018","unstructured":"Wu CC, Liu SC, Lin TY, Yang TH, Chung IH, Lin WC (2018) Bicriterion total flowtime and maximum tardiness minimization for an order scheduling problem. Comput Ind Eng 117(1):152\u2013163","journal-title":"Comput Ind Eng"},{"key":"675_CR34","doi-asserted-by":"publisher","first-page":"39","DOI":"10.1016\/j.asoc.2016.11.031","volume":"52","author":"J Xu","year":"2017","unstructured":"Xu J, Wub CC, Yin Y, Lin WC (2017) An iterated local search for the multi-objective permutation flow shop scheduling problem with sequence-dependent setup times. Appl Soft Comput 52:39\u201347","journal-title":"Appl Soft Comput"},{"issue":"1","key":"675_CR35","doi-asserted-by":"publisher","first-page":"119","DOI":"10.1016\/j.omega.2013.07.004","volume":"45","author":"MM Yenisey","year":"2014","unstructured":"Yenisey MM, Yagmahan B (2014) Multi-objective permutation flow shop scheduling problem: literature review, classification and current trends. Omega 45(1):119\u2013135","journal-title":"Omega"}],"container-title":["Operational Research"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s12351-021-00675-w.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/article\/10.1007\/s12351-021-00675-w\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s12351-021-00675-w.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2022,8,18]],"date-time":"2022-08-18T10:34:06Z","timestamp":1660818846000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/s12351-021-00675-w"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2021,9,23]]},"references-count":35,"journal-issue":{"issue":"4","published-print":{"date-parts":[[2022,9]]}},"alternative-id":["675"],"URL":"https:\/\/doi.org\/10.1007\/s12351-021-00675-w","relation":{},"ISSN":["1109-2858","1866-1505"],"issn-type":[{"value":"1109-2858","type":"print"},{"value":"1866-1505","type":"electronic"}],"subject":[],"published":{"date-parts":[[2021,9,23]]},"assertion":[{"value":"16 May 2020","order":1,"name":"received","label":"Received","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"3 September 2021","order":2,"name":"revised","label":"Revised","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"7 September 2021","order":3,"name":"accepted","label":"Accepted","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"23 September 2021","order":4,"name":"first_online","label":"First Online","group":{"name":"ArticleHistory","label":"Article History"}}]}}