{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,6,18]],"date-time":"2025-06-18T13:03:33Z","timestamp":1750251813596,"version":"3.37.3"},"reference-count":76,"publisher":"Springer Science and Business Media LLC","issue":"5","license":[{"start":{"date-parts":[[2022,5,18]],"date-time":"2022-05-18T00:00:00Z","timestamp":1652832000000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springer.com\/tdm"},{"start":{"date-parts":[[2022,5,18]],"date-time":"2022-05-18T00:00:00Z","timestamp":1652832000000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Oper Res Int J"],"published-print":{"date-parts":[[2022,11]]},"DOI":"10.1007\/s12351-022-00700-6","type":"journal-article","created":{"date-parts":[[2022,5,18]],"date-time":"2022-05-18T02:03:06Z","timestamp":1652839386000},"page":"5055-5105","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":2,"title":["Mathematical modeling and two metaheuristic algorithms for integrated process planning and group scheduling with sequence-dependent setup time"],"prefix":"10.1007","volume":"22","author":[{"given":"Mohammad Reza","family":"Hosseinzadeh","sequence":"first","affiliation":[]},{"ORCID":"https:\/\/orcid.org\/0000-0002-9009-6397","authenticated-orcid":false,"given":"Mehdi","family":"Heydari","sequence":"additional","affiliation":[]},{"given":"Mohammad","family":"Mahdavi Mazdeh","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2022,5,18]]},"reference":[{"key":"700_CR1","doi-asserted-by":"publisher","first-page":"345","DOI":"10.1016\/j.ejor.2015.04.004","volume":"246","author":"A Allahverdi","year":"2015","unstructured":"Allahverdi A (2015) The third comprehensive survey on scheduling problems with setup times\/costs. Eur J Oper Res 246:345\u2013378. https:\/\/doi.org\/10.1016\/j.ejor.2015.04.004","journal-title":"Eur J Oper Res"},{"key":"700_CR2","doi-asserted-by":"publisher","DOI":"10.1016\/S0305-0483(98)00042-5","author":"A Allahverdi","year":"1999","unstructured":"Allahverdi A, Gupta J, Aldowaisan T (1999) A review of scheduling research involving setup considerations. Omega. https:\/\/doi.org\/10.1016\/S0305-0483(98)00042-5","journal-title":"Omega"},{"key":"700_CR3","doi-asserted-by":"publisher","first-page":"985","DOI":"10.1016\/j.ejor.2006.06.060","volume":"187","author":"A Allahverdi","year":"2008","unstructured":"Allahverdi A, Ng CT, Cheng TCE, Kovalyov MY (2008) A survey of scheduling problems with setup times or costs. Eur J Oper Res 187:985\u20131032. https:\/\/doi.org\/10.1016\/j.ejor.2006.06.060","journal-title":"Eur J Oper Res"},{"key":"700_CR4","doi-asserted-by":"crossref","unstructured":"Altarazi S, Yasin O (2015) Integration of process planning and scheduling with sequence dependent setup time: a case study from electrical wires and power cable industry. In, Cham, 2015. Modelling, computation and optimization in information systems and management sciences. Springer International Publishing, pp 283\u2013294","DOI":"10.1007\/978-3-319-18167-7_25"},{"key":"700_CR5","doi-asserted-by":"publisher","first-page":"273","DOI":"10.1007\/s00170-011-3488-y","volume":"59","author":"MR Amin-Naseri","year":"2012","unstructured":"Amin-Naseri MR, Afshari AJ (2012) A hybrid genetic algorithm for integrated process planning and scheduling problem with precedence constraints. Int J Adv Manuf Technol 59:273\u2013287. https:\/\/doi.org\/10.1007\/s00170-011-3488-y","journal-title":"Int J Adv Manuf Technol"},{"key":"700_CR6","doi-asserted-by":"publisher","DOI":"10.1016\/j.omega.2019.01.003","volume":"93","author":"R Barzanji","year":"2019","unstructured":"Barzanji R, Naderi B, Begen MA (2019) Decomposition algorithms for the integrated process planning and scheduling problem. Omega 93:102025","journal-title":"Omega"},{"key":"700_CR7","doi-asserted-by":"publisher","first-page":"22","DOI":"10.1504\/ejie.2017.081418","volume":"11","author":"S Behjat","year":"2017","unstructured":"Behjat S, Salmasi N (2017) Total completion time minimisation of no-wait flowshop group scheduling problem with sequence dependent setup times. Eur J Indust Eng 11:22\u201348. https:\/\/doi.org\/10.1504\/ejie.2017.081418","journal-title":"Eur J Indust Eng"},{"key":"700_CR8","doi-asserted-by":"publisher","first-page":"161","DOI":"10.1080\/00207549508930142","volume":"33","author":"P Brandimarte","year":"1995","unstructured":"Brandimarte P, Calderini M (1995) A hierarchical bicriterion approach to integrated process plan selection and job shop scheduling. Int J Prod Res 33:161\u2013181. https:\/\/doi.org\/10.1080\/00207549508930142","journal-title":"Int J Prod Res"},{"key":"700_CR9","doi-asserted-by":"publisher","first-page":"119","DOI":"10.1080\/00207540600818195","volume":"47","author":"FTS Chan","year":"2009","unstructured":"Chan FTS, Kumar V, Tiwari MK (2009) The relevance of outsourcing and leagile strategies in performance optimization of an integrated process planning and scheduling model. Int J Prod Res 47:119\u2013142. https:\/\/doi.org\/10.1080\/00207540600818195","journal-title":"Int J Prod Res"},{"key":"700_CR10","doi-asserted-by":"publisher","first-page":"315","DOI":"10.1016\/0736-5845(84)90020-6","volume":"1","author":"G Chryssolouris","year":"1984","unstructured":"Chryssolouris G, Chan S, Cobb W (1984) Decision making on the factory floor: an integrated approach to process planning and scheduling. Robot Comput-Integrat Manuf 1:315\u2013319","journal-title":"Robot Comput-Integrat Manuf"},{"key":"700_CR11","doi-asserted-by":"publisher","first-page":"151","DOI":"10.1016\/j.compstruc.2012.07.010","volume":"110\u2013111","author":"H Eskandar","year":"2012","unstructured":"Eskandar H, Sadollah A, Bahreininejad A, Hamdi M (2012) Water cycle algorithm\u2014a novel metaheuristic optimization method for solving constrained engineering optimization problems. Comput Struct 110\u2013111:151\u2013166. https:\/\/doi.org\/10.1016\/j.compstruc.2012.07.010","journal-title":"Comput Struct"},{"key":"700_CR12","doi-asserted-by":"publisher","first-page":"671","DOI":"10.1007\/978-3-319-68759-9_54","volume-title":"Simulated evolution and learning","author":"K Gao","year":"2017","unstructured":"Gao K, Duan P, Su R, Li J (2017) Bi-objective water cycle algorithm for solving remanufacturing rescheduling problem. In: Shi Y et al (eds) Simulated evolution and learning. Springer International Publishing, Cham, pp 671\u2013683"},{"key":"700_CR13","doi-asserted-by":"publisher","first-page":"280","DOI":"10.1016\/j.rcim.2007.12.002","volume":"25","author":"YW Guo","year":"2009","unstructured":"Guo YW, Li W, Mileham AR, Owen GW (2009a) Applications of particle swarm optimisation in integrated process planning and scheduling. Robot Comput-Integrat Manuf 25:280\u2013288","journal-title":"Robot Comput-Integrat Manuf"},{"key":"700_CR14","doi-asserted-by":"publisher","first-page":"3775","DOI":"10.1080\/00207540701827905","volume":"47","author":"YW Guo","year":"2009","unstructured":"Guo YW, Li WD, Mileham AR, Owen GW (2009b) Optimisation of integrated process planning and scheduling using a particle swarm optimisation approach. Int J Prod Res 47:3775\u20133796. https:\/\/doi.org\/10.1080\/00207540701827905","journal-title":"Int J Prod Res"},{"key":"700_CR15","doi-asserted-by":"publisher","first-page":"439","DOI":"10.1016\/0377-2217(86)90037-8","volume":"24","author":"JND Gupta","year":"1986","unstructured":"Gupta JND, Darrow WP (1986) The two-machine sequence dependent flowshop scheduling problem. Eur J Oper Res 24:439\u2013446","journal-title":"Eur J Oper Res"},{"key":"700_CR16","doi-asserted-by":"publisher","DOI":"10.1007\/s10696-019-09360-9","author":"C Ha","year":"2019","unstructured":"Ha C (2019) Evolving ant colony system for large-sized integrated process planning and scheduling problem considering sequence-dependent setup times. Flex Serv Manuf J. https:\/\/doi.org\/10.1007\/s10696-019-09360-9","journal-title":"Flex Serv Manuf J"},{"key":"700_CR17","doi-asserted-by":"publisher","unstructured":"Ham I, Hitomi K, Yoshida T (1985) Basic principles of group technology. In: Group technology: applications to production management. Springer Netherlands, Dordrecht, pp 7\u201320. https:\/\/doi.org\/10.1007\/978-94-009-4976-8_2","DOI":"10.1007\/978-94-009-4976-8_2"},{"key":"700_CR18","first-page":"419","volume":"25","author":"K Hitomi","year":"1976","unstructured":"Hitomi K, Ham I (1976) Operations scheduling for group technology applications. Ann CIRP 25:419\u2013422","journal-title":"Ann CIRP"},{"key":"700_CR19","doi-asserted-by":"publisher","unstructured":"Imanipour N (2006) Modeling and solving flexible job shop problem with sequence dependent setup times. In: 2006 International conference on service systems and service management, 25\u201327 Oct. 2006. pp 1205\u20131210. https:\/\/doi.org\/10.1109\/ICSSSM.2006.320680","DOI":"10.1109\/ICSSSM.2006.320680"},{"key":"700_CR20","doi-asserted-by":"publisher","first-page":"360","DOI":"10.1007\/978-981-13-2829-9_33","volume-title":"Bio-inspired computing: theories and applications","author":"RMS Jafar","year":"2018","unstructured":"Jafar RMS, Geng S, Ahmad W, Hussain S, Wang H (2018) A comprehensive evaluation: water cycle algorithm and its applications. In: Qiao J, Zhao X, Pan L, Zuo X, Zhang X, Zhang Q, Huang S (eds) Bio-inspired computing: theories and applications. Springer, Singapore, pp 360\u2013376"},{"key":"700_CR21","doi-asserted-by":"publisher","first-page":"1253","DOI":"10.1007\/s00170-015-7069-3","volume":"80","author":"L Jin","year":"2015","unstructured":"Jin L, Zhang C, Shao X (2015) An effective hybrid honey bee mating optimization algorithm for integrated process planning and scheduling problems. Int J Adv Manuf Technol 80:1253\u20131264. https:\/\/doi.org\/10.1007\/s00170-015-7069-3","journal-title":"Int J Adv Manuf Technol"},{"key":"700_CR22","doi-asserted-by":"publisher","first-page":"4387","DOI":"10.1080\/00207543.2016.1140917","volume":"54","author":"L Jin","year":"2016","unstructured":"Jin L, Tang Q, Zhang C, Shao X, Tian G (2016a) More MILP models for integrated process planning and scheduling. Int J Prod Res 54:4387\u20134402. https:\/\/doi.org\/10.1080\/00207543.2016.1140917","journal-title":"Int J Prod Res"},{"key":"700_CR23","doi-asserted-by":"publisher","first-page":"1513","DOI":"10.1007\/s00170-015-8037-7","volume":"85","author":"L Jin","year":"2016","unstructured":"Jin L, Zhang C, Shao X, Yang X, Tian G (2016b) A multi-objective memetic algorithm for integrated process planning and scheduling. Int J Adv Manuf Technol 85:1513\u20131528. https:\/\/doi.org\/10.1007\/s00170-015-8037-7","journal-title":"Int J Adv Manuf Technol"},{"key":"700_CR24","doi-asserted-by":"publisher","first-page":"6182","DOI":"10.1080\/00207543.2013.825055","volume":"51","author":"T Keshavarz","year":"2013","unstructured":"Keshavarz T, Salmasi N (2013) Makespan minimisation in flexible flowshop sequence-dependent group scheduling problem. Int J Prod Res 51:6182\u20136193. https:\/\/doi.org\/10.1080\/00207543.2013.825055","journal-title":"Int J Prod Res"},{"key":"700_CR25","doi-asserted-by":"publisher","first-page":"165","DOI":"10.1007\/BF01471363","volume":"2","author":"B Khoshnevis","year":"1991","unstructured":"Khoshnevis B, Chen QM (1991) Integration of process planning and scheduling functions. J Intell Manuf 2:165\u2013175","journal-title":"J Intell Manuf"},{"key":"700_CR26","doi-asserted-by":"publisher","first-page":"2725","DOI":"10.1080\/002075499190491","volume":"37","author":"KH Kim","year":"1999","unstructured":"Kim KH, Egbelu PJ (1999) Scheduling in a production environment with multiple process plans per job. Int J Prod Res 37:2725\u20132753. https:\/\/doi.org\/10.1080\/002075499190491","journal-title":"Int J Prod Res"},{"key":"700_CR27","doi-asserted-by":"publisher","first-page":"1151","DOI":"10.1016\/S0305-0548(02)00063-1","volume":"30","author":"YK Kim","year":"2003","unstructured":"Kim YK, Park K, Ko J (2003) A symbiotic evolutionary algorithm for the integration of process planning and job shop scheduling. Comput Oper Res 30:1151\u20131171","journal-title":"Comput Oper Res"},{"key":"700_CR28","doi-asserted-by":"publisher","first-page":"55","DOI":"10.1016\/0895-7177(93)90196-6","volume":"17","author":"U Kleinau","year":"1993","unstructured":"Kleinau U (1993) Two-machine shop scheduling problems with batch processing. Math Comput Model 17:55\u201366. https:\/\/doi.org\/10.1016\/0895-7177(93)90196-6","journal-title":"Math Comput Model"},{"key":"700_CR29","doi-asserted-by":"publisher","first-page":"502","DOI":"10.3390\/su11020502","volume":"11","author":"HC Lee","year":"2019","unstructured":"Lee HC, Ha C (2019) Sustainable integrated process planning and scheduling optimization using a genetic algorithm with an integrated chromosome representation. Sustainability 11:502","journal-title":"Sustainability"},{"key":"700_CR30","doi-asserted-by":"publisher","first-page":"586","DOI":"10.1007\/s001700170035","volume":"18","author":"H Lee","year":"2001","unstructured":"Lee H, Kim S-S (2001) Integration of process planning and scheduling using simulation based genetic algorithms. Int J Adv Manuf Technol 18:586\u2013590. https:\/\/doi.org\/10.1007\/s001700170035","journal-title":"Int J Adv Manuf Technol"},{"key":"700_CR31","doi-asserted-by":"publisher","first-page":"166","DOI":"10.1016\/j.cie.2009.09.003","volume":"59","author":"CW Leung","year":"2010","unstructured":"Leung CW, Wong TN, Mak K-L, Fung RY (2010) Integrated process planning and scheduling by an agent-based ant colony optimization. Comput Ind Eng 59:166\u2013180","journal-title":"Comput Ind Eng"},{"key":"700_CR32","doi-asserted-by":"publisher","first-page":"80","DOI":"10.1080\/09511920600667366","volume":"20","author":"WD Li","year":"2007","unstructured":"Li WD, McMahon CA (2007) A simulated annealing-based optimization approach for integrated process planning and scheduling. Int J Comput Integr Manuf 20:80\u201395","journal-title":"Int J Comput Integr Manuf"},{"key":"700_CR33","doi-asserted-by":"publisher","DOI":"10.1016\/j.cor.2009.06.008","author":"X Li","year":"2010","unstructured":"Li X, Gao L, Shao X, Zhang C, Wang C (2010a) Mathematical modeling and evolutionary algorithm-based approach for integrated process planning and scheduling. Comput Oper Res. https:\/\/doi.org\/10.1016\/j.cor.2009.06.008","journal-title":"Comput Oper Res"},{"key":"700_CR34","doi-asserted-by":"publisher","first-page":"161","DOI":"10.1504\/IJMR.2010.031630","volume":"5","author":"X Li","year":"2010","unstructured":"Li X, Gao L, Zhang C, Shao X (2010b) A review on integrated process planning and scheduling. Int J Manuf Res 5:161\u2013180","journal-title":"Int J Manuf Res"},{"key":"700_CR35","doi-asserted-by":"publisher","first-page":"289","DOI":"10.1016\/j.ijpe.2010.04.001","volume":"126","author":"X Li","year":"2010","unstructured":"Li X, Shao X, Gao L, Qian W (2010c) An effective hybrid algorithm for integrated process planning and scheduling. Int J Prod Econ 126:289\u2013298","journal-title":"Int J Prod Econ"},{"key":"700_CR36","doi-asserted-by":"publisher","first-page":"1256","DOI":"10.1016\/j.eswa.2009.06.014","volume":"37","author":"X Li","year":"2010","unstructured":"Li X, Zhang C, Gao L, Li W, Shao X (2010d) An agent-based approach for integrated process planning and scheduling. Expert Syst Appl 37:1256\u20131264. https:\/\/doi.org\/10.1016\/j.eswa.2009.06.014","journal-title":"Expert Syst Appl"},{"key":"700_CR37","doi-asserted-by":"publisher","first-page":"6683","DOI":"10.1016\/j.eswa.2011.11.074","volume":"39","author":"X Li","year":"2012","unstructured":"Li X, Gao L, Shao X (2012) An active learning genetic algorithm for integrated process planning and scheduling. Expert Syst Appl 39:6683\u20136691. https:\/\/doi.org\/10.1016\/j.eswa.2011.11.074","journal-title":"Expert Syst Appl"},{"key":"700_CR38","doi-asserted-by":"publisher","first-page":"1933","DOI":"10.1109\/TSMC.2018.2881686","volume":"49","author":"X Li","year":"2019","unstructured":"Li X, Gao L, Pan Q, Wan L, Chao K-M (2019a) An effective hybrid genetic algorithm and variable neighborhood search for integrated process planning and scheduling in a packaging machine workshop. IEEE Trans Syst Man Cybernet 49:1933\u20131945","journal-title":"IEEE Trans Syst Man Cybernet"},{"key":"700_CR39","doi-asserted-by":"publisher","first-page":"1036","DOI":"10.1016\/j.cie.2019.04.028","volume":"135","author":"X Li","year":"2019","unstructured":"Li X, Gao L, Wang W, Wang C, Wen L (2019b) Particle swarm optimization hybridized with genetic algorithm for uncertain integrated process planning and scheduling with interval processing time. Comput Ind Eng 135:1036\u20131046","journal-title":"Comput Ind Eng"},{"key":"700_CR40","doi-asserted-by":"publisher","unstructured":"Li WD, Gao L, Li XY, Guo Y (2008) Game theory-based cooperation of process planning and scheduling. In: 2008 12th international conference on computer supported cooperative work in design, 16\u201318 April 2008. pp 841\u2013845. https:\/\/doi.org\/10.1109\/CSCWD.2008.4537088","DOI":"10.1109\/CSCWD.2008.4537088"},{"key":"700_CR41","doi-asserted-by":"publisher","first-page":"4326","DOI":"10.1080\/00207543.2011.622310","volume":"50","author":"K Lian","year":"2012","unstructured":"Lian K, Zhang C, Gao L, Li X (2012a) Integrated process planning and scheduling using an imperialist competitive algorithm. Int J Prod Res 50:4326\u20134343. https:\/\/doi.org\/10.1080\/00207543.2011.622310","journal-title":"Int J Prod Res"},{"key":"700_CR42","doi-asserted-by":"publisher","first-page":"815","DOI":"10.1007\/s00170-011-3527-8","volume":"59","author":"K Lian","year":"2012","unstructured":"Lian K, Zhang C, Shao X, Gao L (2012b) Optimization of process planning with various flexibilities using an imperialist competitive algorithm. Int J Adv Manuf Technol 59:815\u2013828","journal-title":"Int J Adv Manuf Technol"},{"key":"700_CR43","doi-asserted-by":"publisher","first-page":"727","DOI":"10.1007\/s00170-011-3409-0","volume":"58","author":"Q Lihong","year":"2012","unstructured":"Lihong Q, Shengping L (2012) An improved genetic algorithm for integrated process planning and scheduling. Int J Adv Manuf Technol 58:727\u2013740","journal-title":"Int J Adv Manuf Technol"},{"key":"700_CR44","doi-asserted-by":"publisher","first-page":"393","DOI":"10.1007\/s00170-015-8145-4","volume":"84","author":"X Liu","year":"2016","unstructured":"Liu X, Ni Z, Qiu X (2016) Application of ant colony optimization algorithm in integrated process planning and scheduling. Int J Adv Manuf Technol 84:393\u2013404. https:\/\/doi.org\/10.1007\/s00170-015-8145-4","journal-title":"Int J Adv Manuf Technol"},{"key":"700_CR45","doi-asserted-by":"publisher","first-page":"530","DOI":"10.1057\/jors.2012.61","volume":"64","author":"D Lu","year":"2013","unstructured":"Lu D, Logendran R (2013) Bi-criteria group scheduling with sequence-dependent setup time in a flow shop. J Oper Res Soc 64:530\u2013546. https:\/\/doi.org\/10.1057\/jors.2012.61","journal-title":"J Oper Res Soc"},{"key":"700_CR46","doi-asserted-by":"publisher","first-page":"3145","DOI":"10.1007\/s00170-017-0020-z","volume":"91","author":"G Luo","year":"2017","unstructured":"Luo G, Wen X, Li H, Ming W, Xie G (2017) An effective multi-objective genetic algorithm based on immune principle and external archive for multi-objective integrated process planning and scheduling. Int J Adv Manuf Technol 91:3145\u20133158. https:\/\/doi.org\/10.1007\/s00170-017-0020-z","journal-title":"Int J Adv Manuf Technol"},{"key":"700_CR47","doi-asserted-by":"publisher","first-page":"1712","DOI":"10.1080\/00207543.2014.957872","volume":"53","author":"P Mohapatra","year":"2015","unstructured":"Mohapatra P, Nayak A, Kumar SK, Tiwari MK (2015) Multi-objective process planning and scheduling using controlled elitist non-dominated sorting genetic algorithm. Int J Prod Res 53:1712\u20131735. https:\/\/doi.org\/10.1080\/00207543.2014.957872","journal-title":"Int J Prod Res"},{"key":"700_CR48","doi-asserted-by":"publisher","first-page":"169","DOI":"10.1023\/A:1008976720878","volume":"10","author":"N Morad","year":"1999","unstructured":"Morad N, Zalzala A (1999) Genetic algorithms in integrated process planning and scheduling. J Intell Manuf 10:169\u2013179","journal-title":"J Intell Manuf"},{"key":"700_CR49","doi-asserted-by":"publisher","first-page":"177","DOI":"10.1504\/EJIE.2012.045604","volume":"6","author":"B Naderi","year":"2012","unstructured":"Naderi B, Salmasi N (2012) Permutation flowshops in group scheduling with sequence-dependent setup times. Eur J Indust Eng 6:177\u2013198","journal-title":"Eur J Indust Eng"},{"key":"700_CR50","doi-asserted-by":"crossref","unstructured":"Nayak SK, Padhy SK, Panda CS (2018) Efficient multiprocessor scheduling using water cycle algorithm. In, Singapore, 2018. Soft Computing: Theories and Applications. Springer Singapore, pp 559\u2013568","DOI":"10.1007\/978-981-10-5687-1_50"},{"key":"700_CR51","doi-asserted-by":"publisher","first-page":"56","DOI":"10.1016\/j.cor.2015.12.006","volume":"70","author":"JS Neufeld","year":"2016","unstructured":"Neufeld JS, Gupta JND, Buscher U (2016) A comprehensive review of flowshop group scheduling literature. Comput Oper Res 70:56\u201374. https:\/\/doi.org\/10.1016\/j.cor.2015.12.006","journal-title":"Comput Oper Res"},{"key":"700_CR52","unstructured":"Nourali S, Imanipour N, Shahriari MR (2012) A mathematical model for integrated process planning and scheduling in flexible assembly job shop environment with sequence dependent setup times vol 6."},{"key":"700_CR53","doi-asserted-by":"publisher","first-page":"1539","DOI":"10.1016\/j.apm.2009.09.002","volume":"34","author":"C \u00d6zg\u00fcven","year":"2010","unstructured":"\u00d6zg\u00fcven C, \u00d6zbak\u0131r L, Yavuz Y (2010) Mathematical models for job-shop scheduling problems with routing and process plan flexibility. Appl Math Model 34:1539\u20131548. https:\/\/doi.org\/10.1016\/j.apm.2009.09.002","journal-title":"Appl Math Model"},{"key":"700_CR54","doi-asserted-by":"publisher","first-page":"569","DOI":"10.1016\/j.eswa.2016.08.019","volume":"64","author":"M Petrovi\u0107","year":"2016","unstructured":"Petrovi\u0107 M, Vukovi\u0107 N, Miti\u0107 M, Miljkovi\u0107 Z (2016) Integration of process planning and scheduling using chaotic particle swarm optimization algorithm. Expert Syst Appl 64:569\u2013588. https:\/\/doi.org\/10.1016\/j.eswa.2016.08.019","journal-title":"Expert Syst Appl"},{"key":"700_CR55","first-page":"249","volume-title":"A cooperative coevolutionary approach to function optimization. In, Berlin, Heidelberg, Parallel problem solving from nature\u2014PPSN III","author":"MA Potter","year":"1994","unstructured":"Potter MA, De Jong KA (1994) A cooperative coevolutionary approach to function optimization. In, Berlin, Heidelberg, Parallel problem solving from nature\u2014PPSN III. Springer, Berlin, pp 249\u2013257"},{"key":"700_CR56","doi-asserted-by":"publisher","first-page":"2587","DOI":"10.1007\/s00500-014-1424-4","volume":"19","author":"A Sadollah","year":"2015","unstructured":"Sadollah A, Eskandar H, Bahreininejad A, Kim JH (2015a) Water cycle algorithm for solving multi-objective optimization problems. Soft Comput 19:2587\u20132603. https:\/\/doi.org\/10.1007\/s00500-014-1424-4","journal-title":"Soft Comput"},{"key":"700_CR57","doi-asserted-by":"publisher","first-page":"58","DOI":"10.1016\/j.asoc.2015.01.050","volume":"30","author":"A Sadollah","year":"2015","unstructured":"Sadollah A, Eskandar H, Bahreininejad A, Kim JH (2015b) Water cycle algorithm with evaporation rate for solving constrained and unconstrained optimization problems. Appl Soft Comput 30:58\u201371. https:\/\/doi.org\/10.1016\/j.asoc.2015.01.050","journal-title":"Appl Soft Comput"},{"key":"700_CR58","doi-asserted-by":"publisher","first-page":"199","DOI":"10.1016\/j.cor.2009.04.013","volume":"37","author":"N Salmasi","year":"2010","unstructured":"Salmasi N, Logendran R, Skandari MR (2010) Total flow time minimization in a flowshop sequence-dependent group scheduling problem. Comput Oper Res 37:199\u2013212","journal-title":"Comput Oper Res"},{"key":"700_CR59","doi-asserted-by":"publisher","first-page":"4237","DOI":"10.1080\/00207543.2011.604051","volume":"50","author":"O Shahvari","year":"2012","unstructured":"Shahvari O, Salmasi N, Logendran R, Abbasi B (2012) An efficient tabu search algorithm for flexible flow shop sequence-dependent group scheduling problems. Int J Prod Res 50:4237\u20134254. https:\/\/doi.org\/10.1080\/00207543.2011.604051","journal-title":"Int J Prod Res"},{"key":"700_CR60","doi-asserted-by":"publisher","first-page":"2082","DOI":"10.1016\/j.cor.2008.07.006","volume":"36","author":"X Shao","year":"2009","unstructured":"Shao X, Li X, Gao L, Zhang C (2009) Integration of process planning and scheduling\u2014a modified genetic algorithm-based approach. Comput Oper Res 36:2082\u20132096","journal-title":"Comput Oper Res"},{"key":"700_CR61","doi-asserted-by":"publisher","first-page":"163","DOI":"10.1007\/s00170-007-1087-8","volume":"38","author":"SK Shukla","year":"2007","unstructured":"Shukla SK, Tiwari MK, Son YJ (2007) Bidding-based multi-agent system for integrated process planning and scheduling: a data-mining and hybrid tabu-SA algorithm-oriented approach. Int J Adv Manuf Technol 38:163. https:\/\/doi.org\/10.1007\/s00170-007-1087-8","journal-title":"Int J Adv Manuf Technol"},{"key":"700_CR62","doi-asserted-by":"publisher","DOI":"10.1080\/00207543.2016.1182227","author":"O Sobeyko","year":"2016","unstructured":"Sobeyko O, M\u00f6nch L (2016) Integrated process planning and scheduling for large-scale flexible job shops using metaheuristics. Int J Prod Res. https:\/\/doi.org\/10.1080\/00207543.2016.1182227","journal-title":"Int J Prod Res"},{"key":"700_CR63","doi-asserted-by":"publisher","first-page":"593","DOI":"10.1023\/B:JIMS.0000037710.80847.b6","volume":"15","author":"W Tan","year":"2004","unstructured":"Tan W, Khoshnevis B (2004) A linearized polynomial mixed integer programming model for the integration of process planning and scheduling. J Intell Manuf 15:593\u2013605. https:\/\/doi.org\/10.1023\/B:JIMS.0000037710.80847.b6","journal-title":"J Intell Manuf"},{"key":"700_CR64","unstructured":"Uslu MF, Uslu S, Bulut F (2018) An adaptive hybrid approach: combining genetic algorithm and ant colony optimization for integrated process planning and scheduling. Appl Comput Inform. S2210832718300310"},{"key":"700_CR65","unstructured":"Wan S, Wong TN, Zhang S, Zhang L (2011) Integrated process planning and scheduling with setup time consideration by ant colony optimization."},{"key":"700_CR66","doi-asserted-by":"publisher","first-page":"429","DOI":"10.1023\/a:1025797124367","volume":"14","author":"L Wang","year":"2003","unstructured":"Wang L, Shen W (2003) DPP: an agent-based approach for distributed process planning. J Intell Manuf 14:429\u2013439. https:\/\/doi.org\/10.1023\/a:1025797124367","journal-title":"J Intell Manuf"},{"key":"700_CR67","doi-asserted-by":"publisher","first-page":"1331","DOI":"10.1080\/00207540500409723","volume":"44","author":"TN Wong","year":"2006","unstructured":"Wong TN, Leung CW, Mak KL, Fung RYK (2006a) An agent-based negotiation approach to integrate process planning and scheduling. Int J Prod Res 44:1331\u20131351. https:\/\/doi.org\/10.1080\/00207540500409723","journal-title":"Int J Prod Res"},{"key":"700_CR68","doi-asserted-by":"publisher","first-page":"3627","DOI":"10.1080\/00207540600675801","volume":"44","author":"TN Wong","year":"2006","unstructured":"Wong TN, Leung CW, Mak KL, Fung RYK (2006b) Integrated process planning and scheduling\/rescheduling\u2014an agent-based approach. Int J Prod Res 44:3627\u20133655. https:\/\/doi.org\/10.1080\/00207540600675801","journal-title":"Int J Prod Res"},{"key":"700_CR69","doi-asserted-by":"publisher","first-page":"585","DOI":"10.1007\/s10845-014-1023-3","volume":"29","author":"S Zhang","year":"2014","unstructured":"Zhang S, Wong TN (2014) Integrated process planning and scheduling: an enhanced ant colony optimization heuristic with parameter tuning. J Intell Manuf 29:585\u2013601. https:\/\/doi.org\/10.1007\/s10845-014-1023-3","journal-title":"J Intell Manuf"},{"key":"700_CR70","doi-asserted-by":"publisher","first-page":"434","DOI":"10.1016\/j.ejor.2015.01.032","volume":"244","author":"L Zhang","year":"2015","unstructured":"Zhang L, Wong TN (2015a) An object-coding genetic algorithm for integrated process planning and scheduling. Eur J Oper Res 244:434\u2013444. https:\/\/doi.org\/10.1016\/j.ejor.2015.01.032","journal-title":"Eur J Oper Res"},{"key":"700_CR71","doi-asserted-by":"publisher","DOI":"10.1080\/00207543.2015.1098786","author":"S Zhang","year":"2015","unstructured":"Zhang S, Wong TN (2015b) Studying the impact of sequence-dependent set-up times in integrated process planning and scheduling with E-ACO heuristic. Int J Prod Res. https:\/\/doi.org\/10.1080\/00207543.2015.1098786","journal-title":"Int J Prod Res"},{"key":"700_CR72","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1016\/j.ins.2016.01.001","volume":"340\u2013341","author":"L Zhang","year":"2016","unstructured":"Zhang L, Wong TN (2016) Solving integrated process planning and scheduling problem with constructive meta-heuristics. Inf Sci 340\u2013341:1\u201316. https:\/\/doi.org\/10.1016\/j.ins.2016.01.001","journal-title":"Inf Sci"},{"key":"700_CR73","doi-asserted-by":"publisher","first-page":"246","DOI":"10.1007\/978-3-540-31996-2_23","volume-title":"Berlin, Heidelberg, Evolutionary computation in combinatorial optimization","author":"C Zhang","year":"2005","unstructured":"Zhang C, Li P, Rao Y, Li SA (2005) New hybrid GA\/SA algorithm for the job shop scheduling problem. Berlin, Heidelberg, Evolutionary computation in combinatorial optimization. Springer, Berlin, pp 246\u2013259"},{"key":"700_CR74","doi-asserted-by":"publisher","first-page":"881","DOI":"10.1007\/s10845-013-0814-2","volume":"25","author":"W Zhang","year":"2014","unstructured":"Zhang W, Gen M, Jo J (2014) Hybrid sampling strategy-based multiobjective evolutionary algorithm for process planning and scheduling problem. J Intell Manuf 25:881\u2013897. https:\/\/doi.org\/10.1007\/s10845-013-0814-2","journal-title":"J Intell Manuf"},{"key":"700_CR75","doi-asserted-by":"publisher","first-page":"521","DOI":"10.1016\/j.asoc.2015.08.051","volume":"37","author":"R Zhang","year":"2015","unstructured":"Zhang R, Ong SK, Nee AYC (2015) A simulation-based genetic algorithm approach for remanufacturing process planning and scheduling. Appl Soft Comput 37:521\u2013532. https:\/\/doi.org\/10.1016\/j.asoc.2015.08.051","journal-title":"Appl Soft Comput"},{"key":"700_CR76","doi-asserted-by":"publisher","first-page":"20","DOI":"10.1080\/09511920903207472","volume":"23","author":"F Zhao","year":"2010","unstructured":"Zhao F, Hong Y, Yu D, Yang Y, Zhang Q (2010) A hybrid particle swarm optimisation algorithm and fuzzy logic for process planning and production scheduling integration in holonic manufacturing systems. Int J Comput Integr Manuf 23:20\u201339. https:\/\/doi.org\/10.1080\/09511920903207472","journal-title":"Int J Comput Integr Manuf"}],"container-title":["Operational Research"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s12351-022-00700-6.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/article\/10.1007\/s12351-022-00700-6\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s12351-022-00700-6.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2022,10,21]],"date-time":"2022-10-21T14:10:13Z","timestamp":1666361413000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/s12351-022-00700-6"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2022,5,18]]},"references-count":76,"journal-issue":{"issue":"5","published-print":{"date-parts":[[2022,11]]}},"alternative-id":["700"],"URL":"https:\/\/doi.org\/10.1007\/s12351-022-00700-6","relation":{},"ISSN":["1109-2858","1866-1505"],"issn-type":[{"type":"print","value":"1109-2858"},{"type":"electronic","value":"1866-1505"}],"subject":[],"published":{"date-parts":[[2022,5,18]]},"assertion":[{"value":"30 July 2020","order":1,"name":"received","label":"Received","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"2 February 2022","order":2,"name":"revised","label":"Revised","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"10 February 2022","order":3,"name":"accepted","label":"Accepted","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"18 May 2022","order":4,"name":"first_online","label":"First Online","group":{"name":"ArticleHistory","label":"Article History"}},{"order":1,"name":"Ethics","group":{"name":"EthicsHeading","label":"Declarations"}},{"value":"The authors declare that they have no conflict of interest.","order":2,"name":"Ethics","group":{"name":"EthicsHeading","label":"Conflict of interest"}}]}}