{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,3,17]],"date-time":"2026-03-17T08:38:01Z","timestamp":1773736681463,"version":"3.50.1"},"reference-count":69,"publisher":"Springer Science and Business Media LLC","issue":"5","license":[{"start":{"date-parts":[[2022,7,7]],"date-time":"2022-07-07T00:00:00Z","timestamp":1657152000000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springer.com\/tdm"},{"start":{"date-parts":[[2022,7,7]],"date-time":"2022-07-07T00:00:00Z","timestamp":1657152000000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Oper Res Int J"],"published-print":{"date-parts":[[2022,11]]},"DOI":"10.1007\/s12351-022-00725-x","type":"journal-article","created":{"date-parts":[[2022,7,7]],"date-time":"2022-07-07T09:03:28Z","timestamp":1657184608000},"page":"6055-6073","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":6,"title":["A robust group decision making framework using fuzzy TOPSIS and Monte Carlo simulation for wind energy projects multicriteria evaluation"],"prefix":"10.1007","volume":"22","author":[{"ORCID":"https:\/\/orcid.org\/0000-0002-5232-4985","authenticated-orcid":false,"given":"Athanasios P.","family":"Vavatsikos","sequence":"first","affiliation":[]},{"given":"Efstratios","family":"Tsesmetzis","sequence":"additional","affiliation":[]},{"given":"Georgios","family":"Koulinas","sequence":"additional","affiliation":[]},{"given":"Dimitrios","family":"Koulouriotis","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2022,7,7]]},"reference":[{"key":"725_CR1","doi-asserted-by":"publisher","first-page":"1880","DOI":"10.1016\/j.energy.2017.11.102","volume":"141","author":"S Ahmad","year":"2017","unstructured":"Ahmad S, Nadeem A, Akhanova G, Houghton T, Muhammad-Sukki F (2017) Multi-criteria evaluation of renewable and nuclear resources for electricity generation in Kazakhstan. Energy 141:1880\u20131891. https:\/\/doi.org\/10.1016\/j.energy.2017.11.102","journal-title":"Energy"},{"key":"725_CR2","doi-asserted-by":"publisher","first-page":"137","DOI":"10.1016\/j.seta.2016.05.006","volume":"16","author":"H Al Garni","year":"2016","unstructured":"Al Garni H, Kassem A, Awasthi A, Komljenovic D, Al-Haddad K (2016) A multicriteria decision making approach for evaluating renewable power generation sources in Saudi Arabia. Sustain Energy Technol Assess 16:137\u2013150. https:\/\/doi.org\/10.1016\/j.seta.2016.05.006","journal-title":"Sustain Energy Technol Assess"},{"key":"725_CR3","doi-asserted-by":"publisher","first-page":"125","DOI":"10.1061\/(ASCE)WR.1943-5452.0000155","volume":"138","author":"K Anagnostopoulos","year":"2012","unstructured":"Anagnostopoulos K, Vavatsikos A (2012) Site suitability analysis for natural systems for wastewater treatment with spatial fuzzy analytic hierarchy process. J Water Resour Plan Manag 138:125\u2013134. https:\/\/doi.org\/10.1061\/(ASCE)WR.1943-5452.0000155","journal-title":"J Water Resour Plan Manag"},{"key":"725_CR4","doi-asserted-by":"publisher","first-page":"1383","DOI":"10.1016\/j.renene.2003.12.020","volume":"29","author":"H Aras","year":"2004","unstructured":"Aras H, Erdo\u011fmu\u015f \u015e, Ko\u00e7 E (2004) Multi-criteria selection for a wind observation station location using analytic hierarchy process. Renew Energy 29:1383\u20131392. https:\/\/doi.org\/10.1016\/j.renene.2003.12.020","journal-title":"Renew Energy"},{"key":"725_CR5","doi-asserted-by":"publisher","first-page":"573","DOI":"10.1016\/j.ijmst.2013.07.017","volume":"23","author":"M Ataei","year":"2013","unstructured":"Ataei M, Shahsavany H, Mikaeil R (2013) Monte Carlo analytic hierarchy process (MAHP) approach to selection of optimum mining method. Int J Min Sci Technol 23:573\u2013578. https:\/\/doi.org\/10.1016\/j.ijmst.2013.07.017","journal-title":"Int J Min Sci Technol"},{"key":"725_CR6","doi-asserted-by":"publisher","first-page":"98","DOI":"10.1016\/j.mcm.2010.07.023","volume":"53","author":"A Awasthi","year":"2011","unstructured":"Awasthi A, Chauhan SS, Goyal SK (2011) A multi-criteria decision making approach for location planning for urban distribution centers under uncertainty. Math Comput Model 53:98\u2013109. https:\/\/doi.org\/10.1016\/j.mcm.2010.07.023","journal-title":"Math Comput Model"},{"key":"725_CR7","doi-asserted-by":"publisher","first-page":"6695","DOI":"10.1007\/s10661-014-3883-6","volume":"186","author":"A Azizi","year":"2014","unstructured":"Azizi A, Malekmohammadi B, Jafari HR, Nasiri H, Amini Parsa V (2014) Land suitability assessment for wind power plant site selection using ANP-DEMATEL in a GIS environment: case study of Ardabil province. Iran Environ Monit Assess 186:6695\u20136709. https:\/\/doi.org\/10.1007\/s10661-014-3883-6","journal-title":"Iran Environ Monit Assess"},{"key":"725_CR8","doi-asserted-by":"publisher","first-page":"257","DOI":"10.1080\/14498596.2010.521975","volume":"55","author":"KK Benke","year":"2010","unstructured":"Benke KK, Pelizaro C (2010) A spatial-statistical approach to the visualisation of uncertainty in land suitability analysis. J Spat Sci 55:257\u2013272. https:\/\/doi.org\/10.1080\/14498596.2010.521975","journal-title":"J Spat Sci"},{"key":"725_CR9","doi-asserted-by":"publisher","first-page":"11363","DOI":"10.1016\/j.eswa.2009.03.039","volume":"36","author":"FE Boran","year":"2009","unstructured":"Boran FE, Gen\u00e7 S, Kurt M, Akay D (2009) A multi-criteria intuitionistic fuzzy group decision making for supplier selection with TOPSIS method. Expert Syst Appl 36:11363\u201311368. https:\/\/doi.org\/10.1016\/j.eswa.2009.03.039","journal-title":"Expert Syst Appl"},{"key":"725_CR10","doi-asserted-by":"publisher","first-page":"78","DOI":"10.1016\/j.erss.2017.10.018","volume":"35","author":"MJ Burke","year":"2018","unstructured":"Burke MJ, Stephens JC (2018) Political power and renewable energy futures: a critical review. Energy Res Soc Sci 35:78\u201393. https:\/\/doi.org\/10.1016\/j.erss.2017.10.018","journal-title":"Energy Res Soc Sci"},{"key":"725_CR11","doi-asserted-by":"publisher","first-page":"7044","DOI":"10.1080\/00207543.2011.653451","volume":"50","author":"FTS Chan","year":"2012","unstructured":"Chan FTS, Prakash A (2012) Maintenance policy selection in manufacturing firms using the fuzzy MCDM approach. Int J Prod Res 50:7044\u20137056. https:\/\/doi.org\/10.1080\/00207543.2011.653451","journal-title":"Int J Prod Res"},{"key":"725_CR12","doi-asserted-by":"publisher","first-page":"1","DOI":"10.5267\/j.dsl.2012.11.001","volume":"2","author":"NC Chatterjee","year":"2013","unstructured":"Chatterjee NC, Bose GK (2013) A COPRAS-F base multi-criteria group decision making approach for site selection of wind farm. Decis Sci Lett 2:1\u201310. https:\/\/doi.org\/10.5267\/j.dsl.2012.11.001","journal-title":"Decis Sci Lett"},{"key":"725_CR13","doi-asserted-by":"publisher","first-page":"459","DOI":"10.1142\/S0218488597000348","volume":"05","author":"C-B Chen","year":"1997","unstructured":"Chen C-B, Wei C-C (1997) An approach for solving fuzzy MADM problems. Int J Uncertain Fuzziness Knowl-Based Syst 05:459\u2013480. https:\/\/doi.org\/10.1142\/S0218488597000348","journal-title":"Int J Uncertain Fuzziness Knowl-Based Syst"},{"key":"725_CR14","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1016\/S0165-0114(97)00377-1","volume":"114","author":"C-T Chen","year":"2000","unstructured":"Chen C-T (2000) Extensions of the TOPSIS for group decision-making under fuzzy environment. Fuzzy Sets Syst 114:1\u20139. https:\/\/doi.org\/10.1016\/S0165-0114(97)00377-1","journal-title":"Fuzzy Sets Syst"},{"key":"725_CR15","doi-asserted-by":"publisher","first-page":"289","DOI":"10.1016\/j.ijpe.2005.03.009","volume":"102","author":"C-T Chen","year":"2006","unstructured":"Chen C-T, Lin C-T, Huang S-F (2006) A fuzzy approach for supplier evaluation and selection in supply chain management. Int J Prod Econ 102:289\u2013301. https:\/\/doi.org\/10.1016\/j.ijpe.2005.03.009","journal-title":"Int J Prod Econ"},{"key":"725_CR16","doi-asserted-by":"publisher","unstructured":"Chen SJ, Hwang CL (1992) Fuzzy multiple attribute decision making methods. In: Fuzzy multiple attribute decision making. Lecture notes in economics and mathematical systems, vol 375. Springer, Berlin, pp 289\u2013486. https:\/\/doi.org\/10.1007\/978-3-642-46768-4_5","DOI":"10.1007\/978-3-642-46768-4_5"},{"key":"725_CR17","doi-asserted-by":"publisher","first-page":"2790","DOI":"10.1016\/j.eswa.2009.09.012","volume":"37","author":"SM Chen","year":"2010","unstructured":"Chen SM, Lee LW (2010) Fuzzy multiple attributes group decision-making based on the interval type-2 TOPSIS method. Expert Syst Appl 37:2790\u20132798. https:\/\/doi.org\/10.1016\/j.eswa.2009.09.012","journal-title":"Expert Syst Appl"},{"key":"725_CR18","doi-asserted-by":"publisher","first-page":"1410","DOI":"10.1016\/j.fss.2007.11.004","volume":"159","author":"TY Chen","year":"2008","unstructured":"Chen TY, Tsao CY (2008) The interval-valued fuzzy TOPSIS method and experimental analysis. Fuzzy Sets Syst 159:1410\u20131428. https:\/\/doi.org\/10.1016\/j.fss.2007.11.004","journal-title":"Fuzzy Sets Syst"},{"key":"725_CR19","doi-asserted-by":"publisher","first-page":"687","DOI":"10.1142\/S0218488502001739","volume":"10","author":"TC Chu","year":"2002","unstructured":"Chu TC (2002a) Facility location selection using fuzzy TOPSIS under group decisions. Int J Uncertain Fuzziness Knowl-Based Syst 10:687\u2013701. https:\/\/doi.org\/10.1142\/S0218488502001739","journal-title":"Int J Uncertain Fuzziness Knowl-Based Syst"},{"key":"725_CR20","doi-asserted-by":"publisher","first-page":"859","DOI":"10.1007\/s001700200227","volume":"20","author":"TC Chu","year":"2002","unstructured":"Chu TC (2002b) Selecting plant location via a fuzzy TOPSIS approach. Int J Adv Manuf Technol 20:859\u2013864. https:\/\/doi.org\/10.1007\/s001700200227","journal-title":"Int J Adv Manuf Technol"},{"issue":"11","key":"725_CR21","doi-asserted-by":"publisher","first-page":"6856","DOI":"10.3390\/en7116856","volume":"7","author":"A Colmenar-Santos","year":"2014","unstructured":"Colmenar-Santos A, Camp\u00edez-Romero S, Enr\u00edquez-Garcia AL, P\u00e9rez-Molina C (2014) Simplified analysis of the electric power losses for on-shore wind farms considering Weibull distribution parameters. Energies 7(11):6856\u20136885. https:\/\/doi.org\/10.3390\/en7116856","journal-title":"Energies"},{"key":"725_CR22","volume-title":"Finance for engineers: Evaluation and funding of capital projects","author":"FK Crundwell","year":"2008","unstructured":"Crundwell FK (2008) Finance for engineers: Evaluation and funding of capital projects. Springer, London"},{"key":"725_CR23","doi-asserted-by":"publisher","first-page":"38","DOI":"10.3846\/20294913.2012.762950","volume":"19","author":"T Ertay","year":"2013","unstructured":"Ertay T, Kahraman C, Kaya \u0130 (2013) Evaluation of renewable energy alternatives using MACBETH and fuzzy AHP multicriteria methods: the case of Turkey. Technol Econ Dev Econ 19:38\u201362. https:\/\/doi.org\/10.3846\/20294913.2012.762950","journal-title":"Technol Econ Dev Econ"},{"key":"725_CR24","doi-asserted-by":"publisher","unstructured":"European Commission (EC) (2012) Wind energy development and Natura 2000. Directorate-General for Environment, Publications Office. https:\/\/doi.org\/10.2779\/85175","DOI":"10.2779\/85175"},{"key":"725_CR25","volume-title":"Wind energy\u2014the facts: a guide to the technology, economics and future of wind power","author":"European Wind Energy Association (EWEA)","year":"2009","unstructured":"European Wind Energy Association (EWEA) (2009) Wind energy\u2014the facts: a guide to the technology, economics and future of wind power. Routledge, London"},{"key":"725_CR26","doi-asserted-by":"publisher","first-page":"81","DOI":"10.1016\/j.cageo.2013.11.009","volume":"64","author":"B Feizizadeh","year":"2014","unstructured":"Feizizadeh B, Jankowski P, Blaschke T (2014) A GIS based spatially-explicit sensitivity and uncertainty analysis approach for multi-criteria decision analysis. Comput Geosci 64:81\u201395. https:\/\/doi.org\/10.1016\/j.cageo.2013.11.009","journal-title":"Comput Geosci"},{"key":"725_CR27","doi-asserted-by":"publisher","unstructured":"Gass, V, Strauss, F, Schmidt, J, Schmid, E (2011) Economic assessment of wind power uncertainty. In: Proceedings of the World renewable energy congress, Link\u00f6ping, Sweden, wind energy applications session, pp 4169\u20134176. https:\/\/doi.org\/10.3384\/ecp11057","DOI":"10.3384\/ecp11057"},{"key":"725_CR28","doi-asserted-by":"publisher","first-page":"1276","DOI":"10.1080\/09640568.2016.1216398","volume":"60","author":"G Grilli","year":"2017","unstructured":"Grilli G, De Meo I, Garegnani G, Paletto A (2017) A multi-criteria framework to assess the sustainability of renewable energy development in the Alps. J Environ Plan Manag 60:1276\u20131295. https:\/\/doi.org\/10.1080\/09640568.2016.1216398","journal-title":"J Environ Plan Manag"},{"key":"725_CR29","doi-asserted-by":"publisher","first-page":"390","DOI":"10.1016\/j.apenergy.2015.08.082","volume":"158","author":"S Guo","year":"2015","unstructured":"Guo S, Zhao H (2015) Optimal site selection of electric vehicle charging station by using fuzzy TOPSIS based on sustainability perspective. Appl Energy 158:390\u2013402. https:\/\/doi.org\/10.1016\/j.apenergy.2015.08.082","journal-title":"Appl Energy"},{"key":"725_CR30","doi-asserted-by":"publisher","first-page":"462","DOI":"10.1016\/j.renene.2017.01.035","volume":"107","author":"B Haddad","year":"2017","unstructured":"Haddad B, Liazid A, Ferreira P (2017) A multi-criteria approach to rank renewables for the Algerian electricity system. Renew Energy 107:462\u2013472. https:\/\/doi.org\/10.1016\/j.renene.2017.01.035","journal-title":"Renew Energy"},{"key":"725_CR31","doi-asserted-by":"publisher","first-page":"961","DOI":"10.1016\/S0960-1481(02)00072-1","volume":"28","author":"DA Haralambopoulos","year":"2003","unstructured":"Haralambopoulos DA, Polatidis H (2003) Renewable energy projects: structuring a multi-criteria group decision-making framework. Renew Energy 28:961\u2013973. https:\/\/doi.org\/10.1016\/S0960-1481(02)00072-1","journal-title":"Renew Energy"},{"key":"725_CR32","doi-asserted-by":"publisher","first-page":"81","DOI":"10.1016\/j.ecolmodel.2011.10.013","volume":"223","author":"T H\u00e4yh\u00e4","year":"2011","unstructured":"H\u00e4yh\u00e4 T, Franzese PP, Ulgiati S (2011) Economic and environmental performance of electricity production in Finland: A multicriteria assessment framework. Ecol Modell 223:81\u201390. https:\/\/doi.org\/10.1016\/j.ecolmodel.2011.10.013","journal-title":"Ecol Modell"},{"key":"725_CR33","doi-asserted-by":"publisher","first-page":"2310","DOI":"10.1016\/j.eswa.2007.12.023","volume":"36","author":"TH Hsu","year":"2009","unstructured":"Hsu TH, Pan FFC (2009) Application of Monte Carlo AHP in ranking dental quality attributes. Expert Syst Appl 36:2310\u20132316. https:\/\/doi.org\/10.1016\/j.eswa.2007.12.023","journal-title":"Expert Syst Appl"},{"key":"725_CR34","doi-asserted-by":"publisher","first-page":"889","DOI":"10.1016\/0305-0548(93)90109-V","volume":"20","author":"CL Hwang","year":"1993","unstructured":"Hwang CL, Lai YJ, Liu TY (1993) A new approach for multiple objective decision making. Comput Oper Res 20:889\u2013899. https:\/\/doi.org\/10.1016\/0305-0548(93)90109-V","journal-title":"Comput Oper Res"},{"key":"725_CR35","doi-asserted-by":"publisher","DOI":"10.1007\/978-3-642-48318-9","volume-title":"Multiple attribute decision making: methods and applications. A state-of-the-art survey lecture notes in economics and mathematical systems","author":"CL Hwang","year":"1981","unstructured":"Hwang CL, Yoon K (1981) Multiple attribute decision making: methods and applications. A state-of-the-art survey lecture notes in economics and mathematical systems. Springer, Berlin. https:\/\/doi.org\/10.1007\/978-3-642-48318-9"},{"key":"725_CR36","unstructured":"International Renewable Energy Agency (IRENA) (2012) Wind power, renewable energy technologies: cost analysis series. 1(5\/5), https:\/\/www.irena.org\/Publications. Accessed 8 Aug 2021"},{"key":"725_CR3701","unstructured":"International Renewable Energy Agency (IRENA) (2018) Renewable energy statistics 2018. International Renewable Energy Agency, Abu Dhabi, ISBN 978-92-9260-077-8"},{"key":"725_CR37","unstructured":"International Renewable Energy Agency (IRENA) (2019) Renewable power generation costs in 2018. Abu Dhabi, ISBN 978-92-9260-126-3"},{"key":"725_CR38","doi-asserted-by":"publisher","first-page":"414","DOI":"10.1016\/j.cie.2007.01.005","volume":"52","author":"C Kahraman","year":"2007","unstructured":"Kahraman C, \u00c7evik S, Ates NY, G\u00fclbay M (2007) Fuzzy multi-criteria evaluation of industrial robotic systems. Comput Ind Eng 52:414\u2013433. https:\/\/doi.org\/10.1016\/j.cie.2007.01.005","journal-title":"Comput Ind Eng"},{"key":"725_CR39","doi-asserted-by":"publisher","first-page":"1603","DOI":"10.1016\/j.energy.2009.07.008","volume":"34","author":"C Kahraman","year":"2009","unstructured":"Kahraman C, Kaya \u0130, Cebi S (2009) A comparative analysis for multiattribute selection among renewable energy alternatives using fuzzy axiomatic design and fuzzy analytic hierarchy process. Energy 34:1603\u20131616. https:\/\/doi.org\/10.1016\/j.energy.2009.07.008","journal-title":"Energy"},{"key":"725_CR40","doi-asserted-by":"publisher","first-page":"432","DOI":"10.1016\/j.ejor.2013.07.023","volume":"233","author":"D Kannan","year":"2014","unstructured":"Kannan D, de Jabbour ABLS, Jabbour CJC (2014) Selecting green suppliers based on GSCM practices: using fuzzy TOPSIS applied to a Brazilian electronics company. Eur J Oper Res 233:432\u2013447. https:\/\/doi.org\/10.1016\/j.ejor.2013.07.023","journal-title":"Eur J Oper Res"},{"key":"725_CR41","doi-asserted-by":"publisher","first-page":"2517","DOI":"10.1016\/j.energy.2010.02.051","volume":"35","author":"T Kaya","year":"2010","unstructured":"Kaya T, Kahraman C (2010) Multicriteria renewable energy planning using an integrated fuzzy VIKOR & AHP methodology: the case of Istanbul. Energy 35:2517\u20132527. https:\/\/doi.org\/10.1016\/j.energy.2010.02.051","journal-title":"Energy"},{"key":"725_CR42","doi-asserted-by":"publisher","first-page":"4999","DOI":"10.1016\/j.eswa.2009.12.013","volume":"37","author":"A Kelemenis","year":"2010","unstructured":"Kelemenis A, Askounis D (2010) A new TOPSIS-based multi-criteria approach to personnel selection. Expert Syst Appl 37:4999\u20135008. https:\/\/doi.org\/10.1016\/j.eswa.2009.12.013","journal-title":"Expert Syst Appl"},{"key":"725_CR43","doi-asserted-by":"publisher","first-page":"285","DOI":"10.1007\/978-1-4419-5904-1_10","volume-title":"Trends in multiple criteria decision analysis. International series in operations research & management science","author":"R Lahdelma","year":"2010","unstructured":"Lahdelma R, Salminen P (2010) Stochastic multicriteria acceptability analysis (SMAA). In: Ehrgott M, Figueira JR, Greco S (eds) Trends in multiple criteria decision analysis. International series in operations research & management science, vol 142. Springer, Boston, pp 285\u2013315. https:\/\/doi.org\/10.1007\/978-1-4419-5904-1_10"},{"key":"725_CR44","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1007\/978-3-319-33121-8_1","volume-title":"Robustness analysis in decision aiding, optimization, and analytics. International series in operations research & management science","author":"R Lahdelma","year":"2016","unstructured":"Lahdelma R, Salminen P (2016) SMAA in robustness analysis. In: Doumpos M, Zopounidis C, Grigoroudis E (eds) Robustness analysis in decision aiding, optimization, and analytics. International series in operations research & management science, vol 241. Springer, Cham, pp 1\u201320. https:\/\/doi.org\/10.1007\/978-3-319-33121-8_1"},{"key":"725_CR45","doi-asserted-by":"publisher","first-page":"114635","DOI":"10.1016\/j.apenergy.2020.114635","volume":"263","author":"JY Lim","year":"2020","unstructured":"Lim JY, How BS, Rhee G, Hwangbo S (2020) Yoo CK (2020) Transitioning of localized renewable energy system towards sustainable hydrogen development planning: P-graph approach. Appl Energy 263:114635. https:\/\/doi.org\/10.1016\/j.apenergy.2020.114635","journal-title":"Appl Energy"},{"key":"725_CR46","doi-asserted-by":"publisher","first-page":"114348","DOI":"10.1016\/j.apenergy.2019.114348","volume":"261","author":"L Liu","year":"2020","unstructured":"Liu L, Huang G, Baetz B, Guan Y, Zhang K (2020) Multi-dimensional hypothetical fuzzy risk simulation model for greenhouse gas mitigation policy development. Appl Energy 261:114348. https:\/\/doi.org\/10.1016\/j.apenergy.2019.114348","journal-title":"Appl Energy"},{"key":"725_CR47","isbn-type":"print","volume-title":"Wind energy explained: theory, design and application","author":"JF Manwell","year":"2010","unstructured":"Manwell JF, McGowan JJ, Rogers AL (2010) Wind energy explained: theory, design and application, 2nd edn. Wiley, Sussex. ISBN 978-0-470-01500-1","ISBN":"https:\/\/id.crossref.org\/isbn\/9780470015001","edition":"2"},{"key":"725_CR48","doi-asserted-by":"publisher","first-page":"284","DOI":"10.1016\/j.enpol.2013.09.059","volume":"65","author":"A Maxim","year":"2014","unstructured":"Maxim A (2014) Sustainability assessment of electricity generation technologies using weighted multi-criteria decision analysis. Energy Policy 65:284\u2013297. https:\/\/doi.org\/10.1016\/j.enpol.2013.09.059","journal-title":"Energy Policy"},{"key":"725_CR49","unstructured":"Morthorst PE, Auer H, Garrad A. Bianco I (2009) The economics of wind power, part III. https:\/\/www.wind-energy-the-facts.org. Accessed 7 Sept 2020."},{"key":"725_CR50","doi-asserted-by":"publisher","first-page":"522","DOI":"10.1016\/j.enpol.2012.09.074","volume":"52","author":"JC Mourmouris","year":"2013","unstructured":"Mourmouris JC, Potolias C (2013) A multi-criteria methodology for energy planning and developing renewable energy sources at a regional level: a case study Thassos, Greece. Energy Policy 52:522\u2013530. https:\/\/doi.org\/10.1016\/j.enpol.2012.09.074","journal-title":"Energy Policy"},{"key":"725_CR51","doi-asserted-by":"publisher","first-page":"471","DOI":"10.1007\/s10669-018-9673-x","volume":"38","author":"A Noori","year":"2018","unstructured":"Noori A, Bonakdari H, Morovati K, Gharabaghi B (2018) The optimal dam site selection using a group decision-making method through fuzzy TOPSIS model. Environ Syst Decis 38:471\u2013488","journal-title":"Environ Syst Decis"},{"key":"725_CR52","doi-asserted-by":"publisher","first-page":"2544","DOI":"10.1016\/j.apm.2010.11.025","volume":"35","author":"JH Park","year":"2011","unstructured":"Park JH, Park IY, Kwun YC, Tan X (2011) Extension of the TOPSIS method for decision making problems under interval-valued intuitionistic fuzzy environment. Appl Math Model 35:2544\u20132556. https:\/\/doi.org\/10.1016\/j.apm.2010.11.025","journal-title":"Appl Math Model"},{"key":"725_CR53","unstructured":"Regulatory Authority for Energy (RAE) (2019) Geoportal. https:\/\/geo.rae.gr\/. Accessed 15 Sept 2019."},{"key":"725_CR54","doi-asserted-by":"publisher","first-page":"2433","DOI":"10.1080\/00207543.2012.741330","volume":"51","author":"A Samvedi","year":"2013","unstructured":"Samvedi A, Jain V, Chan FTS (2013) Quantifying risks in a supply chain through integration of fuzzy AHP and fuzzy TOPSIS. Int J Prod Res 51:2433\u20132442. https:\/\/doi.org\/10.1080\/00207543.2012.741330","journal-title":"Int J Prod Res"},{"key":"725_CR55","doi-asserted-by":"publisher","first-page":"2742","DOI":"10.1016\/j.renene.2011.03.008","volume":"36","author":"JR San Crist\u00f3bal","year":"2011","unstructured":"San Crist\u00f3bal JR (2011a) A multi criteria data envelopment analysis model to evaluate the efficiency of the Renewable Energy technologies. Renew Energy 36:2742\u20132746. https:\/\/doi.org\/10.1016\/j.renene.2011.03.008","journal-title":"Renew Energy"},{"key":"725_CR56","doi-asserted-by":"publisher","first-page":"498","DOI":"10.1016\/j.renene.2010.07.031","volume":"36","author":"JR San Crist\u00f3bal","year":"2011","unstructured":"San Crist\u00f3bal JR (2011b) Multi-criteria decision-making in the selection of a renewable energy project in Spain: the VIKOR method. Renew Energy 36:498\u2013502. https:\/\/doi.org\/10.1016\/j.renene.2010.07.031","journal-title":"Renew Energy"},{"key":"725_CR57","doi-asserted-by":"publisher","first-page":"448","DOI":"10.1108\/03684921311323680","volume":"42","author":"K Sari","year":"2013","unstructured":"Sari K (2013) Selection of RFID solution provider: a fuzzy multi-criteria decision model with Monte Carlo simulation. Kybernetes 42:448\u2013465. https:\/\/doi.org\/10.1108\/03684921311323680","journal-title":"Kybernetes"},{"key":"725_CR58","doi-asserted-by":"publisher","DOI":"10.1007\/3-540-30906-3","volume-title":"Wind energy: fundamentals, resource analysis and economics","author":"M Sathyajith","year":"2006","unstructured":"Sathyajith M (2006) Wind energy: fundamentals, resource analysis and economics. Springer, Berlin. https:\/\/doi.org\/10.1007\/3-540-30906-3"},{"key":"725_CR60","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1016\/j.seta.2016.04.004","volume":"16","author":"Z Shirgholami","year":"2016","unstructured":"Shirgholami Z, Zangeneh SN, Bortolini M (2016) Decision system to support the practitioners in the wind farm design: a case study for Iran mainland. Sustain Energy Technol Assess 16:1\u201310. https:\/\/doi.org\/10.1016\/j.seta.2016.04.004","journal-title":"Sustain Energy Technol Assess"},{"key":"725_CR61","doi-asserted-by":"publisher","first-page":"105","DOI":"10.1016\/j.asoc.2014.01.003","volume":"17","author":"O Taylan","year":"2014","unstructured":"Taylan O, Bafail AO, Abdulaal RMS, Kabli MR (2014) Construction projects selection and risk assessment by fuzzy AHP and fuzzy TOPSIS methodologies. Appl Soft Comput 17:105\u2013116. https:\/\/doi.org\/10.1016\/j.asoc.2014.01.003","journal-title":"Appl Soft Comput"},{"key":"725_CR62","doi-asserted-by":"publisher","first-page":"107","DOI":"10.1016\/S0261-5177(01)00050-4","volume":"23","author":"SH Tsaur","year":"2002","unstructured":"Tsaur SH, Chang TY, Yen CH (2002) The evaluation of airline service quality by fuzzy MCDM. Tour Manag 23:107\u2013115. https:\/\/doi.org\/10.1016\/S0261-5177(01)00050-4","journal-title":"Tour Manag"},{"key":"725_CR63","doi-asserted-by":"publisher","first-page":"109670","DOI":"10.1016\/j.jenvman.2019.109670","volume":"252","author":"AP Vavatsikos","year":"2019","unstructured":"Vavatsikos AP, Arvanitidou A, Petsas D (2019) Wind farm investments portfolio formation using GIS-based suitability analysis and simulation procedures. J Environ Manag 252:109670. https:\/\/doi.org\/10.1016\/j.jenvman.2019.109670","journal-title":"J Environ Manag"},{"key":"725_CR64","doi-asserted-by":"publisher","first-page":"377","DOI":"10.1016\/j.asoc.2008.04.014","volume":"9","author":"JW Wang","year":"2009","unstructured":"Wang JW, Cheng CH, Huang KC (2009) Fuzzy hierarchical TOPSIS for supplier selection. Appl Soft Comput 9:377\u2013386. https:\/\/doi.org\/10.1016\/j.asoc.2008.04.014","journal-title":"Appl Soft Comput"},{"key":"725_CR65","doi-asserted-by":"publisher","first-page":"309","DOI":"10.1016\/j.eswa.2005.09.040","volume":"31","author":"YM Wang","year":"2006","unstructured":"Wang YM, Elhag TMS (2006) Fuzzy TOPSIS method based on alpha level sets with an application to bridge risk assessment. Expert Syst Appl 31:309\u2013319. https:\/\/doi.org\/10.1016\/j.eswa.2005.09.040","journal-title":"Expert Syst Appl"},{"key":"725_CR66","doi-asserted-by":"publisher","first-page":"263","DOI":"10.1016\/j.knosys.2014.04.046","volume":"67","author":"F Ye","year":"2014","unstructured":"Ye F, Li Y (2014) An extended TOPSIS model based on the possibility theory under fuzzy environment. Knowl-Based Syst 67:263\u2013269. https:\/\/doi.org\/10.1016\/j.knosys.2014.04.046","journal-title":"Knowl-Based Syst"},{"key":"725_CR67","series-title":"Series in quantitative methods for management","volume-title":"Multiple criteria decision making","author":"M Zeleny","year":"1982","unstructured":"Zeleny M (1982) Multiple criteria decision making. Series in quantitative methods for management. McGraw-Hill, New York"},{"key":"725_CR68","doi-asserted-by":"publisher","first-page":"953","DOI":"10.1016\/j.energy.2015.07.124","volume":"90","author":"L Zhang","year":"2015","unstructured":"Zhang L, Zhou P, Newton S, Fang J, Zhou D, Zhang L (2015) Evaluating clean energy alternatives for Jiangsu, China: an improved multi-criteria decision making method. Energy 90:953\u2013964. https:\/\/doi.org\/10.1016\/j.energy.2015.07.124","journal-title":"Energy"},{"key":"725_CR69","doi-asserted-by":"publisher","DOI":"10.1002\/9781118900116","volume-title":"Wind recourse assessment and mirco-siting: Science and engineering","author":"MH Zhang","year":"2015","unstructured":"Zhang MH (2015) Wind recourse assessment and mirco-siting: Science and engineering. Wiley, Singapore"}],"container-title":["Operational Research"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s12351-022-00725-x.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/article\/10.1007\/s12351-022-00725-x\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s12351-022-00725-x.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2022,10,21]],"date-time":"2022-10-21T14:19:33Z","timestamp":1666361973000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/s12351-022-00725-x"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2022,7,7]]},"references-count":69,"journal-issue":{"issue":"5","published-print":{"date-parts":[[2022,11]]}},"alternative-id":["725"],"URL":"https:\/\/doi.org\/10.1007\/s12351-022-00725-x","relation":{},"ISSN":["1109-2858","1866-1505"],"issn-type":[{"value":"1109-2858","type":"print"},{"value":"1866-1505","type":"electronic"}],"subject":[],"published":{"date-parts":[[2022,7,7]]},"assertion":[{"value":"30 November 2021","order":1,"name":"received","label":"Received","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"13 May 2022","order":2,"name":"revised","label":"Revised","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"12 June 2022","order":3,"name":"accepted","label":"Accepted","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"7 July 2022","order":4,"name":"first_online","label":"First Online","group":{"name":"ArticleHistory","label":"Article History"}}]}}