{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,3,30]],"date-time":"2026-03-30T10:20:05Z","timestamp":1774866005835,"version":"3.50.1"},"reference-count":46,"publisher":"Springer Science and Business Media LLC","issue":"5","license":[{"start":{"date-parts":[[2022,9,15]],"date-time":"2022-09-15T00:00:00Z","timestamp":1663200000000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springer.com\/tdm"},{"start":{"date-parts":[[2022,9,15]],"date-time":"2022-09-15T00:00:00Z","timestamp":1663200000000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Oper Res Int J"],"published-print":{"date-parts":[[2022,11]]},"DOI":"10.1007\/s12351-022-00733-x","type":"journal-article","created":{"date-parts":[[2022,9,15]],"date-time":"2022-09-15T13:08:27Z","timestamp":1663247307000},"page":"4999-5034","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":8,"title":["Robust maintenance planning and scheduling for multi-factory production networks considering disruption cost: a bi-objective optimization model and a metaheuristic solution method"],"prefix":"10.1007","volume":"22","author":[{"given":"Seyed Ahmad","family":"Razavi Al-e-hashem","sequence":"first","affiliation":[]},{"given":"Ali","family":"Papi","sequence":"additional","affiliation":[]},{"ORCID":"https:\/\/orcid.org\/0000-0001-6389-6308","authenticated-orcid":false,"given":"Mir Saman","family":"Pishvaee","sequence":"additional","affiliation":[]},{"given":"Mohammadreza","family":"Rasouli","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2022,9,15]]},"reference":[{"issue":"1","key":"733_CR1","doi-asserted-by":"publisher","first-page":"260","DOI":"10.1016\/j.ijpe.2006.09.005","volume":"107","author":"B Al-Najjar","year":"2007","unstructured":"Al-Najjar B (2007) The lack of maintenance and not maintenance which costs: a model to describe and quantify the impact of vibration-based maintenance on company\u2019s business. Int J Prod Econ 107(1):260\u2013273","journal-title":"Int J Prod Econ"},{"issue":"3","key":"733_CR2","doi-asserted-by":"publisher","first-page":"643","DOI":"10.1016\/S0377-2217(03)00258-3","volume":"157","author":"B Al-Najjar","year":"2004","unstructured":"Al-Najjar B, Alsyouf I (2004) Enhancing a company\u2019s profitability and competitiveness using integrated vibration-based maintenance: a case study. Eur J Oper Res 157(3):643\u2013657","journal-title":"Eur J Oper Res"},{"issue":"24","key":"733_CR3","doi-asserted-by":"publisher","first-page":"7377","DOI":"10.1080\/00207543.2014.931609","volume":"52","author":"M Aramon Bajestani","year":"2014","unstructured":"Aramon Bajestani M, Banjevic D, Beck JC (2014) Integrated maintenance planning and production scheduling with Markovian deteriorating machine conditions. Int J Prod Res 52(24):7377\u20137400","journal-title":"Int J Prod Res"},{"key":"733_CR4","doi-asserted-by":"publisher","first-page":"668","DOI":"10.1016\/j.apm.2017.02.033","volume":"47","author":"J Behnamian","year":"2017","unstructured":"Behnamian J (2017) Matheuristic for the decentralized factories scheduling problem. Appl Math Model 47:668\u2013684","journal-title":"Appl Math Model"},{"key":"733_CR5","doi-asserted-by":"publisher","first-page":"181","DOI":"10.1016\/j.ins.2012.07.020","volume":"219","author":"J Behnamian","year":"2013","unstructured":"Behnamian J, Fatemi Ghomi SMT (2013) The heterogeneous multi-factory production network scheduling with adaptive communication policy and parallel machine. Inf Sci 219:181\u2013196","journal-title":"Inf Sci"},{"key":"733_CR6","doi-asserted-by":"publisher","first-page":"181","DOI":"10.1016\/j.ins.2012.07.020","volume":"219","author":"J Behnamian","year":"2013","unstructured":"Behnamian J, Ghomi SMTF (2013) The heterogeneous multi-factory production network scheduling with adaptive communication policy and parallel machine. Inf Sci 219:181\u2013196","journal-title":"Inf Sci"},{"issue":"1","key":"733_CR7","doi-asserted-by":"publisher","first-page":"231","DOI":"10.1007\/s10845-014-0890-y","volume":"27","author":"J Behnamian","year":"2016","unstructured":"Behnamian J, Ghomi SMTF (2016) A survey of multi-factory scheduling. J Intell Manuf 27(1):231\u2013249","journal-title":"J Intell Manuf"},{"key":"733_CR8","doi-asserted-by":"crossref","unstructured":"Ben-Tal A, El Ghaoui L, Nemirovski A (2009) Robust optimization. Princeton University Press","DOI":"10.1515\/9781400831050"},{"key":"733_CR9","doi-asserted-by":"crossref","unstructured":"Bertsimas D, Sim M (2004) The price of robustness. Oper Res 52(1):35\u201353","DOI":"10.1287\/opre.1030.0065"},{"issue":"1","key":"733_CR10","doi-asserted-by":"publisher","first-page":"71","DOI":"10.1016\/S0951-8320(00)00047-8","volume":"70","author":"M Bevilacqua","year":"2000","unstructured":"Bevilacqua M, Braglia M (2000) The analytic hierarchy process applied to maintenance strategy selection. Reliab Eng Syst Saf 70(1):71\u201383","journal-title":"Reliab Eng Syst Saf"},{"issue":"4","key":"733_CR11","doi-asserted-by":"publisher","first-page":"1515","DOI":"10.1007\/s10845-017-1303-9","volume":"30","author":"A Boudjelida","year":"2019","unstructured":"Boudjelida A (2019) On the robustness of joint production and maintenance scheduling in presence of uncertainties. J Intell Manuf 30(4):1515\u20131530","journal-title":"J Intell Manuf"},{"issue":"2","key":"733_CR12","doi-asserted-by":"publisher","first-page":"147","DOI":"10.1504\/IJOR.2020.107068","volume":"38","author":"I Chaouch","year":"2020","unstructured":"Chaouch I, Driss OB, Ghedira K (2020) A review of job shop scheduling problems in multi-factories. Int J Oper Res 38(2):147\u2013165","journal-title":"Int J Oper Res"},{"issue":"6","key":"733_CR13","doi-asserted-by":"publisher","first-page":"10188","DOI":"10.1016\/j.eswa.2008.12.014","volume":"36","author":"SH Chung","year":"2009","unstructured":"Chung SH, Lau HC, Ho GT, Ip WH (2009) Optimization of system reliability in multi-factory production networks by maintenance approach. Expert Syst Appl 36(6):10188\u201310196","journal-title":"Expert Syst Appl"},{"issue":"2","key":"733_CR14","doi-asserted-by":"publisher","first-page":"300","DOI":"10.1016\/j.ijpe.2009.08.019","volume":"127","author":"S Chung","year":"2010","unstructured":"Chung S, Lau HC, Choy K, Ho GT, Tse Y (2010) Application of genetic approach for advanced planning in multi-factory environment. Int J Prod Econ 127(2):300\u2013308","journal-title":"Int J Prod Econ"},{"key":"733_CR15","doi-asserted-by":"publisher","first-page":"81","DOI":"10.1016\/j.cor.2014.02.006","volume":"47","author":"W Cui","year":"2014","unstructured":"Cui W, Lu Z, Pan E (2014) Integrated production scheduling and maintenance policy for robustness in a single machine. Comput Oper Res 47:81\u201391","journal-title":"Comput Oper Res"},{"issue":"7","key":"733_CR16","doi-asserted-by":"publisher","first-page":"1199","DOI":"10.1080\/00207721.2013.815822","volume":"46","author":"M Doostparast","year":"2015","unstructured":"Doostparast M, Kolahan F, Doostparast M (2015) Optimisation of PM scheduling for multi-component systems\u2013a simulated annealing approach. Int J Syst Sci 46(7):1199\u20131207","journal-title":"Int J Syst Sci"},{"issue":"1","key":"733_CR17","doi-asserted-by":"publisher","first-page":"111","DOI":"10.1007\/s10845-013-0766-6","volume":"26","author":"V Ebrahimipour","year":"2015","unstructured":"Ebrahimipour V, Najjarbashi A, Sheikhalishahi M (2015) Multi-objective modeling for preventive maintenance scheduling in a multiple production line. J Intell Manuf 26(1):111\u2013122","journal-title":"J Intell Manuf"},{"issue":"5","key":"733_CR18","doi-asserted-by":"publisher","first-page":"625","DOI":"10.26599\/TST.2021.9010009","volume":"26","author":"Y Fu","year":"2021","unstructured":"Fu Y, Hou Y, Wang Z, Wu X, Gao K, Wang L (2021) Distributed scheduling problems in intelligent manufacturing systems. Tsinghua Sci Technol 26(5):625\u2013645","journal-title":"Tsinghua Sci Technol"},{"issue":"2","key":"733_CR19","doi-asserted-by":"publisher","first-page":"251","DOI":"10.1016\/S0925-5273(03)00113-0","volume":"85","author":"M Gnoni","year":"2003","unstructured":"Gnoni M, Iavagnilio R, Mossa G, Mummolo G, Di Leva A (2003) Production planning of a multi-site manufacturing system by hybrid modeling: a case study from the automotive industry. Int J Prod Econ 85(2):251\u2013262","journal-title":"Int J Prod Econ"},{"issue":"1","key":"733_CR20","doi-asserted-by":"publisher","first-page":"351","DOI":"10.1007\/s00500-019-03914-7","volume":"24","author":"S Hosseini","year":"2020","unstructured":"Hosseini S, Kalam S, Barker K, Ramirez-Marquez JE (2020) Scheduling multi-component maintenance with a greedy heuristic local search algorithm. Soft Comput 24(1):351\u2013366","journal-title":"Soft Comput"},{"key":"733_CR21","doi-asserted-by":"crossref","unstructured":"Hosseini S, Kalam S, Barker K, Ramirez-Marquez JE (2019) Scheduling multi-component maintenance with a greedy heuristic local search algorithm, Soft Computing, pp 1\u201316","DOI":"10.1007\/s00500-019-03914-7"},{"issue":"6","key":"733_CR22","doi-asserted-by":"publisher","first-page":"1764","DOI":"10.1016\/j.cor.2005.05.034","volume":"34","author":"M Ji","year":"2007","unstructured":"Ji M, He Y, Cheng TCE (2007) Single-machine scheduling with periodic maintenance to minimize makespan. Comput Oper Res 34(6):1764\u20131770","journal-title":"Comput Oper Res"},{"key":"733_CR23","doi-asserted-by":"crossref","unstructured":"Kathleen EM, Elliott NW (2000) TOTAL PRODUCTIVE MAINTENANCE (TPM). Encycl Prod Manuf Manag, pp 796\u2013803","DOI":"10.1007\/1-4020-0612-8_994"},{"key":"733_CR24","doi-asserted-by":"crossref","unstructured":"Kiani A, Taghipour S (2017) Joint optimization of maintenance and production scheduling. In: 2017 Annual Reliability and Maintainability Symposium (RAMS), pp 1\u20136, IEEE","DOI":"10.1109\/RAM.2017.7889710"},{"issue":"5\u20138","key":"733_CR26","doi-asserted-by":"publisher","first-page":"1135","DOI":"10.1007\/s00170-012-4395-6","volume":"66","author":"S Lee","year":"2013","unstructured":"Lee S, Ni J (2013) Joint decision making for maintenance and production scheduling of production systems. Int J Adv Manuf Technol 66(5\u20138):1135\u20131146","journal-title":"Int J Adv Manuf Technol"},{"issue":"2","key":"733_CR27","doi-asserted-by":"publisher","first-page":"597","DOI":"10.1080\/00207543.2019.1598596","volume":"58","author":"D Lei","year":"2020","unstructured":"Lei D, Yuan Y, Cai J, Bai D (2020b) An imperialist competitive algorithm with memory for distributed unrelated parallel machines scheduling. Int J Prod Res 58(2):597\u2013614","journal-title":"Int J Prod Res"},{"key":"733_CR28","doi-asserted-by":"crossref","unstructured":"Lei D, Yuan Y, Cai J, Bai D (2019) An imperialist competitive algorithm with memory for distributed unrelated parallel machines scheduling. Int J Prod Res, pp 1\u201318","DOI":"10.1080\/00207543.2019.1598596"},{"key":"733_CR29","doi-asserted-by":"crossref","unstructured":"Lei D, Liu MJC, Engineering I (2020a) An artificial bee colony with division for distributed unrelated parallel machine scheduling with preventive maintenance. 141: 106320","DOI":"10.1016\/j.cie.2020.106320"},{"issue":"4\u20135","key":"733_CR30","doi-asserted-by":"publisher","first-page":"715","DOI":"10.1016\/j.compchemeng.2007.03.001","volume":"32","author":"Z Li","year":"2008","unstructured":"Li Z, Ierapetritou M (2008) Process scheduling under uncertainty: review and challenges. Comput Chem Eng 32(4\u20135):715\u2013727","journal-title":"Comput Chem Eng"},{"issue":"7","key":"733_CR31","doi-asserted-by":"publisher","first-page":"2028","DOI":"10.1080\/00207543.2020.1797207","volume":"59","author":"J Lohmer","year":"2021","unstructured":"Lohmer J, Lasch R (2021) Production planning and scheduling in multi-factory production networks: a systematic literature review. Int J Prod Res 59(7):2028\u20132054","journal-title":"Int J Prod Res"},{"key":"733_CR32","doi-asserted-by":"publisher","DOI":"10.1016\/j.eswa.2020.114495","volume":"169","author":"J Mao","year":"2021","unstructured":"Mao J, Pan Q, Miao Z-H, Gao L (2021) An effective multi-start iterated greedy algorithm to minimize makespan for the distributed permutation flowshop scheduling problem with preventive maintenance. Expert Syst Appl 169:114495","journal-title":"Expert Syst Appl"},{"issue":"4","key":"733_CR33","doi-asserted-by":"publisher","first-page":"754","DOI":"10.1016\/j.cor.2009.06.019","volume":"37","author":"B Naderi","year":"2010","unstructured":"Naderi B, Ruiz R (2010) The distributed permutation flowshop scheduling problem. Comput Oper Res 37(4):754\u2013768","journal-title":"Comput Oper Res"},{"issue":"9\u201312","key":"733_CR34","doi-asserted-by":"publisher","first-page":"1049","DOI":"10.1007\/s00170-011-3652-4","volume":"60","author":"E Pan","year":"2012","unstructured":"Pan E, Liao W, Xi L (2012) A joint model of production scheduling and predictive maintenance for minimizing job tardiness. Int J Adv Manuf Technol 60(9\u201312):1049\u20131061","journal-title":"Int J Adv Manuf Technol"},{"key":"733_CR35","unstructured":"Paprocka I (2018) The model of maintenance planning and production scheduling for maximising robustness. Int J Prod Res, pp 1\u201322"},{"issue":"14","key":"733_CR36","doi-asserted-by":"publisher","first-page":"4480","DOI":"10.1080\/00207543.2018.1492752","volume":"57","author":"I Paprocka","year":"2019","unstructured":"Paprocka I (2019) The model of maintenance planning and production scheduling for maximising robustness. Int J Prod Res 57(14):4480\u20134501","journal-title":"Int J Prod Res"},{"issue":"3","key":"733_CR37","doi-asserted-by":"publisher","first-page":"363","DOI":"10.1007\/s12351-012-0130-1","volume":"13","author":"M Rebai","year":"2013","unstructured":"Rebai M, Kacem I, Adjallah KH (2013) Scheduling jobs and maintenance activities on parallel machines. Oper Res Int Journal 13(3):363\u2013383","journal-title":"Oper Res Int Journal"},{"issue":"3","key":"733_CR38","doi-asserted-by":"publisher","first-page":"537","DOI":"10.1016\/j.cor.2003.08.002","volume":"32","author":"M Sambasivan","year":"2005","unstructured":"Sambasivan M, Yahya S (2005) A Lagrangean-based heuristic for multi-plant, multi-item, multi-period capacitated lot-sizing problems with inter-plant transfers. Comput Oper Res 32(3):537\u2013555","journal-title":"Comput Oper Res"},{"key":"733_CR39","doi-asserted-by":"crossref","unstructured":"Shen J, Zhu Y (2018) A parallel-machine scheduling problem with periodic maintenance under uncertainty, J Ambient Intell Hum Comput, pp 1\u20139","DOI":"10.1007\/s12652-018-1032-8"},{"issue":"11","key":"733_CR40","doi-asserted-by":"publisher","first-page":"1564","DOI":"10.1016\/j.ress.2011.05.011","volume":"96","author":"Z Simeu-Abazi","year":"2011","unstructured":"Simeu-Abazi Z, Ahmad AA (2011) Optimisation of distributed maintenance: modelling and application to the multi-factory production. Reliab Eng Syst Saf 96(11):1564\u20131575","journal-title":"Reliab Eng Syst Saf"},{"issue":"2","key":"733_CR41","doi-asserted-by":"publisher","first-page":"422","DOI":"10.1016\/S0377-2217(99)00301-X","volume":"126","author":"CH Timpe","year":"2000","unstructured":"Timpe CH, Kallrath J (2000) Optimal planning in large multi-site production networks. Eur J Oper Res 126(2):422\u2013435","journal-title":"Eur J Oper Res"},{"key":"733_CR42","unstructured":"Vasili M, Hong TS, Ismail N, Vasili M (2011) Maintenance optimization models: a review and analysis. Optimization 1(2)"},{"issue":"4","key":"733_CR43","doi-asserted-by":"publisher","first-page":"409","DOI":"10.1108\/01443570010319156","volume":"20","author":"M Vineyard","year":"2000","unstructured":"Vineyard M, Amoako-Gyampah K, Meredith JR (2000) An evaluation of maintenance policies for flexible manufacturing systems: a case study. Int J Oper Prod Manag 20(4):409\u2013426","journal-title":"Int J Oper Prod Manag"},{"issue":"3","key":"733_CR44","doi-asserted-by":"publisher","first-page":"436","DOI":"10.1016\/j.cie.2010.05.016","volume":"59","author":"S Wang","year":"2010","unstructured":"Wang S, Yu J (2010) An effective heuristic for flexible job-shop scheduling problem with maintenance activities. Comput Ind Eng 59(3):436\u2013447","journal-title":"Comput Ind Eng"},{"issue":"2","key":"733_CR45","doi-asserted-by":"publisher","first-page":"253","DOI":"10.2307\/1882150","volume":"69","author":"FM Westfield","year":"1955","unstructured":"Westfield FM (1955) Marginal analysis, multi-plant firms, and business practice: an example. Q J Econ 69(2):253\u2013268","journal-title":"Q J Econ"},{"issue":"2","key":"733_CR46","doi-asserted-by":"publisher","first-page":"226","DOI":"10.1109\/TSMCA.2006.886368","volume":"37","author":"S-J Wu","year":"2007","unstructured":"Wu S-J, Gebraeel N, Lawley MA, Yih Y (2007) A neural network integrated decision support system for condition-based optimal predictive maintenance policy. IEEE Trans Syst Man Cybern Part A Syst Hum 37(2):226\u2013236","journal-title":"IEEE Trans Syst Man Cybern Part A Syst Hum"},{"issue":"3","key":"733_CR47","doi-asserted-by":"publisher","first-page":"1609","DOI":"10.1016\/j.eswa.2007.01.012","volume":"34","author":"T-H Wu","year":"2008","unstructured":"Wu T-H, Chang C-C, Chung S-H (2008) A simulated annealing algorithm for manufacturing cell formation problems. Expert Syst Appl 34(3):1609\u20131617","journal-title":"Expert Syst Appl"}],"container-title":["Operational Research"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s12351-022-00733-x.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/article\/10.1007\/s12351-022-00733-x\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s12351-022-00733-x.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2022,10,21]],"date-time":"2022-10-21T14:21:45Z","timestamp":1666362105000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/s12351-022-00733-x"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2022,9,15]]},"references-count":46,"journal-issue":{"issue":"5","published-print":{"date-parts":[[2022,11]]}},"alternative-id":["733"],"URL":"https:\/\/doi.org\/10.1007\/s12351-022-00733-x","relation":{},"ISSN":["1109-2858","1866-1505"],"issn-type":[{"value":"1109-2858","type":"print"},{"value":"1866-1505","type":"electronic"}],"subject":[],"published":{"date-parts":[[2022,9,15]]},"assertion":[{"value":"30 October 2020","order":1,"name":"received","label":"Received","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"20 June 2022","order":2,"name":"revised","label":"Revised","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"13 July 2022","order":3,"name":"accepted","label":"Accepted","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"15 September 2022","order":4,"name":"first_online","label":"First Online","group":{"name":"ArticleHistory","label":"Article History"}},{"order":1,"name":"Ethics","group":{"name":"EthicsHeading","label":"Declarations"}},{"value":"We wish to confirm that there are no known conflicts of interest associated with this publication and there has been no significant financial support for this work that could have influenced its outcome.","order":2,"name":"Ethics","group":{"name":"EthicsHeading","label":"Conflict of interest"}}]}}