{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,4,24]],"date-time":"2026-04-24T14:49:58Z","timestamp":1777042198818,"version":"3.51.4"},"reference-count":32,"publisher":"Springer Science and Business Media LLC","issue":"3","license":[{"start":{"date-parts":[[2023,6,20]],"date-time":"2023-06-20T00:00:00Z","timestamp":1687219200000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"},{"start":{"date-parts":[[2023,6,20]],"date-time":"2023-06-20T00:00:00Z","timestamp":1687219200000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Oper Res Int J"],"published-print":{"date-parts":[[2023,9]]},"DOI":"10.1007\/s12351-023-00779-5","type":"journal-article","created":{"date-parts":[[2023,6,20]],"date-time":"2023-06-20T07:03:03Z","timestamp":1687244583000},"update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":12,"title":["Optimal pricing and production lot-size policies in imperfect production system with price-sensitive demand, reworking, scrap, and sales return"],"prefix":"10.1007","volume":"23","author":[{"ORCID":"https:\/\/orcid.org\/0000-0002-6974-0782","authenticated-orcid":false,"given":"C. K.","family":"Sivashankari","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"R.","family":"Valarmathi","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2023,6,20]]},"reference":[{"issue":"5","key":"779_CR1","first-page":"2610","volume":"29","author":"S Adak","year":"2022","unstructured":"Adak S, Mahapatra GS (2022) Imperfect production in three-layer supply chain systems incorporating deterioration and screening effect. Sci Iran. 29(5):2610\u20132627","journal-title":"Sci Iran."},{"key":"779_CR3","doi-asserted-by":"publisher","first-page":"3459","DOI":"10.1051\/ro\/2021156","volume":"55","author":"D Barman","year":"2021","unstructured":"Barman D, Mahata GC (2021) A single-manufacturing multi-retailer integrated inventory model for items with imperfect quality, price sensitive demand and planed back orders. RAIRO Oper Res 55:3459\u20133491","journal-title":"RAIRO Oper Res"},{"issue":"3","key":"779_CR4","doi-asserted-by":"publisher","first-page":"1105","DOI":"10.1016\/j.cie.2009.04.020","volume":"57","author":"L Cardenas-Barron","year":"2009","unstructured":"Cardenas-Barron L (2009) Economic production quantity with rework process at a single stage manufacturing system with planned backorders. Comput Ind Eng 57(3):1105\u20131113","journal-title":"Comput Ind Eng"},{"issue":"9","key":"779_CR5","doi-asserted-by":"publisher","first-page":"2755","DOI":"10.1080\/00207543.2018.1557352","volume":"57","author":"X Chen","year":"2019","unstructured":"Chen X, Wu S, Wang X, Li D (2019) Optimal pricing strategy for the perishable food supply chain. Int J Prod Res 57(9):2755\u20132768","journal-title":"Int J Prod Res"},{"issue":"4","key":"779_CR6","doi-asserted-by":"publisher","first-page":"427","DOI":"10.1080\/03052150310001597783","volume":"35","author":"Y Chiu","year":"2003","unstructured":"Chiu Y (2003) Determining the optimal lot size for the finite production model with random defective rate, the rework process, and backlogging. Eng Optim 35(4):427\u2013437","journal-title":"Eng Optim"},{"key":"779_CR7","doi-asserted-by":"crossref","unstructured":"Chiu SW, Ting CK, Chiu YSP (2007) Optimal production lot sizing with reworking scrap rate and service level constraint. Math Comput Model 46(3-4):535\u2013549","DOI":"10.1016\/j.mcm.2006.11.031"},{"issue":"1","key":"779_CR8","first-page":"2113174","volume":"10","author":"M Das Roy","year":"2022","unstructured":"Das Roy M, Sana SS (2022) The return and remanufacturing rates in a multi-stage green supply chain system with rework, variable shipping cost and ordering cost reduction. Int J Syst Sci Oper Logist. 10(1):2113174","journal-title":"Int J Syst Sci Oper Logist."},{"key":"779_CR9","doi-asserted-by":"publisher","DOI":"10.1016\/j.rjor.2022.08.010","author":"LTJ Feng","year":"2022","unstructured":"Feng LTJ, Zhou E (2022) Pricing and lot-sizing decisions on buy-now-and-pay-later installments through a product life cycle. Eur J Oper Res. https:\/\/doi.org\/10.1016\/j.rjor.2022.08.010","journal-title":"Eur J Oper Res"},{"key":"779_CR10","doi-asserted-by":"publisher","first-page":"183","DOI":"10.1051\/ro\/2021188","volume":"56","author":"P Gautam","year":"2022","unstructured":"Gautam P, Maheshwari S, Hasan A, Kausar A, Jaggi CK (2022) Optimal Inventory strategies for an imperfect production system with advertisement and price relevant demand under rework operation for defectives. RAIRO Oper Res 56:183\u2013197","journal-title":"RAIRO Oper Res"},{"issue":"6","key":"779_CR11","doi-asserted-by":"publisher","first-page":"584","DOI":"10.1080\/095372801750397707","volume":"12","author":"A Hayek","year":"2000","unstructured":"Hayek A, Salameh M (2000) Production lot sizing with the reworking of imperfect quality items produced. Prod Plan Control 12(6):584\u2013590","journal-title":"Prod Plan Control"},{"issue":"7","key":"779_CR12","first-page":"59","volume":"4","author":"MR Hejazi","year":"2008","unstructured":"Hejazi MR, Tsou J, Barzoki S (2008) Optimal lot size of epq model considering imperfect and defective products. J Ind Eng Int 4(7):59\u201368","journal-title":"J Ind Eng Int"},{"key":"779_CR13","doi-asserted-by":"publisher","first-page":"77","DOI":"10.1016\/j.cie.2004.03.001","volume":"47","author":"AMM Jamal","year":"2004","unstructured":"Jamal AMM, Sarker BR, Mondal S (2004) Optimal manufacturing batch size with rework process at a single stage production system. Comput Ind Eng 47:77\u201389","journal-title":"Comput Ind Eng"},{"key":"779_CR14","doi-asserted-by":"publisher","first-page":"287","DOI":"10.1051\/ro\/2018102","volume":"54","author":"A Kannan","year":"2020","unstructured":"Kannan A, Kishore BS, Jaggi CK (2020) Inventory and pricing decision for imperfect quality items with inspection errors, sales returns and partially back-orders under inflation. RAIRO Oper Res 54:287\u2013306","journal-title":"RAIRO Oper Res"},{"issue":"12","key":"779_CR15","doi-asserted-by":"publisher","first-page":"1405","DOI":"10.1057\/jors.1994.217","volume":"45","author":"M Khouja","year":"1994","unstructured":"Khouja M, Mehrez A (1994) An economic production lot size model with imperfect quality and variable production rate\u2019. J Oper Res Soc 45(12):1405\u20131417","journal-title":"J Oper Res Soc"},{"issue":"3","key":"779_CR16","first-page":"220","volume":"3","author":"C Krishnamoorthi","year":"2012","unstructured":"Krishnamoorthi C, Panayappan S (2012) An EPQ model with reworking of imperfect production items and shortages. Int J Manag Sci Eng Manag 3(3):220\u2013228","journal-title":"Int J Manag Sci Eng Manag"},{"issue":"1","key":"779_CR17","doi-asserted-by":"publisher","first-page":"104","DOI":"10.1504\/IJOR.2013.053189","volume":"17","author":"C Krishnamoorthi","year":"2013","unstructured":"Krishnamoorthi C, Panayappan S (2013) An EPQ model for an imperfect production system with rework and shortages. Int J Oper Res 17(1):104\u2013124","journal-title":"Int J Oper Res"},{"key":"779_CR18","first-page":"1505","volume":"9","author":"VC Kuraie","year":"2021","unstructured":"Kuraie VC, Padiyar SVS, Bhagat N, Singh SR, Katariya C (2021) Imperfect production process in an integrated inventory system having multivariable demand with limited storage capacity. Des Eng 9:1505\u20131527","journal-title":"Des Eng"},{"key":"779_CR19","doi-asserted-by":"publisher","DOI":"10.3934\/jimo-2022182","author":"D Madhusudan","year":"2022","unstructured":"Madhusudan D, Banu A, Mondal SK (2022) Imperfect production inventory model for green products considering learning effect on screening process under advertisement dependent credit period. J Ind Manag Opt. https:\/\/doi.org\/10.3934\/jimo-2022182","journal-title":"J Ind Manag Opt"},{"issue":"1","key":"779_CR20","first-page":"10","volume":"23","author":"B Mor","year":"2023","unstructured":"Mor B (2023) Single machine scheduling problems involving job-dependent step-deterioration dates and job rejection. Oper Res 23(1):10","journal-title":"Oper Res"},{"key":"779_CR21","doi-asserted-by":"publisher","first-page":"3191","DOI":"10.1080\/00207540600711853","volume":"45","author":"R Ojha","year":"2007","unstructured":"Ojha R, Sarker BD, Biswas P (2007) An optimal batch size for an imperfect production system with quality assurance and rework. Int J Prod Res 45:3191\u20133214","journal-title":"Int J Prod Res"},{"issue":"1","key":"779_CR22","doi-asserted-by":"publisher","first-page":"137","DOI":"10.1287\/opre.34.1.137","volume":"34","author":"EL Porteus","year":"1986","unstructured":"Porteus EL (1986) Optimal Lot sizing, process quality improvement and setup cost reduction. Oper Res 34(1):137\u2013144","journal-title":"Oper Res"},{"issue":"1","key":"779_CR23","doi-asserted-by":"publisher","first-page":"48","DOI":"10.1080\/07408178608975329","volume":"18","author":"M Rosenblatt","year":"1986","unstructured":"Rosenblatt M, Lee H (1986) Economic production cycles with imperfect production processes. IIE Trans 18(1):48\u201355","journal-title":"IIE Trans"},{"key":"779_CR24","first-page":"3713","volume":"22","author":"S Saha","year":"2022","unstructured":"Saha S, Banaszak Z, Bocewicz G, Nielsen IE (2022) Pricing and quality competition for substitutable green products with a common retailer. Oper Res 22:3713\u20133746","journal-title":"Oper Res"},{"issue":"1\u20133","key":"779_CR25","first-page":"59","volume":"64","author":"MK Salameh","year":"2001","unstructured":"Salameh MK, Jaber MY (2001) Economic production quantity model for item with imperfect quality. Int J Prod Econ 64(1\u20133):59\u201364","journal-title":"Int J Prod Econ"},{"issue":"2","key":"779_CR26","first-page":"1","volume":"315","author":"SS Sana","year":"2020","unstructured":"Sana SS (2020a) A structural mathematical model on two echelon supply chain system. Ann Oper Res 315(2):1\u201329","journal-title":"Ann Oper Res"},{"key":"779_CR27","doi-asserted-by":"publisher","first-page":"102118","DOI":"10.1016\/j.jretconser.2020.102118","volume":"55","author":"SS Sana","year":"2020","unstructured":"Sana SS (2020b) Price competition between green and non green products under corporate social responsible firm. J Retail Consum Serv 55:102118","journal-title":"J Retail Consum Serv"},{"key":"779_CR28","first-page":"100008","volume":"2","author":"SS Sana","year":"2022","unstructured":"Sana SS (2022) Sale through dual channel retailing system\u2014a mathematical approach. Sustain Anal Model. 2:100008","journal-title":"Sustain Anal Model."},{"issue":"2","key":"779_CR29","doi-asserted-by":"publisher","first-page":"171","DOI":"10.1504\/IJAMS.2019.098824","volume":"11","author":"CK Sivashankari","year":"2019","unstructured":"Sivashankari CK (2019) Imperfect production system with rework of regular production with sales returns by customers and buffer stock. Int J Appl Manag Sci. 11(2):171\u2013183","journal-title":"Int J Appl Manag Sci."},{"issue":"1","key":"779_CR30","first-page":"9","volume":"9","author":"CK Sivashankari","year":"2013","unstructured":"Sivashankari CK, Panayappan S (2013) Production inventory model with reworking of imperfect production, scrap and shortages. Int J Manag Sci Eng Manag 9(1):9\u201320","journal-title":"Int J Manag Sci Eng Manag"},{"key":"779_CR31","first-page":"4471","volume":"22","author":"AA Taleizadeh","year":"2022","unstructured":"Taleizadeh AA, Aliabadi L, Thaichon P (2022) A sustainable inventory system with price-sensitive demand and carbon emissions under partial trade credit and partial backordering. Oper Res 22:4471\u20134516","journal-title":"Oper Res"},{"key":"779_CR32","first-page":"5707","volume":"22","author":"AS Xanthopoulos","year":"2022","unstructured":"Xanthopoulos AS, Vlastos S, Koulouriotis DE (2022) Coordinating production, inspection and maintenance decisions in a stochastic manufacturing system with deterioration failures. Oper Res 22:5707\u20135732","journal-title":"Oper Res"},{"issue":"1","key":"779_CR33","doi-asserted-by":"publisher","first-page":"255","DOI":"10.1016\/j.ijpe.2009.05.008","volume":"121","author":"SH Yoo","year":"2009","unstructured":"Yoo SH, Kim DS, Park MS (2009) Economic production quantity model with imperfect quality items two way imperfect inspection and sales return. Int J Prod Econ 121(1):255\u2013265","journal-title":"Int J Prod Econ"}],"container-title":["Operational Research"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s12351-023-00779-5.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/article\/10.1007\/s12351-023-00779-5\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s12351-023-00779-5.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2023,9,8]],"date-time":"2023-09-08T10:21:13Z","timestamp":1694168473000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/s12351-023-00779-5"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2023,6,20]]},"references-count":32,"journal-issue":{"issue":"3","published-print":{"date-parts":[[2023,9]]}},"alternative-id":["779"],"URL":"https:\/\/doi.org\/10.1007\/s12351-023-00779-5","relation":{},"ISSN":["1109-2858","1866-1505"],"issn-type":[{"value":"1109-2858","type":"print"},{"value":"1866-1505","type":"electronic"}],"subject":[],"published":{"date-parts":[[2023,6,20]]},"assertion":[{"value":"24 October 2022","order":1,"name":"received","label":"Received","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"2 April 2023","order":2,"name":"revised","label":"Revised","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"6 May 2023","order":3,"name":"accepted","label":"Accepted","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"20 June 2023","order":4,"name":"first_online","label":"First Online","group":{"name":"ArticleHistory","label":"Article History"}},{"order":1,"name":"Ethics","group":{"name":"EthicsHeading","label":"Declarations"}},{"value":"There is no conflict of interest in this paper.","order":2,"name":"Ethics","group":{"name":"EthicsHeading","label":"Conflict of interest"}}],"article-number":"43"}}