{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,3,25]],"date-time":"2026-03-25T21:27:49Z","timestamp":1774474069228,"version":"3.50.1"},"reference-count":73,"publisher":"Springer Science and Business Media LLC","issue":"2","license":[{"start":{"date-parts":[[2024,3,11]],"date-time":"2024-03-11T00:00:00Z","timestamp":1710115200000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"},{"start":{"date-parts":[[2024,3,11]],"date-time":"2024-03-11T00:00:00Z","timestamp":1710115200000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Oper Res Int J"],"published-print":{"date-parts":[[2024,6]]},"DOI":"10.1007\/s12351-024-00822-z","type":"journal-article","created":{"date-parts":[[2024,3,11]],"date-time":"2024-03-11T12:02:17Z","timestamp":1710158537000},"update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":2,"title":["On the availability and changeover cases of the general lot-sizing and scheduling problem with maintenance modelling: a Lagrangian-based heuristic approach"],"prefix":"10.1007","volume":"24","author":[{"given":"Mahyar","family":"Alimian","sequence":"first","affiliation":[]},{"ORCID":"https:\/\/orcid.org\/0000-0001-8188-5426","authenticated-orcid":false,"given":"Vahidreza","family":"Ghezavati","sequence":"additional","affiliation":[]},{"given":"Reza","family":"Tavakkoli-Moghaddam","sequence":"additional","affiliation":[]},{"given":"Reza","family":"Ramezanian","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2024,3,11]]},"reference":[{"key":"822_CR1","doi-asserted-by":"crossref","first-page":"3382","DOI":"10.1016\/j.ins.2008.05.007","volume":"178","author":"EH Aghezzaf","year":"2008","unstructured":"Aghezzaf EH, Najid NM (2008) Integrated production planning and preventive maintenance in deteriorating production systems. Inf Sci 178:3382\u20133392","journal-title":"Inf Sci"},{"key":"822_CR2","doi-asserted-by":"crossref","first-page":"190","DOI":"10.1016\/j.ress.2015.09.017","volume":"145","author":"EH Aghezzaf","year":"2016","unstructured":"Aghezzaf EH, Khatab A, Tam PL (2016) Optimizing production and imperfect preventive maintenance planning\u2019s integration in failure-prone manufacturing systems. Reliab Eng Syst Safety 145:190\u2013198","journal-title":"Reliab Eng Syst Safety"},{"key":"822_CR3","doi-asserted-by":"crossref","first-page":"263","DOI":"10.1016\/j.jmsy.2020.12.003","volume":"58","author":"A Ait El Cadi","year":"2021","unstructured":"Ait El Cadi A, Gharbi A, Dhouib K, Artiba A (2021) Joint production and preventive maintenance controls for unreliable and imperfect manufacturing systems. J Manuf Syst 58:263\u2013279","journal-title":"J Manuf Syst"},{"key":"822_CR4","doi-asserted-by":"crossref","first-page":"125","DOI":"10.1016\/j.cor.2017.09.005","volume":"90","author":"D Alem","year":"2018","unstructured":"Alem D, Curcio E, Amorim P, Almada-Lobo B (2018) A computational study of the general lot-sizing and scheduling model under demand uncertainty via robust and stochastic approaches. Comput Oper Res 90:125\u2013141","journal-title":"Comput Oper Res"},{"key":"822_CR5","doi-asserted-by":"crossref","first-page":"263","DOI":"10.1016\/j.jmsy.2018.12.001","volume":"50","author":"M Alimian","year":"2019","unstructured":"Alimian M, Saidi-Mehrabad M, Jabbarzadeh A (2019) A robust integrated production and preventive maintenance planning model for multi-state systems with uncertain demand and common cause failures. J Manuf Syst 50:263\u2013277","journal-title":"J Manuf Syst"},{"key":"822_CR6","doi-asserted-by":"crossref","first-page":"341","DOI":"10.1016\/j.jmsy.2020.06.011","volume":"56","author":"M Alimian","year":"2020","unstructured":"Alimian M, Ghezavati VR, Tavakkoli-Moghaddam R (2020) New integration of preventive maintenance and production planning with cell formation and group scheduling for dynamic cellular manufacturing systems. J Manuf Syst 56:341\u2013358","journal-title":"J Manuf Syst"},{"key":"822_CR7","doi-asserted-by":"crossref","DOI":"10.1016\/j.cie.2022.108041","volume":"168","author":"M Alimian","year":"2022","unstructured":"Alimian M, Ghezavati VR, Tavakkoli-Moghaddam R, Ramezanian R (2022) Solving a parallel-line capacitated lot-sizing and scheduling problem with sequence-dependent setup time\/cost and preventive maintenance by a rolling horizon method. Comput Ind Eng 168:108041","journal-title":"Comput Ind Eng"},{"key":"822_CR8","doi-asserted-by":"crossref","first-page":"913","DOI":"10.1051\/ro\/2019021","volume":"54","author":"Z Alipour","year":"2020","unstructured":"Alipour Z, Jolai F, Monabbati E, Zerpour N (2020) General lot-sizing and scheduling for perishable food products. RAIRO-Oper Res 54:913\u2013931","journal-title":"RAIRO-Oper Res"},{"key":"822_CR9","doi-asserted-by":"crossref","first-page":"439","DOI":"10.1590\/0101-7438.2015.035.03.0439","volume":"35","author":"B Almada-Lobo","year":"2015","unstructured":"Almada-Lobo B, Clark AR, Guimaraes L, Figueira G, Amorim P (2015) Industrial insights into lot sizing and scheduling modeling. Pesquisa Operacional 35:439\u2013464","journal-title":"Pesquisa Operacional"},{"key":"822_CR10","doi-asserted-by":"crossref","first-page":"204","DOI":"10.1590\/0104-530X2196-15","volume":"23","author":"FF Alves","year":"2016","unstructured":"Alves FF, Nogueira TH, Henriques RS, de Castro PV (2016) Integrated lot sizing and production scheduling formulations: an application in a refractory cement industry. Gest\u00e3o and Produ\u00e7\u00e3o 23:204\u2013218","journal-title":"Gest\u00e3o and Produ\u00e7\u00e3o"},{"key":"822_CR11","volume":"220","author":"Y An","year":"2022","unstructured":"An Y, Chen X, Hu J, Zhang L, Li Y, Jiang J (2022) Joint optimization of preventive maintenance and production rescheduling with new machine insertion and processing speed selection. Reliab Eng Syst Safety 220:108269","journal-title":"Reliab Eng Syst Safety"},{"key":"822_CR12","doi-asserted-by":"crossref","first-page":"3101","DOI":"10.1109\/TCYB.2022.3151855","volume":"53","author":"Y An","year":"2023","unstructured":"An Y, Chen X, Gao K, Li Y, Zhang L (2023a) Multi-objective flexible job-shop rescheduling with new job insertion and machine preventive maintenance. IEEE Trans Cybern 53:3101\u20133113","journal-title":"IEEE Trans Cybern"},{"key":"822_CR13","volume":"77","author":"Y An","year":"2023","unstructured":"An Y, Chen X, Gao K, Zhang L, Li Y, Zhao Z (2023b) Integrated optimization of real-time order acceptance and flexible job-shop rescheduling with multi-level imperfect maintenance constraints. Swarm Evol Comput 77:101243","journal-title":"Swarm Evol Comput"},{"key":"822_CR14","volume":"212","author":"Y An","year":"2023","unstructured":"An Y, Chen X, Gao K, Zhang L, Li Y, Zhao Z (2023c) A hybrid multi-objective evolutionary algorithm for solving an adaptive flexible job-shop rescheduling problem with real-time order acceptance and condition-based preventive maintenance. Expert Syst Appl 212:118711","journal-title":"Expert Syst Appl"},{"key":"822_CR15","doi-asserted-by":"crossref","first-page":"577","DOI":"10.1016\/j.cie.2013.04.003","volume":"65","author":"SA Araujo","year":"2013","unstructured":"Araujo SA, Clark AR (2013) A priori reformulations for joint rolling-horizon scheduling of materials processing and lot-sizing problem. Comput Ind Eng 65:577\u2013585","journal-title":"Comput Ind Eng"},{"key":"822_CR16","doi-asserted-by":"crossref","first-page":"47","DOI":"10.1007\/s43069-023-00230-7","volume":"4","author":"LAG Araujo","year":"2023","unstructured":"Araujo LAG, Birgin EG, Kawamura MS, Ronconi DP (2023) Relax-and-fix heuristics applied to a real-world lot sizing and scheduling problem in the personal care consumer goods industry. Oper Res Forum 4:47","journal-title":"Oper Res Forum"},{"key":"822_CR17","doi-asserted-by":"crossref","first-page":"1352","DOI":"10.1080\/0305215X.2022.2086237","volume":"55","author":"FN Avil\u00e9s","year":"2022","unstructured":"Avil\u00e9s FN, Etchepare RM, Aguayo MM, Valenzuela M (2022) A mixed-integer programming model for an integrated production planning problem with preventive maintenance in the pulp and paper industry. Eng Optim 55:1352\u20131369","journal-title":"Eng Optim"},{"key":"822_CR18","first-page":"1","volume":"41","author":"BEV Boas","year":"2021","unstructured":"Boas BEV, Camargo VCB, Morabito R (2021) Modeling and MIP-heuristics for the general lotsizing and scheduling problem with process configuration selection. Pesquisa Operacional 41:1\u201329","journal-title":"Pesquisa Operacional"},{"key":"822_CR19","doi-asserted-by":"publisher","DOI":"10.1007\/s10479-023-05499-9","author":"MA Bragin","year":"2023","unstructured":"Bragin MA (2023) Survey on Lagrangian relaxation for MILP: importance, challenges, historical review, recent advancements, and opportunities. Ann Oper Res. https:\/\/doi.org\/10.1007\/s10479-023-05499-9","journal-title":"Ann Oper Res"},{"key":"822_CR20","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1007\/s00291-015-0429-4","volume":"39","author":"K Copil","year":"2017","unstructured":"Copil K, Worbelauer M, Meyr H, Tempelmeier H (2017) Simultaneous lotsizing and scheduling problems: a classification and review of models. Or Spectrum 39:1\u201364","journal-title":"Or Spectrum"},{"key":"822_CR21","doi-asserted-by":"crossref","first-page":"81","DOI":"10.1016\/j.ijpe.2018.04.012","volume":"202","author":"E Curcio","year":"2018","unstructured":"Curcio E, Amorim P, Zhang Q, Almada-Lobo B (2018) Adaptation and approximate strategies for solving the lot-sizing and scheduling problem under multistage demand uncertainty. Int J Prod Econ 202:81\u201396","journal-title":"Int J Prod Econ"},{"key":"822_CR22","first-page":"291","volume":"45","author":"S DerakhshanHoreh","year":"2023","unstructured":"DerakhshanHoreh S, Bijari M (2023) Integrated production and non-cyclical maintenance planning in flow-shop environment with limited buffer. Int J Ind Syst Eng 45:291\u2013320","journal-title":"Int J Ind Syst Eng"},{"key":"822_CR23","doi-asserted-by":"crossref","first-page":"221","DOI":"10.1016\/S0377-2217(97)00030-1","volume":"99","author":"A Drexl","year":"1997","unstructured":"Drexl A, Kimms A (1997) Lot sizing and scheduling \u2013 survey and extensions. Eur J Oper Res 99:221\u2013235","journal-title":"Eur J Oper Res"},{"key":"822_CR24","doi-asserted-by":"crossref","DOI":"10.1016\/j.ress.2020.107143","volume":"204","author":"S Eryilmaz","year":"2020","unstructured":"Eryilmaz S (2020) Age-based preventive maintenance for coherent systems with applications to consecutive-k-out-of-n and related systems. Reliab Eng Syst Saf 204:107143","journal-title":"Reliab Eng Syst Saf"},{"key":"822_CR25","doi-asserted-by":"crossref","first-page":"308","DOI":"10.1016\/j.ijpe.2005.04.011","volume":"104","author":"G Fandel","year":"2006","unstructured":"Fandel G, Stammen-Hegene C (2006) Simultaneous lot sizing and scheduling for multi-product multi-level production. Int J Prod Econ 104:308\u2013316","journal-title":"Int J Prod Econ"},{"key":"822_CR26","doi-asserted-by":"crossref","first-page":"218","DOI":"10.1016\/j.ress.2018.04.004","volume":"176","author":"H Feng","year":"2018","unstructured":"Feng H, Xi L, Xiao L, Xia T, Pan E (2018) Imperfect preventive maintenance optimization for flexible flowshop manufacturing cells considering sequence-dependent group scheduling. Reliab Eng Syst Saf 176:218\u2013229","journal-title":"Reliab Eng Syst Saf"},{"key":"822_CR27","doi-asserted-by":"crossref","first-page":"1804","DOI":"10.1016\/j.cor.2013.01.015","volume":"40","author":"G Figueira","year":"2013","unstructured":"Figueira G, Santos MO, Almada-Lobo B (2013) A hybrid VNS approach for the short-term production planning and scheduling: a case study in the pulp and paper industry. Comput Oper Res 40:1804\u20131818","journal-title":"Comput Oper Res"},{"key":"822_CR28","doi-asserted-by":"crossref","first-page":"85","DOI":"10.1016\/j.compchemeng.2015.03.017","volume":"77","author":"G Figueira","year":"2015","unstructured":"Figueira G, Amorim P, Guimaraes L, Amorim-Lopes M, Neves-Moreira F, Almada-Lobo B (2015) A decision support system for the operational production planning and scheduling of an integrated pulp and paper mill. Comput Chem Eng 77:85\u2013104","journal-title":"Comput Chem Eng"},{"key":"822_CR29","doi-asserted-by":"crossref","first-page":"344","DOI":"10.1016\/j.ijpe.2011.12.021","volume":"136","author":"MC Fitouhi","year":"2012","unstructured":"Fitouhi MC, Nourelfath M (2012) Integrating noncyclical preventive maintenance scheduling and production planning for a single machine. Int J Prod Econ 136:344\u2013351","journal-title":"Int J Prod Econ"},{"key":"822_CR30","doi-asserted-by":"crossref","first-page":"175","DOI":"10.1016\/j.ress.2013.07.009","volume":"121","author":"MC Fitouhi","year":"2014","unstructured":"Fitouhi MC, Nourelfath M (2014) Integrating noncyclical preventive maintenance scheduling and production planning for multi-state systems. Reliab Eng Syst Safety 121:175\u2013186","journal-title":"Reliab Eng Syst Safety"},{"key":"822_CR31","doi-asserted-by":"crossref","first-page":"11","DOI":"10.1007\/BF01539800","volume":"19","author":"B Fleischmann","year":"1997","unstructured":"Fleischmann B, Meyr H (1997) The general lotsizing and scheduling problem. Or Spectrum 19:11\u201321","journal-title":"Or Spectrum"},{"key":"822_CR32","doi-asserted-by":"crossref","first-page":"33","DOI":"10.1016\/j.cor.2014.12.008","volume":"59","author":"M Furlan","year":"2015","unstructured":"Furlan M, Almada-Lobo B, Santos M, Morabito R (2015) Unequal individual genetic algorithm with intelligent diversification for the lotscheduling problem in integrated mills using multiple-paper machines. Comput Oper Res 59:33\u201350","journal-title":"Comput Oper Res"},{"key":"822_CR33","doi-asserted-by":"crossref","first-page":"138","DOI":"10.3390\/a13060138","volume":"13","author":"A Goerler","year":"2020","unstructured":"Goerler A, Lalla-Ruiz E, Vo\u00df S (2020) Late acceptance hill-climbing matheuristic for the general lot sizing and scheduling problem with rich constraints. Algorithms 13:138","journal-title":"Algorithms"},{"key":"822_CR34","doi-asserted-by":"crossref","first-page":"644","DOI":"10.1016\/j.ejor.2014.05.018","volume":"239","author":"L Guimar\u00e2es","year":"2014","unstructured":"Guimar\u00e2es L, Klabjan D, Almada-Lobo B (2014) Modeling lotsizing and scheduling problems with sequence dependent setups. Eur J Oper Res 239:644\u2013662","journal-title":"Eur J Oper Res"},{"key":"822_CR35","doi-asserted-by":"crossref","first-page":"2525","DOI":"10.1007\/s12351-019-00507-y","volume":"21","author":"W Jomaa","year":"2021","unstructured":"Jomaa W, Eddaly M, Jarboui B (2021) Variable neighborhood search algorithms for the permutation flowshop scheduling problem with the preventive maintenance. Oper Res Int J 21:2525\u20132542","journal-title":"Oper Res Int J"},{"key":"822_CR36","doi-asserted-by":"crossref","first-page":"230","DOI":"10.1016\/j.ejor.2021.12.032","volume":"302","author":"Y Lee","year":"2022","unstructured":"Lee Y, Lee K (2022) New integer optimization models and an approximate dynamic programming algorithm for the lot-sizing and scheduling problem with sequence-dependent setups. Eur J Oper Res 302:230\u2013243","journal-title":"Eur J Oper Res"},{"key":"822_CR37","doi-asserted-by":"crossref","first-page":"201","DOI":"10.1016\/j.ejor.2023.03.003","volume":"310","author":"Y Lee","year":"2023","unstructured":"Lee Y, Lee K (2023) Valid inequalities and extended formulations for lot-sizing and scheduling problem with sequence-dependent setups. Eur J Oper Res 310:201\u2013216","journal-title":"Eur J Oper Res"},{"key":"822_CR38","doi-asserted-by":"crossref","first-page":"2451","DOI":"10.1002\/qre.2202","volume":"33","author":"X Liu","year":"2017","unstructured":"Liu X, Wang W, Peng R (2017) An integrated preventive maintenance and production planning model with sequence-dependent setup costs and times. Qual Reliab Eng Int 33:2451\u20132461","journal-title":"Qual Reliab Eng Int"},{"key":"822_CR39","doi-asserted-by":"crossref","first-page":"554","DOI":"10.1016\/j.cie.2016.05.024","volume":"98","author":"KYP Martinez","year":"2016","unstructured":"Martinez KYP, Toso EAV, Morabito R (2016) Production planning in the molded pulp packaging industry. Comput Ind Eng 98:554\u2013566","journal-title":"Comput Ind Eng"},{"key":"822_CR40","doi-asserted-by":"crossref","first-page":"227","DOI":"10.1016\/j.ijpe.2018.07.018","volume":"204","author":"KP Martinez","year":"2018","unstructured":"Martinez KP, Toso EAV, Morabito R (2018) A coupled process configuration, lot-sizing and scheduling model for production planning in the molded pulp industry. Int J Prod Econ 204:227\u2013243","journal-title":"Int J Prod Econ"},{"key":"822_CR41","doi-asserted-by":"crossref","first-page":"310","DOI":"10.1016\/j.cor.2018.10.005","volume":"103","author":"KP Martinez","year":"2019","unstructured":"Martinez KP, Adulyasak Y, Jans R, Morabito R, Toso EAV (2019) An exact optimization approach for an integrated process configuration, lot-sizing, and scheduling problem. Comput Oper Res 103:310\u2013323","journal-title":"Comput Oper Res"},{"key":"822_CR42","doi-asserted-by":"crossref","first-page":"272","DOI":"10.1080\/16258312.2021.2007735","volume":"23","author":"A Mediouni","year":"2022","unstructured":"Mediouni A, Zufferey N, Rached M, Cheikhrouhou N (2022) The multi-period multi-level capacitated lot-sizing and scheduling problem in the dairy soft-drink industry. Supply Chain Forum an Int J 23:272\u2013284","journal-title":"Supply Chain Forum an Int J"},{"key":"822_CR43","doi-asserted-by":"crossref","first-page":"1487","DOI":"10.1016\/j.procs.2022.12.348","volume":"217","author":"M Merghem","year":"2023","unstructured":"Merghem M, Haoues M, Mouss KN, Dahane M, Senoussi A (2023) Integrated production and maintenance planning in hybrid manufacturing-remanufacturing system with outsourcing opportunities. Proc Comput Sci 217:1487\u20131496","journal-title":"Proc Comput Sci"},{"key":"822_CR44","doi-asserted-by":"crossref","first-page":"718","DOI":"10.1016\/j.ejor.2013.03.036","volume":"229","author":"H Meyr","year":"2013","unstructured":"Meyr H, Mann M (2013) A decomposition approach for the general lotsizing and scheduling problem for parallel production lines. Eur J Oper Res 229:718\u2013731","journal-title":"Eur J Oper Res"},{"key":"822_CR45","doi-asserted-by":"crossref","first-page":"33","DOI":"10.1007\/s12351-023-00772-y","volume":"23","author":"M Milenkovi\u0107","year":"2023","unstructured":"Milenkovi\u0107 M, Val S, Bojovi\u0107 N (2023) Simultaneous lot sizing and scheduling in the animal feed premix industry. Oper Res Int J 23:33","journal-title":"Oper Res Int J"},{"key":"822_CR46","doi-asserted-by":"crossref","first-page":"167","DOI":"10.5267\/j.uscm.2014.4.003","volume":"2","author":"M Mohammadi","year":"2014","unstructured":"Mohammadi M, Poursabzi O (2014) A rolling horizon-based heuristic to solve a multi-level general lot sizing and scheduling problem with multiple machines (MLGLSP_MM) in job shop manufacturing system. Uncertain Supply Chain Manag 2:167\u2013178","journal-title":"Uncertain Supply Chain Manag"},{"key":"822_CR47","doi-asserted-by":"crossref","first-page":"21","DOI":"10.1016\/j.ress.2015.11.015","volume":"148","author":"M Nourelfath","year":"2016","unstructured":"Nourelfath M, Nahas N, Ben-Daya M (2016) Integrated preventive maintenance and production decisions for imperfect processes. Reliab Eng Syst Saf 148:21\u201331","journal-title":"Reliab Eng Syst Saf"},{"key":"822_CR48","doi-asserted-by":"crossref","first-page":"64","DOI":"10.1590\/0104-530x2288-15","volume":"24","author":"MS Pagliarussi","year":"2017","unstructured":"Pagliarussi MS, Morabito R, Santos MO (2017) Optimizing the production scheduling of fruit juice beverages using mixed integer programming models. Gest\u00e3o and Produ\u00e7\u00e3o 24:64\u201377","journal-title":"Gest\u00e3o and Produ\u00e7\u00e3o"},{"key":"822_CR49","doi-asserted-by":"crossref","first-page":"2099","DOI":"10.3390\/math11092099","volume":"11","author":"D Popovi\u2019c","year":"2023","unstructured":"Popovi\u2019c D, Bjeli\u2019c N, Vidovi\u2019c M, Ratkovi\u2019c B (2023) Solving a production lot-sizing and scheduling problem from an enhanced inventory management perspective. Mathematics 11:2099","journal-title":"Mathematics"},{"key":"822_CR50","doi-asserted-by":"crossref","first-page":"5134","DOI":"10.1016\/j.apm.2012.10.024","volume":"37","author":"R Ramezanian","year":"2013","unstructured":"Ramezanian R, Saidi-Mehrabad M (2013) Hybrid simulated annealing and MIP-based heuristics for stochastic lot-sizing and scheduling problem in capacitated multi-stage production system. Appl Math Modell 37:5134\u20135147","journal-title":"Appl Math Modell"},{"key":"822_CR51","doi-asserted-by":"crossref","first-page":"4999","DOI":"10.1007\/s12351-022-00733-x","volume":"22","author":"SA Razavi Al-e-hashem","year":"2022","unstructured":"Razavi Al-e-hashem SA, Papi A, Pishvaee MS, Rasouli MR (2022) Robust maintenance planning and scheduling for multi-factory production networks considering disruption cost: a bi-objective optimization model and a metaheuristic solution method. Oper Res Int J 22:4999\u20135034","journal-title":"Oper Res Int J"},{"key":"822_CR52","doi-asserted-by":"crossref","first-page":"2191","DOI":"10.1111\/itor.12645","volume":"28","author":"HU Rehman","year":"2019","unstructured":"Rehman HU, Wan G, Zhan Y (2019) Multi-level, multi-stage lot-sizing and scheduling in the flexible flow shop with demand information updating. Int Trans Oper Res 28:2191\u20132217","journal-title":"Int Trans Oper Res"},{"key":"822_CR53","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1007\/s00170-014-6598-5","volume":"78","author":"M Rohaninejad","year":"2015","unstructured":"Rohaninejad M, Kheirkhah A, Fattahi P (2015) Simultaneous lot-sizing and scheduling in flexible job shop problems. Int J Adv Manuf Technol 78:1\u201318","journal-title":"Int J Adv Manuf Technol"},{"key":"822_CR54","doi-asserted-by":"crossref","first-page":"857","DOI":"10.1007\/s12351-017-0358-x","volume":"20","author":"M Rostami","year":"2020","unstructured":"Rostami M, Bagherpour MA (2020) Lagrangian relaxation algorithm for facility locssation of resource-constrained decentralized multi-project scheduling problems. Operatinal Res 20:857\u2013897","journal-title":"Operatinal Res"},{"key":"822_CR55","first-page":"28","volume":"10","author":"M Saidi-Mehrabad","year":"2017","unstructured":"Saidi-Mehrabad M, Jabbarzadeh A, Alimian M (2017) An integrated production and preventive maintenance planning model with imperfect maintenance in multi-state system. J Ind Syst Eng 10:28\u201342","journal-title":"J Ind Syst Eng"},{"key":"822_CR56","doi-asserted-by":"crossref","first-page":"1235","DOI":"10.1007\/s12351-020-00590-6","volume":"22","author":"A Salmasnia","year":"2022","unstructured":"Salmasnia A, Talesh-Kazemi A (2022) Integrating inventory planning, pricing and maintenance for perishable products in a two-component parallel manufacturing system with common cause failures. Oper Res Int J 22:1235\u20131265","journal-title":"Oper Res Int J"},{"key":"822_CR57","volume":"163","author":"TMP Schimidt","year":"2022","unstructured":"Schimidt TMP, Scarpin CT, Loch GV, Schenekemberg CM (2022) A two-level lot sizing and scheduling problem applied to a cosmetic industry. Comput Chem Eng 163:107837","journal-title":"Comput Chem Eng"},{"key":"822_CR58","doi-asserted-by":"crossref","DOI":"10.1007\/978-3-658-02089-7","volume-title":"Multi-Stage Simultaneous lot-sizing and scheduling: planning of flow lines with shifting bottlenecks","author":"F Seeanner","year":"2013","unstructured":"Seeanner F (2013) Multi-Stage Simultaneous lot-sizing and scheduling: planning of flow lines with shifting bottlenecks. Springer"},{"key":"822_CR59","doi-asserted-by":"crossref","first-page":"33","DOI":"10.1007\/s00291-012-0296-1","volume":"35","author":"F Seeanner","year":"2013","unstructured":"Seeanner F, Meyr H (2013) Multi-stage simultaneous lot-sizing and scheduling for flow line production. Or Spectrum 35:33\u201373","journal-title":"Or Spectrum"},{"key":"822_CR60","doi-asserted-by":"crossref","first-page":"303","DOI":"10.1016\/j.cor.2012.07.002","volume":"40","author":"F Seeanner","year":"2013","unstructured":"Seeanner F, Almada-Lobo B, Meyr H (2013) Combining the principles of variable neighborhood decomposition search and the fixandoptimize heuristic to solve multi-level lot-sizing and scheduling problems. Comput Oper Res 40:303\u2013317","journal-title":"Comput Oper Res"},{"key":"822_CR61","doi-asserted-by":"crossref","first-page":"503","DOI":"10.1016\/j.ress.2017.09.003","volume":"169","author":"SH Sheu","year":"2018","unstructured":"Sheu SH, Liu TH, Zhang ZG, Tsai HN (2018) The generalized age maintenance policies with random working times. Reliab Eng Syst Saf 169:503\u2013514","journal-title":"Reliab Eng Syst Saf"},{"key":"822_CR62","doi-asserted-by":"crossref","first-page":"1949","DOI":"10.1051\/ro\/2021084","volume":"55","author":"WAO Soler","year":"2021","unstructured":"Soler WAO, Santos MO, Rangel S (2021) Optimization models for a lot sizing and scheduling problem on parallel production lines that share scarce resources. RAIRO-Oper Res 55:1949\u20131970","journal-title":"RAIRO-Oper Res"},{"key":"822_CR63","doi-asserted-by":"crossref","first-page":"3097","DOI":"10.1080\/00207540701675833","volume":"47","author":"CFM Toledo","year":"2009","unstructured":"Toledo CFM, Franca PM, Morabito R, Kimms A (2009) Multi-population genetic algorithm to solve the synchronized and integrated two-level lot sizing and scheduling problem. Int J Prod Res 47:3097\u20133119","journal-title":"Int J Prod Res"},{"key":"822_CR64","doi-asserted-by":"crossref","first-page":"40","DOI":"10.1016\/j.cor.2014.02.012","volume":"48","author":"CFM Toledo","year":"2014","unstructured":"Toledo CFM, de Oliviera L, de Freitas PR, Franca PM, Morabito R (2014) A genetic algorithm\/mathematical programming approach to solve a two-level soft drink production problem. Comput Oper Res 48:40\u201352","journal-title":"Comput Oper Res"},{"key":"822_CR65","first-page":"182781","volume":"2015","author":"CFM Toledo","year":"2015","unstructured":"Toledo CFM, Kimms A, Franca PM, Morabito R (2015) The synchronized and integrated two-level lot sizing and scheduling problem: evaluating the generalized mathematical model. Math Problems Eng 2015:182781","journal-title":"Math Problems Eng"},{"key":"822_CR66","doi-asserted-by":"crossref","first-page":"813","DOI":"10.1016\/j.cie.2009.02.011","volume":"57","author":"EVA Toso","year":"2009","unstructured":"Toso EVA, Morabito R, Clark AR (2009) Lot sizing and sequencing optimisation at an animal-feed plant. Comput Ind Eng 57:813\u2013821","journal-title":"Comput Ind Eng"},{"key":"822_CR67","doi-asserted-by":"crossref","DOI":"10.1016\/j.compchemeng.2023.108341","volume":"177","author":"R Wallrath","year":"2023","unstructured":"Wallrath R, Seeanner F, Lampe M, Franke MB (2023) A time-bucket MILP formulation for optimal lot-sizing and scheduling of real-world chemical batch plants. Comput Chem Eng 177:108341","journal-title":"Comput Chem Eng"},{"key":"822_CR68","doi-asserted-by":"crossref","first-page":"204","DOI":"10.1016\/j.ijpe.2019.04.015","volume":"216","author":"MG Wichmann","year":"2019","unstructured":"Wichmann MG, Johannes C, Spengler TS (2019) Energy-oriented lot-sizing and scheduling considering energy storages. Int J Prod Econ 216:204\u2013214","journal-title":"Int J Prod Econ"},{"key":"822_CR69","doi-asserted-by":"crossref","first-page":"489","DOI":"10.1007\/s10100-015-0403-x","volume":"24","author":"A Wolter","year":"2016","unstructured":"Wolter A, Helber S (2016) Simultaneous production and maintenance planning for a single capacitated resource facing both a dynamic demand and intensive wear and tear. CEJOR 24:489\u2013513","journal-title":"CEJOR"},{"key":"822_CR70","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1007\/s00291-018-0536-0","volume":"41","author":"M Worbelauer","year":"2019","unstructured":"Worbelauer M, Meyr H, Almada-Lobo B (2019) Simultaneous lotsizing and scheduling considering secondary resources: a general model, literature review and classification. Or Spectrum 41:1\u201343","journal-title":"Or Spectrum"},{"key":"822_CR71","doi-asserted-by":"crossref","first-page":"242","DOI":"10.1109\/TR.2010.2041972","volume":"59","author":"S Wu","year":"2010","unstructured":"Wu S, Zuo MJ (2010) Linear and nonlinear preventive maintenance models. IEEE Trans Reliab 59:242\u2013249","journal-title":"IEEE Trans Reliab"},{"key":"822_CR72","doi-asserted-by":"crossref","first-page":"72","DOI":"10.1016\/j.cor.2015.04.010","volume":"63","author":"J Xiao","year":"2015","unstructured":"Xiao J, Yang H, Zhang C, Zheng L, Gupta JND (2015) A hybrid Lagrangian-simulated annealing-based heuristic for the parallel-machine capacitated lot-sizing and scheduling problem with sequence-dependent setup times. Comput Oper Res 63:72\u201382","journal-title":"Comput Oper Res"},{"key":"822_CR73","doi-asserted-by":"crossref","first-page":"1419","DOI":"10.1007\/s00170-014-5834-3","volume":"74","author":"MB Yildirim","year":"2014","unstructured":"Yildirim MB, Ghazi Nezami F (2014) Integrated maintenance and production planning with energy consumption and minimal repair. Int J Adv Manuf Technol 74:1419\u20131430","journal-title":"Int J Adv Manuf Technol"}],"container-title":["Operational Research"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s12351-024-00822-z.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/article\/10.1007\/s12351-024-00822-z\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s12351-024-00822-z.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2024,7,12]],"date-time":"2024-07-12T13:22:26Z","timestamp":1720790546000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/s12351-024-00822-z"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2024,3,11]]},"references-count":73,"journal-issue":{"issue":"2","published-print":{"date-parts":[[2024,6]]}},"alternative-id":["822"],"URL":"https:\/\/doi.org\/10.1007\/s12351-024-00822-z","relation":{},"ISSN":["1109-2858","1866-1505"],"issn-type":[{"value":"1109-2858","type":"print"},{"value":"1866-1505","type":"electronic"}],"subject":[],"published":{"date-parts":[[2024,3,11]]},"assertion":[{"value":"9 December 2022","order":1,"name":"received","label":"Received","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"11 December 2023","order":2,"name":"revised","label":"Revised","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"31 January 2024","order":3,"name":"accepted","label":"Accepted","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"11 March 2024","order":4,"name":"first_online","label":"First Online","group":{"name":"ArticleHistory","label":"Article History"}},{"order":1,"name":"Ethics","group":{"name":"EthicsHeading","label":"Declarations"}},{"value":"The authors declare that they have no conflict of interest.","order":2,"name":"Ethics","group":{"name":"EthicsHeading","label":"Conflict of interest"}}],"article-number":"15"}}