{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,4,3]],"date-time":"2026-04-03T13:29:42Z","timestamp":1775222982267,"version":"3.50.1"},"reference-count":49,"publisher":"Springer Science and Business Media LLC","issue":"2","license":[{"start":{"date-parts":[[2020,4,26]],"date-time":"2020-04-26T00:00:00Z","timestamp":1587859200000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/creativecommons.org\/licenses\/by\/4.0"},{"start":{"date-parts":[[2020,4,26]],"date-time":"2020-04-26T00:00:00Z","timestamp":1587859200000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/creativecommons.org\/licenses\/by\/4.0"}],"funder":[{"DOI":"10.13039\/501100013178","name":"Trafikverket","doi-asserted-by":"crossref","award":["TRV 2013\/55886"],"award-info":[{"award-number":["TRV 2013\/55886"]}],"id":[{"id":"10.13039\/501100013178","id-type":"DOI","asserted-by":"crossref"}]}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Public Transp"],"published-print":{"date-parts":[[2020,6]]},"abstract":"<jats:title>Abstract<\/jats:title><jats:p>This paper concerns a case study for optimal planning and coordination of railway maintenance windows and train traffic. The purpose is to validate a previously presented optimization model on a demanding real-life problem instance and to obtain results that apply in similar planning situations. A mixed integer linear programming model is used for a 913 km long, single-track railway line through the northern part of Sweden, with traffic consisting of 82 trains per day, most of which are freight trains. Cyclic 1-day schedules are produced, which show that 2 h long maintenance windows can be scheduled with small adjustments of the train traffic. The sensitivity for cost changes is studied, which shows that the train costs must increase by more than 30% in order to change the structure of the window solutions. Resource efficient window schedules are obtained by assigning maintenance teams to all windows while respecting crew work and rest time restrictions. A comparison with manually constructed plans from the Swedish Transport Administration indicates that larger window volumes can be scheduled at a lower cost and with solution structures which are deemed reasonable and useful as guidance for constructing the real window patterns. Finally, we estimate that using an integrated planning approach (where maintenance and trains are jointly planned) instead of a sequential approach (where a train timetable has precedence over the maintenance windows), will give maintenance cost savings of 11\u201317%, without incurring any large cost increases for the train traffic. The paper also presents a method for achieving cyclic schedules without any period-deciding variables, and discusses the consequences of the aggregated capacity usage model that has been adopted.<\/jats:p>","DOI":"10.1007\/s12469-020-00232-2","type":"journal-article","created":{"date-parts":[[2020,4,26]],"date-time":"2020-04-26T10:02:30Z","timestamp":1587895350000},"page":"261-298","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":14,"title":["Coordinating maintenance windows and train traffic: a case study"],"prefix":"10.1007","volume":"12","author":[{"ORCID":"https:\/\/orcid.org\/0000-0002-1643-6365","authenticated-orcid":false,"given":"Tomas","family":"Lid\u00e9n","sequence":"first","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2020,4,26]]},"reference":[{"issue":"3","key":"232_CR1","doi-asserted-by":"publisher","first-page":"703","DOI":"10.1016\/j.cor.2010.09.001","volume":"40","author":"AR Albrecht","year":"2013","unstructured":"Albrecht AR, Panton DM, Lee DH (2013) Rescheduling rail networks with maintenance disruptions using Problem Space Search. Comput Oper Res 40(3):703\u2013712. https:\/\/doi.org\/10.1016\/j.cor.2010.09.001","journal-title":"Comput Oper Res"},{"key":"232_CR2","doi-asserted-by":"publisher","first-page":"123","DOI":"10.1016\/j.cor.2018.02.018","volume":"95","author":"D Arenas","year":"2018","unstructured":"Arenas D, Pellegrini P, Hanafi S, Rodriguez J (2018) Timetable rearrangement to cope with railway maintenance activities. Comput Oper Res 95:123\u2013138. https:\/\/doi.org\/10.1016\/j.cor.2018.02.018","journal-title":"Comput Oper Res"},{"key":"232_CR3","unstructured":"ASEK (2018) Appraisal guidelines. Swedish Transport Administration. http:\/\/www.trafikverket.se\/ASEK"},{"key":"232_CR4","doi-asserted-by":"publisher","first-page":"195","DOI":"10.1007\/s13676-018-0119-x","volume":"8","author":"N Boland","year":"2019","unstructured":"Boland N, Hewitt M, Marshall L, Savelsbergh M (2019) The price of discretizing time: a study in service network design. EURO J Transp Logist 8:195\u2013216. https:\/\/doi.org\/10.1007\/s13676-018-0119-x","journal-title":"EURO J Transp Logist"},{"issue":"6","key":"232_CR5","doi-asserted-by":"publisher","first-page":"649","DOI":"10.1007\/s10951-012-0284-y","volume":"16","author":"N Boland","year":"2013","unstructured":"Boland N, Kalinowski T, Waterer H, Zheng L (2013) Mixed integer programming based maintenance scheduling for the Hunter Valley coal chain. J Sched 16(6):649\u2013659. https:\/\/doi.org\/10.1007\/s10951-012-0284-y","journal-title":"J Sched"},{"key":"232_CR6","unstructured":"Borraz-S\u00e1nchez C, Klabjan D (2012) Strategic gang scheduling for railroad maintenance. CCITT, Center for the Commercialization of Innovative Transportation Technology, Northwestern University. http:\/\/ntl.bts.gov\/lib\/46000\/46100\/46128\/CCITT_Final_Report_Y201.pdf"},{"key":"232_CR7","doi-asserted-by":"publisher","unstructured":"Brucker P, Heitmann S, Knust S, (2005) Scheduling railway traffic at a construction site. In: G\u00fcnther HO, Kim KH (eds) Container terminals and automated transport systems. Springer, Berlin Heidelberg, pp 345\u2013356. https:\/\/doi.org\/10.1007\/3-540-26686-0_15","DOI":"10.1007\/3-540-26686-0_15"},{"issue":"9","key":"232_CR8","doi-asserted-by":"publisher","first-page":"1035","DOI":"10.1057\/palgrave.jors.2602085","volume":"57","author":"G Budai","year":"2006","unstructured":"Budai G, Huisman D, Dekker R (2006) Scheduling preventive railway maintenance activities. J Oper Res Soc 57(9):1035\u20131044. https:\/\/doi.org\/10.1057\/palgrave.jors.2602085","journal-title":"J Oper Res Soc"},{"issue":"2","key":"232_CR9","doi-asserted-by":"publisher","first-page":"217","DOI":"10.1287\/trsc.1110.0388","volume":"46","author":"V Cacchiani","year":"2012","unstructured":"Cacchiani V, Caprara A, Galli L, Kroon L, Mar\u00f3ti G, Toth P (2012) Railway rolling stock planning: robustness against large disruptions. Transp Sci 46(2):217\u2013232. https:\/\/doi.org\/10.1287\/trsc.1110.0388","journal-title":"Transp Sci"},{"key":"232_CR10","doi-asserted-by":"publisher","first-page":"15","DOI":"10.1016\/j.trb.2014.01.009","volume":"63","author":"V Cacchiani","year":"2014","unstructured":"Cacchiani V, Huisman D, Kidd M, Kroon L, Toth P, Veelenturf L, Wagenaar J (2014) An overview of recovery models and algorithms for real-time railway rescheduling. Transp Res Part B Methodol 63:15\u201337. https:\/\/doi.org\/10.1016\/j.trb.2014.01.009","journal-title":"Transp Res Part B Methodol"},{"issue":"3","key":"232_CR11","doi-asserted-by":"publisher","first-page":"727","DOI":"10.1016\/j.ejor.2011.11.003","volume":"219","author":"V Cacchiani","year":"2012","unstructured":"Cacchiani V, Toth P (2012) Nominal and robust train timetabling problems. Eur J Oper Res 219(3):727\u2013737. https:\/\/doi.org\/10.1016\/j.ejor.2011.11.003","journal-title":"Eur J Oper Res"},{"issue":"8","key":"232_CR12","doi-asserted-by":"publisher","first-page":"1131","DOI":"10.1016\/j.cor.2010.10.029","volume":"38","author":"L Cadarso","year":"2011","unstructured":"Cadarso L, Mar\u00edn \u00c1 (2011) Robust rolling stock in rapid transit networks. Comput Oper Res 38(8):1131\u20131142. https:\/\/doi.org\/10.1016\/j.cor.2010.10.029","journal-title":"Comput Oper Res"},{"issue":"2","key":"232_CR13","doi-asserted-by":"publisher","first-page":"506","DOI":"10.1016\/j.ejor.2015.03.023","volume":"245","author":"F Camci","year":"2015","unstructured":"Camci F (2015) Maintenance scheduling of geographically distributed assets with prognostics information. Eur J Oper Res 245(2):506\u2013516. https:\/\/doi.org\/10.1016\/j.ejor.2015.03.023","journal-title":"Eur J Oper Res"},{"key":"232_CR14","doi-asserted-by":"publisher","unstructured":"Caprara A, Kroon L, Monaci M, Peeters M, Toth P (2007) Passenger railway optimization (ch 3). In: Handbooks in operations research and management science, vol 14. Elsevier, pp 129\u2013187. https:\/\/doi.org\/10.1016\/S0927-0507(06)14003-7","DOI":"10.1016\/S0927-0507(06)14003-7"},{"key":"232_CR15","doi-asserted-by":"publisher","DOI":"10.1002\/9780470400531.eorms0647","author":"A Caprara","year":"2011","unstructured":"Caprara A, Kroon L, Toth P (2011) Optimization problems in passenger railway systems. Wiley Encycl Oper Res Manag Sci. https:\/\/doi.org\/10.1002\/9780470400531.eorms0647","journal-title":"Wiley Encycl Oper Res Manag Sci"},{"issue":"5","key":"232_CR16","doi-asserted-by":"publisher","first-page":"738","DOI":"10.1016\/j.dam.2005.05.026","volume":"154","author":"A Caprara","year":"2006","unstructured":"Caprara A, Monaci M, Toth P, Guida PL (2006) A Lagrangian heuristic algorithm for a real-world train timetabling problem. Discrete Appl Math 154(5):738\u2013753. https:\/\/doi.org\/10.1016\/j.dam.2005.05.026","journal-title":"Discrete Appl Math"},{"issue":"3","key":"232_CR17","doi-asserted-by":"publisher","first-page":"1274","DOI":"10.1109\/TITS.2014.2358392","volume":"16","author":"F Corman","year":"2014","unstructured":"Corman F, Meng L (2014) A review of online dynamic models and algorithms for railway traffic management. IEEE Trans Intell Transp Syst 16(3):1274\u20131284. https:\/\/doi.org\/10.1109\/TITS.2014.2358392","journal-title":"IEEE Trans Intell Transp Syst"},{"key":"232_CR18","doi-asserted-by":"publisher","first-page":"1315","DOI":"10.1016\/j.cie.2017.12.010","volume":"127","author":"A D\u2019Ariano","year":"2019","unstructured":"D\u2019Ariano A, Meng L, Centulio G, Corman F (2019) Integrated stochastic optimization approaches for tactical scheduling of trains and railway infrastructure maintenance. Comput Ind Eng 127:1315\u20131335. https:\/\/doi.org\/10.1016\/j.cie.2017.12.010","journal-title":"Comput Ind Eng"},{"issue":"5","key":"232_CR19","doi-asserted-by":"publisher","first-page":"890","DOI":"10.1016\/j.aap.2005.04.006","volume":"37","author":"D den Hertog","year":"2005","unstructured":"den Hertog D, van Zante-de Fokkert JI, Sjamaar SA, Beusmans R (2005) Optimal working zone division for safe track maintenance in The Netherlands. Accid Anal Prev 37(5):890\u2013893. https:\/\/doi.org\/10.1016\/j.aap.2005.04.006","journal-title":"Accid Anal Prev"},{"key":"232_CR20","doi-asserted-by":"publisher","unstructured":"Ehrgott M (2005) Multicriteria optimization. Springer, Berlin. https:\/\/doi.org\/10.1007\/3-540-27659-9","DOI":"10.1007\/3-540-27659-9"},{"key":"232_CR21","unstructured":"EIM-EFRTC-CER Working\u00a0Group, (2012) Market strategies for track maintenance and renewal. Tech. Rep. 2353 7473-11, CER-Community of European Railway and Infrastructure Companies. http:\/\/www.cer.be\/publications\/brochures-studies-and-reports\/report-eim-efrtc-cer-working-group-market-strategies"},{"issue":"3","key":"232_CR22","doi-asserted-by":"publisher","first-page":"111","DOI":"10.1016\/j.jrtpm.2013.11.001","volume":"3","author":"M Forsgren","year":"2013","unstructured":"Forsgren M, Aronsson M, Gestrelius S (2013) Maintaining tracks and traffic flow at the same time. J Rail Transp Plan Manag 3(3):111\u2013123. https:\/\/doi.org\/10.1016\/j.jrtpm.2013.11.001","journal-title":"J Rail Transp Plan Manag"},{"issue":"1","key":"232_CR23","doi-asserted-by":"publisher","first-page":"95","DOI":"10.1080\/15472450.2013.801712","volume":"18","author":"GL Giacco","year":"2014","unstructured":"Giacco GL, D\u2019Ariano A, Pacciarelli D (2014) Rolling stock rostering optimization under maintenance constraints. J Intell Transp Syst 18(1):95\u2013105. https:\/\/doi.org\/10.1080\/15472450.2013.801712","journal-title":"J Intell Transp Syst"},{"issue":"1","key":"232_CR24","doi-asserted-by":"publisher","first-page":"97","DOI":"10.1007\/s13676-014-0067-z","volume":"4","author":"E Gustavsson","year":"2014","unstructured":"Gustavsson E (2014) Scheduling tamping operations on railway tracks using mixed integer linear programming. EURO J Transp Logist 4(1):97\u2013112. https:\/\/doi.org\/10.1007\/s13676-014-0067-z","journal-title":"EURO J Transp Logist"},{"issue":"10","key":"232_CR25","doi-asserted-by":"publisher","first-page":"1026","DOI":"10.2307\/3010526","volume":"49","author":"A Higgins","year":"1998","unstructured":"Higgins A (1998) Scheduling of railway track maintenance activities and crews. J Oper Res Soc 49(10):1026\u20131033. https:\/\/doi.org\/10.2307\/3010526","journal-title":"J Oper Res Soc"},{"key":"232_CR26","unstructured":"Kalinowski T, Lid\u00e9n T, Waterer H (2018) Tight MIP formulations for bounded up\/down times with cyclic boundary conditions. ArXiv e-prints. https:\/\/ui.adsabs.harvard.edu\/abs\/2018arXiv180901773K"},{"key":"232_CR27","doi-asserted-by":"publisher","first-page":"284","DOI":"10.1016\/j.cie.2015.03.016","volume":"85","author":"Y-C Lai","year":"2015","unstructured":"Lai Y-C, Fan D-C, Huang K-L (2015) Optimizing rolling stock assignment and maintenance plan for passenger railway operations. Comput Ind Eng 85:284\u2013295. https:\/\/doi.org\/10.1016\/j.cie.2015.03.016","journal-title":"Comput Ind Eng"},{"key":"232_CR28","doi-asserted-by":"publisher","first-page":"574","DOI":"10.1016\/j.trpro.2015.09.011","volume":"10","author":"T Lid\u00e9n","year":"2015","unstructured":"Lid\u00e9n T (2015) Railway infrastructure maintenance\u2014a survey of planning problems and conducted research. Transp Res Proc 10:574\u2013583. https:\/\/doi.org\/10.1016\/j.trpro.2015.09.011","journal-title":"Transp Res Proc"},{"key":"232_CR29","doi-asserted-by":"publisher","unstructured":"Lid\u00e9n T (2016) Towards concurrent planning of railway maintenance and train services. Licentiate thesis, Link\u00f6ping University. https:\/\/doi.org\/10.3384\/lic.diva-128780","DOI":"10.3384\/lic.diva-128780"},{"issue":"1","key":"232_CR30","doi-asserted-by":"publisher","first-page":"32","DOI":"10.1016\/j.jrtpm.2016.03.002","volume":"6","author":"T Lid\u00e9n","year":"2016","unstructured":"Lid\u00e9n T, Joborn M (2016) Dimensioning windows for railway infrastructure maintenance: cost efficiency versus traffic impact. J Rail Transp Plan Manag 6(1):32\u201347. https:\/\/doi.org\/10.1016\/j.jrtpm.2016.03.002","journal-title":"J Rail Transp Plan Manag"},{"key":"232_CR31","doi-asserted-by":"publisher","first-page":"327","DOI":"10.1016\/j.trc.2016.11.016","volume":"74","author":"T Lid\u00e9n","year":"2017","unstructured":"Lid\u00e9n T, Joborn M (2017) An optimization model for integrated planning of railway traffic and network maintenance. Transp Res Part C Emerg Technol 74:327\u2013347. https:\/\/doi.org\/10.1016\/j.trc.2016.11.016","journal-title":"Transp Res Part C Emerg Technol"},{"issue":"1","key":"232_CR32","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1016\/j.jrtpm.2018.02.001","volume":"8","author":"T Lid\u00e9n","year":"2018","unstructured":"Lid\u00e9n T, Kalinowski T, Waterer H (2018) Resource considerations for integrated planning of railway traffic and maintenance windows. J Rail Transp Plan Manag 8(1):1\u201315. https:\/\/doi.org\/10.1016\/j.jrtpm.2018.02.001","journal-title":"J Rail Transp Plan Manag"},{"issue":"3","key":"232_CR33","doi-asserted-by":"publisher","first-page":"583","DOI":"10.1016\/j.ejor.2013.12.020","volume":"235","author":"I Louwerse","year":"2014","unstructured":"Louwerse I, Huisman D (2014) Adjusting a railway timetable in case of partial or complete blockades. Eur J Oper Res 235(3):583\u2013593. https:\/\/doi.org\/10.1016\/j.ejor.2013.12.020","journal-title":"Eur J Oper Res"},{"key":"232_CR34","doi-asserted-by":"publisher","first-page":"329","DOI":"10.1016\/j.trc.2017.04.010","volume":"80","author":"X Luan","year":"2017","unstructured":"Luan X, Miao J, Meng L, Corman F, Lodewijks G (2017) Integrated optimization on train scheduling and preventive maintenance time slots planning. Transp Res Part C Emerg Technol 80:329\u2013359. https:\/\/doi.org\/10.1016\/j.trc.2017.04.010","journal-title":"Transp Res Part C Emerg Technol"},{"issue":"10","key":"232_CR35","doi-asserted-by":"publisher","first-page":"1474","DOI":"10.1016\/j.trb.2012.07.004","volume":"46","author":"F Peng","year":"2012","unstructured":"Peng F, Ouyang Y (2012) Track maintenance production team scheduling in railroad networks. Transp Res Part B Methodol 46(10):1474\u20131488. https:\/\/doi.org\/10.1016\/j.trb.2012.07.004","journal-title":"Transp Res Part B Methodol"},{"issue":"1\u20132","key":"232_CR36","doi-asserted-by":"publisher","first-page":"129","DOI":"10.1007\/s10107-016-1079-2","volume":"164","author":"M Queyranne","year":"2017","unstructured":"Queyranne M, Wolsey LA (2017) Tight MIP formulations for bounded up\/down times and interval-dependent start-ups. Math Program A 164(1\u20132):129\u2013155. https:\/\/doi.org\/10.1007\/s10107-016-1079-2","journal-title":"Math Program A"},{"key":"232_CR37","unstructured":"Ruffing JA (1993) An analysis of the scheduling of work windows for railroad track maintenance gangs. In: Proceedings of the transportation research forum, vol 35, pp 307\u2013314. http:\/\/trid.trb.org\/view.aspx?id=551772"},{"issue":"1","key":"232_CR38","doi-asserted-by":"publisher","first-page":"139","DOI":"10.1007\/s13676-014-0066-0","volume":"4","author":"M Savelsbergh","year":"2015","unstructured":"Savelsbergh M, Waterer H, Dall M, Moffiet C (2015) Possession assessment and capacity evaluation of the Central Queensland Coal Network. EURO J Transp Logist 4(1):139\u2013173. https:\/\/doi.org\/10.1007\/s13676-014-0066-0","journal-title":"EURO J Transp Logist"},{"key":"232_CR39","doi-asserted-by":"publisher","unstructured":"Serafini P, Ukovich W (1989) A mathematical model for periodic scheduling problems. SIAM J Discrete Math 2(4):32. https:\/\/doi.org\/10.1137\/0402049","DOI":"10.1137\/0402049"},{"key":"232_CR40","doi-asserted-by":"publisher","first-page":"92","DOI":"10.1016\/j.trc.2017.08.018","volume":"84","author":"Z Su","year":"2017","unstructured":"Su Z, Jamshidi A, N\u00fa\u00f1ez A, Baldi S, De Schutter B (2017) Multi-level condition-based maintenance planning for railway infrastructures\u2014a scenario-based chance-constrained approach. Transp Res Part C Emerg Technol 84:92\u2013123. https:\/\/doi.org\/10.1016\/j.trc.2017.08.018","journal-title":"Transp Res Part C Emerg Technol"},{"issue":"5","key":"232_CR41","doi-asserted-by":"publisher","first-page":"686","DOI":"10.3846\/13923730.2013.802711","volume":"20","author":"C Vale","year":"2014","unstructured":"Vale C, Ribeiro IM (2014) Railway condition-based maintenance model with stochastic deterioration. J Civ Eng Manag 20(5):686\u2013692. https:\/\/doi.org\/10.3846\/13923730.2013.802711","journal-title":"J Civ Eng Manag"},{"issue":"1","key":"232_CR42","doi-asserted-by":"publisher","first-page":"123","DOI":"10.1061\/(ASCE)TE.1943-5436.0000296","volume":"138","author":"C Vale","year":"2012","unstructured":"Vale C, Ribeiro IM, Cal\u00e7ada R (2012) Integer programming to optimize tamping in railway tracks as preventive maintenance. J Transp Eng 138(1):123\u2013131. https:\/\/doi.org\/10.1061\/(ASCE)TE.1943-5436.0000296","journal-title":"J Transp Eng"},{"key":"232_CR43","doi-asserted-by":"publisher","first-page":"224","DOI":"10.1016\/j.trb.2016.12.019","volume":"98","author":"S Van Aken","year":"2017","unstructured":"Van Aken S, Be\u0161inovi\u0107 N, Goverde RM (2017a) Designing alternative railway timetables under infrastructure maintenance possessions. Transp Res Part B Methodol 98:224\u2013238. https:\/\/doi.org\/10.1016\/j.trb.2016.12.019","journal-title":"Transp Res Part B Methodol"},{"issue":"3","key":"232_CR44","doi-asserted-by":"publisher","first-page":"141","DOI":"10.1016\/j.jrtpm.2017.06.003","volume":"7","author":"S Van Aken","year":"2017","unstructured":"Van Aken S, Be\u0161inovi\u0107 N, Goverde RM (2017b) Solving large-scale train timetable adjustment problems under infrastructure maintenance possessions. J Rail Transp Plan Manag 7(3):141\u2013156. https:\/\/doi.org\/10.1016\/j.jrtpm.2017.06.003","journal-title":"J Rail Transp Plan Manag"},{"issue":"2","key":"232_CR45","doi-asserted-by":"publisher","first-page":"133","DOI":"10.1287\/inte.1060.0246","volume":"37","author":"JI van Zante-de Fokkert","year":"2007","unstructured":"van Zante-de Fokkert JI, den Hertog D, van den Berg FJ, Verhoeven JHM (2007) The Netherlands schedules track maintenance to improve track workers\u2019 safety. Interfaces 37(2):133\u2013142. https:\/\/doi.org\/10.1287\/inte.1060.0246","journal-title":"Interfaces"},{"issue":"1","key":"232_CR46","doi-asserted-by":"publisher","first-page":"39","DOI":"10.1016\/j.ejor.2015.12.037","volume":"252","author":"P Vansteenwegen","year":"2015","unstructured":"Vansteenwegen P, Dewilde T, Burggraeve S, Cattrysse D (2015) An iterative approach for reducing the impact of infrastructure maintenance on the performance of railway systems. Eur J Oper Res 252(1):39\u201353. https:\/\/doi.org\/10.1016\/j.ejor.2015.12.037","journal-title":"Eur J Oper Res"},{"issue":"3","key":"232_CR47","doi-asserted-by":"publisher","first-page":"841","DOI":"10.1287\/trsc.2015.0618","volume":"50","author":"LP Veelenturf","year":"2016","unstructured":"Veelenturf LP, Kidd MP, Cacchiani V, Kroon LG, Toth P (2016) A railway timetable rescheduling approach for handling large-scale disruptions. Transp Sci 50(3):841\u2013862. https:\/\/doi.org\/10.1287\/trsc.2015.0618","journal-title":"Transp Sci"},{"issue":"2","key":"232_CR48","doi-asserted-by":"publisher","first-page":"455","DOI":"10.1016\/j.ejor.2016.01.024","volume":"252","author":"M Wen","year":"2016","unstructured":"Wen M, Li R, Salling KB (2016) Optimization of preventive condition-based tamping for railway tracks. Eur J Oper Res 252(2):455\u2013465. https:\/\/doi.org\/10.1016\/j.ejor.2016.01.024","journal-title":"Eur J Oper Res"},{"key":"232_CR49","unstructured":"Zhu Y, Goverde RMP, Quaglietta E (2018) Railway timetable rescheduling for multiple simultaneous disruptions. In: CASPT 2018: 14th conference on advanced systems in public transport and TransitData 2018. http:\/\/resolver.tudelft.nl\/uuid:1664b528-4e12-4745-bf87-a798a7e878ef"}],"container-title":["Public Transport"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s12469-020-00232-2.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/article\/10.1007\/s12469-020-00232-2\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s12469-020-00232-2.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2021,4,26]],"date-time":"2021-04-26T00:04:00Z","timestamp":1619395440000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/s12469-020-00232-2"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2020,4,26]]},"references-count":49,"journal-issue":{"issue":"2","published-print":{"date-parts":[[2020,6]]}},"alternative-id":["232"],"URL":"https:\/\/doi.org\/10.1007\/s12469-020-00232-2","relation":{},"ISSN":["1866-749X","1613-7159"],"issn-type":[{"value":"1866-749X","type":"print"},{"value":"1613-7159","type":"electronic"}],"subject":[],"published":{"date-parts":[[2020,4,26]]},"assertion":[{"value":"12 February 2020","order":1,"name":"accepted","label":"Accepted","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"26 April 2020","order":2,"name":"first_online","label":"First Online","group":{"name":"ArticleHistory","label":"Article History"}}]}}