{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,1,15]],"date-time":"2026-01-15T15:06:20Z","timestamp":1768489580120,"version":"3.49.0"},"reference-count":29,"publisher":"Springer Science and Business Media LLC","issue":"3","license":[{"start":{"date-parts":[[2019,3,6]],"date-time":"2019-03-06T00:00:00Z","timestamp":1551830400000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Bus Inf Syst Eng"],"published-print":{"date-parts":[[2019,6]]},"DOI":"10.1007\/s12599-019-00590-7","type":"journal-article","created":{"date-parts":[[2019,3,6]],"date-time":"2019-03-06T10:43:27Z","timestamp":1551869007000},"page":"299-309","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":39,"title":["An Adaptive Scheduling Algorithm for Dynamic Jobs for Dealing with the Flexible Job Shop Scheduling Problem"],"prefix":"10.1007","volume":"61","author":[{"given":"Zhengcai","family":"Cao","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Lijie","family":"Zhou","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Biao","family":"Hu","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Chengran","family":"Lin","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2019,3,6]]},"reference":[{"issue":"2","key":"590_CR1","doi-asserted-by":"publisher","first-page":"525","DOI":"10.1016\/j.ejor.2004.04.020","volume":"165","author":"R Alvarez-Valdesabacc","year":"2005","unstructured":"Alvarez-Valdesabacc R (2005) A heuristic to schedule flexible job-shop in a glass factory. Eur J Oper Res 165(2):525\u2013534","journal-title":"Eur J Oper Res"},{"issue":"4","key":"590_CR2","doi-asserted-by":"publisher","first-page":"1417","DOI":"10.1007\/s11590-013-0669-7","volume":"8","author":"EG Birgin","year":"2014","unstructured":"Birgin EG, Feofiloff P, Fernandes CG, De Melo EL, Oshiro MT, Ronconi DP (2014) A milp model for an extended version of the flexible job shop problem. Optim Lett 8(4):1417\u20131431","journal-title":"Optim Lett"},{"issue":"2","key":"590_CR3","doi-asserted-by":"publisher","first-page":"421","DOI":"10.1016\/j.ejor.2015.06.023","volume":"247","author":"EG Birgin","year":"2015","unstructured":"Birgin EG, Ferreira JE, Ronconi DP (2015) List scheduling and beam search methods for the flexible job shop scheduling problem with sequencing flexibility. Eur J Oper Res 247(2):421\u2013440","journal-title":"Eur J Oper Res"},{"issue":"1","key":"590_CR4","doi-asserted-by":"publisher","first-page":"78","DOI":"10.1016\/S0377-2217(99)00324-0","volume":"127","author":"D Borenstein","year":"2000","unstructured":"Borenstein D (2000) A directed acyclic graph representation of routing manufacturing flexibility. Eur J Oper Res 127(1):78\u201393","journal-title":"Eur J Oper Res"},{"issue":"4","key":"590_CR5","doi-asserted-by":"publisher","first-page":"369","DOI":"10.1007\/BF02238804","volume":"45","author":"P Brucker","year":"1990","unstructured":"Brucker P, Schlie R (1990) Job-shop scheduling with multi-purpose machines. Computing 45(4):369\u2013375","journal-title":"Computing"},{"key":"590_CR6","doi-asserted-by":"publisher","first-page":"1498","DOI":"10.4028\/www.scientific.net\/AMM.496-500.1498","volume":"496\u2013500","author":"Y Cao","year":"2014","unstructured":"Cao Y, Jia LW, Cao S, Bai Y (2014) Visualized modeling and simulation of manufacturing execution system in dynamic job-shop scheduling. Appl Mech Mater 496\u2013500:1498\u20131501","journal-title":"Appl Mech Mater"},{"key":"590_CR7","doi-asserted-by":"crossref","unstructured":"Cao Z, Lin C, Zhou M, Huang R (2017) An improved cuckoo search algorithm for semiconductor final testing scheduling. In: Automation science and engineering (CASE), pp 1040\u20131045","DOI":"10.1109\/COASE.2017.8256241"},{"issue":"1","key":"590_CR8","doi-asserted-by":"publisher","first-page":"17","DOI":"10.1007\/s12599-013-0310-4","volume":"6","author":"A Fink","year":"2014","unstructured":"Fink A, Kliewer N, Mattfeld D, M\u00f6nch L, Rothlauf F, Schryen G, Suhl L, Vo\u00df S (2014) Model-based decision support in manufacturing and service networks. Bus Inf Syst Eng 6(1):17\u201324","journal-title":"Bus Inf Syst Eng"},{"issue":"3","key":"590_CR9","doi-asserted-by":"publisher","first-page":"214","DOI":"10.1007\/s001700200144","volume":"20","author":"PY Gan","year":"2002","unstructured":"Gan PY, Lee KS (2002) Scheduling of flexible-sequenced process plans in a mould manufacturing shop. Int J Adv Manuf Technol 20(3):214\u2013222","journal-title":"Int J Adv Manuf Technol"},{"issue":"2","key":"590_CR10","doi-asserted-by":"publisher","first-page":"117","DOI":"10.1287\/moor.1.2.117","volume":"1","author":"MR Garey","year":"1976","unstructured":"Garey MR, Johnson DS, Sethi R (1976) The complexity of flowshop and jobshop scheduling. Math Oper Res 1(2):117\u2013129","journal-title":"Math Oper Res"},{"issue":"3","key":"590_CR11","doi-asserted-by":"publisher","first-page":"147","DOI":"10.1007\/s12599-017-0470-8","volume":"59","author":"K Hoffmann","year":"2017","unstructured":"Hoffmann K, Buscher U, Neufeld JS, Tamke F (2017) Solving practical railway crew scheduling problems with attendance rates. Bus Inf Syst Eng 59(3):147\u2013159","journal-title":"Bus Inf Syst Eng"},{"key":"590_CR12","doi-asserted-by":"crossref","unstructured":"Kennedy J (2011) Particle swarm optimization. In: Encyclopedia of machine learning. Springer, Berlin, pp 760\u2013766","DOI":"10.1007\/978-0-387-30164-8_630"},{"issue":"6","key":"590_CR13","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1007\/s12599-016-0427-3","volume":"58","author":"S Kriglstein","year":"2016","unstructured":"Kriglstein S, Leitner M, Kabicher-Fuchs S (2016) Evaluation methods in process-aware information systems research with a perspective on human orientation. Bus Inf Syst Eng 58(6):1\u201318","journal-title":"Bus Inf Syst Eng"},{"issue":"7","key":"590_CR14","doi-asserted-by":"publisher","first-page":"1979","DOI":"10.1080\/00207543.2011.561375","volume":"50","author":"S Lee","year":"2012","unstructured":"Lee S, Moon I, Bae H, Kim J (2012) Flexible job-shop scheduling problems with \u2019and\u2019\/\u2019or\u2019 precedence constraints. Int J Prod Res 50(7):1979\u20132001","journal-title":"Int J Prod Res"},{"issue":"6","key":"590_CR15","doi-asserted-by":"publisher","first-page":"1866","DOI":"10.1080\/00207543.2014.965355","volume":"53","author":"Y Li","year":"2015","unstructured":"Li Y (2015) Combined scheduling algorithm for re-entrant batch-processing machines in semiconductor wafer manufacturing. Int J Prod Res 53(6):1866\u20131879","journal-title":"Int J Prod Res"},{"issue":"3","key":"590_CR16","doi-asserted-by":"publisher","first-page":"455","DOI":"10.1002\/asi.20456","volume":"58","author":"H Ma","year":"2010","unstructured":"Ma H (2010) Process-aware information systems: bridging people and software through process technology. J Assoc Inf Sci Technol 58(3):455\u2013456","journal-title":"J Assoc Inf Sci Technol"},{"key":"590_CR17","doi-asserted-by":"crossref","unstructured":"Raileanu S, Borangiu T, Morariu O, Stocklosa O (2014) Ilog-based mixed planning and scheduling system for job-shop manufacturing. In: IEEE international conference on automation, quality and testing, robotics, pp 1\u20136","DOI":"10.1109\/AQTR.2014.6857898"},{"issue":"4","key":"590_CR18","doi-asserted-by":"publisher","first-page":"243","DOI":"10.1007\/s12599-015-0381-5","volume":"57","author":"G Schryen","year":"2015","unstructured":"Schryen G, Rauchecker G, Comes T (2015) Resource planning in disaster response. Bus Inf Syst Eng 57(4):243\u2013259","journal-title":"Bus Inf Syst Eng"},{"issue":"11","key":"590_CR19","doi-asserted-by":"publisher","first-page":"3009","DOI":"10.1109\/TITS.2015.2505323","volume":"17","author":"G Tian","year":"2016","unstructured":"Tian G, Ren Y, Zhou MC (2016) Dual-objective scheduling of rescue vehicles to distinguish forest fires via differential evolution and particle swarm optimization combined algorithm. IEEE Trans Intell Transp Syst 17(11):3009\u20133021","journal-title":"IEEE Trans Intell Transp Syst"},{"issue":"3","key":"590_CR20","doi-asserted-by":"publisher","first-page":"260","DOI":"10.1109\/71.993206","volume":"13","author":"H Topcuouglu","year":"2002","unstructured":"Topcuouglu H, Hariri S, Wu MY (2002) Performance-effective and low-complexity task scheduling for heterogeneous computing. IEEE Trans Parallel Distrib Syst 13(3):260\u2013274","journal-title":"IEEE Trans Parallel Distrib Syst"},{"issue":"2","key":"590_CR21","first-page":"1","volume":"59","author":"MW Ulmer","year":"2017","unstructured":"Ulmer MW, Heilig L, Vo\u00df S (2017) On the value and challenge of real-time information in dynamic dispatching of service vehicles. Bus Inf Syst Eng 59(2):1\u201311","journal-title":"Bus Inf Syst Eng"},{"key":"590_CR22","doi-asserted-by":"crossref","unstructured":"Varvara G (2016) Service architecture for CSP based planning for holonic manufacturing execution systems. In: International conference on exploring services science, pp 403\u2013416","DOI":"10.1007\/978-3-319-32689-4_31"},{"issue":"2","key":"590_CR23","doi-asserted-by":"publisher","first-page":"398","DOI":"10.1016\/j.ejor.2007.06.039","volume":"190","author":"G Vilcota","year":"2008","unstructured":"Vilcota G, Billautb JC (2008) A tabu search and a genetic algorithm for solving a bicriteria general job shop scheduling problem. Eur J Oper Res 190(2):398\u2013411","journal-title":"Eur J Oper Res"},{"key":"590_CR24","doi-asserted-by":"crossref","unstructured":"Wang H, Liu L, Fei Y, Liu T (2014) A collaborative manufacturing execution system oriented to discrete manufacturing enterprises. In: International conference on cooperative design, visualization and engineering, pp 277\u2013285","DOI":"10.1007\/978-3-319-10831-5_40"},{"issue":"3","key":"590_CR25","doi-asserted-by":"publisher","first-page":"353","DOI":"10.1109\/TSM.2015.2439054","volume":"28","author":"HK Wang","year":"2015","unstructured":"Wang HK, Chien CF, Gen M (2015) An algorithm of multi-subpopulation parameters with hybrid estimation of distribution for semiconductor scheduling with constrained waiting time. IEEE Trans Semicond Manuf 28(3):353\u2013366","journal-title":"IEEE Trans Semicond Manuf"},{"issue":"3","key":"590_CR26","doi-asserted-by":"publisher","first-page":"235","DOI":"10.1109\/JAS.2016.7508797","volume":"3","author":"L Wang","year":"2016","unstructured":"Wang L, Wang S, Zheng X, Automation DO, University T (2016) A hybrid estimation of distribution algorithm for unrelated parallel machine scheduling with sequence-dependent setup times. IEEE\/CAA J Autom Sin 3(3):235\u2013246","journal-title":"IEEE\/CAA J Autom Sin"},{"issue":"8","key":"590_CR27","doi-asserted-by":"publisher","first-page":"6676","DOI":"10.1109\/TVT.2017.2674302","volume":"66","author":"G Xie","year":"2017","unstructured":"Xie G, Zeng G, Li Z, Li R, Li K (2017) Adaptive dynamic scheduling on multifunctional mixed-criticality automotive cyber-physical systems. IEEE Trans Veh Technol 66(8):6676\u20136692","journal-title":"IEEE Trans Veh Technol"},{"key":"590_CR28","unstructured":"Zeng J, Jacson S, Lin L, Gustafson J, Hoarau E, Mitchell R (2010) On-demand digital print operations a simulation based case study. Hewlett-Packard. Techchnical, report"},{"key":"590_CR29","first-page":"1","volume":"29","author":"L Zhou","year":"2015","unstructured":"Zhou L, Chen Z, Chen S (2015) An effective detailed operation scheduling in MES based on hybrid genetic algorithm. J Intell Manuf 29:1\u201319","journal-title":"J Intell Manuf"}],"container-title":["Business &amp; Information Systems Engineering"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s12599-019-00590-7.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s12599-019-00590-7\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s12599-019-00590-7.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2024,7,15]],"date-time":"2024-07-15T12:13:13Z","timestamp":1721045593000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s12599-019-00590-7"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2019,3,6]]},"references-count":29,"journal-issue":{"issue":"3","published-print":{"date-parts":[[2019,6]]}},"alternative-id":["590"],"URL":"https:\/\/doi.org\/10.1007\/s12599-019-00590-7","relation":{},"ISSN":["2363-7005","1867-0202"],"issn-type":[{"value":"2363-7005","type":"print"},{"value":"1867-0202","type":"electronic"}],"subject":[],"published":{"date-parts":[[2019,3,6]]},"assertion":[{"value":"1 July 2018","order":1,"name":"received","label":"Received","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"17 December 2018","order":2,"name":"accepted","label":"Accepted","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"6 March 2019","order":3,"name":"first_online","label":"First Online","group":{"name":"ArticleHistory","label":"Article History"}}]}}