{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,5,14]],"date-time":"2026-05-14T11:21:22Z","timestamp":1778757682475,"version":"3.51.4"},"reference-count":24,"publisher":"Springer Science and Business Media LLC","issue":"1","license":[{"start":{"date-parts":[[2014,11,5]],"date-time":"2014-11-05T00:00:00Z","timestamp":1415145600000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["J Ambient Intell Human Comput"],"published-print":{"date-parts":[[2015,2]]},"DOI":"10.1007\/s12652-014-0251-x","type":"journal-article","created":{"date-parts":[[2014,11,4]],"date-time":"2014-11-04T05:20:56Z","timestamp":1415078456000},"page":"57-67","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":35,"title":["CART\u2013BPN approach for estimating cycle time in wafer fabrication"],"prefix":"10.1007","volume":"6","author":[{"given":"Hsin-Chieh","family":"Wu","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Toly","family":"Chen","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2014,11,5]]},"reference":[{"key":"251_CR1","volume-title":"Classification and regression trees","author":"I Breiman","year":"1984","unstructured":"Breiman I, Friedman JH, Olsen RA, Stone CJ (1984) Classification and regression trees. Wadsworth, Pacific Growe"},{"key":"251_CR2","doi-asserted-by":"crossref","unstructured":"Broderick T, Gramacy RB (2010) Treed Gaussian process models for classification. In: Studies in Classification, Data Analysis, and Knowledge Organization, pp 101\u2013108","DOI":"10.1007\/978-3-642-10745-0_10"},{"issue":"1","key":"251_CR3","first-page":"55","volume":"10","author":"P-C Chang","year":"2003","unstructured":"Chang P-C, Hsieh J-C (2003) A neural networks approach for due-date assignment in a wafer fabrication factory. Int J Ind Eng 10(1):55\u201361","journal-title":"Int J Ind Eng"},{"issue":"3","key":"251_CR4","doi-asserted-by":"crossref","first-page":"211","DOI":"10.1016\/S1568-4946(02)00066-2","volume":"2","author":"T Chen","year":"2003","unstructured":"Chen T (2003) A fuzzy back propagation network for output time prediction in a wafer fab. Appl Soft Comput 2(3):211\u2013222","journal-title":"Appl Soft Comput"},{"issue":"3","key":"251_CR5","doi-asserted-by":"crossref","first-page":"271","DOI":"10.1007\/s11063-006-9027-4","volume":"24","author":"T Chen","year":"2006","unstructured":"Chen T (2006) A hybrid SOM-BPN approach to lot output time prediction in a wafer fab. Neural Process Lett 24(3):271\u2013288","journal-title":"Neural Process Lett"},{"key":"251_CR6","doi-asserted-by":"crossref","first-page":"575","DOI":"10.1007\/s00170-006-0741-x","volume":"35","author":"T Chen","year":"2007","unstructured":"Chen T (2007a) A hybrid look-ahead SOM-FBPN and FIR system for wafer lot output time prediction and achievability evaluation. Int J Adv Manuf Technol 35:575\u2013586","journal-title":"Int J Adv Manuf Technol"},{"key":"251_CR7","doi-asserted-by":"crossref","first-page":"55","DOI":"10.1016\/j.aei.2006.10.002","volume":"21","author":"T Chen","year":"2007","unstructured":"Chen T (2007b) An intelligent hybrid system for wafer lot output time prediction. Adv Eng Inform 21:55\u201365","journal-title":"Adv Eng Inform"},{"issue":"7\u20138","key":"251_CR8","doi-asserted-by":"crossref","first-page":"782","DOI":"10.1007\/s00170-007-1007-y","volume":"37","author":"T Chen","year":"2008","unstructured":"Chen T (2008) A SOM-FBPN-ensemble approach with error feedback to adjust classification for wafer-lot completion time prediction. Int J Adv Manuf Technol 37(7\u20138):782\u2013792","journal-title":"Int J Adv Manuf Technol"},{"issue":"8","key":"251_CR9","doi-asserted-by":"crossref","first-page":"889","DOI":"10.1080\/00207720902974553","volume":"40","author":"T Chen","year":"2009","unstructured":"Chen T (2009) A fuzzy-neural knowledge-based system for job completion time prediction and internal due date assignment in a wafer fabrication plant. Int J Syst Sci 40(8):889\u2013902","journal-title":"Int J Syst Sci"},{"key":"251_CR10","doi-asserted-by":"crossref","first-page":"4637","DOI":"10.3390\/su5114637","volume":"5","author":"T Chen","year":"2013","unstructured":"Chen T (2013a) A systematic cycle time reduction procedure for enhancing the competitiveness and sustainability of a semiconductor manufacturer. Sustainability 5:4637\u20134652","journal-title":"Sustainability"},{"key":"251_CR11","doi-asserted-by":"crossref","unstructured":"Chen T (2013b) An effective fuzzy collaborative forecasting approach for predicting the job cycle time in wafer fabrication. Comput Ind Eng (In press)","DOI":"10.1016\/j.cie.2013.09.010"},{"key":"251_CR12","doi-asserted-by":"crossref","unstructured":"Chen T, Wang YC (2012) An iterative procedure for optimizing the performance of the fuzzy-neural job cycle time estimation approach in a wafer fabrication factory. Math Probl Eng (In press)","DOI":"10.1155\/2013\/740478"},{"issue":"2","key":"251_CR13","doi-asserted-by":"crossref","first-page":"202","DOI":"10.1287\/opre.36.2.202","volume":"36","author":"H Chen","year":"1988","unstructured":"Chen H, Harrison JM, Mandelbaum A, Van Ackere A, Wein LM (1988) Empirical evaluation of a queueing network model for semiconductor wafer fabrication. Oper Res 36(2):202\u2013215","journal-title":"Oper Res"},{"key":"251_CR14","doi-asserted-by":"crossref","unstructured":"Chien CF, Hsu CY, Hsiao CW (2011) Manufacturing intelligence to forecast and reduce semiconductor cycle time. J Intell Manuf (In press)","DOI":"10.1007\/s10845-011-0572-y"},{"issue":"3","key":"251_CR15","doi-asserted-by":"crossref","first-page":"1","DOI":"10.4018\/ijfsa.2013070101","volume":"3","author":"A Firoze","year":"2013","unstructured":"Firoze A, Arifin MS, Rahman RM (2013) Bangla user adaptive word Speech recognition: approaches and comparisons. Int J Fuzzy Syst Appl 3(3):1\u201336","journal-title":"Int J Fuzzy Syst Appl"},{"key":"251_CR16","unstructured":"Hecht-Nielson R (1987) Kolmogorov\u2019s mapping neural network existence theorem. In: Proceedings of the First IEEE International Joint Conference on Neural Networks 3, pp 11\u201314"},{"key":"251_CR17","doi-asserted-by":"crossref","unstructured":"Inoue T, Ishii Y, Igarashi K, Takagi H, Muneta T, Imaoka K (2006) Conveyer Belt Model to analyze cycle time conditions in a semiconductor manufacturing line. In: IEEE International Symposium on Semiconductor Manufacturing Conference Proceedings, pp 74\u201377","DOI":"10.1109\/ISSM.2006.4493026"},{"issue":"4","key":"251_CR18","doi-asserted-by":"crossref","first-page":"902","DOI":"10.1017\/S0305004100036094","volume":"57","author":"JFC Kingman","year":"1961","unstructured":"Kingman JFC (1961) The single server queue in heavy traffic. Math Proc Camb Philos Soc 57(4):902\u2013904","journal-title":"Math Proc Camb Philos Soc"},{"issue":"2","key":"251_CR19","doi-asserted-by":"crossref","first-page":"158","DOI":"10.1109\/66.492810","volume":"9","author":"RC Leachman","year":"1996","unstructured":"Leachman RC, Hodges DA (1996) Benchmarking semiconductor manufacturing. IEEE Trans Semicond Manuf 9(2):158\u2013169","journal-title":"IEEE Trans Semicond Manuf"},{"issue":"2","key":"251_CR21","doi-asserted-by":"crossref","first-page":"165","DOI":"10.1109\/TSM.2007.895215","volume":"20","author":"WL Pearn","year":"2007","unstructured":"Pearn WL, Chung SL, Lai CM (2007) Due-date assignment for wafer fabrication under demand variate environment. IEEE Trans Semicond Manuf 20(2):165\u2013175","journal-title":"IEEE Trans Semicond Manuf"},{"key":"251_CR22","unstructured":"Ranganathan A (2004) The Levenberg-Marquardt algorithm. http:\/\/www.scribd.com\/doc\/10093320\/Levenberg-Marquardt-Algorithm . Accessed 28 Feb 2014"},{"issue":"2","key":"251_CR23","doi-asserted-by":"crossref","first-page":"457","DOI":"10.1029\/93WR01494","volume":"30","author":"LL Rogers","year":"1994","unstructured":"Rogers LL, Dowla FU (1994) Optimization of groundwater remediation using artificial neural networks with parallel solute transport modeling. Water Resour Res 30(2):457\u2013481","journal-title":"Water Resour Res"},{"key":"251_CR24","volume-title":"Classification and regression trees","author":"D Steinburg","year":"1997","unstructured":"Steinburg D, Colla P (1997) Classification and regression trees. Salford Systems, San Diego"},{"issue":"2","key":"251_CR25","doi-asserted-by":"crossref","first-page":"156","DOI":"10.1109\/66.136277","volume":"5","author":"LM Wein","year":"1992","unstructured":"Wein LM (1992) On the relationship between yield and cycle time in semiconductor wafer fabrication. IEEE Trans Semicond Manuf 5(2):156\u2013158","journal-title":"IEEE Trans Semicond Manuf"}],"container-title":["Journal of Ambient Intelligence and Humanized Computing"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s12652-014-0251-x.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s12652-014-0251-x\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s12652-014-0251-x","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,8,17]],"date-time":"2019-08-17T00:15:18Z","timestamp":1566000918000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s12652-014-0251-x"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2014,11,5]]},"references-count":24,"journal-issue":{"issue":"1","published-print":{"date-parts":[[2015,2]]}},"alternative-id":["251"],"URL":"https:\/\/doi.org\/10.1007\/s12652-014-0251-x","relation":{},"ISSN":["1868-5137","1868-5145"],"issn-type":[{"value":"1868-5137","type":"print"},{"value":"1868-5145","type":"electronic"}],"subject":[],"published":{"date-parts":[[2014,11,5]]}}}