{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,3,25]],"date-time":"2026-03-25T00:45:35Z","timestamp":1774399535940,"version":"3.50.1"},"reference-count":17,"publisher":"Springer Science and Business Media LLC","issue":"1","license":[{"start":{"date-parts":[[2021,2,18]],"date-time":"2021-02-18T00:00:00Z","timestamp":1613606400000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springer.com\/tdm"},{"start":{"date-parts":[[2021,2,18]],"date-time":"2021-02-18T00:00:00Z","timestamp":1613606400000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["J Ambient Intell Human Comput"],"published-print":{"date-parts":[[2022,1]]},"DOI":"10.1007\/s12652-021-02896-5","type":"journal-article","created":{"date-parts":[[2021,2,19]],"date-time":"2021-02-19T10:10:36Z","timestamp":1613729436000},"page":"201-217","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":8,"title":["Optimal fuzzy repairs\u2019 scheduling and sequencing of failure types over multiple periods"],"prefix":"10.1007","volume":"13","author":[{"ORCID":"https:\/\/orcid.org\/0000-0002-3291-0805","authenticated-orcid":false,"given":"Abbas","family":"Al-Refaie","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"ORCID":"https:\/\/orcid.org\/0000-0002-5431-2048","authenticated-orcid":false,"given":"Ahmad","family":"Al-Hawadi","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2021,2,18]]},"reference":[{"key":"2896_CR1","doi-asserted-by":"publisher","first-page":"261","DOI":"10.1016\/j.ress.2018.11.028","volume":"183","author":"L Boliang","year":"2019","unstructured":"Boliang L, Jianping W, Ruixi L, Jiaxi W, Hui W, Xuhui Z (2019) Optimization of high-level preventive maintenance scheduling for highspeed trains. Reliab Eng Syst Saf 183:261\u2013275. https:\/\/doi.org\/10.1016\/j.ress.2018.11.028","journal-title":"Reliab Eng Syst Saf"},{"issue":"2","key":"2896_CR2","doi-asserted-by":"publisher","first-page":"304","DOI":"10.1109\/TR.2005.845967","volume":"54","author":"R Cassady","year":"2005","unstructured":"Cassady R, Kutanoglu E (2005) Integrating preventive maintenance planning and production scheduling for a single machine. IEEE Trans Reliab 54(2):304\u2013309. https:\/\/doi.org\/10.1109\/TR.2005.845967","journal-title":"IEEE Trans Reliab"},{"issue":"1","key":"2896_CR3","doi-asserted-by":"publisher","first-page":"61","DOI":"10.1080\/00207543.2018.1459923","volume":"57","author":"S Chansombat","year":"2018","unstructured":"Chansombat S, Pongcharoen P, Hicks C (2018) A mixed-integer linear programming model for integrated production and preventive maintenance scheduling in the capital goods industry. Int J Prod Res 57(1):61\u201382. https:\/\/doi.org\/10.1080\/00207543.2018.1459923","journal-title":"Int J Prod Res"},{"issue":"2","key":"2896_CR4","doi-asserted-by":"publisher","first-page":"862","DOI":"10.1109\/TPWRS.2003.811004","volume":"18","author":"MY El-Sharkh","year":"2003","unstructured":"El-Sharkh MY, El-Keib AA (2003) Maintenance scheduling of generation and transmission systems using fuzzy evolutionary programming. IEEE Trans Power Syst 18(2):862\u2013866. https:\/\/doi.org\/10.1109\/TPWRS.2003.811004","journal-title":"IEEE Trans Power Syst"},{"issue":"1","key":"2896_CR5","doi-asserted-by":"publisher","first-page":"294","DOI":"10.1080\/21693277.2019.1620651","volume":"7","author":"A Goli","year":"2019","unstructured":"Goli A, Tirkolaee EB, Soltani M (2019) A robust just-in-time flow shop scheduling problem with outsourcing option on subcontractors. Prod Manuf Res 7(1):294\u2013315. https:\/\/doi.org\/10.1080\/21693277.2019.1620651","journal-title":"Prod Manuf Res"},{"key":"2896_CR6","doi-asserted-by":"publisher","first-page":"106007","DOI":"10.1016\/j.cie.2019.106007","volume":"137","author":"H Golp\u00eera","year":"2019","unstructured":"Golp\u00eera H, Tirkolaee EB (2019) Stable maintenance tasks scheduling: a bi-objective robust optimization model. Comput Ind Eng 137:106007. https:\/\/doi.org\/10.1016\/j.cie.2019.106007","journal-title":"Comput Ind Eng"},{"issue":"5","key":"2896_CR7","doi-asserted-by":"publisher","first-page":"535","DOI":"10.1109\/91.873577","volume":"8","author":"Q Liang","year":"2000","unstructured":"Liang Q, Mendel JM (2000) Interval type-2 fuzzy logic systems: theory and design. IEEE Trans Fuzzy Syst 8(5):535\u2013550. https:\/\/doi.org\/10.1109\/91.873577","journal-title":"IEEE Trans Fuzzy Syst"},{"issue":"11","key":"2896_CR8","doi-asserted-by":"publisher","first-page":"1890","DOI":"10.1080\/0305215X.2017.1280258","volume":"49","author":"W Liao","year":"2017","unstructured":"Liao W, Zhang X, Jiang M (2017) Multi-objective group scheduling optimization integrated with preventive maintenance. Eng Optim 49(11):1890\u20131904. https:\/\/doi.org\/10.1080\/0305215X.2017.1280258","journal-title":"Eng Optim"},{"key":"2896_CR9","doi-asserted-by":"publisher","first-page":"236","DOI":"10.1016\/j.cie.2014.12.017","volume":"80","author":"Z Lu","year":"2014","unstructured":"Lu Z, Cui W, Han X (2014) Integrated production and preventive maintenance scheduling for a single machine with failure uncertainty. Comput Ind Eng 80:236\u2013244. https:\/\/doi.org\/10.1016\/j.cie.2014.12.017","journal-title":"Comput Ind Eng"},{"issue":"7","key":"2896_CR10","doi-asserted-by":"publisher","first-page":"701","DOI":"10.1080\/0305215X.2010.512084","volume":"43","author":"KS Moghaddam","year":"2011","unstructured":"Moghaddam KS, Usher JS (2011) A new multi-objective optimization model for preventive maintenance and replacement scheduling of multi-component systems. Eng Optim 43(7):701\u2013719. https:\/\/doi.org\/10.1080\/0305215X.2010.512084","journal-title":"Eng Optim"},{"issue":"10","key":"2896_CR11","doi-asserted-by":"publisher","first-page":"5151","DOI":"10.1016\/j.jfranklin.2019.05.006","volume":"356","author":"A Mohammadzadeh","year":"2019","unstructured":"Mohammadzadeh A, Kaynak O (2019) A novel general type-2 fuzzy controller for fractional-order multi-agent systems under unknown time-varying topology. J Franklin Inst 356(10):5151\u20135171. https:\/\/doi.org\/10.1016\/j.jfranklin.2019.05.006","journal-title":"J Franklin Inst"},{"issue":"9","key":"2896_CR12","doi-asserted-by":"publisher","first-page":"1940","DOI":"10.1109\/TFUZZ.2019.2928509","volume":"28","author":"A Mohammadzadeh","year":"2020","unstructured":"Mohammadzadeh A, Sabzalian MH, Zhang W (2020) An interval type-3 fuzzy system and a new online fractional-order learning algorithm: theory and practice. IEEE Trans Fuzzy Syst 28(9):1940\u20131950. https:\/\/doi.org\/10.1109\/TFUZZ.2019.2928509","journal-title":"IEEE Trans Fuzzy Syst"},{"issue":"11","key":"2896_CR13","doi-asserted-by":"publisher","first-page":"3314","DOI":"10.1016\/j.cor.2005.12.007","volume":"34","author":"R Ruiz","year":"2007","unstructured":"Ruiz R, Garc\u00eda-D\u00edaz JC, Maroto C (2007) Considering scheduling and preventive maintenance in the flowshop sequencing problem. Comput Oper Res 34(11):3314\u20133330. https:\/\/doi.org\/10.1016\/j.cor.2005.12.007","journal-title":"Comput Oper Res"},{"issue":"6","key":"2896_CR14","doi-asserted-by":"publisher","first-page":"404","DOI":"10.1080\/21681015.2016.1173599","volume":"33","author":"H Seidgar","year":"2016","unstructured":"Seidgar H, Zandieh M, Mahdavi I (2016) Bi-objective optimization for integrating production and preventive maintenance scheduling in two-stage assembly flow shop problem. J Ind Prod Eng 33(6):404\u2013425. https:\/\/doi.org\/10.1080\/21681015.2016.1173599","journal-title":"J Ind Prod Eng"},{"issue":"3","key":"2896_CR15","doi-asserted-by":"publisher","first-page":"241","DOI":"10.1080\/09537287.2012.665094","volume":"25","author":"M Tantardini","year":"2012","unstructured":"Tantardini M, Portioli-Staudacher A, Macchi M (2012) A model for considering the impact of rescheduling planned maintenance activities in a maintenance service contract. Prod Plan Control 25(3):241\u2013259. https:\/\/doi.org\/10.1080\/09537287.2012.665094","journal-title":"Prod Plan Control"},{"key":"2896_CR16","doi-asserted-by":"publisher","DOI":"10.1109\/TFUZZ.2020.2998174","author":"EB Tirkolaee","year":"2020","unstructured":"Tirkolaee EB, Goli A, Weber GW (2020) Fuzzy mathematical programming and self-adaptive artificial fish swarm algorithm for just-in-time energy-aware flow shop scheduling problem with outsourcing option. IEEE Trans Fuzzy Syst. https:\/\/doi.org\/10.1109\/TFUZZ.2020.2998174","journal-title":"IEEE Trans Fuzzy Syst"},{"key":"2896_CR17","doi-asserted-by":"publisher","first-page":"68","DOI":"10.1016\/j.ress.2015.10.013","volume":"46","author":"L Xiao","year":"2016","unstructured":"Xiao L, Song S, Chen X, Coit DW (2016) Joint optimization of production scheduling and machine group preventive maintenance. Reliab Eng Syst Saf 46:68\u201378. https:\/\/doi.org\/10.1016\/j.ress.2015.10.013","journal-title":"Reliab Eng Syst Saf"}],"container-title":["Journal of Ambient Intelligence and Humanized Computing"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s12652-021-02896-5.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/article\/10.1007\/s12652-021-02896-5\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s12652-021-02896-5.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2022,1,31]],"date-time":"2022-01-31T18:46:39Z","timestamp":1643654799000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/s12652-021-02896-5"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2021,2,18]]},"references-count":17,"journal-issue":{"issue":"1","published-print":{"date-parts":[[2022,1]]}},"alternative-id":["2896"],"URL":"https:\/\/doi.org\/10.1007\/s12652-021-02896-5","relation":{},"ISSN":["1868-5137","1868-5145"],"issn-type":[{"value":"1868-5137","type":"print"},{"value":"1868-5145","type":"electronic"}],"subject":[],"published":{"date-parts":[[2021,2,18]]},"assertion":[{"value":"12 June 2020","order":1,"name":"received","label":"Received","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"9 January 2021","order":2,"name":"accepted","label":"Accepted","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"18 February 2021","order":3,"name":"first_online","label":"First Online","group":{"name":"ArticleHistory","label":"Article History"}}]}}