{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,10,5]],"date-time":"2025-10-05T21:54:39Z","timestamp":1759701279218,"version":"3.37.3"},"reference-count":37,"publisher":"Springer Science and Business Media LLC","issue":"1","license":[{"start":{"date-parts":[[2015,7,29]],"date-time":"2015-07-29T00:00:00Z","timestamp":1438128000000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"funder":[{"DOI":"10.13039\/501100002543","name":"Pusan National University","doi-asserted-by":"publisher","id":[{"id":"10.13039\/501100002543","id-type":"DOI","asserted-by":"publisher"}]}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Int. J. Mach. Learn. &amp; Cyber."],"published-print":{"date-parts":[[2016,2]]},"DOI":"10.1007\/s13042-015-0393-y","type":"journal-article","created":{"date-parts":[[2015,7,28]],"date-time":"2015-07-28T12:27:17Z","timestamp":1438086437000},"page":"121-133","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":13,"title":["Retailer\u2019s optimal strategy for fixed lifetime products"],"prefix":"10.1007","volume":"7","author":[{"given":"Biswajit","family":"Sarkar","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Sumon","family":"Sarkar","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Won Young","family":"Yun","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2015,7,29]]},"reference":[{"key":"393_CR1","first-page":"449","volume":"21","author":"PM Ghare","year":"1963","unstructured":"Ghare PM, Schrader GF (1963) A model for exponentially decaying inventory system. Int J Prod Res 21:449\u2013460","journal-title":"Int J Prod Res"},{"key":"393_CR2","doi-asserted-by":"crossref","first-page":"323","DOI":"10.1080\/05695557308974918","volume":"5","author":"RP Covert","year":"1973","unstructured":"Covert RP, Philip GC (1973) An EOQ model for items with Weibull distribution deterioration. AIIE Tran 5:323\u2013326","journal-title":"AIIE Tran"},{"key":"393_CR3","doi-asserted-by":"crossref","first-page":"223","DOI":"10.1016\/S0305-0548(02)00182-X","volume":"31","author":"ZT Balkhi","year":"2004","unstructured":"Balkhi ZT, Benkherouf L (2004) On an inventory model for deteriorating items with stock dependent and time-varying demand rates. Comput Oper Res 31:223\u2013240","journal-title":"Comput Oper Res"},{"key":"393_CR4","doi-asserted-by":"crossref","first-page":"665","DOI":"10.1007\/s00170-006-0744-7","volume":"35","author":"CJ Chung","year":"2007","unstructured":"Chung CJ, Wee HM (2007) Scheduling and replenishment plan for an integrated deteriorating inventory model with stock-dependent selling rate. Int J Adv Manuf Tech 35:665\u2013679","journal-title":"Int J Adv Manuf Tech"},{"key":"393_CR5","doi-asserted-by":"crossref","first-page":"388","DOI":"10.1016\/j.ijpe.2009.11.034","volume":"124","author":"PH Hsu","year":"2010","unstructured":"Hsu PH, Wee HM, Teng HM (2010) Preservation technology investment for deteriorating inventory. Int J Prod Eco 124:388\u2013394","journal-title":"Int J Prod Eco"},{"key":"393_CR6","doi-asserted-by":"crossref","first-page":"1569","DOI":"10.1016\/j.mcm.2011.04.028","volume":"54","author":"GA Widyadana","year":"2011","unstructured":"Widyadana GA, C\u00e1rdenas-Barr\u00f3n LE, Wee HM (2011) Economics order quantity model for deteriorating items with planned backorder level. Math Comput Model 54:1569\u20131575","journal-title":"Math Comput Model"},{"key":"393_CR7","doi-asserted-by":"crossref","first-page":"237","DOI":"10.1080\/0020772131000158500","volume":"34","author":"BC Giri","year":"2003","unstructured":"Giri BC, Jalan AK, Chaudhuri KS (2003) Economic order quantity model with Weibull deterioration distribution, shortage and ramp-type demand. Int J Syst Sci 34:237\u2013243","journal-title":"Int J Syst Sci"},{"key":"393_CR8","doi-asserted-by":"crossref","first-page":"557","DOI":"10.1016\/j.ejor.2004.08.041","volume":"171","author":"S Manna","year":"2006","unstructured":"Manna S, Chaudhuri KS (2006) An EOQ model with ramp type demand rate, time dependent deterioration rate, unit production cost and shortages. Eur J Oper Res 171:557\u2013566","journal-title":"Eur J Oper Res"},{"key":"393_CR9","doi-asserted-by":"crossref","first-page":"185","DOI":"10.1016\/j.amc.2010.05.040","volume":"217","author":"SS Sana","year":"2010","unstructured":"Sana SS (2010) Optimal selling price and lotsize with time varying deterioration and partial backlogging. Appl Math Comput 217:185\u2013194","journal-title":"Appl Math Comput"},{"key":"393_CR10","doi-asserted-by":"crossref","first-page":"1969","DOI":"10.1016\/j.scient.2012.10.040","volume":"19","author":"BK Sett","year":"2012","unstructured":"Sett BK, Sarkar B, Goswami A (2012) A two-warehouse inventory model with increasing demand and time varying deterioration. Sci Iran 19:1969\u20131977","journal-title":"Sci Iran"},{"key":"393_CR11","doi-asserted-by":"crossref","first-page":"367","DOI":"10.1016\/j.mcm.2011.08.009","volume":"55","author":"B Sarkar","year":"2012","unstructured":"Sarkar B (2012) An EOQ model with delay in payments and time varying demand. Math Comput Model 55:367\u2013377","journal-title":"Math Comput Model"},{"key":"393_CR12","doi-asserted-by":"crossref","first-page":"3138","DOI":"10.1016\/j.apm.2012.07.026","volume":"37","author":"B Sarkar","year":"2013","unstructured":"Sarkar B (2013) A production-inventory model with probabilistic deterioration in two echelon supply chain management. Appl Math Model 37:3138\u20133151","journal-title":"Appl Math Model"},{"key":"393_CR13","doi-asserted-by":"crossref","first-page":"245","DOI":"10.1016\/j.econmod.2012.11.019","volume":"31","author":"B Sarkar","year":"2013","unstructured":"Sarkar B, Sarkar M (2013) An economic manufacturing quantity model with probabilistic deterioration in a production system. Eco Model 31:245\u2013252","journal-title":"Eco Model"},{"key":"393_CR14","doi-asserted-by":"crossref","first-page":"289","DOI":"10.1016\/S0925-5273(00)00068-2","volume":"70","author":"LE C\u00e1rdenas-Barr\u00f3n","year":"2001","unstructured":"C\u00e1rdenas-Barr\u00f3n LE (2001) The economic production quantity (EPQ) with shortage derived algebraically. Int J Prod Eco 70:289\u2013292","journal-title":"Int J Prod Eco"},{"key":"393_CR15","doi-asserted-by":"crossref","first-page":"196","DOI":"10.1016\/j.cie.2007.04.008","volume":"53","author":"LE C\u00e1rdenas-Barr\u00f3n","year":"2007","unstructured":"C\u00e1rdenas-Barr\u00f3n LE (2007) On optimal manufacturing batch size with rework process at single-stage production system. Comput Ind Eng 53:196\u2013198","journal-title":"Comput Ind Eng"},{"key":"393_CR16","doi-asserted-by":"crossref","first-page":"758","DOI":"10.1016\/j.cie.2007.07.017","volume":"55","author":"LE C\u00e1rdenas-Barr\u00f3n","year":"2008","unstructured":"C\u00e1rdenas-Barr\u00f3n LE (2008) Optimal manufacturing batch size with rework in a single-stage production system\u2014a simple derivation. Comput Ind Eng 55:758\u2013765","journal-title":"Comput Ind Eng"},{"key":"393_CR17","doi-asserted-by":"crossref","first-page":"1238","DOI":"10.1016\/j.ejor.2008.04.015","volume":"196","author":"LE C\u00e1rdenas-Barr\u00f3n","year":"2009","unstructured":"C\u00e1rdenas-Barr\u00f3n LE (2009a) On optimal batch sizing in a multi-stage production system with rework consideration. Eur J Oper Res 196:1238\u20131244","journal-title":"Eur J Oper Res"},{"key":"393_CR18","doi-asserted-by":"crossref","first-page":"1105","DOI":"10.1016\/j.cie.2009.04.020","volume":"57","author":"LE C\u00e1rdenas-Barr\u00f3n","year":"2009","unstructured":"C\u00e1rdenas-Barr\u00f3n LE (2009) Economic production quantity with rework process at a single-stage manufacturing system with planned backorders. Comput Ind Eng 57:1105\u20131113","journal-title":"Comput Ind Eng"},{"key":"393_CR19","doi-asserted-by":"crossref","first-page":"1642","DOI":"10.1016\/j.apm.2009.09.013","volume":"34","author":"LE C\u00e1rdenas-Barr\u00f3n","year":"2010","unstructured":"C\u00e1rdenas-Barr\u00f3n LE (2010) Optimal order size to take advantage of a one-time discount offer with allowed backorders. Appl Math Model 34:1642\u20131652","journal-title":"Appl Math Model"},{"key":"393_CR20","doi-asserted-by":"crossref","first-page":"2394","DOI":"10.1016\/j.apm.2010.11.053","volume":"35","author":"LE C\u00e1rdenas-Barr\u00f3n","year":"2011","unstructured":"C\u00e1rdenas-Barr\u00f3n LE (2011) The derivation of EOQ\/EPQ inventory models with two backorders costs using analytic geometry and algebra. Appl Math Model 35:2394\u20132407","journal-title":"Appl Math Model"},{"key":"393_CR21","doi-asserted-by":"crossref","first-page":"6338","DOI":"10.1016\/j.apm.2012.02.021","volume":"36","author":"LE C\u00e1rdenas-Barr\u00f3n","year":"2012","unstructured":"C\u00e1rdenas-Barr\u00f3n LE (2012) A complement to a comprehensive note on: an economic order quantity with imperfect quality and quantity discounts. Appl Math Model 36:6338\u20136340","journal-title":"Appl Math Model"},{"key":"393_CR22","doi-asserted-by":"crossref","first-page":"4881","DOI":"10.1016\/j.amc.2011.10.053","volume":"218","author":"B Sarkar","year":"2012","unstructured":"Sarkar B (2012) An inventory model with reliability in an imperfect production process. Appl Math Comput 218:4881\u20134891","journal-title":"Appl Math Comput"},{"key":"393_CR23","doi-asserted-by":"crossref","first-page":"13540","DOI":"10.1016\/j.eswa.2012.07.012","volume":"39","author":"LE C\u00e1rdenas-Barr\u00f3n","year":"2012","unstructured":"C\u00e1rdenas-Barr\u00f3n LE, Taleizadeh AA, Trevi\u00f1o-Garza G (2012) An improved solution to replenishment lot size problem with discontinuous issuing policy and rework, and the multi-delivery policy into economic production lot size problem with partial rework. Exp Syst Appl 39:13540\u201313546","journal-title":"Exp Syst Appl"},{"key":"393_CR24","doi-asserted-by":"crossref","first-page":"264","DOI":"10.1016\/j.omega.2011.06.007","volume":"40","author":"HM Wee","year":"2012","unstructured":"Wee HM, Wang WT (2012) A supplement to the EPQ with partial backordering and phase-dependent backordering rate. Omega 40:264\u2013266","journal-title":"Omega"},{"key":"393_CR25","doi-asserted-by":"crossref","first-page":"630","DOI":"10.1287\/mnsc.1040.0228","volume":"50","author":"A Balakrishnan","year":"2004","unstructured":"Balakrishnan A, Pungburn MS, Stavrulaki E (2004) \u201cStack them high, let\u2019em fly\u201d: lot-sizing policies when inventories stimulate demand. Manag Sci 50:630\u2013644","journal-title":"Manag Sci"},{"key":"393_CR26","doi-asserted-by":"crossref","first-page":"369","DOI":"10.1016\/j.ijpe.2005.01.010","volume":"101","author":"KS Wu","year":"2006","unstructured":"Wu KS, Ouyang LY, Yang CT (2006) An optimal replenishment policy for non-instantaneous deteriorating items with stock-dependent demand and partial backlogging. Int J Prod Econ 101:369\u2013384","journal-title":"Int J Prod Econ"},{"key":"393_CR27","doi-asserted-by":"crossref","first-page":"463","DOI":"10.1016\/j.ejor.2004.05.011","volume":"168","author":"KL Hou","year":"2006","unstructured":"Hou KL (2006) An inventory model for deteriorating items with stock-dependent consumption rate and shortages under inflation and time discounting. Eur J Oper Res 168:463\u2013474","journal-title":"Eur J Oper Res"},{"key":"393_CR28","doi-asserted-by":"crossref","first-page":"259","DOI":"10.1016\/j.ijpe.2006.12.013","volume":"108","author":"HK Alfares","year":"2007","unstructured":"Alfares HK (2007) Inventory model with stock-level dependent demand rate and variable holding cost. Int J Prod Eco 108:259\u2013265","journal-title":"Int J Prod Eco"},{"key":"393_CR29","first-page":"361","volume":"3","author":"B Sarkar","year":"2010","unstructured":"Sarkar B, Sana SS, Chaudhuri KS (2010) A stock-dependent inventory model in an imperfect production process. Int J Proc Manag 3:361\u2013378","journal-title":"Int J Proc Manag"},{"key":"393_CR30","doi-asserted-by":"crossref","first-page":"467","DOI":"10.1504\/IJMOR.2010.033441","volume":"2","author":"B Sarkar","year":"2010","unstructured":"Sarkar B, Sana SS, Chaudhuri KS (2010) Optimal reliability, production lot size and safety stock in an imperfect production system. Int J Math Oper Res 2:467\u2013490","journal-title":"Int J Math Oper Res"},{"key":"393_CR31","first-page":"13543","volume":"38","author":"B Sarkar","year":"2011","unstructured":"Sarkar B, Sana SS, Chaudhuri KS (2011) An imperfect-production process for time varying demand with inflation and time value of money. Exp Syst Appl 38:13543\u201313548","journal-title":"Exp Syst Appl"},{"key":"393_CR32","doi-asserted-by":"crossref","first-page":"548","DOI":"10.1016\/j.econmod.2012.11.045","volume":"31","author":"B Sarkar","year":"2013","unstructured":"Sarkar B, Sarkar S (2013) Variable deterioration and demand\u2014an inventory model. Econ Model 31:548\u2013556","journal-title":"Econ Model"},{"key":"393_CR33","doi-asserted-by":"crossref","first-page":"414","DOI":"10.1016\/j.amc.2014.01.004","volume":"231","author":"B Sarkar","year":"2014","unstructured":"Sarkar B, Mandal P, Sarkar S (2014) An EMQ model with price and time dependent demand under the effect of reliability and inflation. Appl Math Comput 231:414\u2013421","journal-title":"Appl Math Comput"},{"key":"393_CR34","doi-asserted-by":"crossref","first-page":"924","DOI":"10.1016\/j.econmod.2012.09.049","volume":"30","author":"B Sarkar","year":"2013","unstructured":"Sarkar B, Sarkar S (2013) An improved inventory model with partial backlogging, time varying deterioration and stock-dependent demand. Econ Model 30:924\u2013932","journal-title":"Econ Model"},{"key":"393_CR35","first-page":"73","volume":"5","author":"B Sarkar","year":"2015","unstructured":"Sarkar B, Seth BK, Goswami A, Sarkar S (2015) Mitigation of high-tech products with probabilistic deterioration and inflations. Am J Ind Bus Manag 5:73\u201389","journal-title":"Am J Ind Bus Manag"},{"key":"393_CR36","doi-asserted-by":"crossref","first-page":"2636","DOI":"10.1016\/j.jmsy.2014.11.012","volume":"35","author":"B Sarkar","year":"2015","unstructured":"Sarkar B, Mandal B, Sarkar S (2015) Quality improvement and backorder price discount under controllable lead time in an inventory model. J Manuf Syst 35:2636","journal-title":"J Manuf Syst"},{"key":"393_CR37","doi-asserted-by":"crossref","first-page":"204","DOI":"10.1016\/j.ijpe.2013.11.014","volume":"155","author":"B Sarkar","year":"2014","unstructured":"Sarkar B, Moon I (2014) Improved quality, setup cost reduction, and variable backorder costs in an imperfect production process. Int J Prod Econ 155:204\u201313","journal-title":"Int J Prod Econ"}],"container-title":["International Journal of Machine Learning and Cybernetics"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s13042-015-0393-y.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s13042-015-0393-y\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s13042-015-0393-y","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,6,2]],"date-time":"2019-06-02T10:31:19Z","timestamp":1559471479000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s13042-015-0393-y"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2015,7,29]]},"references-count":37,"journal-issue":{"issue":"1","published-print":{"date-parts":[[2016,2]]}},"alternative-id":["393"],"URL":"https:\/\/doi.org\/10.1007\/s13042-015-0393-y","relation":{},"ISSN":["1868-8071","1868-808X"],"issn-type":[{"type":"print","value":"1868-8071"},{"type":"electronic","value":"1868-808X"}],"subject":[],"published":{"date-parts":[[2015,7,29]]}}}