{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,1,5]],"date-time":"2026-01-05T21:46:31Z","timestamp":1767649591944},"reference-count":62,"publisher":"Springer Science and Business Media LLC","issue":"1","license":[{"start":{"date-parts":[[2012,3,1]],"date-time":"2012-03-01T00:00:00Z","timestamp":1330560000000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["Int J Syst Assur Eng Manag"],"published-print":{"date-parts":[[2012,3]]},"DOI":"10.1007\/s13198-012-0092-y","type":"journal-article","created":{"date-parts":[[2012,4,25]],"date-time":"2012-04-25T04:35:48Z","timestamp":1335328548000},"page":"47-63","source":"Crossref","is-referenced-by-count":32,"title":["Advanced model for maintenance management in a continuous improvement cycle: integration into the business strategy"],"prefix":"10.1007","volume":"3","author":[{"given":"Luis","family":"Barber\u00e1","sequence":"first","affiliation":[]},{"given":"Adolfo","family":"Crespo","sequence":"additional","affiliation":[]},{"given":"Pablo","family":"Viveros","sequence":"additional","affiliation":[]},{"given":"Ra\u00fal","family":"Stegmaier","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2012,4,26]]},"reference":[{"issue":"2003","key":"92_CR1","doi-asserted-by":"crossref","first-page":"339","DOI":"10.1016\/S0965-9978(03)00033-4","volume":"34","author":"A Abran","year":"2003","unstructured":"Abran A, Blugione L (2003) A multidimensional performance model for consolidating balanced scorecards. Adv Eng Softw 34(2003):339\u2013349","journal-title":"Adv Eng Softw"},{"issue":"8","key":"92_CR2","doi-asserted-by":"crossref","first-page":"540","DOI":"10.1016\/j.advengsoft.2005.01.007","volume":"36","author":"O Abudayyeh","year":"2005","unstructured":"Abudayyeh O, Khan T, Yehia S, Randolph D (2005) The design and implementation of a maintenance information model for rural municipalities. Adv Eng Softw 36(8):540\u2013548","journal-title":"Adv Eng Softw"},{"key":"92_CR3","doi-asserted-by":"crossref","first-page":"261","DOI":"10.1016\/0378-7206(94)00040-P","volume":"28","author":"NU Ahmed","year":"1995","unstructured":"Ahmed NU (1995) A design and implementation model for life cycle cost management system. Inf Manag 28:261\u2013269","journal-title":"Inf Manag"},{"key":"92_CR4","volume-title":"Management control systems","author":"RN Anthony","year":"1998","unstructured":"Anthony RN (1998) Management control systems, 9th edn. Irwin\/McGraw-Hill, USA","edition":"9"},{"key":"92_CR5","unstructured":"Barber\u00e1 L, Gonz\u00e1lez-Prida V, Parra C, Crespo A (2011) Review and evaluation criteria for software tools supporting the implementation of the RCM methodology. Int J E-Bus Dev 1(1):1\u20138"},{"key":"92_CR6","doi-asserted-by":"crossref","DOI":"10.1007\/978-1-4899-4459-7","volume-title":"Reliability and decision making","author":"RE Barlow","year":"1993","unstructured":"Barlow RE, Clarotti CA, Spizzichino F (1993) Reliability and decision making. Chapman & Hall, London"},{"key":"92_CR7","volume-title":"Logistics engineering and management","author":"BS Blanchard","year":"1998","unstructured":"Blanchard BS (1998) Logistics engineering and management. Prentice-Hall, Upper Saddle River"},{"key":"92_CR8","volume-title":"Maintenance excellence","author":"JD Campbell","year":"2001","unstructured":"Campbell JD, Jardine AKS (2001) Maintenance excellence. Marcel Dekker, New York"},{"issue":"1","key":"92_CR9","doi-asserted-by":"crossref","first-page":"5","DOI":"10.1108\/13552510410526820","volume":"10","author":"C Cholasuke","year":"2004","unstructured":"Cholasuke C, Bhardwa R, Antony J (2004) The status of maintenance management in UK manufacturing organisations: results from a pilot survey. J Qual Maint Eng 10(1):5","journal-title":"J Qual Maint Eng"},{"key":"92_CR10","volume-title":"WebKaizen, better faster cheaper. Problem solving for business","author":"K Cornell","year":"2010","unstructured":"Cornell K (2010) WebKaizen, better faster cheaper. Problem solving for business. Prevail Digital Publishing, Omaha"},{"key":"92_CR11","volume-title":"The maintenance management framework. Models and methods for complex systems maintenance","author":"A Crespo M\u00e1rquez","year":"2007","unstructured":"Crespo MA (2007) The maintenance management framework. Models and methods for complex systems maintenance. Springer, London"},{"key":"92_CR12","doi-asserted-by":"crossref","first-page":"8955","DOI":"10.1016\/j.eswa.2008.11.021","volume":"36","author":"J Andres De","year":"2009","unstructured":"De Andres J, Landajo M, Lorca P (2009) Flexible quantile-based modeling of bivariate financial relationships: the case of ROA ratio. Expert Syst Appl 36:8955\u20138966","journal-title":"Expert Syst Appl"},{"key":"92_CR13","volume-title":"Maintenance system. Planning and control","author":"S Duffuaa","year":"2000","unstructured":"Duffuaa S, Raouf A, Dixon Campbell J (2000) Maintenance system. Planning and control. M\u00e9xico, Limusa"},{"issue":"1","key":"92_CR14","doi-asserted-by":"crossref","first-page":"30","DOI":"10.1016\/S1066-7938(01)00141-5","volume":"9","author":"S Durairaj","year":"2002","unstructured":"Durairaj S, Ong S (2002) Evaluation of life cycle cost analysis methodologies. Corp Environ Strateg 9(1):30\u201339","journal-title":"Corp Environ Strateg"},{"key":"92_CR15","unstructured":"EN 13306:2001 (2001) Maintenance terminology. European Standard. CEN. European Committee for Standardization, Brussels"},{"key":"92_CR16","unstructured":"Fleisher CY, Mahaffy D (1997) A balanced scorecard approach to public relations management assessment. Publ Relat Rev 23(2):117\u2013142"},{"key":"92_CR17","unstructured":"Gonz\u00e1lez V, Barber\u00e1 L, Crespo A (2010) Practical application of a RAMS analysis for the improvement of the warranty management. In: Published in the 1st IFAC workshop on advanced maintenance engineering, services and technology, Lisbon, Portugal"},{"issue":"1","key":"92_CR18","doi-asserted-by":"crossref","first-page":"177","DOI":"10.1016\/S0954-1810(01)00015-2","volume":"15","author":"MA Hassanain","year":"2001","unstructured":"Hassanain MA, Froese TM, Vanier DJ (2001) Development of a maintenance management model based on IAI standards. Artif Intell Eng 15(1):177\u2013193","journal-title":"Artif Intell Eng"},{"key":"92_CR19","doi-asserted-by":"crossref","first-page":"32","DOI":"10.1016\/j.compind.2007.06.003","volume":"59","author":"M Kans","year":"2008","unstructured":"Kans M (2008) An approach for determining the requirements of computerized maintenance management systems. Comput Ind 59:32\u201340","journal-title":"Comput Ind"},{"key":"92_CR20","unstructured":"Kaplan RY, Norton D (1992) The balanced scorecard: measures that drive performance. Harv Bus Rev 70(1): 71\u201379"},{"key":"92_CR21","volume-title":"The balanced scorecard: translating strategy into action","author":"RS Kaplan","year":"1996","unstructured":"Kaplan RS, Norton DP (1996) The balanced scorecard: translating strategy into action. Harvard Business School Press, Boston"},{"key":"92_CR22","unstructured":"Kaplan RY, Norton D (2005) The office of strategy management. Harv Bus Rev 83(10):72"},{"key":"92_CR23","volume-title":"Alignment: using the balanced scorecard to create corporate synergies","author":"R Kaplan","year":"2006","unstructured":"Kaplan R, Norton D (2006) Alignment: using the balanced scorecard to create corporate synergies. Harvard Business School Press, Boston"},{"key":"92_CR24","volume-title":"Maintenance and the industrial organization in strategic maintenance planning","author":"A Kelly","year":"2006","unstructured":"Kelly A (2006) Maintenance and the industrial organization in strategic maintenance planning. Butterworth-Heinemann, UK"},{"key":"92_CR25","first-page":"6","volume-title":"Life cycle costing for design professionals","author":"S Kirk","year":"1996","unstructured":"Kirk S, Dellisola A (1996) Life cycle costing for design professionals. McGraw Hill, New York, pp 6\u201357"},{"key":"92_CR26","doi-asserted-by":"crossref","DOI":"10.1201\/9781420040418","volume-title":"Root cause analysis: improving performance for bottom-line results","author":"RJ Latino","year":"2002","unstructured":"Latino RJ, Latino KC (2002) Root cause analysis: improving performance for bottom-line results, 2nd edn. CRC Press, Boca Raton","edition":"2"},{"key":"92_CR28","doi-asserted-by":"crossref","first-page":"622","DOI":"10.1016\/j.jlp.2010.06.008","volume":"23","author":"D Li","year":"2010","unstructured":"Li D, Gao J (2010) Study and application of reliability-centered maintenance. J Loss Prev Process Ind 23:622\u2013629","journal-title":"J Loss Prev Process Ind"},{"key":"92_CR29","doi-asserted-by":"crossref","unstructured":"L\u00f3pez Campos MA, M\u00e1rquez AC (2009) Review, classification and comparative analysis of maintenance management models. J Autom Mob Robot Intell Syst 3(3)","DOI":"10.3182\/20081205-2-CL-4009.00043"},{"key":"92_CR30","unstructured":"L\u00f3pez Campos MA, G\u00f3mez Fern\u00e1ndez JF, Gonz\u00e1lez D\u00edaz V, Crespo MA (2010a) A new maintenance management model expressed in UML reliability, risk and safety: theory and applications. In: Bri\u0161 GS, Martorell (eds) Taylor & Francis Group, London, ISBN 978-0-415-55509-8"},{"key":"92_CR31","unstructured":"L\u00f3pez Campos MA, G\u00f3mez JF, Gonz\u00e1lez V, Crespo A (2010b) A new maintenance management model expressed in UML. In: Reliability, risk and safety: theory and applications. Taylor & Francis Group, London, ISBN 978-0-415-55509-8"},{"issue":"3","key":"92_CR32","doi-asserted-by":"crossref","first-page":"33","DOI":"10.1016\/S0840-4704(10)60668-0","volume":"11","author":"M Macdonald","year":"1998","unstructured":"Macdonald M (1998) Using the balanced scorecard to align strategy and performance in long-term care. Healthc Manag Forum 11(3):33\u201338","journal-title":"Healthc Manag Forum"},{"key":"92_CR34","doi-asserted-by":"crossref","first-page":"751","DOI":"10.1016\/j.jmatprotec.2005.02.227","volume":"162\u2013163","author":"J Michalska","year":"2005","unstructured":"Michalska J (2005) The usage of the balanced scorecard for the estimation of the enterprise\u2019s effectiveness. J Mater Process Technol 162\u2013163:751\u2013758","journal-title":"J Mater Process Technol"},{"key":"92_CR35","volume-title":"Root cause failure analysis","author":"RK Mobley","year":"1999","unstructured":"Mobley RK (1999) Root cause failure analysis. Butterworth-Heinemann, UK"},{"key":"92_CR36","volume-title":"Reliability-centred maintenance","author":"J Moubray","year":"1997","unstructured":"Moubray J (1997) Reliability-centred maintenance, 2nd edn. Butterworth-Heinemann, Oxford","edition":"2"},{"issue":"4","key":"92_CR37","doi-asserted-by":"crossref","first-page":"287","DOI":"10.1108\/13552510210448504","volume":"8","author":"DNP Murthy","year":"2002","unstructured":"Murthy DNP, Atrens A, Eccleston JA (2002) Strategic maintenance management. J Qual Maint Eng 8(4):287\u2013305","journal-title":"J Qual Maint Eng"},{"key":"92_CR38","unstructured":"Bloom NB (2006) Reliability centered maintenance: implementation made simple. McGraw Hill, New York"},{"issue":"3","key":"92_CR39","doi-asserted-by":"crossref","first-page":"241","DOI":"10.1108\/13552510710780276","volume":"13","author":"Aditya Parida","year":"2007","unstructured":"Parida A, Chattopadhyay G (2007) Development of a multi-criteria hierarchical framework for maintenance performance measurement (MPM). J Qual Maint Eng 13(3):241\u2013258","journal-title":"J Qual Maint Eng"},{"issue":"3","key":"92_CR40","doi-asserted-by":"crossref","first-page":"301","DOI":"10.1016\/0377-2217(92)90062-E","volume":"58","author":"LM Pintelon","year":"1992","unstructured":"Pintelon LM, Gelders LF (1992) Maintenance management decision making. Eur J Oper Res 58(3):301\u2013317","journal-title":"Eur J Oper Res"},{"issue":"1","key":"92_CR41","doi-asserted-by":"crossref","first-page":"59","DOI":"10.1016\/0305-0483(90)90018-5","volume":"18","author":"L Pintelon","year":"1990","unstructured":"Pintelon L, Van Wassenhove L (1990) A maintenance management tool. Omega 18(1):59\u201370","journal-title":"Omega"},{"key":"92_CR42","volume-title":"Competitive advantage","author":"ME Porter","year":"1985","unstructured":"Porter ME (1985) Competitive advantage. The Free Press, New York"},{"issue":"2","key":"92_CR43","doi-asserted-by":"crossref","first-page":"1355","DOI":"10.1108\/13552510610667174","volume":"12","author":"VR Pramod","year":"2006","unstructured":"Pramod VR, Devadasan SR, Muthu S, Jagathyraj VP, Dhakshina Moorthy G (2006) Integrating TPM and QFD for improving quality in maintenance engineering. J Qual Maint Eng 12(2):1355\u20132511","journal-title":"J Qual Maint Eng"},{"issue":"2","key":"92_CR44","doi-asserted-by":"crossref","first-page":"141","DOI":"10.1142\/S0219686706000807","volume":"5","author":"R Prasad Mishra","year":"2006","unstructured":"Prasad MR, Anand D, Kodali R (2006) Development of a framework for world-class maintenance systems. J Adv Manuf Syst 5(2):141\u2013165","journal-title":"J Adv Manuf Syst"},{"key":"92_CR45","doi-asserted-by":"crossref","first-page":"121","DOI":"10.1016\/S0951-8320(98)83005-6","volume":"60","author":"M Rausand","year":"1998","unstructured":"Rausand M (1998) Reability centered maintenance. Reliab Eng Syst Saf 60:121\u2013132","journal-title":"Reliab Eng Syst Saf"},{"issue":"4","key":"92_CR46","doi-asserted-by":"crossref","first-page":"349","DOI":"10.1108\/02656719710170620","volume":"14","author":"J Riis","year":"1997","unstructured":"Riis J, Luxhoj J, Thorsteinsson U (1997) A situational maintenance model. Int J Qual Reliab Manag 14(4):349\u2013366","journal-title":"Int J Qual Reliab Manag"},{"key":"92_CR47","first-page":"175","volume-title":"Consideration of failure diagnosis in conceptual design of mechanical systems. Design theory and methodology","author":"DN Ruff","year":"1993","unstructured":"Ruff DN, Paasch RK (1993) Consideration of failure diagnosis in conceptual design of mechanical systems. Design theory and methodology. ASME, New York, pp 175\u2013187"},{"key":"92_CR48","unstructured":"SAE JA1011 (1999) Evaluation criteria for reliability-centered maintenance (RCM) processes. Society for Automotive Engineers, Agosto"},{"key":"92_CR49","unstructured":"SAE JA1012 (2002)\u2014A guide to the reliability-centered maintenance (RCM) standard"},{"key":"92_CR50","unstructured":"SIS (2001) Official Swedish version of EN 13306:2001"},{"issue":"1","key":"92_CR51","doi-asserted-by":"crossref","first-page":"19","DOI":"10.1108\/13552510710735096","volume":"13","author":"P S\u00f6derholm","year":"2007","unstructured":"S\u00f6derholm P, Holmgren M, Klefsj\u00f6 B (2007) A process view of maintenance and its stakeholders. J Qual Maint Eng 13(1):19\u201332","journal-title":"J Qual Maint Eng"},{"issue":"4","key":"92_CR52","doi-asserted-by":"crossref","first-page":"364","DOI":"10.1108\/13552510710829461","volume":"13","author":"A Tam","year":"2007","unstructured":"Tam A, Price J, Beveridge A (2007) A maintenance optimisation framework in application to optimise power station boiler pressure parts maintenance. J Qual Maint Eng 13(4):364\u2013384","journal-title":"J Qual Maint Eng"},{"issue":"1","key":"92_CR53","doi-asserted-by":"crossref","first-page":"7","DOI":"10.1108\/13552510210420577","volume":"8","author":"A Tsang","year":"2002","unstructured":"Tsang A (2002) Strategic dimensions of maintenance management. J Qual Maint Eng 8(1):7\u201339","journal-title":"J Qual Maint Eng"},{"issue":"7","key":"92_CR54","doi-asserted-by":"crossref","first-page":"691","DOI":"10.1108\/01443579910271674","volume":"19","author":"A Tsang","year":"1999","unstructured":"Tsang A, Jardine A, Kolodny H (1999) Measuring maintenance performance: a holistic approach. Int J Oper Prod Manag 19(7):691\u2013715","journal-title":"Int J Oper Prod Manag"},{"key":"92_CR55","unstructured":"U.S department of Energy (DOE) (1992) Root cause analysis guidance document. Washington, DC"},{"key":"92_CR56","volume-title":"Gestire la manutenzione. Perche e come","author":"F Vagliasindi","year":"1989","unstructured":"Vagliasindi F (1989) Gestire la manutenzione. Perche e come. Franco Angeli, Milano"},{"issue":"3","key":"92_CR57","doi-asserted-by":"crossref","first-page":"189","DOI":"10.1007\/s13198-011-0045-x","volume":"1","author":"A Horenbeek Van","year":"2011","unstructured":"Van Horenbeek A, Pintelon L, Muchiri P (2011) Maintenance optimization models and criteria. Int J Syst Assur Eng Manag 1(3):189\u2013200","journal-title":"Int J Syst Assur Eng Manag"},{"key":"92_CR58","doi-asserted-by":"crossref","first-page":"241","DOI":"10.1016\/0377-2217(94)00261-A","volume":"82","author":"SG Vanneste","year":"1995","unstructured":"Vanneste SG, Van Wassenhove LN (1995) An integrated and structured approach to improve maintenance. Eur J Oper Res 82:241\u2013257","journal-title":"Eur J Oper Res"},{"issue":"1","key":"92_CR59","doi-asserted-by":"crossref","first-page":"299","DOI":"10.1016\/S0925-5273(01)00156-6","volume":"77","author":"G Waeyenbergh","year":"2002","unstructured":"Waeyenbergh G, Pintelon L (2002) Aframework for maintenance concept development. Int J Prod Econ 77(1):299\u2013313","journal-title":"Int J Prod Econ"},{"key":"92_CR60","volume-title":"Development performance indicators for managing maintenance","author":"T Wireman","year":"1998","unstructured":"Wireman T (1998) Development performance indicators for managing maintenance. Industrial Press, NewYork"},{"key":"92_CR61","unstructured":"Woodhouse J (1991) Turning engineers into businessmen. In: 14th national maintenance conference, London"},{"key":"92_CR62","volume-title":"Managing industrial risk","author":"J Woodhouse","year":"1993","unstructured":"Woodhouse J (1993) Managing industrial risk. Chapman Hill Inc, London"},{"key":"92_CR63","doi-asserted-by":"crossref","DOI":"10.1002\/9780470117880","volume-title":"Life cycle reliability engineering","author":"G Yang","year":"2007","unstructured":"Yang G (2007a) Life cycle reliability engineering. Wiley, New Jersey"},{"key":"92_CR64","doi-asserted-by":"crossref","DOI":"10.1002\/9780470117880","volume-title":"Life cycle reliability engineering","author":"Guangbin Yang","year":"2007","unstructured":"Yang G (2007b) Life cycle reliability engineering. Wiley, Hoboken"}],"container-title":["International Journal of System Assurance Engineering and Management"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s13198-012-0092-y.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s13198-012-0092-y\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s13198-012-0092-y","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,6,27]],"date-time":"2019-06-27T18:30:39Z","timestamp":1561660239000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s13198-012-0092-y"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2012,3]]},"references-count":62,"journal-issue":{"issue":"1","published-print":{"date-parts":[[2012,3]]}},"alternative-id":["92"],"URL":"https:\/\/doi.org\/10.1007\/s13198-012-0092-y","relation":{},"ISSN":["0975-6809","0976-4348"],"issn-type":[{"value":"0975-6809","type":"print"},{"value":"0976-4348","type":"electronic"}],"subject":[],"published":{"date-parts":[[2012,3]]}}}