{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,9,15]],"date-time":"2024-09-15T15:36:16Z","timestamp":1726414576690},"reference-count":33,"publisher":"Springer Science and Business Media LLC","issue":"3","license":[{"start":{"date-parts":[[2012,6,8]],"date-time":"2012-06-08T00:00:00Z","timestamp":1339113600000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["Int J Syst Assur Eng Manag"],"published-print":{"date-parts":[[2012,9]]},"DOI":"10.1007\/s13198-012-0108-7","type":"journal-article","created":{"date-parts":[[2012,6,7]],"date-time":"2012-06-07T04:21:56Z","timestamp":1339042916000},"page":"255-265","source":"Crossref","is-referenced-by-count":3,"title":["System assurance of subsea petroleum production systems: a case study mapping factors influencing the sourcing strategy"],"prefix":"10.1007","volume":"3","author":[{"given":"Jorge","family":"Moreno-Trejo","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Rajesh","family":"Kumar","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Tore","family":"Markeset","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2012,6,8]]},"reference":[{"key":"108_CR1","unstructured":"Chopra S, Meindl P (2001) Supply chain management: strategy, planning, and operation. Prentice Hall, Upper Saddle River, NJ, pp 49\u201363"},{"key":"108_CR2","unstructured":"Cousins P, Lamming R, Benn L, Squire B (2008) Strategy supply management, principles, theories and practice. Financial Times\/Prentice Hall, Harlow, pp 28\u201338"},{"key":"108_CR3","doi-asserted-by":"crossref","first-page":"567","DOI":"10.1080\/002075499191698","volume":"37","author":"A Toni De","year":"1999","unstructured":"De Toni A, Nassimbeni G (1999) Buyer-supplier operational practices, sourcing policies and plant performances: results of an empirical research. Int J Prod Res 37:567\u2013619","journal-title":"Int J Prod Res"},{"key":"108_CR4","unstructured":"DNV-OSS-306 (2004) Verification of subsea facilities. Offshore service specification. Det Norske Veritas, Norway"},{"key":"108_CR5","unstructured":"DNV-RP-C205 (2010) Environmental conditions and environmental loads, Recommended practice. Det Norske Veritas, Norway"},{"key":"108_CR6","unstructured":"Energy Institute and Lloyd\u2019s Register (2009) Guidelines for the management of integrity of subsea facilities, England, 39"},{"issue":"6","key":"108_CR7","doi-asserted-by":"crossref","first-page":"602","DOI":"10.1016\/j.indmarman.2004.11.004","volume":"34","author":"LC Giunipero","year":"2005","unstructured":"Giunipero LC, Denslow D, Eltantawy R (2005) Purchasing\/supply chain management flexibility: moving to an entrepreneurial skill set. J Ind Mark Manag 34(6):602\u2013613","journal-title":"J Ind Mark Manag"},{"key":"108_CR8","unstructured":"Hovland E (2007) Evaluation of vessel concepts for subsea operations in northern seas, PhD Thesis No. 43, University of Stavanger, Stavanger, Norway, ISBN: 978-82-7644-335-6, ISSN: 1890-1387"},{"key":"108_CR9","doi-asserted-by":"crossref","first-page":"51","DOI":"10.1016\/j.indmarman.2003.08.010","volume":"33","author":"DJ Ketchen","year":"2004","unstructured":"Ketchen DJ, Giunipero LC (2004) The intersection of strategic management and supply chain management. J Ind Mark Manag 33:51\u201356","journal-title":"J Ind Mark Manag"},{"issue":"4","key":"108_CR10","doi-asserted-by":"crossref","first-page":"272","DOI":"10.1108\/08858620710754531","volume":"22","author":"R Kumar","year":"2007","unstructured":"Kumar R, Markeset T (2007) Development of performance-based service strategies for the oil and gas industry: a case study. J Bus Ind Mark 22(4):272\u2013280","journal-title":"J Bus Ind Mark"},{"issue":"4","key":"108_CR11","doi-asserted-by":"crossref","first-page":"400","DOI":"10.1108\/09564230410552077","volume":"15","author":"R Kumar","year":"2004","unstructured":"Kumar R, Markeset T, Kumar U (2004) Maintenance of machinery negotiation service contracts in business-to-business marketing. Int J Serv Ind Manag 15(4):400\u2013413","journal-title":"Int J Serv Ind Manag"},{"key":"108_CR12","unstructured":"Lysons K, Gillingham M (2003) Purchasing and supply chain management, 6th edn. FT\/Prentice Hall, Harlow, pp 332\u2013335"},{"key":"108_CR13","unstructured":"Mangan J, Lalwani Ch, Butcher T (2008) Global logistics and supply chain management. Wiley, Hoboken, NJ, pp 76-78"},{"issue":"1","key":"108_CR14","doi-asserted-by":"crossref","first-page":"53","DOI":"10.1108\/13552510510589370","volume":"11","author":"T Markeset","year":"2005","unstructured":"Markeset T, Kumar U (2005) Product support strategy: conventional versus functional products. J Qual Maintenance Eng 11(1):53\u201367","journal-title":"J Qual Maintenance Eng"},{"key":"108_CR15","unstructured":"Marsh PDV (1984) Contract negotiation handbook, 2nd edn. Gower, Aldershot, England, pp 230\u2013238"},{"key":"108_CR16","doi-asserted-by":"crossref","unstructured":"McAndrews KL (2011) Consequences of Macondo: a summary of recently proposed and enacted changes to US offshore drilling safety and environmental regulation. SPE143718. In: The proceedings of the SPE Americas E&P health, safety, security and environmental conference, Houston, Texas, USA, March 21\u201323","DOI":"10.2118\/143718-MS"},{"key":"108_CR17","first-page":"16","volume-title":"FACTS: the Norwegian petroleum sector 2011","author":"Ministry of Petroleum and Energy","year":"2011","unstructured":"Ministry of Petroleum and Energy (2011) FACTS: the Norwegian petroleum sector 2011. Ministry of Petroleum and Energy, Oslo, Norway, pp 16\u201325"},{"key":"108_CR18","unstructured":"Mohammad MF (2008) Procurement strategies for the oil and gas industry: to capture changing values and dealing with multi cultural complexity. In: The proceedings of the international conference on construction and building technology (ICCBT2008), Universiti Teknologi MARA (UiTM), Malaysia, 29\u201338"},{"key":"108_CR19","unstructured":"Moreno-Trejo J, Markeset T (2011a) Subsea petroleum production facilities: identifying development challenges. In: The proceedings of the international conference of advances in production management system (APMS2011), Stavanger, Norway, September 26\u201328"},{"key":"108_CR20","unstructured":"Moreno-Trejo J, Markeset T (2011b) Subsea petroleum production facilities: mapping factors influencing the system selection process. In: The proceedings of the international conference of advances in production management system (APMS2011), Stavanger, Norway, September 26\u201328"},{"key":"108_CR21","unstructured":"Moum IO, Laskemoen I (1993) The new business challenge for major suppliers in the offshore oil and gas industry. In: The proceedings of the society of petroleum engineers (SPE1993), Aberdeen, UK, September 07\u201310"},{"issue":"1","key":"108_CR22","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1016\/j.pursup.2005.03.003","volume":"11","author":"BE Olsen","year":"2005","unstructured":"Olsen BE, Haugland SA, Karlsen E, Hus\u00f8y GJ (2005) Governance of complex procurements in the oil and gas industry. J Purch Supply Manag 11(1):1\u201313","journal-title":"J Purch Supply Manag"},{"key":"108_CR23","doi-asserted-by":"crossref","unstructured":"Osmundsen P, S\u00f8rnes T, Toft A (2008) Drilling contracts and incentives. Energy Policy 36(8):3138\u20133144","DOI":"10.1016\/j.enpol.2008.05.003"},{"key":"108_CR24","doi-asserted-by":"crossref","unstructured":"Panesar SS, Markeset T (2008) Industrial service innovation through improved contractual relationship: a case study in maintenance. J Qual Maintenance Eng 14(3):290\u2013305","DOI":"10.1108\/13552510810899481"},{"key":"108_CR25","unstructured":"Panesar SS, Kumar R, Markeset T (2007) Innovation and contracts in business-to-business services. In: The proceedings of the 2nd international conference on operations and supply chain management (OSCM2007), Bangkok, Thailand, May 18\u201320"},{"key":"108_CR26","doi-asserted-by":"crossref","first-page":"707","DOI":"10.1002\/smj.249","volume":"23","author":"L Poppo","year":"2002","unstructured":"Poppo L, Zenger T (2002) Do formal contracts and relational governance function as substitutes or complements? Journal of Strategic Management 23:707\u2013725","journal-title":"Journal of Strategic Management"},{"key":"108_CR27","doi-asserted-by":"crossref","first-page":"635","DOI":"10.1016\/S0377-2217(00)00106-5","volume":"131","author":"DA Serel","year":"2001","unstructured":"Serel DA, Dada M, Moskowitz H (2001) Sourcing decisions with capacity reservation contracts. Eur J Oper Res 131:635\u2013648","journal-title":"Eur J Oper Res"},{"key":"108_CR28","first-page":"71","volume-title":"Negotiating commercial contracts","author":"D Sheridan","year":"1991","unstructured":"Sheridan D (1991) Negotiating commercial contracts. McGraw-Hill, London, p 71"},{"key":"108_CR29","doi-asserted-by":"crossref","unstructured":"Sund KA, Bratvold RB (2008) Integrate operations: how effective is the current relationship between operating companies and suppliers In: The proceedings of SPE intelligent energy conference and exhibition (SPE2008), Amsterdam, The Netherlands, February 25\u201327","DOI":"10.2118\/112180-MS"},{"key":"108_CR30","doi-asserted-by":"crossref","first-page":"55","DOI":"10.1016\/j.pursup.2008.01.005","volume":"14","author":"R Tassabehji","year":"2008","unstructured":"Tassabehji R, Moorhouse A (2008) The changing role of procurement: developing professional effectiveness. J Purch Supply Manag 14:55\u201368","journal-title":"J Purch Supply Manag"},{"issue":"1","key":"108_CR31","first-page":"19","volume":"23","author":"M Treleven","year":"1987","unstructured":"Treleven M (1987) Single sourcing: a management tool for the quality supplier. J Purch Mater Manag 23(1):19\u201324","journal-title":"J Purch Mater Manag"},{"key":"108_CR32","volume-title":"Purchasing and supply chain management: analysis, planning and practice","author":"AJ Weele van","year":"2000","unstructured":"van Weele AJ (2000) Purchasing and supply chain management: analysis, planning and practice, 2nd edn. Business press, Thomson","edition":"2"},{"key":"108_CR33","volume-title":"The North Sea contracting industry\u2014key issues and companies","author":"PJC Wright","year":"1996","unstructured":"Wright PJC (1996) The North Sea contracting industry\u2014key issues and companies. Financial Times Energy, London"}],"container-title":["International Journal of System Assurance Engineering and Management"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s13198-012-0108-7.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s13198-012-0108-7\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s13198-012-0108-7","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,6,29]],"date-time":"2019-06-29T13:45:17Z","timestamp":1561815917000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s13198-012-0108-7"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2012,6,8]]},"references-count":33,"journal-issue":{"issue":"3","published-print":{"date-parts":[[2012,9]]}},"alternative-id":["108"],"URL":"https:\/\/doi.org\/10.1007\/s13198-012-0108-7","relation":{},"ISSN":["0975-6809","0976-4348"],"issn-type":[{"type":"print","value":"0975-6809"},{"type":"electronic","value":"0976-4348"}],"subject":[],"published":{"date-parts":[[2012,6,8]]}}}