{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,2,25]],"date-time":"2026-02-25T13:54:45Z","timestamp":1772027685751,"version":"3.50.1"},"reference-count":55,"publisher":"Springer Science and Business Media LLC","issue":"3","license":[{"start":{"date-parts":[[2013,8,6]],"date-time":"2013-08-06T00:00:00Z","timestamp":1375747200000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["Int J Syst Assur Eng Manag"],"published-print":{"date-parts":[[2014,9]]},"DOI":"10.1007\/s13198-013-0183-4","type":"journal-article","created":{"date-parts":[[2013,8,5]],"date-time":"2013-08-05T08:38:29Z","timestamp":1375691909000},"page":"407-426","source":"Crossref","is-referenced-by-count":18,"title":["A novel approach for production scheduling of a high pressure die casting machine subjected to selective maintenance and a sampling procedure for quality control"],"prefix":"10.1007","volume":"5","author":[{"given":"Pravin P.","family":"Tambe","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Makarand S.","family":"Kulkarni","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2013,8,6]]},"reference":[{"issue":"7","key":"183_CR1","doi-asserted-by":"crossref","first-page":"1753","DOI":"10.1080\/00207540701636348","volume":"47","author":"S Batun","year":"2009","unstructured":"Batun S, Azizoglu M (2009) Single machine scheduling with preventive maintenances. Int J Prod Res 47(7):1753\u20131771","journal-title":"Int J Prod Res"},{"key":"183_CR2","first-page":"491","volume":"31","author":"M Ben-Daya","year":"1999","unstructured":"Ben-Daya M (1999) Integrated production maintenance and quality model for imperfect processes. IIE Trans 31:491\u2013501","journal-title":"IIE Trans"},{"issue":"1","key":"183_CR3","doi-asserted-by":"crossref","first-page":"1355","DOI":"10.1108\/13552519510083110","volume":"1","author":"M Ben-Daya","year":"1995","unstructured":"Ben-Daya M, Duffuaa SO (1995) Maintenance and quality: the missing link. J Qual Maint Eng 1(1):1355\u20132511","journal-title":"J Qual Maint Eng"},{"key":"183_CR4","doi-asserted-by":"crossref","unstructured":"Ben-Daya M, Duffuaa SO (2003) Integration of Taguchi\u2019s loss function approach in the economic design of $$ \\bar{x} $$ x \u00af -chart. Int J Qual Reliab Manage 20 (5): 607\u2013619","DOI":"10.1108\/02656710310476552"},{"key":"183_CR5","doi-asserted-by":"crossref","unstructured":"Ben-Daya M, Rahim MA (2000) Effect of maintenance on the economic design of $$ \\bar{x} $$ x \u00af -control chart. Eur J Oper Res 120 (1): 131\u2013143","DOI":"10.1016\/S0377-2217(98)00379-8"},{"key":"183_CR6","doi-asserted-by":"crossref","first-page":"503","DOI":"10.1080\/07408170304416","volume":"35","author":"CR Cassady","year":"2003","unstructured":"Cassady CR, Kutanoglu E (2003) Minimizing job tardiness using integrated preventive maintenance planning and production scheduling. IIE Trans 35:503\u2013513","journal-title":"IIE Trans"},{"issue":"2","key":"183_CR7","doi-asserted-by":"crossref","first-page":"304","DOI":"10.1109\/TR.2005.845967","volume":"54","author":"CR Cassady","year":"2005","unstructured":"Cassady CR, Kutanoglu E (2005) Integrating preventive maintenance planning and production scheduling for a single machine. IEEE Trans Reliab 54(2):304\u2013309","journal-title":"IEEE Trans Reliab"},{"issue":"6","key":"183_CR8","doi-asserted-by":"crossref","first-page":"471","DOI":"10.1023\/A:1007693017671","volume":"32","author":"CR Cassady","year":"2000","unstructured":"Cassady CR, Bowden RO, Liew L, Pohl EA (2000) Combining preventive maintenance and statistical process control: a preliminary investigation. IIE Trans 32(6):471\u2013478","journal-title":"IIE Trans"},{"key":"183_CR9","unstructured":"Chen W, Yu F, Guh R, Lin Y (2011) Economic design of $$ \\bar{x} $$ x \u00af -control charts under preventive maintenance and Taguchi loss functions. J Appl Oper Res 3 (2): 103\u2013109"},{"key":"183_CR10","unstructured":"Chiu HN, Huang BS (1996) The economic design of $$ \\bar{x} $$ x \u00af -control chart under preventive maintenance policy. J Qual Maint Eng 13 (1): 61\u201371"},{"key":"183_CR11","volume-title":"An introduction to reliability and maintainability engineering","author":"CE Ebeling","year":"2010","unstructured":"Ebeling CE (2010) An introduction to reliability and maintainability engineering. Tata McGraw-Hill Education Private Limited, New Delhi"},{"key":"183_CR12","doi-asserted-by":"crossref","first-page":"17","DOI":"10.1007\/s13198-010-0002-0","volume":"1","author":"X Gao","year":"2010","unstructured":"Gao X, Barabady J, Markeset T (2010) Criticality analysis of a production facility using cost importance measures. Int J Syst Assur Eng Manage 1:17\u201323","journal-title":"Int J Syst Assur Eng Manage"},{"issue":"1","key":"183_CR13","doi-asserted-by":"crossref","first-page":"74","DOI":"10.1108\/13552511311304492","volume":"19","author":"A Gustafson","year":"2013","unstructured":"Gustafson A, Schunnesson H, Galar D, Kumar U (2013) Production and maintenance performance analysis: manual versus semi-automatic LHDs. J Qual Maint Eng 19(1):74\u201388","journal-title":"J Qual Maint Eng"},{"issue":"1","key":"183_CR14","first-page":"21","volume":"10","author":"LA Hadidi","year":"2012","unstructured":"Hadidi LA, Al-Turki UM, Rahim A (2012) Integrated models in production planning and scheduling, maintenance and quality: a review. Int J Ind Sys Eng 10(1):21\u201350","journal-title":"Int J Ind Sys Eng"},{"key":"183_CR15","doi-asserted-by":"crossref","first-page":"97","DOI":"10.1007\/s00170-012-4309-7","volume":"66","author":"AZ Hamadani","year":"2013","unstructured":"Hamadani AZ, Khorshidi HA (2013) System reliability optimization using time value of money. Int J Adv Manuf Technol 66:97\u2013106","journal-title":"Int J Adv Manuf Technol"},{"key":"183_CR16","doi-asserted-by":"crossref","first-page":"253","DOI":"10.1016\/j.ejor.2012.04.019","volume":"222","author":"LL Ho","year":"2012","unstructured":"Ho LL, Quinino RC (2012) Integrating on-line process control and imperfect corrective maintenance: an economical design. Eur J Oper Res 222:253\u2013262","journal-title":"Eur J Oper Res"},{"issue":"1","key":"183_CR17","doi-asserted-by":"crossref","first-page":"26","DOI":"10.1504\/IJMME.2011.041447","volume":"3","author":"SH Hoseinie","year":"2011","unstructured":"Hoseinie SH, Khalokakaie R, Ataei M, Kumar U (2011) Reliability-based maintenance scheduling of haulage system of drum shearer. Int J Min Miner Eng 3(1):26\u201337","journal-title":"Int J Min Miner Eng"},{"issue":"6","key":"183_CR18","doi-asserted-by":"crossref","first-page":"1764","DOI":"10.1016\/j.cor.2005.05.034","volume":"34","author":"M Ji","year":"2007","unstructured":"Ji M, He Y, Cheng T (2007) Single-machine scheduling with periodic maintenance to minimize makespan. Comput Oper Res 34(6):1764\u20131770","journal-title":"Comput Oper Res"},{"key":"183_CR19","doi-asserted-by":"crossref","first-page":"827","DOI":"10.1016\/j.cor.2006.04.010","volume":"35","author":"I Kacem","year":"2008","unstructured":"Kacem I, Chu C, Souissi A (2008) Single-machine scheduling with an availability constraint to minimize the weighted sum of the completion times. Comput Oper Res 35:827\u2013844","journal-title":"Comput Oper Res"},{"key":"183_CR20","doi-asserted-by":"crossref","first-page":"183","DOI":"10.1016\/0377-2217(88)90329-3","volume":"37","author":"M Kijima","year":"1988","unstructured":"Kijima M, Morimura H, Suzuki Y (1988) Periodical replacement problem without assuming minimal repair. Eur J Oper Res 37:183\u2013186","journal-title":"Eur J Oper Res"},{"issue":"4598","key":"183_CR21","doi-asserted-by":"crossref","first-page":"671","DOI":"10.1126\/science.220.4598.671","volume":"220","author":"S Kirkpatrick","year":"1983","unstructured":"Kirkpatrick S, Gelatt CD Jr, Vecchi MP (1983) Optimization by simulated annealing. Science 220(4598):671\u2013680","journal-title":"Science"},{"key":"183_CR22","doi-asserted-by":"crossref","first-page":"375","DOI":"10.1007\/BF01178778","volume":"29","author":"CY Lee","year":"1992","unstructured":"Lee CY, Liman SD (1992) Single machine flow-time scheduling with scheduled maintenance. Acta Inform 29:375\u2013382","journal-title":"Acta Inform"},{"issue":"4","key":"183_CR23","doi-asserted-by":"crossref","first-page":"581","DOI":"10.1080\/08982110108918688","volume":"13","author":"BH Lee","year":"2001","unstructured":"Lee BH, Rahim MA (2001) An integrated economic design model for quality control, replacement and maintenance. Qual Eng 13(4):581\u2013593","journal-title":"Qual Eng"},{"issue":"4","key":"183_CR24","doi-asserted-by":"crossref","first-page":"541","DOI":"10.1016\/j.orl.2006.08.005","volume":"35","author":"CY Lee","year":"2007","unstructured":"Lee CY, Yu G (2007) Single machine scheduling under potential disruption. Oper Res Lett 35(4):541\u2013548","journal-title":"Oper Res Lett"},{"key":"183_CR25","doi-asserted-by":"crossref","first-page":"324","DOI":"10.1016\/j.ejor.2003.11.026","volume":"164","author":"K Linderman","year":"2005","unstructured":"Linderman K, McKone-Sweet KE, Anderson JC (2005) An integrated systems approach to process control and maintenance. Eur J Oper Res 164:324\u2013340","journal-title":"Eur J Oper Res"},{"issue":"1","key":"183_CR26","doi-asserted-by":"crossref","first-page":"3","DOI":"10.1080\/00401706.1986.10488092","volume":"28","author":"TJ Lorenzen","year":"1986","unstructured":"Lorenzen TJ, Vance LC (1986) The economic design of control charts: a unified approach. Technometrics 28(1):3\u201310","journal-title":"Technometrics"},{"key":"183_CR27","doi-asserted-by":"crossref","first-page":"334","DOI":"10.1016\/j.apm.2009.04.014","volume":"34","author":"C Low","year":"2010","unstructured":"Low C, Ji M, Hsu CJ, Su CT (2010) Minimizing the makespan in a single machine scheduling problems with flexible and periodic maintenance. App Math Model 34:334\u2013342","journal-title":"App Math Model"},{"key":"183_CR28","doi-asserted-by":"crossref","first-page":"644","DOI":"10.1016\/j.ress.2008.07.004","volume":"94","author":"KB Marais","year":"2009","unstructured":"Marais KB, Saleh JH (2009) Beyond its cost, the value of maintenance: an analytical framework for capturing its net present value. Eng Syst Saf 94:644\u2013657","journal-title":"Eng Syst Saf"},{"key":"183_CR29","doi-asserted-by":"crossref","first-page":"1245","DOI":"10.1016\/j.cie.2011.07.017","volume":"61","author":"Z Mehrafrooz","year":"2011","unstructured":"Mehrafrooz Z, Noorossana R (2011) An integrated model based on statistical process control and maintenance. Comput Ind Eng 61:1245\u20131255","journal-title":"Comput Ind Eng"},{"key":"183_CR30","volume-title":"Introduction to statistical quality control","author":"DC Montgomery","year":"2002","unstructured":"Montgomery DC (2002) Introduction to statistical quality control, 4th edn. Wiley, New Delhi","edition":"4"},{"key":"183_CR31","doi-asserted-by":"crossref","first-page":"619","DOI":"10.1016\/j.camwa.2008.11.008","volume":"57","author":"G Mosheiov","year":"2009","unstructured":"Mosheiov G, Sarig A (2009) Scheduling a maintenance activity to minimize total weighted completion-time. Comput Math Appl 57:619\u2013623","journal-title":"Comput Math Appl"},{"issue":"1","key":"183_CR32","doi-asserted-by":"crossref","first-page":"17","DOI":"10.1108\/09544789910246589","volume":"11","author":"A Ollila","year":"1999","unstructured":"Ollila A, Malmipuro M (1999) Maintenance has a role in quality. TQM Mag 11(1):17\u201321","journal-title":"TQM Mag"},{"key":"183_CR33","doi-asserted-by":"crossref","first-page":"365","DOI":"10.1007\/s00170-009-2514-9","volume":"50","author":"E Pan","year":"2010","unstructured":"Pan E, Liao W, Xi L (2010) Single-machine-based production scheduling model integrated preventive maintenance planning. Int J Adv Manuf Technol 50:365\u2013375","journal-title":"Int J Adv Manuf Technol"},{"key":"183_CR34","doi-asserted-by":"crossref","first-page":"732","DOI":"10.1016\/j.ress.2008.07.003","volume":"94","author":"S Panagiotidou","year":"2009","unstructured":"Panagiotidou S, Nenes G (2009) An economically designed, integrated quality and maintenance model using an adaptive Shewhart chart. Reliab Eng Syst Saf 94:732\u2013741","journal-title":"Reliab Eng Syst Saf"},{"issue":"2","key":"183_CR35","doi-asserted-by":"crossref","first-page":"156","DOI":"10.1111\/j.1937-5956.2009.01073.x","volume":"19","author":"S Panagiotidou","year":"2010","unstructured":"Panagiotidou S, Tagaras G (2010) Statistical process control and condition-based maintenance: a meaningful relationship through data sharing. Prod Oper Manage 19(2):156\u2013171","journal-title":"Prod Oper Manage"},{"key":"183_CR36","doi-asserted-by":"crossref","first-page":"58","DOI":"10.1016\/j.ress.2012.03.019","volume":"104","author":"S Panagiotidou","year":"2012","unstructured":"Panagiotidou S, Tagaras G (2012) Optimal integrated process control and maintenance under general deterioration. Reliab Eng Syst Saf 104:58\u201370","journal-title":"Reliab Eng Syst Saf"},{"issue":"1\/2","key":"183_CR37","first-page":"1","volume":"2","author":"D Pandey","year":"2010","unstructured":"Pandey D, Kulkarni MS, Vrat P (2010) Joint consideration of production scheduling, maintenance and quality policies: a review and conceptual framework. Int J Adv Oper Manage 2(1\/2):1\u201324","journal-title":"Int J Adv Oper Manage"},{"issue":"4","key":"183_CR38","doi-asserted-by":"crossref","first-page":"1098","DOI":"10.1016\/j.cie.2011.06.023","volume":"61","author":"D Pandey","year":"2011","unstructured":"Pandey D, Kulkarni MS, Vrat P (2011) A methodology for joint optimization for maintenance planning, process quality and production scheduling. Comput Ind Eng 61(4):1098\u20131106","journal-title":"Comput Ind Eng"},{"issue":"7","key":"183_CR39","doi-asserted-by":"crossref","first-page":"2030","DOI":"10.1080\/00207543.2011.561882","volume":"50","author":"D Pandey","year":"2012","unstructured":"Pandey D, Kulkarni MS, Vrat P (2012) A methodology for simultaneous optimization of design parameters for the preventive maintenance and quality policy incorporating Taguchi loss function. Int J Prod Res 50(7):2030\u20132045","journal-title":"Int J Prod Res"},{"key":"183_CR40","doi-asserted-by":"crossref","first-page":"1071","DOI":"10.1057\/palgrave.jors.2600791","volume":"50","author":"X Qi","year":"1999","unstructured":"Qi X, Chen T, Tu F (1999) Scheduling the maintenance on a single machine. J Oper Res Soc 50:1071\u20131078","journal-title":"J Oper Res Soc"},{"key":"183_CR41","doi-asserted-by":"crossref","unstructured":"Rahim MA, Banerjee PK (1993) A generalized model for the economic design of $$ \\bar{x} $$ x \u00af -control charts for production systems with increasing failure rate and early replacement. Nav Res Logist 40 (6): 789\u2013809","DOI":"10.1002\/1520-6750(199310)40:6<787::AID-NAV3220400605>3.0.CO;2-4"},{"issue":"9","key":"183_CR42","doi-asserted-by":"crossref","first-page":"795","DOI":"10.1007\/s002360050143","volume":"35","author":"E Sanlaville","year":"1998","unstructured":"Sanlaville E, Schmidt G (1998) Machine scheduling with availability constraints. Acta Inform 35(9):795\u2013811","journal-title":"Acta Inform"},{"issue":"1","key":"183_CR43","doi-asserted-by":"crossref","first-page":"49","DOI":"10.1108\/13552510710735113","volume":"13","author":"N Sortrakul","year":"2007","unstructured":"Sortrakul N, Cassady CR (2007) Genetic algorithms for total weighted expected tardiness integrated preventive maintenance planning and production scheduling for a single machine. J Qual Maint Eng 13(1):49\u201361","journal-title":"J Qual Maint Eng"},{"key":"183_CR44","doi-asserted-by":"crossref","DOI":"10.1201\/9781420044218","volume-title":"Production planning and industrial scheduling","author":"DR Sule","year":"2007","unstructured":"Sule DR (2007) Production planning and industrial scheduling, 2nd edn. CRC Press, Boca Raton","edition":"2"},{"issue":"8","key":"183_CR45","doi-asserted-by":"crossref","first-page":"757","DOI":"10.1057\/jors.1988.131","volume":"39","author":"G Tagaras","year":"1988","unstructured":"Tagaras G (1988) An integrated cost model for the joint optimization of the process control and maintenance. J Oper Res Soc 39(8):757\u2013766","journal-title":"J Oper Res Soc"},{"key":"183_CR46","doi-asserted-by":"crossref","first-page":"399","DOI":"10.1007\/s00170-006-0593-4","volume":"34","author":"ASB Tam","year":"2007","unstructured":"Tam ASB, Chan WM, Price JWH (2007) Maintenance scheduling to support the operation of manufacturing and production assets. Int J Adv Manuf Technol 34:399\u2013405","journal-title":"Int J Adv Manuf Technol"},{"issue":"3","key":"183_CR47","doi-asserted-by":"crossref","first-page":"239","DOI":"10.1007\/s13198-011-0044-y","volume":"1","author":"AK Verma","year":"2010","unstructured":"Verma AK, Srividya A, Ramesh PG (2010) A systems approach to integrated E-maintenance of large engineering plants. Int J Syst Assur Eng Manage 1(3):239\u2013245","journal-title":"Int J Syst Assur Eng Manage"},{"issue":"3","key":"183_CR48","doi-asserted-by":"crossref","first-page":"847","DOI":"10.1080\/00207543.2012.676683","volume":"51","author":"S Wang","year":"2013","unstructured":"Wang S, Liu M (2013) A branch and bound algorithm for single-machine production scheduling integrated with preventive maintenance planning. Int J Prod Res 51(3):847\u2013868","journal-title":"Int J Prod Res"},{"key":"183_CR49","doi-asserted-by":"crossref","first-page":"183","DOI":"10.1007\/s10479-004-5032-z","volume":"133","author":"G Wang","year":"2005","unstructured":"Wang G, Sun H, Chu C (2005) Preemptive scheduling with availability constraints to minimize total weighted completion times. Ann Oper Res 133:183\u2013192","journal-title":"Ann Oper Res"},{"issue":"3","key":"183_CR50","doi-asserted-by":"crossref","first-page":"883","DOI":"10.1080\/00207543.2012.677070","volume":"51","author":"CS Wong","year":"2013","unstructured":"Wong CS, Chan FTS, Chung SH (2013) A joint production scheduling approach considering multiple resources and preventive maintenance tasks. Int J Prod Res 51(3):883\u2013896","journal-title":"Int J Prod Res"},{"key":"183_CR51","doi-asserted-by":"crossref","first-page":"167","DOI":"10.1016\/S0951-8320(02)00044-3","volume":"77","author":"M Yanez","year":"2002","unstructured":"Yanez M, Joglar F, Modarres M (2002) Generalized renewal process for analysis of repairable systems with limited failure experience. Reliab Eng Syst Saf 77:167\u2013180","journal-title":"Reliab Eng Syst Saf"},{"issue":"9\u201310","key":"183_CR52","doi-asserted-by":"crossref","first-page":"954","DOI":"10.1007\/s00170-007-1268-5","volume":"39","author":"J Yulan","year":"2008","unstructured":"Yulan J, Zuhua J, Wenrui H (2008) Multi-objective integrated optimization research on preventive maintenance planning and production scheduling for a single machine. Int J Adv Manuf Technol 39(9\u201310):954\u2013964","journal-title":"Int J Adv Manuf Technol"},{"key":"183_CR53","doi-asserted-by":"crossref","first-page":"203","DOI":"10.1002\/qre.645","volume":"21","author":"T Zhang","year":"2005","unstructured":"Zhang T, Nakamura M (2005) Reliability-based optimal maintenance scheduling by considering maintenance effect to reduce cost. Qual Reliab Eng Int 21:203\u2013220","journal-title":"Qual Reliab Eng Int"},{"key":"183_CR54","doi-asserted-by":"crossref","first-page":"1389","DOI":"10.1016\/j.mcm.2007.09.008","volume":"47","author":"W Zhou","year":"2008","unstructured":"Zhou W, Zhu G (2008) Economic design of integrated model of control chart and maintenance management. Math Comput Model 47:1389\u20131395","journal-title":"Math Comput Model"},{"key":"183_CR55","doi-asserted-by":"crossref","first-page":"14","DOI":"10.1016\/j.ress.2012.01.005","volume":"101","author":"X Zhou","year":"2012","unstructured":"Zhou X, Lu Z, Xi L (2012) Preventive maintenance optimization for a multi-component system under changing job shop schedule. Reliab Eng Syst Saf 101:14\u201320","journal-title":"Reliab Eng Syst Saf"}],"container-title":["International Journal of System Assurance Engineering and Management"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s13198-013-0183-4.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s13198-013-0183-4\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s13198-013-0183-4","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,7,20]],"date-time":"2019-07-20T10:42:43Z","timestamp":1563619363000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s13198-013-0183-4"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2013,8,6]]},"references-count":55,"journal-issue":{"issue":"3","published-print":{"date-parts":[[2014,9]]}},"alternative-id":["183"],"URL":"https:\/\/doi.org\/10.1007\/s13198-013-0183-4","relation":{},"ISSN":["0975-6809","0976-4348"],"issn-type":[{"value":"0975-6809","type":"print"},{"value":"0976-4348","type":"electronic"}],"subject":[],"published":{"date-parts":[[2013,8,6]]}}}