{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,2,24]],"date-time":"2026-02-24T18:06:52Z","timestamp":1771956412475,"version":"3.50.1"},"reference-count":17,"publisher":"Springer Science and Business Media LLC","issue":"3","license":[{"start":{"date-parts":[[2014,6,10]],"date-time":"2014-06-10T00:00:00Z","timestamp":1402358400000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Int J Syst Assur Eng Manag"],"published-print":{"date-parts":[[2015,9]]},"DOI":"10.1007\/s13198-014-0269-7","type":"journal-article","created":{"date-parts":[[2014,6,10]],"date-time":"2014-06-10T18:56:21Z","timestamp":1402426581000},"page":"304-318","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":6,"title":["Mathematical modeling and fuzzy availability analysis of stainless steel utensil manufacturing unit in steady state: a case study"],"prefix":"10.1007","volume":"6","author":[{"given":"Pawan Kumar","family":"Chhoker","sequence":"first","affiliation":[]},{"given":"Atulya","family":"Nagar","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2014,6,10]]},"reference":[{"key":"269_CR1","doi-asserted-by":"crossref","unstructured":"Cai KY (1996) Introduction to fuzzy reliability. Kluwer Academic Publishers, Norwell, MA, USA. ISBN: 0792397371","DOI":"10.1007\/978-1-4613-1403-5"},{"key":"269_CR2","doi-asserted-by":"crossref","first-page":"161","DOI":"10.1016\/0165-0114(90)90039-9","volume":"37","author":"KY Cai","year":"1990","unstructured":"Cai KY, Wen CY (1990) Street-lighting lamps replacement: a fuzzy viewpoint. Fuzzy Sets Syst 37:161\u2013172","journal-title":"Fuzzy Sets Syst"},{"key":"269_CR3","doi-asserted-by":"crossref","first-page":"141","DOI":"10.1016\/0951-8320(91)90030-B","volume":"33","author":"KY Cai","year":"1991","unstructured":"Cai KY, Wen CY, Zhang ML (1991a) Fuzzy reliability modeling of gracefully degradable computing systems. Reliab Eng Syst Saf 33:141\u2013157","journal-title":"Reliab Eng Syst Saf"},{"key":"269_CR4","doi-asserted-by":"crossref","first-page":"71","DOI":"10.1016\/0951-8320(91)90026-4","volume":"33","author":"KY Cai","year":"1991","unstructured":"Cai KY, Wen CY, Zhang ML (1991b) Survivability index for CCNs: a measure of fuzzy reliability. Reliab Eng Syst Saf 33:71\u201399","journal-title":"Reliab Eng Syst Saf"},{"key":"269_CR5","doi-asserted-by":"crossref","first-page":"2253","DOI":"10.1016\/0026-2714(93)90065-7","volume":"33","author":"KY Cai","year":"1993","unstructured":"Cai KY, Wen CY, Zhang ML (1993) Fuzzy states as a basis for a theory of fuzzy reliability. Microelectron Reliab 33:2253\u20132263","journal-title":"Microelectron Reliab"},{"issue":"4","key":"269_CR6","doi-asserted-by":"crossref","first-page":"385","DOI":"10.1080\/019697296126480","volume":"27","author":"SM Chen","year":"1996","unstructured":"Chen SM (1996) New method for fuzzy system reliability analysis. Cybern Syst Int J 27(4):385\u2013401","journal-title":"Cybern Syst Int J"},{"key":"269_CR7","first-page":"434","volume":"10\u201312","author":"G Chongshan","year":"2009","unstructured":"Chongshan G (2009) Fuzzy availability analysis of a repairable consecutive-2-out-of-3: f System. IEEE Int Conf Grey Syst Intell Serv 10\u201312:434\u2013437","journal-title":"IEEE Int Conf Grey Syst Intell Serv"},{"key":"269_CR8","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1016\/0026-2714(92)90079-Z","volume":"32","author":"SG Chowdhury","year":"1992","unstructured":"Chowdhury SG, Misra KB (1992) Evaluation of fuzzy reliability of a non-series parallel network. Microelectron Reliab 32:1\u20134","journal-title":"Microelectron Reliab"},{"issue":"4","key":"269_CR9","doi-asserted-by":"crossref","first-page":"676","DOI":"10.3844\/ajeassp.2009.676.682","volume":"2","author":"A Hafaifa","year":"2009","unstructured":"Hafaifa A, Laaouad F, Guemana M (2009) A new engineering method for fuzzy reliability analysis of surge control in centrifugal compressor. Am J Eng Appl Sci 2(4):676\u2013682","journal-title":"Am J Eng Appl Sci"},{"key":"269_CR10","doi-asserted-by":"crossref","first-page":"1483","DOI":"10.1016\/0026-2714(94)00173-L","volume":"35","author":"HZ Huang","year":"1995","unstructured":"Huang HZ (1995) Reliability analysis method in the presence of fuzziness attached to operating time. Microelectron Reliab 35:1483\u20131487","journal-title":"Microelectron Reliab"},{"key":"269_CR11","doi-asserted-by":"crossref","unstructured":"Jiang MH, Zhou J, Hu M (2007) Fuzzy reliability analysis of an iSCSI-based fault tolerant storage system organization. IEEE fourth international conference on fuzzy systems and knowledge discovery (FSKD 2007)","DOI":"10.1109\/FSKD.2007.332"},{"issue":"8","key":"269_CR12","doi-asserted-by":"crossref","first-page":"909","DOI":"10.1080\/03052150600795854","volume":"38","author":"JC Ke","year":"2006","unstructured":"Ke JC, Huang HI, Lin CH (2006) Fuzzy analysis for steady-state availability: a mathematical programming approach. Eng Optim 38(8):909\u2013921","journal-title":"Eng Optim"},{"issue":"4","key":"269_CR13","doi-asserted-by":"crossref","first-page":"281","DOI":"10.1080\/08827500600815263","volume":"27","author":"C Ketata","year":"2006","unstructured":"Ketata C, Rockwell MC (2006) Fuzzy evaluation of stream sample reliability. Miner Process Extr Metall Rev 27(4):281\u2013294","journal-title":"Miner Process Extr Metall Rev"},{"issue":"1","key":"269_CR14","first-page":"65","volume":"5","author":"K Kumar","year":"2009","unstructured":"Kumar K, Kumar P (2009) Fuzzy reliability and fuzzy availability of the serial process in butter-oil processing plant. J Math Stat (Science Publication, USA) 5(1):65\u201371","journal-title":"J Math Stat (Science Publication, USA)"},{"issue":"3","key":"269_CR15","doi-asserted-by":"crossref","first-page":"193","DOI":"10.1007\/s13198-011-0076-3","volume":"2","author":"K Kumar","year":"2011","unstructured":"Kumar K, Kumar P (2011) Fuzzy availability modeling and analysis of biscuit manufacturing plant: a case study. Int J Syst Assur Eng Manag (Springer) 2(3):193\u2013204","journal-title":"Int J Syst Assur Eng Manag (Springer)"},{"key":"269_CR16","first-page":"525","volume":"6","author":"X Qiang","year":"2009","unstructured":"Qiang X, Jing L, Chen J (2009) Fuzzy reliability analysis of deep slidin g plane in rock foundation under dam. IEEE Sixth Int Conf Fuzzy Syst Knowl Discov 6:525\u2013529","journal-title":"IEEE Sixth Int Conf Fuzzy Syst Knowl Discov"},{"issue":"4","key":"269_CR17","first-page":"161","volume":"2","author":"T Wang","year":"2008","unstructured":"Wang T, Meng X, Guan Y, Yang J (2008) Fuzzy reliability of two units of the cold storing system. Mod Appl Sci (CCSE) 2(4):161\u2013166","journal-title":"Mod Appl Sci (CCSE)"}],"container-title":["International Journal of System Assurance Engineering and Management"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s13198-014-0269-7.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s13198-014-0269-7\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s13198-014-0269-7","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,6,2]],"date-time":"2019-06-02T10:48:46Z","timestamp":1559472526000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s13198-014-0269-7"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2014,6,10]]},"references-count":17,"journal-issue":{"issue":"3","published-print":{"date-parts":[[2015,9]]}},"alternative-id":["269"],"URL":"https:\/\/doi.org\/10.1007\/s13198-014-0269-7","relation":{},"ISSN":["0975-6809","0976-4348"],"issn-type":[{"value":"0975-6809","type":"print"},{"value":"0976-4348","type":"electronic"}],"subject":[],"published":{"date-parts":[[2014,6,10]]}}}