{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,3,31]],"date-time":"2026-03-31T10:21:35Z","timestamp":1774952495706,"version":"3.50.1"},"reference-count":20,"publisher":"Springer Science and Business Media LLC","issue":"3","license":[{"start":{"date-parts":[[2014,9,16]],"date-time":"2014-09-16T00:00:00Z","timestamp":1410825600000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Int J Syst Assur Eng Manag"],"published-print":{"date-parts":[[2015,9]]},"DOI":"10.1007\/s13198-014-0291-9","type":"journal-article","created":{"date-parts":[[2014,9,15]],"date-time":"2014-09-15T04:03:28Z","timestamp":1410753808000},"page":"224-230","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":17,"title":["Practical implications of managerial decisions to integrate production scheduling and maintenance"],"prefix":"10.1007","volume":"6","author":[{"given":"Laith A.","family":"Hadidi","sequence":"first","affiliation":[]},{"given":"Umar M.","family":"Al-Turki","sequence":"additional","affiliation":[]},{"given":"M. Abdur","family":"Rahim","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2014,9,16]]},"reference":[{"issue":"10","key":"291_CR1","doi-asserted-by":"crossref","first-page":"1411","DOI":"10.1016\/j.ress.2011.05.004","volume":"96","author":"R Ahmadi","year":"2011","unstructured":"Ahmadi R, Newby M (2011) Maintenance scheduling of a manufacturing system subject to deterioration. Reliab Eng Syst Saf 96(10):1411\u20131420","journal-title":"Reliab Eng Syst Saf"},{"issue":"1\u20134","key":"291_CR2","doi-asserted-by":"crossref","first-page":"82","DOI":"10.1504\/IJVD.2010.029637","volume":"52","author":"A Aksoy","year":"2010","unstructured":"Aksoy A, Ozturk N (2010) Simulated annealing approach in scheduling of virtual cellular manufacturing in the automotive industry. Int J Veh Des 52(1\u20134):82\u201395","journal-title":"Int J Veh Des"},{"issue":"8","key":"291_CR3","doi-asserted-by":"crossref","first-page":"1127","DOI":"10.1002\/(SICI)1520-6750(199612)43:8<1127::AID-NAV5>3.0.CO;2-G","volume":"43","author":"X Cai","year":"1996","unstructured":"Cai X, Tu ES (1996) Scheduling jobs with random processing times on a single machine subject to stochastic breakdowns to minimize early-tardy penalties. Nav Res Logist 43(8):1127\u20131146","journal-title":"Nav Res Logist"},{"issue":"2","key":"291_CR4","doi-asserted-by":"crossref","first-page":"503","DOI":"10.1080\/07408170304416","volume":"35","author":"C Cassady","year":"2003","unstructured":"Cassady C, Kutanoglu E (2003) Minimizing job tardiness using integrated preventive maintenance planning and production scheduling. IIE Trans 35(2):503\u2013513","journal-title":"IIE Trans"},{"issue":"2","key":"291_CR5","doi-asserted-by":"crossref","first-page":"304","DOI":"10.1109\/TR.2005.845967","volume":"54","author":"C Cassady","year":"2005","unstructured":"Cassady C, Kutanoglu E (2005) Integrating preventive maintenance planning and production scheduling for a single machine. IEEE Trans Reliab 54(2):304\u2013309","journal-title":"IEEE Trans Reliab"},{"issue":"4","key":"291_CR6","doi-asserted-by":"crossref","first-page":"395","DOI":"10.1504\/IJMOR.2011.040875","volume":"3","author":"LA Hadidi","year":"2011","unstructured":"Hadidi LA, Al-Turki UM, Rahim MA (2011) An integrated cost model for production scheduling and perfect maintenance. Int J Math Oper Res 3(4):395\u2013413","journal-title":"Int J Math Oper Res"},{"issue":"1","key":"291_CR7","first-page":"21","volume":"10","author":"LA Hadidi","year":"2012","unstructured":"Hadidi LA, Al-Turki UM, Rahim MA (2012a) Integrated models in production planning and scheduling, maintenance and quality: a review. Int J Ind Syst Eng 10(1):21\u201350","journal-title":"Int J Ind Syst Eng"},{"issue":"2","key":"291_CR8","doi-asserted-by":"crossref","first-page":"174","DOI":"10.1504\/IJOR.2012.045185","volume":"13","author":"LA Hadidi","year":"2012","unstructured":"Hadidi LA, Al-Turki UM, Rahim MA (2012b) Joint job scheduling and preventive maintenance on a single machine. Int J Oper Res 13(2):174\u2013184","journal-title":"Int J Oper Res"},{"issue":"6","key":"291_CR9","doi-asserted-by":"crossref","first-page":"1764","DOI":"10.1016\/j.cor.2005.05.034","volume":"34","author":"M Ji","year":"2007","unstructured":"Ji M, He Y, Cheng TCE (2007) Single machine scheduling with periodic maintenance to minimize makespan. Comput Oper Res 34(6):1764\u20131770","journal-title":"Comput Oper Res"},{"issue":"1","key":"291_CR10","doi-asserted-by":"crossref","first-page":"297","DOI":"10.1016\/j.ejor.2010.04.022","volume":"207","author":"C Karamatsoukis","year":"2010","unstructured":"Karamatsoukis C, Kyriakidis E (2010) Optimal maintenance of two stochastically deteriorating machines with an intermediate buffer. Eur J Oper Res 207(1):297\u2013308","journal-title":"Eur J Oper Res"},{"issue":"1","key":"291_CR11","doi-asserted-by":"crossref","first-page":"88","DOI":"10.1016\/j.ejor.2012.11.052","volume":"227","author":"B Kazaz","year":"2013","unstructured":"Kazaz B, Sloan TW (2013) The impact of process deterioration of production and maintenance policy. Eur J Oper Res 227(1):88\u2013100","journal-title":"Eur J Oper Res"},{"issue":"3\u20138","key":"291_CR12","doi-asserted-by":"crossref","first-page":"1135","DOI":"10.1007\/s00170-012-4395-6","volume":"66","author":"S Lee","year":"2013","unstructured":"Lee S, Ni J (2013) Joint decision making for maintenance and production scheduling of production systems. Int J Adv Manuf Technol 66(3\u20138):1135\u20131146","journal-title":"Int J Adv Manuf Technol"},{"issue":"6","key":"291_CR13","doi-asserted-by":"crossref","first-page":"875","DOI":"10.1007\/s10845-009-0264-z","volume":"21","author":"Pan E Liao","year":"2010","unstructured":"Liao Pan E, Xi L (2010) Preventive maintenance scheduling for repairable system with deterioration. Int J Intell Manuf 21(6):875\u2013884","journal-title":"Int J Intell Manuf"},{"issue":"1","key":"291_CR14","doi-asserted-by":"crossref","first-page":"15","DOI":"10.1080\/095119299130443","volume":"12","author":"SV Mehta","year":"1999","unstructured":"Mehta SV (1999) Predictable scheduling of single machine subject to breakdowns. Int J Comput Integr Manuf 12(1):15\u201338","journal-title":"Int J Comput Integr Manuf"},{"issue":"2","key":"291_CR15","doi-asserted-by":"crossref","first-page":"117","DOI":"10.1002\/nav.20270","volume":"55","author":"TW Sloan","year":"2008","unstructured":"Sloan TW (2008) Simultaneous determination of production an maintenance schedules using in-line equipment condition and yield information. Nav Res Logist 55(2):117\u2013119","journal-title":"Nav Res Logist"},{"key":"291_CR16","doi-asserted-by":"crossref","unstructured":"Von Hoyningen-Huene W, Kiesmuller G P (2014) Evaluation of the expected makespan of a set of non-resumable jobs on parallel machines with stochastic failures. Eur J Oper Res. http:\/\/dx.doi.org\/10.1016\/j.ejor.2014.07.044","DOI":"10.1016\/j.ejor.2014.07.044"},{"issue":"2","key":"291_CR17","doi-asserted-by":"crossref","first-page":"151","DOI":"10.1002\/nav.20124","volume":"53","author":"C Wang","year":"2006","unstructured":"Wang C (2006) Optimal production and maintenance policy for imperfect production systems. Nav Res Logist 53(2):151\u2013156","journal-title":"Nav Res Logist"},{"issue":"2","key":"291_CR18","first-page":"140","volume":"18","author":"S Wang","year":"2013","unstructured":"Wang S (2013) Integrated model of production planning and imperfect preventive maintenance for single machine system. J Oper Res 18(2):140\u2013156","journal-title":"J Oper Res"},{"issue":"9\u201310","key":"291_CR19","doi-asserted-by":"crossref","first-page":"954","DOI":"10.1007\/s00170-007-1268-5","volume":"39","author":"J Yulan","year":"2008","unstructured":"Yulan J, Zuhua J, Wenrui H (2008) Multi-objective integrated optimization research on preventive maintenance planning and production scheduling for a single machine. Int J Adv Manuf Technol 39(9\u201310):954\u2013964","journal-title":"Int J Adv Manuf Technol"},{"issue":"2","key":"291_CR20","doi-asserted-by":"crossref","first-page":"162","DOI":"10.1108\/IMDS-07-2013-0314","volume":"114","author":"S Zho","year":"2014","unstructured":"Zho S, Wang L, Zheng Y (2014) Integrating production planning and maintenance: an integrated method. Ind Manag Data Syst 114(2):162\u2013182","journal-title":"Ind Manag Data Syst"}],"container-title":["International Journal of System Assurance Engineering and Management"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s13198-014-0291-9.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s13198-014-0291-9\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s13198-014-0291-9","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,6,2]],"date-time":"2019-06-02T10:48:46Z","timestamp":1559472526000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s13198-014-0291-9"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2014,9,16]]},"references-count":20,"journal-issue":{"issue":"3","published-print":{"date-parts":[[2015,9]]}},"alternative-id":["291"],"URL":"https:\/\/doi.org\/10.1007\/s13198-014-0291-9","relation":{},"ISSN":["0975-6809","0976-4348"],"issn-type":[{"value":"0975-6809","type":"print"},{"value":"0976-4348","type":"electronic"}],"subject":[],"published":{"date-parts":[[2014,9,16]]}}}