{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2022,3,30]],"date-time":"2022-03-30T11:41:29Z","timestamp":1648640489241},"reference-count":18,"publisher":"Springer Science and Business Media LLC","issue":"S1","license":[{"start":{"date-parts":[[2015,3,22]],"date-time":"2015-03-22T00:00:00Z","timestamp":1426982400000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Int J Syst Assur Eng Manag"],"published-print":{"date-parts":[[2017,1]]},"DOI":"10.1007\/s13198-015-0351-9","type":"journal-article","created":{"date-parts":[[2015,3,21]],"date-time":"2015-03-21T06:53:27Z","timestamp":1426920807000},"page":"118-128","update-policy":"http:\/\/dx.doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":0,"title":["Joint optimization for inspection and replacement model based on a three-stage failure process"],"prefix":"10.1007","volume":"8","author":[{"given":"Ruifeng","family":"Yang","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Jianshe","family":"Kang","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2015,3,22]]},"reference":[{"issue":"1","key":"351_CR1","doi-asserted-by":"crossref","first-page":"197","DOI":"10.1109\/TR.2011.2104530","volume":"60","author":"A Alireza","year":"2011","unstructured":"Alireza A, Uday K (2011) Cost based risk analysis to identify inspection and restoration intervals of hidden failures subject to aging. IEEE Trans Reliab 60(1):197\u2013209","journal-title":"IEEE Trans Reliab"},{"issue":"4","key":"351_CR2","doi-asserted-by":"crossref","first-page":"361","DOI":"10.1057\/jors.1993.66","volume":"44","author":"RD Baker","year":"1993","unstructured":"Baker RD, Wang W (1993) Developing and testing the delay time model. J Oper Res Soc 44(4):361\u2013374","journal-title":"J Oper Res Soc"},{"key":"351_CR3","volume-title":"Mathematical theory of reliability","author":"RE Barlow","year":"1965","unstructured":"Barlow RE, Proschan F (1965) Mathematical theory of reliability. Wiley, New York"},{"issue":"2","key":"351_CR4","doi-asserted-by":"crossref","first-page":"261","DOI":"10.1007\/s10589-006-6449-x","volume":"35","author":"M Bartholomew","year":"2006","unstructured":"Bartholomew M, Christianson B, Zuo MJ (2006) Optimizing preventive maintenance models. Comput Optim Appl 35(2):261\u2013279","journal-title":"Comput Optim Appl"},{"key":"351_CR5","unstructured":"Christer AH (1976) Innovative decision making. In Proceedings of the NATO conference on the role and effectiveness of theories of decision in practice. Hodder and Stoughton, pp 368\u2013377"},{"issue":"4","key":"351_CR6","doi-asserted-by":"crossref","first-page":"329","DOI":"10.1057\/jors.1987.54","volume":"38","author":"AH Christer","year":"1987","unstructured":"Christer AH (1987) Delay-time model of reliability of equipment subject to inspection monitoring. J Oper Res Soc 38(4):329\u2013334","journal-title":"J Oper Res Soc"},{"key":"351_CR7","doi-asserted-by":"crossref","first-page":"398","DOI":"10.1108\/13552511111180195","volume":"17","author":"J Koochaki","year":"2011","unstructured":"Koochaki J, Bokhorst J, Wortmann H, Klingenberg W (2011) Evaluating condition based maintenance effectiveness for two processes in series. J Qual Maint Eng 17:398\u2013414","journal-title":"J Qual Maint Eng"},{"key":"351_CR8","doi-asserted-by":"crossref","first-page":"479","DOI":"10.2307\/1427402","volume":"20","author":"Y Lan","year":"1988","unstructured":"Lan Y (1988) A note on the optimal replacement problem. Adv Appl Prob 20:479\u2013482","journal-title":"Adv Appl Prob"},{"key":"351_CR9","doi-asserted-by":"crossref","first-page":"221","DOI":"10.1177\/0954405411418752","volume":"226","author":"TF Lipi","year":"2012","unstructured":"Lipi TF, Lim JH, Zuo MJ, Wang WB (2012) A condition- and age-based replacement model using delay time modeling. Proc Inst Mech Eng Part O J Risk Reliab 226:221","journal-title":"Proc Inst Mech Eng Part O J Risk Reliab"},{"key":"351_CR10","volume-title":"Weibull models","author":"DNP Murthy","year":"2004","unstructured":"Murthy DNP, Xie M, Jiang R (2004) Weibull models. Willey, New Jersey"},{"key":"351_CR11","volume-title":"Complex system maintenance handbook","author":"RP Nicola","year":"2008","unstructured":"Nicola RP, Dekker R (2008) Optimal maintenance of multi-component systems: a review. In: Murthy DNP, Kobbacy AKS (eds) Complex system maintenance handbook. Springer, Amsterdam"},{"key":"351_CR12","volume-title":"Stochastic processes","author":"SM Ross","year":"1983","unstructured":"Ross SM (1983) Stochastic processes. Wiley, New York"},{"key":"351_CR13","doi-asserted-by":"crossref","first-page":"133","DOI":"10.1016\/S0951-8320(98)00030-1","volume":"63","author":"JK Vaurio","year":"1999","unstructured":"Vaurio JK (1999) Availability and cost functions for periodically inspected preventively maintained units. Reliab Eng Syst Saf 63:133\u2013140","journal-title":"Reliab Eng Syst Saf"},{"key":"351_CR14","doi-asserted-by":"crossref","first-page":"345","DOI":"10.1007\/978-1-84800-011-7_14","volume-title":"Complex system maintenance handbook","author":"W Wang","year":"2008","unstructured":"Wang W (2008) Delay time modelling. In: Murthy DNP, Kobbacy AKS (eds) Complex system maintenance handbook. Springer, Amsterdam, pp 345\u2013370"},{"issue":"7","key":"351_CR15","doi-asserted-by":"crossref","first-page":"838","DOI":"10.1016\/j.ress.2011.03.003","volume":"96","author":"W Wang","year":"2011","unstructured":"Wang W (2011) An inspection model based on a three-stage failure process. Reliab Eng Syst Saf 96(7):838\u2013848","journal-title":"Reliab Eng Syst Saf"},{"key":"351_CR16","doi-asserted-by":"crossref","first-page":"165","DOI":"10.1016\/j.ress.2012.04.004","volume":"106","author":"W Wang","year":"2012","unstructured":"Wang W (2012) An overview of the recent advances in delay-time-based maintenance modelling. Reliab Eng Syst Saf 106:165\u2013178","journal-title":"Reliab Eng Syst Saf"},{"key":"351_CR17","doi-asserted-by":"crossref","first-page":"57","DOI":"10.1016\/j.ress.2013.03.006","volume":"116","author":"W Wang","year":"2013","unstructured":"Wang W (2013) Models of inspection, routine service, and replacement for a serviceable one-component system. Reliab Eng Syst Saf 116:57\u201363","journal-title":"Reliab Eng Syst Saf"},{"key":"351_CR18","unstructured":"Zhao F, Peng R, Wang W (2012) An inspection and replacement model based on a three-stage failure process. Prognostics & System Health Management Conference"}],"container-title":["International Journal of System Assurance Engineering and Management"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s13198-015-0351-9.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s13198-015-0351-9\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s13198-015-0351-9","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s13198-015-0351-9.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,6,2]],"date-time":"2019-06-02T14:48:48Z","timestamp":1559486928000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s13198-015-0351-9"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2015,3,22]]},"references-count":18,"journal-issue":{"issue":"S1","published-print":{"date-parts":[[2017,1]]}},"alternative-id":["351"],"URL":"https:\/\/doi.org\/10.1007\/s13198-015-0351-9","relation":{},"ISSN":["0975-6809","0976-4348"],"issn-type":[{"value":"0975-6809","type":"print"},{"value":"0976-4348","type":"electronic"}],"subject":[],"published":{"date-parts":[[2015,3,22]]}}}