{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2022,10,21]],"date-time":"2022-10-21T12:27:18Z","timestamp":1666355238676},"reference-count":21,"publisher":"Springer Science and Business Media LLC","issue":"S1","license":[{"start":{"date-parts":[[2015,9,23]],"date-time":"2015-09-23T00:00:00Z","timestamp":1442966400000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Int J Syst Assur Eng Manag"],"published-print":{"date-parts":[[2017,1]]},"DOI":"10.1007\/s13198-015-0378-y","type":"journal-article","created":{"date-parts":[[2015,9,23]],"date-time":"2015-09-23T05:54:03Z","timestamp":1442987643000},"page":"301-316","update-policy":"http:\/\/dx.doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":8,"title":["Availability and profit analysis of a feeding system in sugar industry"],"prefix":"10.1007","volume":"8","author":[{"given":"M. S.","family":"Kadyan","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Ramesh","family":"Kumar","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2015,9,23]]},"reference":[{"issue":"2","key":"378_CR1","first-page":"165","volume":"6","author":"SC Agarwal","year":"2011","unstructured":"Agarwal SC, Deepika, Sharma N (2011) Reliability analysis of sugar manufacturing plant using Boolean function technique. Int J Res Rev Appl Sci 6(2):165\u2013171","journal-title":"Int J Res Rev Appl Sci"},{"key":"378_CR2","doi-asserted-by":"publisher","DOI":"10.1007\/s13198-014-0310-x","author":"K Aggarwal","year":"2014","unstructured":"Aggarwal K, Singh V, Kumar S (2014) Availability analysis and performance optimization of a butter oil production system: a case study. Int J Syst Assur Eng Manag. doi: 10.1007\/s13198-014-0310-x","journal-title":"Int J Syst Assur Eng Manag"},{"issue":"5","key":"378_CR3","doi-asserted-by":"crossref","first-page":"795","DOI":"10.1016\/0026-2714(95)00115-8","volume":"37","author":"N Arora","year":"1997","unstructured":"Arora N, Kumar D (1997) Availability analysis of steam and power generation systems in the thermal power plant. Microelectron Reliab 37(5):795\u2013799","journal-title":"Microelectron Reliab"},{"key":"378_CR4","doi-asserted-by":"crossref","first-page":"433","DOI":"10.1017\/S0305004100030437","volume":"51","author":"DR Cox","year":"1955","unstructured":"Cox DR (1955) Analysis of non Markovian stochastic processes by the inclusion of supplementary variables. Proc Comb Philos Soc 51:433\u2013441","journal-title":"Proc Comb Philos Soc"},{"issue":"3","key":"378_CR5","doi-asserted-by":"crossref","first-page":"231","DOI":"10.1007\/s13198-013-0167-4","volume":"4","author":"SM Famurewa","year":"2013","unstructured":"Famurewa SM, Asplund M, Galar D, Kumar U (2013) Implementation of performance based maintenance contracting in railway industries. Int J Syst Assur Eng Manag 4(3):231\u2013240","journal-title":"Int J Syst Assur Eng Manag"},{"issue":"1","key":"378_CR6","first-page":"101","volume":"1","author":"S Garg","year":"2010","unstructured":"Garg S, Singh J, Singh DV (2010) Availability and maintenance scheduling of a repairable block- board manufacturing system. Int J Reliab Saf 1(1):101\u2013118","journal-title":"Int J Reliab Saf"},{"key":"378_CR7","doi-asserted-by":"crossref","first-page":"30","DOI":"10.1109\/TR.1963.5218202","volume":"R-12","author":"DP Gaver","year":"1963","unstructured":"Gaver DP (1963) Time to failure and availability of parallel system with repair. IEEE Trans Reliab R-12:30\u201338","journal-title":"IEEE Trans Reliab"},{"issue":"2","key":"378_CR8","first-page":"387","volume":"2","author":"S Gupta","year":"2009","unstructured":"Gupta S, Tewari PC (2009) Simulation modeling and analysis of complex system of thermal power plant. J Ind Eng Manag 2(2):387\u2013406","journal-title":"J Ind Eng Manag"},{"key":"378_CR9","volume-title":"Reliability technology","author":"JS Gurjar","year":"2007","unstructured":"Gurjar JS (2007) Reliability technology. I.K. International, New Delhi"},{"issue":"1","key":"378_CR10","doi-asserted-by":"crossref","first-page":"78","DOI":"10.1007\/s13198-012-0100-2","volume":"4","author":"J Jaise","year":"2013","unstructured":"Jaise J, Kumar ANB, Shanmugam NS et al (2013) Power system: a reliability assessment using FTA. Int J Syst Assur Eng Manag 4(1):78\u201385","journal-title":"Int J Syst Assur Eng Manag"},{"issue":"3","key":"378_CR11","doi-asserted-by":"crossref","first-page":"313","DOI":"10.1007\/s13198-013-0168-3","volume":"5","author":"MS Kadyan","year":"2014","unstructured":"Kadyan MS, Promila, Kumar J (2014) Reliability modeling of a single-unit system with arbitrary distributions subject to different weather conditions. Int J Syst Assur Eng Manag 5(3):313\u2013319","journal-title":"Int J Syst Assur Eng Manag"},{"issue":"6","key":"378_CR12","doi-asserted-by":"crossref","first-page":"867","DOI":"10.1016\/0026-2714(88)90284-3","volume":"28","author":"D Kumar","year":"1988","unstructured":"Kumar D, Singh IP, Singh J (1988) Availability of the feeding system in the sugar industry. Microelectron Reliab 28(6):867\u2013871","journal-title":"Microelectron Reliab"},{"issue":"6","key":"378_CR13","doi-asserted-by":"crossref","first-page":"1025","DOI":"10.1016\/0026-2714(90)90274-Q","volume":"30","author":"D Kumar","year":"1990","unstructured":"Kumar D, Pandey PC, Singh J (1990) Design and cost analysis of a refining system in a Sugar industry. Microelectron Reliab 30(6):1025\u20131028","journal-title":"Microelectron Reliab"},{"issue":"6","key":"378_CR14","doi-asserted-by":"crossref","first-page":"949","DOI":"10.1016\/S0026-2714(96)00136-9","volume":"37","author":"S Kumar","year":"1997","unstructured":"Kumar S, Mehta NP, Kumar D (1997) Steady state behavior and maintenance planning of a desulphurization system in urea fertilizer plant. Microelectron Reliab 37(6):949\u2013953","journal-title":"Microelectron Reliab"},{"issue":"4","key":"378_CR15","doi-asserted-by":"crossref","first-page":"424","DOI":"10.1007\/s13198-012-0127-4","volume":"4","author":"J Kumar","year":"2011","unstructured":"Kumar J, Kadyan MS, Malik SC (2011) Profit analysis of a 2-out-of-2 redundant system with single standby and degradation of the units after repair. Int J Syst Assur Eng Manag 4(4):424\u2013434","journal-title":"Int J Syst Assur Eng Manag"},{"issue":"3","key":"378_CR16","doi-asserted-by":"crossref","first-page":"293","DOI":"10.1007\/s13198-013-0175-4","volume":"4","author":"A Philip","year":"2013","unstructured":"Philip A, Sharama RK (2013) A stochastic reward net approach for reliability analysis of a flexible manufacturing modul. Int J Syst Assur Eng Manag 4(3):293\u2013302","journal-title":"Int J Syst Assur Eng Manag"},{"key":"378_CR17","doi-asserted-by":"crossref","first-page":"3981","DOI":"10.1016\/j.amc.2011.10.016","volume":"218","author":"S Shakuntla","year":"2011","unstructured":"Shakuntla S, Lal AK, Bhatia SS, Singh J (2011) Reliability analysis of polytube industry using supplementary variable technique. Appl Math Comput 218:3981\u20133992","journal-title":"Appl Math Comput"},{"issue":"4","key":"378_CR18","doi-asserted-by":"crossref","first-page":"341","DOI":"10.1007\/s13198-012-0102-0","volume":"4","author":"VV Singh","year":"2013","unstructured":"Singh VV, Singh SB, Ram M, Goel CK (2013) Availability, MTTF and cost analysis of a system having two units in series configuration with controller. Int J Syst Assur Eng Manag 4(4):341\u2013352","journal-title":"Int J Syst Assur Eng Manag"},{"issue":"1","key":"378_CR19","doi-asserted-by":"crossref","first-page":"32","DOI":"10.1007\/s13198-014-0240-7","volume":"6","author":"RS Sinha","year":"2014","unstructured":"Sinha RS, Mukhopadhyay AK (2014) Reliability centered maintenance of cone crusher: a case study. Int J Syst Assur Eng Manag 6(1):32\u201335","journal-title":"Int J Syst Assur Eng Manag"},{"issue":"15","key":"378_CR20","first-page":"21","volume":"4","author":"K Suleiman","year":"2013","unstructured":"Suleiman K, Ali UA, Yusuf I (2013) Stochastic analysis and performance evaluation of a complex thermal power plant. Innov Syst Des Eng 4(15):21\u201331","journal-title":"Innov Syst Des Eng"},{"issue":"4","key":"378_CR21","doi-asserted-by":"crossref","first-page":"362","DOI":"10.1007\/s13198-011-0037-x","volume":"1","author":"X Zhang","year":"2010","unstructured":"Zhang X, Pham H, Johnon CR (2010) Reliability models for systems with internal and external redundancy. Int J Syst Assur Eng Manag 1(4):362\u2013369","journal-title":"Int J Syst Assur Eng Manag"}],"container-title":["International Journal of System Assurance Engineering and Management"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s13198-015-0378-y.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s13198-015-0378-y\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s13198-015-0378-y","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s13198-015-0378-y.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2022,5,22]],"date-time":"2022-05-22T04:36:32Z","timestamp":1653194192000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s13198-015-0378-y"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2015,9,23]]},"references-count":21,"journal-issue":{"issue":"S1","published-print":{"date-parts":[[2017,1]]}},"alternative-id":["378"],"URL":"https:\/\/doi.org\/10.1007\/s13198-015-0378-y","relation":{},"ISSN":["0975-6809","0976-4348"],"issn-type":[{"value":"0975-6809","type":"print"},{"value":"0976-4348","type":"electronic"}],"subject":[],"published":{"date-parts":[[2015,9,23]]}}}