{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,10,19]],"date-time":"2025-10-19T06:04:37Z","timestamp":1760853877647},"reference-count":74,"publisher":"Springer Science and Business Media LLC","issue":"2","license":[{"start":{"date-parts":[[2016,3,18]],"date-time":"2016-03-18T00:00:00Z","timestamp":1458259200000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Int J Syst Assur Eng Manag"],"published-print":{"date-parts":[[2017,6]]},"DOI":"10.1007\/s13198-016-0443-1","type":"journal-article","created":{"date-parts":[[2016,3,18]],"date-time":"2016-03-18T18:21:51Z","timestamp":1458325311000},"page":"408-422","update-policy":"http:\/\/dx.doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":17,"title":["Analyzing the factors affecting the flexibility in FMS using weighted interpretive structural modeling (WISM) approach"],"prefix":"10.1007","volume":"8","author":[{"given":"Suman","family":"Gothwal","sequence":"first","affiliation":[]},{"given":"Tilak","family":"Raj","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2016,3,18]]},"reference":[{"key":"443_CR1","unstructured":"Anand V (2012) How to improve throughput in component conformance and maximize output. QuEST Global Services. www.quest-global.com\/newsroom\/CMM%20CoE.pdf"},{"issue":"4","key":"443_CR2","doi-asserted-by":"crossref","first-page":"365","DOI":"10.1007\/s13198-012-0122-9","volume":"4","author":"R Attri","year":"2013","unstructured":"Attri R, Grover S, Dev N, Kumar D (2013a) Analysis of barriers of total productive maintenance (TPM). Int J Syst Assur Eng Manag 4(4):365\u2013377","journal-title":"Int J Syst Assur Eng Manag"},{"issue":"4","key":"443_CR3","doi-asserted-by":"crossref","first-page":"313","DOI":"10.1007\/s13198-012-0088-7","volume":"4","author":"R Attri","year":"2013","unstructured":"Attri R, Grover S, Dev N, Kumar D (2013b) An ISM approach for modelling the enablers in the implementation of total productive maintenance (TPM). Int J Syst Assur Eng Manag 4(4):313\u2013326","journal-title":"Int J Syst Assur Eng Manag"},{"key":"443_CR4","doi-asserted-by":"crossref","first-page":"735","DOI":"10.1080\/00207548908942583","volume":"27","author":"G Azzone","year":"1989","unstructured":"Azzone G, Bertele U (1989) Measuring the economic effectiveness of flexible automation: a new approach. Int J Prod Res 27:735\u2013746","journal-title":"Int J Prod Res"},{"issue":"2","key":"443_CR5","first-page":"107","volume":"4","author":"BS Babu","year":"2010","unstructured":"Babu BS, Srinivasan G (2010) The impact of volume, routing and product mix flexibilities on the performance of a job shop: a simulation study. Int J Enterp Netw Manag 4(2):107\u2013135","journal-title":"Int J Enterp Netw Manag"},{"issue":"7","key":"443_CR6","doi-asserted-by":"crossref","first-page":"808","DOI":"10.1108\/17410380510626204","volume":"16","author":"O Bayazit","year":"2005","unstructured":"Bayazit O (2005) Use of AHP in decision-making for flexible manufacturing systems. J Manuf Technol Manag 16(7):808\u2013819","journal-title":"J Manuf Technol Manag"},{"key":"443_CR7","doi-asserted-by":"crossref","first-page":"144","DOI":"10.1016\/0377-2217(92)90089-R","volume":"60","author":"JJ Bernardo","year":"1992","unstructured":"Bernardo JJ, Mohamed Z (1992) The measurement and use of operational flexibility in the loading of flexible manufacturing systems. Eur J Oper Res 60:144\u2013155","journal-title":"Eur J Oper Res"},{"issue":"1","key":"443_CR8","doi-asserted-by":"crossref","first-page":"45","DOI":"10.1016\/S0925-5273(03)00195-6","volume":"89","author":"A Beskese","year":"2004","unstructured":"Beskese A, Kahraman C, Irani Z (2004) Quantification of flexibility in advanced manufacturing systems using fuzzy concept. Int J Prod Econ 89(1):45\u201356","journal-title":"Int J Prod Econ"},{"issue":"6","key":"443_CR9","doi-asserted-by":"crossref","first-page":"877","DOI":"10.1108\/00251740510603619","volume":"43","author":"R Bolanos","year":"2005","unstructured":"Bolanos R, Fontela E, Nenclares A, Paster P (2005) Using interpretive structural modeling in strategic decision making groups. Manag Decis 43(6):877\u2013895","journal-title":"Manag Decis"},{"issue":"5","key":"443_CR10","doi-asserted-by":"crossref","first-page":"747","DOI":"10.1080\/00207548908942584","volume":"27","author":"P Brill","year":"1989","unstructured":"Brill P, Mandelbaum M (1989) On measures of flexibility in manufacturing systems. Int J Prod Res 27(5):747\u2013756","journal-title":"Int J Prod Res"},{"issue":"2","key":"443_CR11","first-page":"114","volume":"2","author":"J Browne","year":"1984","unstructured":"Browne J, Dubois D, Rathmill K, Sethi S, Stecke K (1984) Classification of flexible manufacturing systems. FMS Mag 2(2):114\u2013117","journal-title":"FMS Mag"},{"issue":"2","key":"443_CR12","doi-asserted-by":"crossref","first-page":"193","DOI":"10.1016\/1047-8310(91)90004-8","volume":"2","author":"RL Cardy","year":"1991","unstructured":"Cardy RL, Krzystofiak FJ (1991) Interfacing high technology operations with blue collar workers: selection and appraisal in a computerized manufacturing setting. J High Technol Manag Res 2(2):193\u2013210","journal-title":"J High Technol Manag Res"},{"issue":"2","key":"443_CR13","doi-asserted-by":"crossref","first-page":"121","DOI":"10.1016\/S0736-5845(99)00013-7","volume":"15","author":"FTS Chan","year":"1999","unstructured":"Chan FTS (1999) Evaluations of operational control rules in scheduling a flexible manufacturing system. Robot Comput Integr Manuf 15(2):121\u2013132","journal-title":"Robot Comput Integr Manuf"},{"issue":"4","key":"443_CR14","doi-asserted-by":"crossref","first-page":"353","DOI":"10.1016\/j.rcim.2005.08.001","volume":"22","author":"FTS Chan","year":"2006","unstructured":"Chan FTS, Swarnkar R (2006) Ant colony optimization approach to a fuzzy goal programming model for a machine tool selection and operation allocation problem in an FMS. Robot Comput Integr Manuf 22(4):353\u2013362","journal-title":"Robot Comput Integr Manuf"},{"issue":"2","key":"443_CR15","first-page":"151","volume":"1","author":"M Chand","year":"2010","unstructured":"Chand M, Singh RK (2010) Study of select issues of supply chain management: a case study. Int J Adv Manuf Syst 1(2):151\u2013155","journal-title":"Int J Adv Manuf Syst"},{"issue":"4","key":"443_CR16","first-page":"378","volume":"18","author":"M Chand","year":"2014","unstructured":"Chand M, Raj T, Shankar R (2014a) Analysing the operational risks in supply chain by using weighted interpretive structural modeling (W-ISM) technique. Int J Serv Oper Manag 18(4):378\u2013403","journal-title":"Int J Serv Oper Manag"},{"issue":"4","key":"443_CR17","first-page":"378","volume":"18","author":"M Chand","year":"2014","unstructured":"Chand M, Raj T, Shankar R (2014b) Analysing the operational risks in supply chain by using weighted interpretive structure modelling technique. Int J Serv Oper Manag 18(4):378\u2013403","journal-title":"Int J Serv Oper Manag"},{"issue":"2","key":"443_CR18","doi-asserted-by":"crossref","first-page":"181","DOI":"10.1504\/IJLSM.2015.069374","volume":"21","author":"M Chand","year":"2015","unstructured":"Chand M, Raj T, Shankar R (2015) Weighted-ISM technique for analysing the competitiveness of uncertainty and risk measures in supply chain. Int J Logist Syst Manag 21(2):181\u2013198","journal-title":"Int J Logist Syst Manag"},{"key":"443_CR19","doi-asserted-by":"crossref","first-page":"949","DOI":"10.1016\/j.ijmachtools.2004.10.010","volume":"45","author":"J-H Chen","year":"2005","unstructured":"Chen J-H, Ho S-Y (2005) A novel approach to production planning of flexible manufacturing systems using an efficient multi-objective genetic algorithm. Int J Mach Tools Manuf 45:949\u2013957","journal-title":"Int J Mach Tools Manuf"},{"key":"443_CR20","first-page":"27","volume-title":"Proceedings of the 3rd ORS4\/TIMS conference on FMS","author":"CH Chung","year":"1989","unstructured":"Chung CH, Chen IJ (1989) A systematic assessment of the value of flexibility for an FMS. In: Stecke KE, Suri R (eds) Proceedings of the 3rd ORS4\/TIMS conference on FMS. Elsevier Science Publishers, Amsterdam, pp 27\u201334"},{"key":"443_CR21","doi-asserted-by":"crossref","first-page":"280","DOI":"10.1007\/978-3-642-95621-8_13","volume-title":"Selection and evaluation at advanced manufacturing technologies","author":"CH Chung","year":"1990","unstructured":"Chung CH, Chen IJ (1990) Managing the flexibility of Flexible Manufacturing System 10, competitive edge. In: Liberatore M (ed) Selection and evaluation at advanced manufacturing technologies. Springer-Verlag, Heidelberg, pp 280\u2013305"},{"issue":"4","key":"443_CR22","doi-asserted-by":"crossref","first-page":"655","DOI":"10.1111\/j.1540-5915.1989.tb01410.x","volume":"20","author":"G Cleveland","year":"1989","unstructured":"Cleveland G, Schroeder RG, Anderson JC (1989) A theory of production competence. Decis Sci 20(4):655\u2013668","journal-title":"Decis Sci"},{"issue":"2","key":"443_CR23","doi-asserted-by":"crossref","first-page":"263","DOI":"10.1016\/S1047-8310(97)90006-7","volume":"8","author":"R Cordero","year":"1997","unstructured":"Cordero R (1997) Changing human resources to make flexible manufacturing system (FMS) successful. J High Technol Manag Res 8(2):263\u2013275","journal-title":"J High Technol Manag Res"},{"key":"443_CR24","unstructured":"De Groote X (1988) The manufacturing\/marketing interface. Wharton Decision Sciences, working paper No 88-09-06"},{"key":"443_CR024","unstructured":"Duperrin JC, Godet M (1973) Methode De Hierar Chization Des Elements D\u2019um System. In: Proceedings of Rapport Economique De CEA. Paris, pp 45\u201351"},{"issue":"4","key":"443_CR25","first-page":"532","volume":"12","author":"MN Faisal","year":"2006","unstructured":"Faisal MN, Banwat DK, Shankar R (2006) Supply chain risk mitigation: modeling the enablers. Bus Process Manag J 12(4):532\u2013552","journal-title":"Bus Process Manag J"},{"issue":"6","key":"443_CR26","doi-asserted-by":"crossref","first-page":"677","DOI":"10.1108\/17410390710830727","volume":"20","author":"MN Faisal","year":"2007","unstructured":"Faisal MN, Banwat DK, Shankar R (2007) Information risks management in supply chain: an assessment and mitigation framework. J Enterp Inf Manag 20(6):677\u2013699","journal-title":"J Enterp Inf Manag"},{"issue":"2","key":"443_CR27","doi-asserted-by":"crossref","first-page":"149","DOI":"10.1016\/0045-7906(75)90004-X","volume":"2","author":"DR Farris","year":"1975","unstructured":"Farris DR, Sage AP (1975) On the use of interpretive structural modeling for worth assessment. Comput Electr Eng 2(2):149\u2013174","journal-title":"Comput Electr Eng"},{"key":"443_CR28","doi-asserted-by":"crossref","first-page":"150","DOI":"10.1016\/j.jmatprotec.2004.09.012","volume":"157","author":"M Ficko","year":"2004","unstructured":"Ficko M, Brezocnik M, Balic J (2004) Designing the layout of single- and multiple-rows flexible manufacturing system by genetic algorithms. J Mater Process Technol 157:150\u2013158","journal-title":"J Mater Process Technol"},{"key":"443_CR29","doi-asserted-by":"crossref","unstructured":"Filote C, Ciufudean C (2010) Discrete event models for flexible manufacturing cells. In: Aized T (ed) Future manufacturing systems. In Tech. ISBN: 978-953-307-128-2. http:\/\/www.intechopen.com\/books\/future-manufacturing-systems\/discrete-event-models-for-flexiblemanufacturing-cells","DOI":"10.5772\/10238"},{"issue":"1","key":"443_CR30","first-page":"67","volume":"1","author":"S Grave","year":"1988","unstructured":"Grave S (1988) Safety stocks in manufacturing systems. J Manuf Oper Manag 1(1):67\u2013101","journal-title":"J Manuf Oper Manag"},{"key":"443_CR31","volume-title":"Automation, production systems and computer integrated manufacturing","author":"MP Groover","year":"2003","unstructured":"Groover MP (2003) Automation, production systems and computer integrated manufacturing. Prentice-Hall, Inc, New Delhi"},{"issue":"4","key":"443_CR32","first-page":"7","volume":"31","author":"RA Inman","year":"1991","unstructured":"Inman RA (1991) Flexible manufacturing systems: issues and implementation. Ind Manag 31(4):7\u201311","journal-title":"Ind Manag"},{"issue":"3","key":"443_CR33","doi-asserted-by":"crossref","first-page":"350","DOI":"10.1007\/s13198-015-0368-0","volume":"6","author":"V Jain","year":"2015","unstructured":"Jain V, Raj T (2015) Modeling and analysis of FMS flexibility factors by TISM and fuzzy MICMAC. Int J Syst Assur Eng Manag 6(3):350\u2013371","journal-title":"Int J Syst Assur Eng Manag"},{"issue":"8","key":"443_CR34","doi-asserted-by":"crossref","first-page":"700","DOI":"10.1108\/17410400410569116","volume":"53","author":"S Jharkharia","year":"2004","unstructured":"Jharkharia S, Shankar R (2004) IT enablement of supply chains: modelling the enablers. Int J Product Perform Manag 53(8):700\u2013712","journal-title":"Int J Product Perform Manag"},{"issue":"8","key":"443_CR35","doi-asserted-by":"crossref","first-page":"700","DOI":"10.1108\/17410400410569116","volume":"53","author":"S Jharkharia","year":"2005","unstructured":"Jharkharia S, Shankar R (2005) IT enablement of supply chains: modeling the enablers. Int J Product Perform Manag 53(8):700\u2013712","journal-title":"Int J Product Perform Manag"},{"issue":"7","key":"443_CR36","doi-asserted-by":"crossref","first-page":"957","DOI":"10.1080\/00207548708919888","volume":"25","author":"V Kumar","year":"1987","unstructured":"Kumar V (1987) Entropic measures of manufacturing flexibility. Int J Prod Res 25(7):957\u2013966","journal-title":"Int J Prod Res"},{"issue":"4","key":"443_CR37","doi-asserted-by":"crossref","first-page":"511","DOI":"10.1007\/s13198-014-0279-5","volume":"6","author":"S Kumar","year":"2015","unstructured":"Kumar S, Sharma RK (2015) An ISM based framework for structural relationship among various manufacturing flexibility dimensions. Int J Syst Assur Eng Manag 6(4):511\u2013521","journal-title":"Int J Syst Assur Eng Manag"},{"issue":"2","key":"443_CR38","doi-asserted-by":"crossref","first-page":"1043","DOI":"10.1016\/j.ejor.2005.06.025","volume":"175","author":"AP Kumar","year":"2006","unstructured":"Kumar AP, Tiwari MK, Shankar R, Baveja A (2006) Solving machine-loading problem of a flexible manufacturing system with a constraint-based genetic algorithm. Eur J Oper Res 175(2):1043\u20131069","journal-title":"Eur J Oper Res"},{"issue":"4","key":"443_CR39","doi-asserted-by":"crossref","first-page":"407","DOI":"10.1016\/S0272-6963(98)00021-7","volume":"16","author":"MK Malhotra","year":"1998","unstructured":"Malhotra MK, Grover V (1998) An assessment of survey research in POM: from constructs to theory. J Oper Manag 16(4):407\u2013425","journal-title":"J Oper Manag"},{"key":"443_CR40","doi-asserted-by":"crossref","first-page":"397","DOI":"10.1109\/PROC.1975.9765","volume":"63","author":"DW Malone","year":"1975","unstructured":"Malone DW (1975) An Introduction to the application of interpretive structural modelling. Proc IEEE 63:397\u2013404","journal-title":"Proc IEEE"},{"issue":"1","key":"443_CR41","first-page":"35","volume":"11","author":"S Mishra","year":"2012","unstructured":"Mishra S, Datta S, Mahapatra SS (2012) Interrelationship of drivers for agile manufacturing: an Indian experience. Int J Serv Oper Manag 11(1):35\u201348","journal-title":"Int J Serv Oper Manag"},{"issue":"4","key":"443_CR42","first-page":"309","volume":"4","author":"B Nagar","year":"2012","unstructured":"Nagar B, Raj T (2012) Analysis of critical success factors for implementation of humanised flexible manufacturing system in industries. Int J Logist Econ Glob 4(4):309\u2013329","journal-title":"Int J Logist Econ Glob"},{"issue":"1","key":"443_CR43","doi-asserted-by":"crossref","first-page":"91","DOI":"10.1504\/IJSEAM.2012.044990","volume":"1","author":"NK Nayak","year":"2012","unstructured":"Nayak NK, Ray PK (2012) Production system flexibility and product quality relationships in manufacturing firm: an empirical research. Int J Strateg Eng Asset Manag 1(1):91\u2013113","journal-title":"Int J Strateg Eng Asset Manag"},{"key":"443_CR44","doi-asserted-by":"crossref","first-page":"487","DOI":"10.1016\/S0167-9236(02)00128-8","volume":"35","author":"M Ozbayrak","year":"2003","unstructured":"Ozbayrak M, Bell R (2003) A knowledge-based decision support system for the management of parts and tools in FMS. Decis Support Syst 35:487\u2013515","journal-title":"Decis Support Syst"},{"key":"443_CR45","first-page":"203","volume-title":"The second industrial divide: possibilities for prosperity","author":"MJ Piore","year":"1984","unstructured":"Piore MJ, Sabel CF (1984) The second industrial divide: possibilities for prosperity. Basic Books, New York, p 203"},{"issue":"6","key":"443_CR46","doi-asserted-by":"crossref","first-page":"4","DOI":"10.1108\/01443579610119054","volume":"16","author":"PL Primrose","year":"1996","unstructured":"Primrose PL, Verter V (1996) Do companies need to measure their production flexibility. Int J Oper Prod Manag 16(6):4\u201311","journal-title":"Int J Oper Prod Manag"},{"issue":"8","key":"443_CR47","doi-asserted-by":"crossref","first-page":"689","DOI":"10.1108\/17410400710833001","volume":"56","author":"MN Qureshi","year":"2007","unstructured":"Qureshi MN, Kumar D, Kumar P (2007) Modeling the logistics outsourcing relationships variables to enhance shippers productivity and competitiveness in logistics supply chain. Int J Product Perform Manag 56(8):689\u2013714","journal-title":"Int J Product Perform Manag"},{"key":"443_CR48","unstructured":"Raj T (2004) Improving productivity and flexibility of a machine shop by implementing AMT. Un-published M.E. Production Engineering Dissertation, Department of Mechanical Engineering, Delhi College of Engineering, Delhi University, India"},{"issue":"24","key":"443_CR49","first-page":"1","volume":"46","author":"T Raj","year":"2007","unstructured":"Raj T, Shankar R, Suhaib M (2007) An ISM approach for modeling the enablers of flexible manufacturing system: the case of India. Int J Prod Res 46(24):1\u201330","journal-title":"Int J Prod Res"},{"issue":"24","key":"443_CR50","doi-asserted-by":"crossref","first-page":"6883","DOI":"10.1080\/00207540701429926","volume":"46","author":"T Raj","year":"2008","unstructured":"Raj T, Shankar R, Suhaib M (2008) An ISM approach for modeling the enablers of flexible manufacturing system: the case for India. Int J Prod Res 46(24):6883\u20136912","journal-title":"Int J Prod Res"},{"issue":"4","key":"443_CR51","doi-asserted-by":"crossref","first-page":"417","DOI":"10.1504\/IJMTM.2009.023756","volume":"16","author":"T Raj","year":"2009","unstructured":"Raj T, Shankar R, Suhaib M (2009) An ISM approach to analyse interaction between barriers of transition to flexible manufacturing system. Int J Manuf Technol Manage 16(4):417\u2013438","journal-title":"Int J Manuf Technol Manage"},{"issue":"4","key":"443_CR52","first-page":"350","volume":"11","author":"T Raj","year":"2012","unstructured":"Raj T, Attri R, Jain V (2012) Modeling the factors affecting flexibility in FMS. Int J Ind Syst Eng 11(4):350\u2013374","journal-title":"Int J Ind Syst Eng"},{"issue":"4","key":"443_CR53","doi-asserted-by":"crossref","first-page":"50","DOI":"10.1108\/01443579410056038","volume":"14","author":"KVS Rao","year":"1994","unstructured":"Rao KVS, Deshmukh SG (1994) Strategic framework for implementing flexible manufacturing systems in India. Int J Oper Prod Manag 14(4):50\u201363","journal-title":"Int J Oper Prod Manag"},{"issue":"8","key":"443_CR54","doi-asserted-by":"crossref","first-page":"1011","DOI":"10.1016\/j.techfore.2004.07.002","volume":"72","author":"V Ravi","year":"2005","unstructured":"Ravi V, Shankar R (2005) Analysis of interactions among the barriers of reverse logistics. Technol Forecast Social Changes 72(8):1011\u20131029","journal-title":"Technol Forecast Social Changes"},{"issue":"4","key":"443_CR55","doi-asserted-by":"crossref","first-page":"289","DOI":"10.1007\/BF00186471","volume":"2","author":"AK Sethi","year":"1990","unstructured":"Sethi AK, Sethi SP (1990) Flexibility in manufacturing: a survey. Int J Flex Manuf Syst 2(4):289\u2013328","journal-title":"Int J Flex Manuf Syst"},{"key":"443_CR056","doi-asserted-by":"crossref","unstructured":"Sharma S, Terence AS, Shin J (1995) Consumer ethnocentrism: a test of antecedents and moderators. J Acad Mark Sci 23(1):26\u201337","DOI":"10.1007\/BF02894609"},{"issue":"4","key":"443_CR56","doi-asserted-by":"crossref","first-page":"619","DOI":"10.1108\/14637151111149456","volume":"17","author":"RK Singh","year":"2011","unstructured":"Singh RK (2011) Developing the framework for coordination in supply chain of SMEs. Bus Process Manag J 17(4):619\u2013638","journal-title":"Bus Process Manag J"},{"issue":"4","key":"443_CR57","doi-asserted-by":"crossref","first-page":"423","DOI":"10.1504\/IJPQM.2007.013336","volume":"2","author":"R Singh","year":"2007","unstructured":"Singh R, Garg S (2007) Interpretive structural modeling of factors for improving competitiveness of SMEs. Int J Product Qual Manag 2(4):423\u2013440","journal-title":"Int J Product Qual Manag"},{"issue":"2","key":"443_CR58","first-page":"141","volume":"3","author":"MD Singh","year":"2008","unstructured":"Singh MD, Kant R (2008) Knowledge management barriers: an interpretive structural modeling approach. Int J Manag Sci Eng Manag 3(2):141\u2013150","journal-title":"Int J Manag Sci Eng Manag"},{"issue":"1","key":"443_CR59","doi-asserted-by":"crossref","first-page":"28","DOI":"10.1108\/97279810380000356","volume":"1","author":"MD Singh","year":"2003","unstructured":"Singh MD, Shankar R, Narain R, Agarwal A (2003) An interpretive structural modeling of knowledge management in engineering industries. J Adv Manag Res 1(1):28\u201340","journal-title":"J Adv Manag Res"},{"issue":"1","key":"443_CR60","first-page":"96","volume":"10","author":"A Singholi","year":"2012","unstructured":"Singholi A, Ali M, Sharma C (2012) Impact of manufacturing flexibility on FMS performance: a simulation study. Int J Ind Syst Eng 10(1):96\u2013116","journal-title":"Int J Ind Syst Eng"},{"issue":"2","key":"443_CR61","first-page":"240","volume":"16","author":"A Singholi","year":"2013","unstructured":"Singholi A, Ali M, Sharma C (2013) Evaluating the effect of machine and routing flexibility on flexible manufacturing system performance. Int J Serv Oper Manag 16(2):240\u2013261 (ISSN:1744-2389)","journal-title":"Int J Serv Oper Manag"},{"issue":"3","key":"443_CR62","doi-asserted-by":"crossref","first-page":"193","DOI":"10.1016\/0278-6125(87)90018-5","volume":"6","author":"YK Soon","year":"1987","unstructured":"Soon YK, Park CS (1987) Economic measure of productivity, quality and flexibility in advanced manufacturing systems. J Manuf Syst 6(3):193\u2013207","journal-title":"J Manuf Syst"},{"key":"443_CR63","doi-asserted-by":"crossref","first-page":"185","DOI":"10.1016\/0166-3615(93)90135-N","volume":"21","author":"MR Spano","year":"1993","unstructured":"Spano MR, O\u2019Grady PJ, Young RE (1993) The design of flexible manufacturing systems. Comput Ind 21:185\u2013198","journal-title":"Comput Ind"},{"issue":"4","key":"443_CR64","first-page":"292","volume":"5","author":"C Subramanian","year":"2010","unstructured":"Subramanian C, Chandrasekaran M, Govind DS (2010) Analyzing the buyer supplier relationship factors: an integrated modeling approach. Int J Manag Sci Eng Manag 5(4):292\u2013301","journal-title":"Int J Manag Sci Eng Manag"},{"key":"443_CR65","doi-asserted-by":"crossref","first-page":"116","DOI":"10.1016\/j.ijpe.2005.07.007","volume":"105","author":"S Sujono","year":"2007","unstructured":"Sujono S, Lashkari RS (2007) A multi-objective model of operation allocation and material handling system selection in FMS design. Int J Prod Econ 105:116\u2013133","journal-title":"Int J Prod Econ"},{"key":"443_CR66","unstructured":"Swamidass P (1988) Manufacturing flexibility. Monograph No. 2. Operations Management Association"},{"issue":"1","key":"443_CR67","doi-asserted-by":"crossref","first-page":"25","DOI":"10.1108\/17410400710717073","volume":"56","author":"J Thakkar","year":"2007","unstructured":"Thakkar J, Deshmukh SG, Gupta AD, Shankar R (2007) Development of score card: an integrated approach of ISM and ANP. Int J Product Perform Manag 56(1):25\u201359","journal-title":"Int J Product Perform Manag"},{"issue":"1","key":"443_CR68","doi-asserted-by":"crossref","first-page":"92","DOI":"10.1108\/17410380810843471","volume":"19","author":"J Thakkar","year":"2008","unstructured":"Thakkar J, Kanda A, Deshmukh SG (2008) Evaluation of buyer-supplier relationships using an integrated mathematical approach of interpretive structural modeling (ISM) and graph theoretic approach. J Manuf Technol Manag 19(1):92\u2013124","journal-title":"J Manuf Technol Manag"},{"key":"443_CR69","doi-asserted-by":"crossref","first-page":"3665","DOI":"10.1016\/j.enpol.2007.01.009","volume":"35","author":"B Tonn","year":"2007","unstructured":"Tonn B, Peretz JH (2007) State level benefits of energy efficiency. Energy Policy 35:3665\u20133674","journal-title":"Energy Policy"},{"issue":"5","key":"443_CR70","first-page":"1","volume":"4","author":"RK Verma","year":"2014","unstructured":"Verma RK (2014) Implementation of interpretive structural model and topsis in manufacturing industries for supplier selection. Ind Eng Lett 4(5):1\u20138","journal-title":"Ind Eng Lett"},{"issue":"5","key":"443_CR71","doi-asserted-by":"crossref","first-page":"441","DOI":"10.1109\/TSMC.1973.4309270","volume":"3","author":"JN Warfield","year":"1973","unstructured":"Warfield JN (1973) Binary matrices in systems modeling. IEEE Trans Syst Men Cybern 3(5):441\u2013449","journal-title":"IEEE Trans Syst Men Cybern"},{"issue":"1","key":"443_CR72","first-page":"51","volume":"4","author":"J Warfield","year":"1974","unstructured":"Warfield J (1974) Developing interconnected matrices in structural modelling. IEEE Trans Syst Men Cybern 4(1):51\u201381","journal-title":"IEEE Trans Syst Men Cybern"}],"container-title":["International Journal of System Assurance Engineering and Management"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s13198-016-0443-1\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s13198-016-0443-1.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s13198-016-0443-1","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s13198-016-0443-1.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,9,5]],"date-time":"2019-09-05T18:12:06Z","timestamp":1567707126000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s13198-016-0443-1"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2016,3,18]]},"references-count":74,"journal-issue":{"issue":"2","published-print":{"date-parts":[[2017,6]]}},"alternative-id":["443"],"URL":"https:\/\/doi.org\/10.1007\/s13198-016-0443-1","relation":{},"ISSN":["0975-6809","0976-4348"],"issn-type":[{"value":"0975-6809","type":"print"},{"value":"0976-4348","type":"electronic"}],"subject":[],"published":{"date-parts":[[2016,3,18]]}}}