{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,8,23]],"date-time":"2025-08-23T05:13:48Z","timestamp":1755926028074},"reference-count":29,"publisher":"Springer Science and Business Media LLC","issue":"1","license":[{"start":{"date-parts":[[2016,10,17]],"date-time":"2016-10-17T00:00:00Z","timestamp":1476662400000},"content-version":"unspecified","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Int J Syst Assur Eng Manag"],"published-print":{"date-parts":[[2017,3]]},"DOI":"10.1007\/s13198-016-0536-x","type":"journal-article","created":{"date-parts":[[2016,10,17]],"date-time":"2016-10-17T08:00:40Z","timestamp":1476691240000},"page":"123-134","update-policy":"http:\/\/dx.doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":2,"title":["Joint quality control and preventive maintenance strategy: a unique taguchi approach"],"prefix":"10.1007","volume":"8","author":[{"given":"A.","family":"Azadeh","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"M.","family":"Sheikhalishahi","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"S.","family":"Mortazavi","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"E. Ahmadi","family":"Jooghi","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2016,10,17]]},"reference":[{"issue":"5","key":"536_CR1","doi-asserted-by":"crossref","first-page":"899","DOI":"10.1080\/0020754042000298511","volume":"43","author":"HK Alfares","year":"2005","unstructured":"Alfares HK, Khursheed SN, Noman SM (2005) Integrating quality and maintenance decisions in a production-inventory model for deteriorating items. Int J Prod Res 43(5):899\u2013911","journal-title":"Int J Prod Res"},{"issue":"23","key":"536_CR2","doi-asserted-by":"crossref","first-page":"6870","DOI":"10.1080\/00207543.2011.631601","volume":"50","author":"S Ayed","year":"2012","unstructured":"Ayed S, Sofiene D, Nidhal R (2012) Joint optimization of maintenance and production policies considering random demand and variable production rate. Int J Prod Res 50(23):6870\u20136885","journal-title":"Int J Prod Res"},{"issue":"18","key":"536_CR3","doi-asserted-by":"crossref","first-page":"5374","DOI":"10.1080\/00207543.2013.774496","volume":"51","author":"A Azadeh","year":"2013","unstructured":"Azadeh A, Sheikhalishahi M, Firoozi M, Khalili SM (2013) An integrated multi-criteria Taguchi computer simulation-DEA approach for optimum maintenance policy and planning by incorporating learning effects. Int J Prod Res 51(18):5374\u20135385","journal-title":"Int J Prod Res"},{"issue":"2","key":"536_CR4","doi-asserted-by":"crossref","first-page":"181","DOI":"10.1080\/0951192X.2013.812804","volume":"27","author":"A Azadeh","year":"2014","unstructured":"Azadeh A, Sheikhalishahi M, Khalili SM, Firoozi M (2014) An integrated fuzzy simulation\u2013fuzzy data envelopment analysis approach for optimum maintenance planning. Int J Comput Integrated Manuf 27(2):181\u2013199","journal-title":"Int J Comput Integrated Manuf"},{"key":"536_CR5","doi-asserted-by":"crossref","unstructured":"Azadivar F (1999) Simulation optimization methodologies. In: Proceedings of the 31st conference on winter simulation: simulation\u2014a bridge to the future ACM, vol 1, pp 93\u2013100","DOI":"10.1145\/324138.324168"},{"issue":"3","key":"536_CR6","doi-asserted-by":"crossref","first-page":"257","DOI":"10.1016\/S0925-5273(01)00168-2","volume":"76","author":"M Ben-Daya","year":"2002","unstructured":"Ben-Daya M (2002) The economic production lot-sizing problem with imperfect production processes and imperfect maintenance. Int J Prod Econ 76(3):257\u2013264","journal-title":"Int J Prod Econ"},{"issue":"3","key":"536_CR7","doi-asserted-by":"crossref","first-page":"1142","DOI":"10.1016\/j.ejor.2008.03.037","volume":"197","author":"V Boschian","year":"2009","unstructured":"Boschian V, Rezg N, Chelbi A (2009) Contribution of simulation to the optimization of maintenance strategies for a randomly failing production system. Eur J Oper Res 197(3):1142\u20131149","journal-title":"Eur J Oper Res"},{"issue":"3","key":"536_CR8","doi-asserted-by":"crossref","first-page":"712","DOI":"10.1016\/S0377-2217(03)00254-6","volume":"156","author":"A Chelbi","year":"2004","unstructured":"Chelbi A, Ait-Kadi D (2004) Analysis of a production inventory system with randomly failing production unit submitted to regular preventive maintenance. Eur J Oper Res 156(3):712\u2013718","journal-title":"Eur J Oper Res"},{"issue":"3","key":"536_CR9","first-page":"123","volume":"10","author":"YC Chen","year":"2013","unstructured":"Chen YC (2013) Optimal production and inspection strategy with inspection time and reworking for a deteriorating process. Int J Oper Res 10(3):123\u2013133","journal-title":"Int J Oper Res"},{"issue":"1","key":"536_CR10","doi-asserted-by":"crossref","first-page":"455","DOI":"10.1016\/j.cirp.2012.03.072","volume":"61","author":"M Colledani","year":"2012","unstructured":"Colledani M, Tolio T (2012) Integrated quality, production logistics and maintenance analysis of multi-stage asynchronous manufacturing systems with degrading machines. CIRP Ann Manuf Technol 61(1):455\u2013458","journal-title":"CIRP Ann Manuf Technol"},{"issue":"1","key":"536_CR11","doi-asserted-by":"crossref","first-page":"126","DOI":"10.1016\/j.ijpe.2012.01.023","volume":"137","author":"K Dhouib","year":"2012","unstructured":"Dhouib K, Gharbi A, Ben Aziza MN (2012) Joint optimal production control\/preventive maintenance policy for imperfect process manufacturing cell. Int J Prod Econ 137(1):126\u2013136","journal-title":"Int J Prod Econ"},{"key":"536_CR12","doi-asserted-by":"crossref","unstructured":"Fu MC, Glover FW, April J (2005) Simulation optimization: a review, new developments, and applications. In: 2005 Proceedings of the winter simulation conference. IEEE, 13\u00a0pp","DOI":"10.1109\/WSC.2005.1574242"},{"issue":"3","key":"536_CR13","doi-asserted-by":"crossref","first-page":"19","DOI":"10.1108\/02656719510084754","volume":"12","author":"BS Huang","year":"1995","unstructured":"Huang BS, Chiu HN (1995) The quality management of the imperfect production process under two monitoring policies. Int J Qual Reliab Manag 12(3):19\u201331","journal-title":"Int J Qual Reliab Manag"},{"issue":"4","key":"536_CR14","doi-asserted-by":"crossref","first-page":"41","DOI":"10.1108\/13552519510105197","volume":"1","author":"V Makis","year":"1995","unstructured":"Makis V, Fung J (1995) Optimal preventive replacement, lot sizing and inspection policy for a deteriorating production system. J Qual Maint Eng 1(4):41\u201355","journal-title":"J Qual Maint Eng"},{"issue":"3","key":"536_CR15","doi-asserted-by":"crossref","first-page":"577","DOI":"10.1016\/0377-2217(95)00313-4","volume":"95","author":"RD Meller","year":"1996","unstructured":"Meller RD, Kim DS (1996) The impact of preventive maintenance on system cost and buffer size. Eur J Oper Res 95(3):577\u2013591","journal-title":"Eur J Oper Res"},{"key":"536_CR16","doi-asserted-by":"crossref","unstructured":"Rahim MA, Ben-Daya M (2001) Joint determination of production quantity, inspection schedule, and quality control for an imperfect process with deteriorating products. J Oper Res Soc 1370\u20131378","DOI":"10.1057\/palgrave.jors.2601238"},{"issue":"10","key":"536_CR17","doi-asserted-by":"crossref","first-page":"2029","DOI":"10.1080\/00207540310001638235","volume":"42","author":"N Rezg","year":"2004","unstructured":"Rezg N, Xie X, Mati Y (2004) Joint optimization of preventive maintenance and inventory control in a production line using simulation. Int J Prod Res 42(10):2029\u20132046","journal-title":"Int J Prod Res"},{"issue":"2\u20133","key":"536_CR18","doi-asserted-by":"crossref","first-page":"225","DOI":"10.1080\/0951192052000288152","volume":"18","author":"N Rezg","year":"2005","unstructured":"Rezg N, Chelbi A, Xie X (2005) Modeling and optimizing a joint inventory control and preventive maintenance strategy for a randomly failing production unit: analytical and simulation approaches. Int J Comput Integr Manuf 18(2\u20133):225\u2013235","journal-title":"Int J Comput Integr Manuf"},{"issue":"19","key":"536_CR19","doi-asserted-by":"crossref","first-page":"5349","DOI":"10.1080\/00207540802273942","volume":"46","author":"N Rezg","year":"2008","unstructured":"Rezg N, Dellagi S, Chelbi A (2008) Joint optimal inventory control and preventive maintenance policy. Int J Prod Res 46(19):5349\u20135365","journal-title":"Int J Prod Res"},{"issue":"1","key":"536_CR20","doi-asserted-by":"crossref","first-page":"405","DOI":"10.1016\/j.ejor.2005.08.007","volume":"176","author":"MA Ribeiro","year":"2007","unstructured":"Ribeiro MA, Silveira JL, Qassim RY (2007) Joint optimisation of maintenance and buffer size in a manufacturing system. Eur J Oper Res 176(1):405\u2013413","journal-title":"Eur J Oper Res"},{"issue":"6","key":"536_CR21","doi-asserted-by":"crossref","first-page":"807","DOI":"10.1002\/1520-6750(199012)37:6<807::AID-NAV3220370602>3.0.CO;2-F","volume":"37","author":"MH Safizadeh","year":"1990","unstructured":"Safizadeh MH (1990) Optimization in simulation: current issues and the future outlook. Nav Res Logist 37(6):807\u2013825","journal-title":"Nav Res Logist"},{"issue":"1","key":"536_CR22","doi-asserted-by":"crossref","first-page":"157","DOI":"10.1016\/S0925-5273(01)00122-0","volume":"74","author":"MK Salameh","year":"2001","unstructured":"Salameh MK, Ghattas RE (2001) Optimal just-in-time buffer inventory for regular preventive maintenance. Int J Prod Econ 74(1):157\u2013161","journal-title":"Int J Prod Econ"},{"issue":"23","key":"536_CR23","doi-asserted-by":"crossref","first-page":"6763","DOI":"10.1080\/00207543.2011.623838","volume":"50","author":"SS Sana","year":"2012","unstructured":"Sana SS (2012) Preventive maintenance and optimal buffer inventory for products sold with warranty in an imperfect production system. Int J Prod Res 50(23):6763\u20136774","journal-title":"Int J Prod Res"},{"issue":"9","key":"536_CR24","doi-asserted-by":"crossref","first-page":"858","DOI":"10.1080\/0951192X.2013.869832","volume":"27","author":"M Sheikhalishahi","year":"2014","unstructured":"Sheikhalishahi M (2014) An integrated simulation data envelopment analysis approach for maintenance activities planning. Int J Comput Integr Manuf 27(9):858\u2013868","journal-title":"Int J Comput Integr Manuf"},{"issue":"6","key":"536_CR25","doi-asserted-by":"crossref","first-page":"1455","DOI":"10.1007\/s10845-013-0752-z","volume":"25","author":"M Sheikhalishahi","year":"2014","unstructured":"Sheikhalishahi M, Ebrahimipour V, Farahani MH (2014) An integrated GA-DEA algorithm for determining the most effective maintenance policy for ak-out-of-n problem. J Intell Manuf 25(6):1455\u20131462","journal-title":"J Intell Manuf"},{"issue":"1","key":"536_CR26","doi-asserted-by":"crossref","first-page":"19","DOI":"10.1016\/j.ijpe.2012.01.006","volume":"137","author":"S Suliman","year":"2012","unstructured":"Suliman S, Jawad SH (2012) Optimization of preventive maintenance schedule and production lot size. Int J Prod Econ 137(1):19\u201328","journal-title":"Int J Prod Econ"},{"key":"536_CR27","unstructured":"Taguchi G, Yokoyama Y (1993) Taguchi methods: design of experiments, vol 4. Am Suppl Inst"},{"issue":"2","key":"536_CR28","doi-asserted-by":"crossref","first-page":"191","DOI":"10.1016\/S0925-5273(98)00059-0","volume":"55","author":"ST Tseng","year":"1998","unstructured":"Tseng ST, Yeh RH, Ho WT (1998) Imperfect maintenance policies for deteriorating production systems. Int J Prod Econ 55(2):191\u2013201","journal-title":"Int J Prod Econ"},{"issue":"2","key":"536_CR29","doi-asserted-by":"crossref","first-page":"686","DOI":"10.1016\/j.ijpe.2007.02.037","volume":"111","author":"RI Zequeira","year":"2008","unstructured":"Zequeira RI, Valdes JE, Berenguer C (2008) Optimal buffer inventory and opportunistic preventive maintenance under random production capacity availability. Int J Prod Econ 111(2):686\u2013696","journal-title":"Int J Prod Econ"}],"container-title":["International Journal of System Assurance Engineering and Management"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s13198-016-0536-x.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s13198-016-0536-x\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s13198-016-0536-x.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2017,6,25]],"date-time":"2017-06-25T01:18:57Z","timestamp":1498353537000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s13198-016-0536-x"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2016,10,17]]},"references-count":29,"journal-issue":{"issue":"1","published-print":{"date-parts":[[2017,3]]}},"alternative-id":["536"],"URL":"https:\/\/doi.org\/10.1007\/s13198-016-0536-x","relation":{},"ISSN":["0975-6809","0976-4348"],"issn-type":[{"value":"0975-6809","type":"print"},{"value":"0976-4348","type":"electronic"}],"subject":[],"published":{"date-parts":[[2016,10,17]]}}}