{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,4,24]],"date-time":"2026-04-24T21:55:13Z","timestamp":1777067713569,"version":"3.51.4"},"reference-count":46,"publisher":"Springer Science and Business Media LLC","issue":"S2","license":[{"start":{"date-parts":[[2017,5,26]],"date-time":"2017-05-26T00:00:00Z","timestamp":1495756800000},"content-version":"unspecified","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Int J Syst Assur Eng Manag"],"published-print":{"date-parts":[[2017,11]]},"DOI":"10.1007\/s13198-017-0635-3","type":"journal-article","created":{"date-parts":[[2017,5,26]],"date-time":"2017-05-26T03:17:02Z","timestamp":1495768622000},"page":"1630-1642","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":12,"title":["Integrated production scheduling and maintenance planning in a hybrid flow shop system: a multi-objective approach"],"prefix":"10.1007","volume":"8","author":[{"ORCID":"https:\/\/orcid.org\/0000-0003-1209-9514","authenticated-orcid":false,"given":"Mostafa","family":"Zandieh","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Seyed Mojtaba","family":"Sajadi","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Reza","family":"Behnoud","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2017,5,26]]},"reference":[{"key":"635_CR1","doi-asserted-by":"crossref","first-page":"131","DOI":"10.1023\/B:JIMS.0000018029.60981.e6","volume":"15","author":"KP Adzapka","year":"2004","unstructured":"Adzapka KP, Adjallah KH, Yalaoui F (2004) On-line maintenance job scheduling and assignment to resources in distributed systems by heuristic-based optimization. J Intell Manuf 15:131\u2013140","journal-title":"J Intell Manuf"},{"key":"635_CR2","doi-asserted-by":"crossref","first-page":"161","DOI":"10.1016\/j.ijpe.2006.08.017","volume":"112","author":"H Allaoui","year":"2008","unstructured":"Allaoui H, Lamouri S, Artiba A, Aghezzaf E (2008) Simultaneously scheduling n jobs and the preventive maintenance on the two-machine flowshop to minimize the makespan. Int J Prod Econ 112:161\u2013167","journal-title":"Int J Prod Econ"},{"key":"635_CR3","first-page":"732","volume":"4448","author":"L Amodeo","year":"2007","unstructured":"Amodeo L, Chen H, El-Hadji A (2007) Multi-objective supply chain optimization: an industrial case study. Appl Evolut Comput 4448:732\u2013741","journal-title":"Appl Evolut Comput"},{"key":"635_CR4","doi-asserted-by":"crossref","first-page":"797","DOI":"10.1016\/j.camwa.2010.12.028","volume":"61","author":"F Angelo-Bello","year":"2011","unstructured":"Angelo-Bello F, Alvarez A, Pacheco J, Martinez I (2011) A heuristic approach for a scheduling problem with periodic maintenance and sequence-dependent setup times. Comput Math Appl 61:797\u2013808","journal-title":"Comput Math Appl"},{"key":"635_CR5","doi-asserted-by":"crossref","first-page":"255","DOI":"10.1007\/s10288-006-0002-8","volume":"4","author":"M Basseur","year":"2006","unstructured":"Basseur M (2006) Design of cooperative algorithms for multi-objective optimization: application to flowshop scheduling problems. 4OR 4:255\u2013258","journal-title":"4OR"},{"key":"635_CR6","doi-asserted-by":"crossref","unstructured":"Bechikh S, Belgasmi N, Ben Said L, Gh\u00e9dira K (2008) PHC-NSGA-II: a novel multi-objective memetic algorithm for continuous optimization. In: 20th IEEE international conference on tools with artificial intelligence, pp 180\u2013189","DOI":"10.1109\/ICTAI.2008.87"},{"key":"635_CR7","doi-asserted-by":"crossref","first-page":"4949","DOI":"10.1080\/00207540902998349","volume":"48","author":"J Behnamian","year":"2010","unstructured":"Behnamian J, Zandieh M, Fatemi Ghomi SMT (2010) A multi-phase covering Pareto-optimum front method to multi-objective parallel machine scheduling. Int J Prod Res 48:4949\u20134976","journal-title":"Int J Prod Res"},{"issue":"4","key":"635_CR8","doi-asserted-by":"crossref","first-page":"389","DOI":"10.1007\/s10845-008-0113-5","volume":"20","author":"A Berrichi","year":"2009","unstructured":"Berrichi A, Amodeo L, Yalaoui F, Chatelet E, Mezghiche M (2009) Bi-objective optimization algorithms for joint production and maintenance scheduling: application to the parallel machine problem. J Intell Manuf 20(4):389\u2013400","journal-title":"J Intell Manuf"},{"key":"635_CR9","unstructured":"Coellom CA, Cortes NC (2002) Solving multi-objective optimization problems using an artificial immune system. In: Evolutionary computation group, Institute Polit\u00e9cnico Nacional No. 2508 Col. San Pedro Zacatenco M\u00e9xico"},{"key":"635_CR10","doi-asserted-by":"crossref","unstructured":"Deb K, Agrawal S, Pratab A, Meyarivan T (2000) A fast elitist non-dominated sorting genetic algorithm for multi-objective optimization: NSGA-II. In: KanGAL report 200001, Indian Institute of Technology, Kanpur","DOI":"10.1007\/3-540-45356-3_83"},{"key":"635_CR11","volume-title":"An introduction to reliability and maintainability engineering","author":"CE Ebeling","year":"1997","unstructured":"Ebeling CE (1997) An introduction to reliability and maintainability engineering. McGraw-Hill, New York"},{"key":"635_CR12","volume-title":"A guide to the theory of NP-completeness","author":"M Garey","year":"1979","unstructured":"Garey M, Johnson DS (1979) A guide to the theory of NP-completeness. W.H. Freeman and Company, San Francisco"},{"key":"635_CR13","unstructured":"Gaspar-Cunta A, Covas JA (2003) A real-word test problem for EMO algorithms. In: Lecture notes in computer science, LNCS 2632. Springer, Heidelberg, pp 752\u2013766"},{"key":"635_CR14","doi-asserted-by":"crossref","first-page":"1489","DOI":"10.1080\/00207549108948025","volume":"29","author":"JND Gupta","year":"1991","unstructured":"Gupta JND, Tunc EA (1991) Schedules for a two stage hybrid flowshop with parallel machines at the second stage. Int J Prod Res 29:1489\u20131502","journal-title":"Int J Prod Res"},{"issue":"3","key":"635_CR15","doi-asserted-by":"crossref","first-page":"103","DOI":"10.1007\/s13198-014-0249-y","volume":"6","author":"LA Hadidi","year":"2015","unstructured":"Hadidi LA, Rahim MA (2015) Reliability for multiple units adopting sequential imperfect maintenance policies. Int J Syst Assur Eng Manag 6(3):103\u2013109","journal-title":"Int J Syst Assur Eng Manag"},{"issue":"2","key":"635_CR16","doi-asserted-by":"crossref","first-page":"174","DOI":"10.1504\/IJOR.2012.045185","volume":"13","author":"LA Hadidi","year":"2012","unstructured":"Hadidi LA, Al-Turki UM, Rahim MA (2012a) Joint job scheduling and preventive maintenance on a single machine. Int J Oper Res 13(2):174\u2013184","journal-title":"Int J Oper Res"},{"issue":"1","key":"635_CR17","first-page":"21","volume":"10","author":"LA Hadidi","year":"2012","unstructured":"Hadidi LA, Al-Turki UM, Rahim MA (2012b) Integrated models in production planning and scheduling, maintenance and quality: a review. Int J Ind Syst Eng 10(1):21\u201350","journal-title":"Int J Ind Syst Eng"},{"issue":"3","key":"635_CR18","doi-asserted-by":"crossref","first-page":"224","DOI":"10.1007\/s13198-014-0291-9","volume":"6","author":"LA Hadidi","year":"2015","unstructured":"Hadidi LA, Al-Turki UM, Rahim MA (2015) Practical implications of managerial decisions to integrate production scheduling and maintenance. Int J Syst Assur Eng Manag 6(3):224\u2013230","journal-title":"Int J Syst Assur Eng Manag"},{"issue":"3","key":"635_CR19","doi-asserted-by":"crossref","first-page":"759","DOI":"10.1016\/j.scient.2011.05.023","volume":"18","author":"D Hajinejad","year":"2011","unstructured":"Hajinejad D, Salmasi N, Mokhtari R (2011) A fast hybrid particle swarm optimization algorithm for flow shop sequence dependent group scheduling problem. Sci Iran 18(3):759\u2013764","journal-title":"Sci Iran"},{"issue":"2","key":"635_CR20","doi-asserted-by":"crossref","first-page":"204","DOI":"10.1109\/TEVC.2003.810752","volume":"7","author":"H Ishibuchi","year":"2003","unstructured":"Ishibuchi H, Yoshida T, Murata T (2003) Balance between genetic search and local search in memetic algorithms for multi-objective permutation flowshop scheduling. IEEE Trans Evol Comput 7(2):204\u2013223","journal-title":"IEEE Trans Evol Comput"},{"key":"635_CR21","doi-asserted-by":"crossref","unstructured":"Kaabi J, Varnier C, Zerhouni N (2002) Heuristics for scheduling maintenance and production on a single machine. In: IEEE conference on systems, man and cybernetics, Hammamet","DOI":"10.1109\/ICSMC.2002.1176339"},{"key":"635_CR23","doi-asserted-by":"crossref","first-page":"165","DOI":"10.1016\/j.asoc.2014.06.020","volume":"23","author":"V Kapalanoglu","year":"2014","unstructured":"Kapalanoglu V (2014) Multi-agent based approach for single machine scheduling with sequence-dependent setup times and machine maintenance. Appl Soft Comput 23:165\u2013179","journal-title":"Appl Soft Comput"},{"issue":"1","key":"635_CR24","doi-asserted-by":"crossref","first-page":"66","DOI":"10.1016\/S0377-2217(03)00401-6","volume":"159","author":"ME Kurz","year":"2004","unstructured":"Kurz ME, Askin RG (2004) Scheduling flexible flow lines with sequence-dependent setup times. Eur J Oper Res 159(1):66\u201382","journal-title":"Eur J Oper Res"},{"key":"635_CR25","doi-asserted-by":"crossref","unstructured":"Landa-Silva JD, Burke EK, Petrovic S (2003) An introduction to multi-objectivemeta-heuristics for scheduling and timetabling. In: Automated scheduling, optimisation and planning research group, School of Computer Science and IT, University of Nottingham, Nottingham","DOI":"10.1007\/978-3-642-17144-4_4"},{"key":"635_CR26","doi-asserted-by":"crossref","first-page":"42","DOI":"10.1016\/j.ejor.2003.08.029","volume":"161","author":"T Loukil","year":"2005","unstructured":"Loukil T, Teghem J, Tuyttens D (2005) Solving multi-objective production scheduling problems using meta-heuristics. Eur J Oper Res 161:42\u201361","journal-title":"Eur J Oper Res"},{"key":"635_CR27","doi-asserted-by":"crossref","first-page":"465","DOI":"10.1016\/0305-0548(95)00029-1","volume":"23","author":"R Marett","year":"1996","unstructured":"Marett R, Wright M (1996) A comparison of neighborhood search techniques for multi-objective combinatorial problems. Comput Oper Res 23:465\u2013483","journal-title":"Comput Oper Res"},{"issue":"6","key":"635_CR28","doi-asserted-by":"crossref","first-page":"683","DOI":"10.1007\/s10845-008-0157-6","volume":"20","author":"B Naderi","year":"2009","unstructured":"Naderi B, Zandieh M, Fatemi Ghomi SMT (2009a) A study on integrating sequence dependent setup time flexible flow lines and preventive maintenance scheduling. J Intell Manuf 20(6):683\u2013694","journal-title":"J Intell Manuf"},{"issue":"1\u20132","key":"635_CR29","doi-asserted-by":"crossref","first-page":"170","DOI":"10.1007\/s00170-008-1693-0","volume":"43","author":"B Naderi","year":"2009","unstructured":"Naderi B, Zandieh M, Fatemi Ghomi SMT (2009b) Scheduling sequnce-dependent setup time job shops with preventive maintenance. Int J Adv Manuf Technol 43(1\u20132):170\u2013181","journal-title":"Int J Adv Manuf Technol"},{"issue":"2","key":"635_CR30","doi-asserted-by":"crossref","first-page":"2094","DOI":"10.1016\/j.asoc.2010.07.008","volume":"11","author":"B Naderi","year":"2011","unstructured":"Naderi B, Zandieh M, Aminnayeri M (2011) Incorporating periodic preventive maintenance into flexible flowshop scheduling problems. Appl Soft Comput 11(2):2094\u20132101","journal-title":"Appl Soft Comput"},{"key":"635_CR31","volume-title":"Heuristics for the traveling salesman problem","author":"C Nilsson","year":"2003","unstructured":"Nilsson C (2003) Heuristics for the traveling salesman problem. Link\u00f6ping University, Link\u00f6ping"},{"issue":"5","key":"635_CR32","doi-asserted-by":"crossref","first-page":"351","DOI":"10.1016\/S0305-0548(97)00079-8","volume":"25","author":"RZ Rios-Mercado","year":"1998","unstructured":"Rios-Mercado RZ, Bard JF (1998) Computational experience with a branch-and-cut algorithm for flowshop scheduling with setups. Comput Oper Res 25(5):351\u2013366","journal-title":"Comput Oper Res"},{"key":"635_CR33","unstructured":"Shahvari O, Logendran R (2015) Bi-criteria batch scheduling on unrelated-parallel machines. In: Proceedings of the 2015 industrial and systems engineering research conference (ISERC2015), Tennessee"},{"key":"635_CR34","unstructured":"Shahvari O, Logendran R (2016a) Bi-criteria batch scheduling in hybrid flow shop. In: Proceedings of the 2016 industrial and systems engineering research conference (ISERC2016), CA"},{"key":"635_CR35","doi-asserted-by":"crossref","first-page":"239","DOI":"10.1016\/j.ijpe.2016.06.005","volume":"179","author":"O Shahvari","year":"2016","unstructured":"Shahvari O, Logendran R (2016b) Hybrid flow shop batching and scheduling with a bi-criteria objective. Int J Prod Econ 179:239\u2013258","journal-title":"Int J Prod Econ"},{"key":"635_CR36","doi-asserted-by":"crossref","first-page":"154","DOI":"10.1016\/j.cor.2016.07.021","volume":"77","author":"O Shahvari","year":"2017","unstructured":"Shahvari O, Logendran R (2017) An enhanced tabu search algorithm to minimize a bi-criteria objective in batching and scheduling problems on unrelated-parallel machines with desired lower bounds on batch sizes. Comput Oper Res 77:154\u2013176","journal-title":"Comput Oper Res"},{"key":"635_CR37","unstructured":"Shahvari O, Salmasi N, Logendran R (2009) A meta-heuristic algorithm for flexible flow shop sequence dependent group scheduling problem. In: Proceedings of the 2009 International conference on value chain sustainability (ICOVACS 2009), Kentucky"},{"key":"635_CR38","doi-asserted-by":"crossref","first-page":"4237","DOI":"10.1080\/00207543.2011.604051","volume":"50","author":"O Shahvari","year":"2012","unstructured":"Shahvari O, Salmasi N, Logendran R, Abbasi B (2012) An efficient tabu search algorithm for flexible flow shop sequence-dependent group scheduling problems. Int J Prod Res 50:4237\u20134254","journal-title":"Int J Prod Res"},{"key":"635_CR39","unstructured":"Van Veldhuizen DA, Lamont GB (1998) Evolutionary computation and convergence to a Pareto front. In: Late breaking papers at the genetic programming conference, Stanford University, Stanford, CA, pp 221\u2013228"},{"key":"635_CR40","unstructured":"Velasco, N., Dejax, P., Gu\u00e9ret, C., and Prins, C. (2006). Genetic algorithm for the bi-objective collection and delivery problem. In: 6th international Francophone conference of modeling and simulation, Mosim\u201906, Marocco"},{"key":"635_CR41","doi-asserted-by":"crossref","unstructured":"Vilcot G, Billaut J-C, Esswein C (2006) A genetic algorithm for a bi-criteria flexible job shop scheduling problem. In: IEEE international conference on service systems and service management (ICSSSM\u201906)","DOI":"10.1109\/ICSSSM.2006.320686"},{"key":"635_CR42","volume-title":"Reliability, availability, maintainability and safety assessment","author":"A Villemeur","year":"1991","unstructured":"Villemeur A (1991) Reliability, availability, maintainability and safety assessment. Wiley, New York"},{"key":"635_CR43","doi-asserted-by":"crossref","first-page":"540","DOI":"10.1016\/S1000-9361(08)60172-7","volume":"21","author":"S Yijie","year":"2008","unstructured":"Yijie S, Gongzhang S (2008) Improved NSGA-II multi-objective genetic algorithm based on hybridization-encouraged mechanism. Chin J Aeronaut 21:540\u2013549","journal-title":"Chin J Aeronaut"},{"issue":"9","key":"635_CR44","doi-asserted-by":"crossref","first-page":"954","DOI":"10.1007\/s00170-007-1268-5","volume":"39","author":"J Yulan","year":"2008","unstructured":"Yulan J, Zuhua J, Wenrui H (2008) Multi-objective integrated optimization research on preventive maintenance planning and production scheduling for a single machine. Int J Adv Manuf Technol 39(9):954\u2013964","journal-title":"Int J Adv Manuf Technol"},{"issue":"6","key":"635_CR45","doi-asserted-by":"crossref","first-page":"979","DOI":"10.1007\/s10845-009-0374-7","volume":"22","author":"M Zandieh","year":"2011","unstructured":"Zandieh M, Karimi N (2011) An adaptive multi-population genetic algorithm to solve the multi-objective group scheduling problem in hybrid flexible flowshop with sequence-dependent setup times. J Intell Manuf 22(6):979\u2013989","journal-title":"J Intell Manuf"},{"issue":"6","key":"635_CR46","doi-asserted-by":"crossref","first-page":"731","DOI":"10.1007\/s10845-009-0250-5","volume":"21","author":"M Zandieh","year":"2010","unstructured":"Zandieh M, Mozaffari E, Gholami M (2010) A robust genetic algorithm for scheduling realistic hybrid flexible flow line problems. J Intell Manuf 21(6):731\u2013743","journal-title":"J Intell Manuf"},{"key":"635_CR47","unstructured":"Zitzler E (1999) Evolutionary algorithms for multi-objective optimization: methods and applications. PhD thesis, Swiss Federal Institute of Technology, Zurich"}],"container-title":["International Journal of System Assurance Engineering and Management"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s13198-017-0635-3\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s13198-017-0635-3.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s13198-017-0635-3.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,9,25]],"date-time":"2019-09-25T00:36:54Z","timestamp":1569371814000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s13198-017-0635-3"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2017,5,26]]},"references-count":46,"journal-issue":{"issue":"S2","published-print":{"date-parts":[[2017,11]]}},"alternative-id":["635"],"URL":"https:\/\/doi.org\/10.1007\/s13198-017-0635-3","relation":{},"ISSN":["0975-6809","0976-4348"],"issn-type":[{"value":"0975-6809","type":"print"},{"value":"0976-4348","type":"electronic"}],"subject":[],"published":{"date-parts":[[2017,5,26]]}}}