{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,6,4]],"date-time":"2026-06-04T05:21:06Z","timestamp":1780550466767,"version":"3.54.1"},"reference-count":42,"publisher":"Springer Science and Business Media LLC","issue":"2","license":[{"start":{"date-parts":[[2017,11,14]],"date-time":"2017-11-14T00:00:00Z","timestamp":1510617600000},"content-version":"unspecified","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Int J  Syst  Assur  Eng  Manag"],"published-print":{"date-parts":[[2018,4]]},"DOI":"10.1007\/s13198-017-0680-y","type":"journal-article","created":{"date-parts":[[2017,11,14]],"date-time":"2017-11-14T02:49:27Z","timestamp":1510627767000},"page":"377-400","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":8,"title":["Reliability prediction of fault tolerant machining system with reboot and recovery delay"],"prefix":"10.1007","volume":"9","author":[{"given":"Chandra","family":"Shekhar","sequence":"first","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Madhu","family":"Jain","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Ather Aziz","family":"Raina","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Javid","family":"Iqbal","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"297","published-online":{"date-parts":[[2017,11,14]]},"reference":[{"issue":"3","key":"680_CR1","doi-asserted-by":"crossref","first-page":"275","DOI":"10.1109\/24.799899","volume":"48","author":"SV Amari","year":"1999","unstructured":"Amari SV, Dugan JB, Mishra RB (1999) Optimal reliability of systems subject to imperfect fault-coverage. IEEE Trans Reliab 48(3):275\u2013284","journal-title":"IEEE Trans Reliab"},{"issue":"4","key":"680_CR2","doi-asserted-by":"crossref","first-page":"567","DOI":"10.1109\/TR.2004.837703","volume":"53","author":"SV Amari","year":"2004","unstructured":"Amari SV, Pham H, Dill G (2004) Optimal design of K-out-of-N:G\u00a0subsystems subject to imperfect fault coverage. IEEE Trans Reliab 53(4):567\u2013575","journal-title":"IEEE Trans Reliab"},{"issue":"2","key":"680_CR3","doi-asserted-by":"crossref","first-page":"209","DOI":"10.1016\/j.future.2006.05.002","volume":"23","author":"YS Dai","year":"2007","unstructured":"Dai YS, Levitin G, Wang X (2007) Optimal task partition and distribution in grid service system with common cause failure. Future Gener Comput Syst 23(2):209\u2013218","journal-title":"Future Gener Comput Syst"},{"key":"680_CR4","doi-asserted-by":"crossref","first-page":"331","DOI":"10.1016\/j.ress.2016.03.023","volume":"152","author":"MC Delia","year":"2016","unstructured":"Delia MC, Rafael PO (2016) A warm standby system\u00a0under shocks and repair governed by MAPs. Reliab Eng Syst Saf 152:331\u2013338","journal-title":"Reliab Eng Syst Saf"},{"issue":"3","key":"680_CR5","doi-asserted-by":"crossref","first-page":"343","DOI":"10.1504\/IJOR.2011.041348","volume":"11","author":"MA Hajeeh","year":"2011","unstructured":"Hajeeh MA (2011) Reliability and availability of a standby system with common cause failure. Int J Oper Res 11(3):343\u2013363","journal-title":"Int J Oper Res"},{"issue":"7","key":"680_CR6","doi-asserted-by":"crossref","first-page":"2227","DOI":"10.1016\/j.matcom.2008.12.018","volume":"79","author":"YL Hsu","year":"2008","unstructured":"Hsu YL, Lee SL, Ke JC (2008) A repairable system with imperfect fault coverage and reboot: Bayesian and asymptotic estimation. Math Comput Simul 79(7):2227\u20132239","journal-title":"Math Comput Simul"},{"issue":"11","key":"680_CR7","doi-asserted-by":"crossref","first-page":"2400","DOI":"10.1016\/j.matcom.2011.03.003","volume":"81","author":"YL Hsu","year":"2011","unstructured":"Hsu YL, Ke JC, Liu TH (2011) Standby system with general repair, reboot delay, switching failure and unreliable repair facility\u2014a statistical standpoint. Math Comput Simul 81(11):2400\u20132413","journal-title":"Math Comput Simul"},{"key":"680_CR11","first-page":"100","volume":"27","author":"M Jain","year":"2011","unstructured":"Jain M, Rani S (2011) Availability of hardware\u2013software systems with standbys, switching failures and reboot delay. Math Today 27:100\u2013116","journal-title":"Math Today"},{"issue":"3","key":"680_CR13","doi-asserted-by":"crossref","first-page":"231","DOI":"10.5829\/idosi.ije.2012.25.03c.07","volume":"25","author":"M Jain","year":"2012","unstructured":"Jain M, Agrawal SC, Naresh Preeti (2012) Fuzzy reliability evaluation of a repairable system with imperfect coverage, reboot and common-cause shock failure. Int J Eng 25(3):231\u2013238","journal-title":"Int J Eng"},{"issue":"3","key":"680_CR9","doi-asserted-by":"crossref","first-page":"374","DOI":"10.1504\/IJOR.2013.054441","volume":"17","author":"M Jain","year":"2013","unstructured":"Jain M (2013) Availability prediction of imperfect fault coverage system with reboot and common cause failure. Int J Math Oper Res 17(3):374\u2013397","journal-title":"Int J Math Oper Res"},{"issue":"4","key":"680_CR10","doi-asserted-by":"crossref","first-page":"710","DOI":"10.1016\/j.cie.2013.09.011","volume":"66","author":"M Jain","year":"2013","unstructured":"Jain M, Gupta R (2013) Optimal replacement policy for a repairable system with multiple vacations and imperfect fault coverage. Comput Ind Eng 66(4):710\u2013719","journal-title":"Comput Ind Eng"},{"issue":"9","key":"680_CR8","first-page":"1077","volume":"26","author":"M Jain","year":"2013","unstructured":"Jain M, Preeti (2013) Performance analysis of a repairable reboot safety system with standby, imperfect coverage and reboot delay. Int J Eng Trans C: Aspects 26(9):1077\u20131088","journal-title":"Int J Eng Trans C: Aspects"},{"issue":"1","key":"680_CR12","doi-asserted-by":"crossref","first-page":"19","DOI":"10.1504\/IJMOR.2013.050605","volume":"5","author":"M Jain","year":"2013","unstructured":"Jain M, Rani S (2013) Availability analysis for repairable system with warm standby, switching failure and reboot delay. Int J Math Oper Res 5(1):19\u201339","journal-title":"Int J Math Oper Res"},{"issue":"1","key":"680_CR14","first-page":"457","volume":"2","author":"M Jain","year":"2014","unstructured":"Jain M, Shekhar C, Rani V (2014) N-policy for a multi-component machining system with imperfect coverage, reboot and unreliable server. Prod Manuf Res 2(1):457\u2013476","journal-title":"Prod Manuf Res"},{"issue":"1","key":"680_CR15","doi-asserted-by":"crossref","first-page":"296","DOI":"10.1016\/j.cie.2011.09.017","volume":"62","author":"JC Ke","year":"2012","unstructured":"Ke JC, Wu CH (2012) Multi-server machine repair model with standbys and synchronous multiple vacation. Comput Ind Eng 62(1):296\u2013305","journal-title":"Comput Ind Eng"},{"issue":"3","key":"680_CR16","first-page":"336","volume":"18","author":"JC Ke","year":"2010","unstructured":"Ke JC, Su ZL, Wang KH, Hsu YL (2010) Simulation inferences for an available system with general repair distribution and imperfect fault coverage. Simul Model, Pract Theory 18(3):336\u2013347","journal-title":"Simul Model, Pract Theory"},{"issue":"1","key":"680_CR17","doi-asserted-by":"crossref","first-page":"15","DOI":"10.1080\/16843703.2011.11673243","volume":"8","author":"JB Ke","year":"2011","unstructured":"Ke JB, Chen JW, Wang KH (2011) Reliability measures of a repairable system with standby switching failures and reboot delay. Qual Technol Quant Manag 8(1):15\u201326","journal-title":"Qual Technol Quant Manag"},{"issue":"4","key":"680_CR18","doi-asserted-by":"crossref","first-page":"290","DOI":"10.1109\/TR.1980.5220842","volume":"29","author":"A Kumar","year":"1980","unstructured":"Kumar A, Agarwal M (1980) A review of standby systems. IEEE Trans Reliab 29(4):290\u2013294","journal-title":"IEEE Trans Reliab"},{"key":"680_CR19","volume-title":"Introduction to reliability engineering","author":"EE Lewis","year":"1996","unstructured":"Lewis EE (1996) Introduction to reliability engineering, 2nd edn. Wiley, New York","edition":"2"},{"key":"680_CR20","doi-asserted-by":"publisher","DOI":"10.1155\/2014\/896379","author":"R Malhotra","year":"2014","unstructured":"Malhotra R, Taneja G (2014) Stochastic analysis of a two-unit cold standbys system wherein both units may become operative depending upon the demand. J Qual Reliab En. doi:\n                        http:\/\/doi.org\/10.1155\/2014\/896379","journal-title":"J Qual Reliab En"},{"issue":"3","key":"680_CR21","doi-asserted-by":"crossref","first-page":"249","DOI":"10.1016\/0951-8320(91)90104-F","volume":"34","author":"A Mosleh","year":"1991","unstructured":"Mosleh A (1991) Common cause failure: an analysis methodology and examples. Reliab Eng Syst Saf 34(3):249\u2013292","journal-title":"Reliab Eng Syst Saf"},{"issue":"1","key":"680_CR22","doi-asserted-by":"crossref","first-page":"15","DOI":"10.1016\/S0951-8320(97)00050-1","volume":"58","author":"MS Moustafa","year":"1997","unstructured":"Moustafa MS (1997) Reliability analysis of K-out-of-N:G systems with dependent failures and imperfect coverage. Reliab Eng Syst Saf 58(1):15\u201317","journal-title":"Reliab Eng Syst Saf"},{"issue":"3","key":"680_CR23","doi-asserted-by":"crossref","first-page":"297","DOI":"10.1016\/0951-8320(95)00082-8","volume":"50","author":"Z Pan","year":"1995","unstructured":"Pan Z, Nonaka Y (1995) Importance analysis for the systems with common cause failures. Reliab Eng Syst Saf 50(3):297\u2013300","journal-title":"Reliab Eng Syst Saf"},{"issue":"1","key":"680_CR24","doi-asserted-by":"crossref","first-page":"25","DOI":"10.1016\/0143-8174(84)90004-0","volume":"9","author":"O Platz","year":"1984","unstructured":"Platz O (1984) A Markov model for common cause failure. Reliab Eng 9(1):25\u201331","journal-title":"Reliab Eng"},{"issue":"1","key":"680_CR25","first-page":"41","volume":"7","author":"C Shekhar","year":"2014","unstructured":"Shekhar C, Jain M, Bhatia S (2014) Fuzzy analysis of machine repair problem with switching failure and reboot. J Reliab Stat Stud 7(1):41\u201355","journal-title":"J Reliab Stat Stud"},{"issue":"3","key":"680_CR26","doi-asserted-by":"crossref","first-page":"396","DOI":"10.1504\/IJMOR.2017.087215","volume":"11","author":"C Shekhar","year":"2016","unstructured":"Shekhar C, Jain M, Raina AA (2016a) Transient analysis of machining system with spare provisioning and geometric reneging. Int J Math Oper Res 11(3):396\u2013421","journal-title":"Int J Math Oper Res"},{"issue":"5","key":"680_CR27","first-page":"324","volume":"5","author":"C Shekhar","year":"2016","unstructured":"Shekhar C, Raina AA, Kumar A (2016b) A brief review on retrial queue: progress in 2010\u20132015. Int J Appl Sci Eng Res 5(5):324\u2013336","journal-title":"Int J Appl Sci Eng Res"},{"issue":"3","key":"680_CR28","doi-asserted-by":"crossref","first-page":"299","DOI":"10.18187\/pjsor.v10i3.724","volume":"10","author":"VV Singh","year":"2014","unstructured":"Singh VV, Rawal DK (2014) Availability, MTTF and cost analysis of complex system under preemptive resume repair policy using copula distribution. Pak J Stat Oper Res 10(3):299\u2013312","journal-title":"Pak J Stat Oper Res"},{"key":"680_CR29","doi-asserted-by":"publisher","DOI":"10.1155\/2014\/740936","author":"S Tang","year":"2014","unstructured":"Tang S, Guo X, Sun X, Xue H, Zhou Z (2014) Unavailability analysis for K-out-of-N:G\u00a0system with multiple failure modes based on micro-Markov models. Math Prob Eng. doi:\n                        http:\/\/doi.org\/10.1155\/2014\/740936","journal-title":"Math Prob Eng"},{"key":"680_CR30","volume-title":"Probability and statistics with reliability, queueing and computer science applications","author":"KS Trivedi","year":"2002","unstructured":"Trivedi KS (2002) Probability and statistics with reliability, queueing and computer science applications, 2nd edn. Wiley, New York","edition":"2"},{"issue":"4","key":"680_CR31","doi-asserted-by":"crossref","first-page":"587","DOI":"10.18187\/pjsor.v11i4.968","volume":"11","author":"KV Vijayashree","year":"2015","unstructured":"Vijayashree KV, Janani B (2015) Transient analysis of an M\/M\/1 queue with multiple exponential vacation and N policy. Pak J Stat Oper Res 11(4):587\u2013600","journal-title":"Pak J Stat Oper Res"},{"issue":"1","key":"680_CR32","first-page":"384","volume":"215","author":"KH Wang","year":"2009","unstructured":"Wang KH, Chen YJ (2009) Comparative analysis of availability between three systems with general repair times, reboot delay and switching failures. Appl Math Comput 215(1):384\u2013394","journal-title":"Appl Math Comput"},{"issue":"4","key":"680_CR33","doi-asserted-by":"crossref","first-page":"327","DOI":"10.1016\/S0307-904X(02)00133-6","volume":"27","author":"KH Wang","year":"2003","unstructured":"Wang KH, Ke JC (2003) Probabilistic analysis of a repairable system with warm standbys plus balking and reneging. Appl Math Model 27(4):327\u2013336","journal-title":"Appl Math Model"},{"issue":"5","key":"680_CR34","doi-asserted-by":"crossref","first-page":"849","DOI":"10.1016\/0026-2714(89)90184-4","volume":"29","author":"KH Wang","year":"1989","unstructured":"Wang KH, Sivazlian BD (1989) Reliability of a system with warm standbys and repairmen. Microelectr Reliab 29(5):849\u2013860","journal-title":"Microelectr Reliab"},{"issue":"2","key":"680_CR35","first-page":"1310","volume":"183","author":"KH Wang","year":"2006","unstructured":"Wang KH, Dong WL, Ke JB (2006) Comparing of reliability and the availability between four systems with warm standbys and switching failures. Appl Math Comput 183(2):1310\u20131322","journal-title":"Appl Math Comput"},{"issue":"3","key":"680_CR36","doi-asserted-by":"crossref","first-page":"835","DOI":"10.1016\/j.cor.2005.05.013","volume":"34","author":"KH Wang","year":"2007","unstructured":"Wang KH, Ke JB, Ke JC (2007a) Profit analysis of the M\/M\/R machine repair problem with balking, reneging, and standby switching failures. Comput Oper Res 34(3):835\u2013847","journal-title":"Comput Oper Res"},{"issue":"11\u201312","key":"680_CR37","doi-asserted-by":"crossref","first-page":"1223","DOI":"10.1007\/s00170-005-0298-0","volume":"31","author":"KH Wang","year":"2007","unstructured":"Wang KH, Ke JB, Lee WC (2007b) Reliability and sensitivity analysis of a repairable system with warm standbys and R unreliable service station. Int J Adv Manuf Technol 31(11\u201312):1223\u20131232","journal-title":"Int J Adv Manuf Technol"},{"issue":"5","key":"680_CR38","doi-asserted-by":"crossref","first-page":"2870","DOI":"10.1016\/j.apm.2012.06.024","volume":"37","author":"KH Wang","year":"2013","unstructured":"Wang KH, Liou CD, Lin YH (2013) Comparative analysis of the machine repair problem with imperfect coverage and service pressure condition. Appl Math Model 37(5):2870\u20132880","journal-title":"Appl Math Model"},{"key":"680_CR39","doi-asserted-by":"publisher","DOI":"10.1155\/2015\/209653","author":"W Wu","year":"2015","unstructured":"Wu W, Tang Y (2015) Transient analysis of a\u00a0K-out-of-N:G\u00a0system with\u00a0N-Policy, repairmen\u2019s multiple vacations and redundant dependency. Discr Dyn Nat Soc. doi:\n                        10.1155\/2015\/209653","journal-title":"Discr Dyn Nat Soc"},{"key":"680_CR40","doi-asserted-by":"publisher","DOI":"10.1155\/2015\/726853","author":"C Yang","year":"2015","unstructured":"Yang C, Zeng S, Guo J (2015) Reliability analysis of load sharing a\u00a0K-out-of-N system considering component degradation. Math Prob Eng. doi:\n                        http:\/\/doi.org\/10.1155\/2015\/726853","journal-title":"Math Prob Eng"},{"key":"680_CR41","doi-asserted-by":"crossref","first-page":"84","DOI":"10.1016\/j.cie.2016.04.019","volume":"97","author":"TC Yen","year":"2016","unstructured":"Yen TC, Chen WL, Chen JC (2016) Reliability and sensitivity analysis of the controllable repair system with warm standbys and working breakdown. Comput Ind Eng 97:84\u201392","journal-title":"Comput Ind Eng"},{"issue":"12","key":"680_CR42","doi-asserted-by":"crossref","first-page":"6319","DOI":"10.1109\/TPEL.2014.2304561","volume":"29","author":"W Zhang","year":"2014","unstructured":"Zhang W, Xu D, Enjeti PN, Li H, Hawke JT, Krishnamoorthy HS (2014) Survey on fault-tolerant techniques for power electronic converters. IEEE Trans Power Electron 29(12):6319\u20136331","journal-title":"IEEE Trans Power Electron"}],"container-title":["International Journal of System Assurance Engineering and Management"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s13198-017-0680-y\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s13198-017-0680-y.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s13198-017-0680-y.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2018,4,26]],"date-time":"2018-04-26T01:23:54Z","timestamp":1524705834000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s13198-017-0680-y"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2017,11,14]]},"references-count":42,"journal-issue":{"issue":"2","published-print":{"date-parts":[[2018,4]]}},"alternative-id":["680"],"URL":"https:\/\/doi.org\/10.1007\/s13198-017-0680-y","relation":{},"ISSN":["0975-6809","0976-4348"],"issn-type":[{"value":"0975-6809","type":"print"},{"value":"0976-4348","type":"electronic"}],"subject":[],"published":{"date-parts":[[2017,11,14]]}}}