{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,4,9]],"date-time":"2026-04-09T17:56:24Z","timestamp":1775757384200,"version":"3.50.1"},"reference-count":58,"publisher":"Springer Science and Business Media LLC","issue":"6","license":[{"start":{"date-parts":[[2018,7,19]],"date-time":"2018-07-19T00:00:00Z","timestamp":1531958400000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Int J  Syst  Assur  Eng  Manag"],"published-print":{"date-parts":[[2018,12]]},"DOI":"10.1007\/s13198-018-0729-6","type":"journal-article","created":{"date-parts":[[2018,7,19]],"date-time":"2018-07-19T08:39:50Z","timestamp":1531989590000},"page":"1302-1314","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":13,"title":["An adaptive neuro-fuzzy inference system for makespan estimation of flexible manufacturing system assembly shop: a case study"],"prefix":"10.1007","volume":"9","author":[{"ORCID":"https:\/\/orcid.org\/0000-0002-4662-3081","authenticated-orcid":false,"given":"Vineet","family":"Jain","sequence":"first","affiliation":[]},{"given":"Tilak","family":"Raj","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2018,7,19]]},"reference":[{"key":"729_CR1","doi-asserted-by":"publisher","first-page":"158","DOI":"10.1016\/j.asoc.2014.11.012","volume":"27","author":"AM Abdulshahed","year":"2015","unstructured":"Abdulshahed AM, Longstaff AP, Fletcher S (2015) The application of ANFIS prediction models for thermal error compensation on CNC machine tools. Appl Soft Comput 27:158\u2013168","journal-title":"Appl Soft Comput"},{"key":"729_CR2","doi-asserted-by":"publisher","first-page":"152","DOI":"10.1016\/j.cor.2009.04.002","volume":"37","author":"F Ahmadizar","year":"2010","unstructured":"Ahmadizar F, Ghazanfari M, Ghomi SMTF (2010) Group shops scheduling with makespan criterion subject to random release dates and processing times. Comput Oper Res 37:152\u2013162","journal-title":"Comput Oper Res"},{"key":"729_CR3","doi-asserted-by":"publisher","first-page":"679","DOI":"10.1016\/j.cie.2004.05.005","volume":"46","author":"DE Akyol","year":"2004","unstructured":"Akyol DE (2004) Application of neural networks to heuristic scheduling algorithms. Comput Ind Eng 46:679\u2013696. \n                    https:\/\/doi.org\/10.1016\/j.cie.2004.05.005","journal-title":"Comput Ind Eng"},{"key":"729_CR4","doi-asserted-by":"publisher","first-page":"279","DOI":"10.1016\/j.jhydrol.2014.01.054","volume":"511","author":"M Ay","year":"2014","unstructured":"Ay M, Kisi O (2014) Modelling of chemical oxygen demand by using anns, anfis and k-means clustering techniques. J Hydrol 511:279\u2013289. \n                    https:\/\/doi.org\/10.1016\/j.jhydrol.2014.01.054","journal-title":"J Hydrol"},{"key":"729_CR5","doi-asserted-by":"publisher","first-page":"135","DOI":"10.1007\/s00170-015-6795-x","volume":"79","author":"A Azadeh","year":"2015","unstructured":"Azadeh A, Hosseini N, Zadeh SA, Jalalvand F (2015) A hybrid computer simulation-adaptive neuro-fuzzy inference system algorithm for optimization of dispatching rule selection in job shop scheduling problems under uncertainty. Int J Adv Manuf Technol 79:135\u2013145","journal-title":"Int J Adv Manuf Technol"},{"key":"729_CR6","doi-asserted-by":"publisher","first-page":"630","DOI":"10.1287\/mnsc.16.10.B630","volume":"16","author":"HG Campbell","year":"1970","unstructured":"Campbell HG, Dudek RA, Smith ML (1970) A heuristic algorithm for the n job, m machine sequencing problem. Manag Sci 16:630\u2013637","journal-title":"Manag Sci"},{"key":"729_CR7","doi-asserted-by":"publisher","DOI":"10.1007\/s00521-014-1809-4","author":"HH \u00c7evik","year":"2015","unstructured":"\u00c7evik HH, \u00c7unka\u015f M (2015) Short-term load forecasting using fuzzy logic and ANFIS. Neural Comput Appl. \n                    https:\/\/doi.org\/10.1007\/s00521-014-1809-4","journal-title":"Neural Comput Appl"},{"key":"729_CR8","doi-asserted-by":"publisher","first-page":"180","DOI":"10.1016\/j.ins.2011.09.013","volume":"220","author":"M-Y Chen","year":"2013","unstructured":"Chen M-Y (2013) A hybrid ANFIS model for business failure prediction utilizing particle swarm optimization and subtractive clustering. Inf Sci 220:180\u2013195. \n                    https:\/\/doi.org\/10.1016\/j.ins.2011.09.013","journal-title":"Inf Sci"},{"key":"729_CR9","doi-asserted-by":"publisher","first-page":"3483","DOI":"10.1080\/002075497194200","volume":"35","author":"W Chen","year":"1997","unstructured":"Chen W, Muraki M (1997) An action strategy generation framework for an on-line scheduling and control system in batch processes with neural networks. Int J Prod Res 35:3483\u20133508","journal-title":"Int J Prod Res"},{"key":"729_CR10","series-title":"Lecture notes in electrical engineering","volume-title":"AETA 2013: recent advances in electrical engineering and related sciences","author":"S-C Chen","year":"2014","unstructured":"Chen SC, Le DK, Nguyen VS (2014) Adaptive network-based fuzzy inference system (ANFIS) controller for an active magnetic bearing system with unbalance mass. In: Zelinka I, Duy V, Cha J (eds) AETA 2013: recent advances in electrical engineering and related sciences. Lecture notes in electrical engineering, vol. 282, Springer, Berlin"},{"key":"729_CR11","doi-asserted-by":"publisher","first-page":"156","DOI":"10.1016\/0377-2217(89)90100-8","volume":"38","author":"T Cheng","year":"1989","unstructured":"Cheng T, Gupta M (1989) Survey of scheduling research involving due date determination decisions. Eur J Oper Res 38:156\u2013166","journal-title":"Eur J Oper Res"},{"key":"729_CR12","doi-asserted-by":"publisher","first-page":"113","DOI":"10.1016\/S0736-5845(02)00068-6","volume":"19","author":"F Cus","year":"2003","unstructured":"Cus F, Balic J (2003) Optimization of cutting process by GA approach. Robot Comput Integr Manuf 19:113\u2013121","journal-title":"Robot Comput Integr Manuf"},{"key":"729_CR13","doi-asserted-by":"publisher","first-page":"541","DOI":"10.1023\/A:1008960721370","volume":"10","author":"M Jeng Der","year":"1999","unstructured":"Der Jeng M, Lin CS, Huang YS (1999) Petri net dynamics-based scheduling of flexible manufacturing systems with assembly. J Intell Manuf 10:541\u2013555","journal-title":"J Intell Manuf"},{"key":"729_CR14","doi-asserted-by":"publisher","first-page":"3962","DOI":"10.1016\/j.cor.2007.05.005","volume":"35","author":"X Dong","year":"2008","unstructured":"Dong X, Huang H, Chen P (2008) An improved NEH-based heuristic for the permutation flowshop problem. Comput Oper Res 35:3962\u20133968","journal-title":"Comput Oper Res"},{"key":"729_CR15","doi-asserted-by":"publisher","first-page":"413","DOI":"10.1016\/j.ejor.2015.05.006","volume":"246","author":"JM Framinan","year":"2015","unstructured":"Framinan JM, Perez-Gonzalez P (2015) On heuristic solutions for the stochastic flowshop scheduling problem. Eur J Oper Res 246:413\u2013420","journal-title":"Eur J Oper Res"},{"key":"729_CR16","unstructured":"Fransoo JC, de Kok TG, Paulli J (1995) Makespan estimations in flexible manufacturing systems working papers, Department of Mathematical Sciences, University of Aarhus"},{"key":"729_CR17","doi-asserted-by":"publisher","first-page":"741","DOI":"10.1007\/s10845-011-0622-5","volume":"24","author":"MA Gonz\u00e1lez","year":"2013","unstructured":"Gonz\u00e1lez MA, Vela CR, Gonz\u00e1lez-Rodr\u00edguez I, Varela R (2013) Lateness minimization with Tabu search for job shop scheduling problem with sequence dependent setup times. J Intell Manuf 24:741\u2013754","journal-title":"J Intell Manuf"},{"key":"729_CR18","doi-asserted-by":"publisher","first-page":"14907","DOI":"10.1016\/j.eswa.2011.05.056","volume":"38","author":"AF G\u00fcneri","year":"2011","unstructured":"G\u00fcneri AF, Ertay T, Y\u00fcCel A (2011) An approach based on ANFIS input selection and modeling for supplier selection problem. Expert Syst Appl 38:14907\u201314917. \n                    https:\/\/doi.org\/10.1016\/j.eswa.2011.05.056","journal-title":"Expert Syst Appl"},{"key":"729_CR19","doi-asserted-by":"publisher","first-page":"11","DOI":"10.1080\/05695557208974823","volume":"4","author":"JN Gupta","year":"1972","unstructured":"Gupta JN (1972) Heuristic algorithms for multistage flowshop scheduling problem. AIIE Trans 4:11\u201318","journal-title":"AIIE Trans"},{"key":"729_CR20","doi-asserted-by":"publisher","first-page":"597","DOI":"10.1007\/s10661-013-3402-1","volume":"186","author":"S Heddam","year":"2014","unstructured":"Heddam S (2014) Modeling hourly dissolved oxygen concentration (DO) using two different adaptive neuro-fuzzy inference systems (ANFIS): a comparative study. Environ Monit Assess 186:597\u2013619","journal-title":"Environ Monit Assess"},{"key":"729_CR21","doi-asserted-by":"publisher","first-page":"1953","DOI":"10.1007\/s10661-011-2091-x","volume":"184","author":"S Heddam","year":"2012","unstructured":"Heddam S, Bermad A, Dechemi N (2012) ANFIS-based modelling for coagulant dosage in drinking water treatment plant: a case study. Environ Monit Assess 184:1953\u20131971","journal-title":"Environ Monit Assess"},{"key":"729_CR22","doi-asserted-by":"publisher","first-page":"3216","DOI":"10.1016\/j.eswa.2008.01.051","volume":"36","author":"W-H Ho","year":"2009","unstructured":"Ho W-H, Tsai J-T, Lin B-T, Chou J-H (2009) Adaptive network-based fuzzy inference system for prediction of surface roughness in end milling process using hybrid Taguchi-genetic learning algorithm. Expert Syst Appl 36:3216\u20133222. \n                    https:\/\/doi.org\/10.1016\/j.eswa.2008.01.051","journal-title":"Expert Syst Appl"},{"key":"729_CR23","doi-asserted-by":"publisher","first-page":"467","DOI":"10.1007\/s00291-002-0108-0","volume":"24","author":"CV Ivanescu","year":"2002","unstructured":"Ivanescu CV, Fransoo JC, Bertrand JWM (2002) Makespan estimation and order acceptance in batch process industries when processing times are uncertain. OR Spectr 24:467\u2013495","journal-title":"OR Spectr"},{"key":"729_CR24","doi-asserted-by":"publisher","first-page":"84","DOI":"10.1016\/j.ijpe.2015.10.024","volume":"171","author":"V Jain","year":"2016","unstructured":"Jain V, Raj T (2016a) Modeling and analysis of FMS performance variables by ISM, SEM and GTMA approach. Int J Prod Econ 171:84\u201396. \n                    https:\/\/doi.org\/10.1016\/j.ijpe.2015.10.024","journal-title":"Int J Prod Econ"},{"key":"729_CR25","doi-asserted-by":"publisher","DOI":"10.1007\/s13198-016-0450-2","author":"V Jain","year":"2016","unstructured":"Jain V, Raj T (2016b) Tool life management of unmanned production system based on surface roughness by ANFIS. Int J Syst Assur Eng Manag. \n                    https:\/\/doi.org\/10.1007\/s13198-016-0450-2","journal-title":"Int J Syst Assur Eng Manag"},{"key":"729_CR26","doi-asserted-by":"publisher","first-page":"665","DOI":"10.1109\/21.256541","volume":"23","author":"JS Jang","year":"1993","unstructured":"Jang JS (1993) ANFIS: adaptive-network-based fuzzy inference system. Syst Man Cybern IEEE Trans 23:665\u2013685. \n                    https:\/\/doi.org\/10.1109\/21.256541","journal-title":"Syst Man Cybern IEEE Trans"},{"key":"729_CR27","doi-asserted-by":"publisher","first-page":"61","DOI":"10.1002\/nav.3800010110","volume":"1","author":"SM Johnson","year":"1954","unstructured":"Johnson SM (1954) Optimal two-and three-stage production schedules with setup times included. Naval Res Logist Q 1:61\u201368","journal-title":"Naval Res Logist Q"},{"key":"729_CR28","doi-asserted-by":"publisher","first-page":"502","DOI":"10.1016\/j.asoc.2015.05.028","volume":"34","author":"SH Jung","year":"2015","unstructured":"Jung SH, Choi S-U (2015) Prediction of composite suitability index for physical habitat simulations using the ANFIS method. Appl Soft Comput 34:502\u2013512","journal-title":"Appl Soft Comput"},{"key":"729_CR29","doi-asserted-by":"publisher","first-page":"53","DOI":"10.1016\/j.omega.2005.03.003","volume":"35","author":"PJ Kalczynski","year":"2007","unstructured":"Kalczynski PJ, Kamburowski J (2007) On the NEH heuristic for minimizing the makespan in permutation flow shops. Omega 35:53\u201360","journal-title":"Omega"},{"key":"729_CR30","doi-asserted-by":"publisher","first-page":"3001","DOI":"10.1016\/j.cor.2007.01.020","volume":"35","author":"PJ Kalczynski","year":"2008","unstructured":"Kalczynski PJ, Kamburowski J (2008) An improved NEH heuristic to minimize makespan in permutation flow shops. Comput Oper Res 35:3001\u20133008","journal-title":"Comput Oper Res"},{"key":"729_CR31","doi-asserted-by":"publisher","first-page":"1003","DOI":"10.1016\/j.amc.2006.07.024","volume":"185","author":"S Li","year":"2007","unstructured":"Li S, Li Y, Liu Y, Xu Y (2007) A GA-based NN approach for makespan estimation. Appl Math Comput 185:1003\u20131014. \n                    https:\/\/doi.org\/10.1016\/j.amc.2006.07.024","journal-title":"Appl Math Comput"},{"key":"729_CR32","doi-asserted-by":"publisher","first-page":"531","DOI":"10.1007\/s00170-014-6016-z","volume":"74","author":"I Maher","year":"2014","unstructured":"Maher I, Eltaib M, Sarhan AA, El-Zahry R (2014) Investigation of the effect of machining parameters on the surface quality of machined brass (60\/40) in CNC end milling\u2014ANFIS modeling. Int J Adv Manuf Technol 74:531\u2013537","journal-title":"Int J Adv Manuf Technol"},{"key":"729_CR33","doi-asserted-by":"publisher","first-page":"1459","DOI":"10.1007\/s00170-014-6379-1","volume":"76","author":"I Maher","year":"2015","unstructured":"Maher I, Eltaib M, Sarhan AA, El-Zahry R (2015) Cutting force-based adaptive neuro-fuzzy approach for accurate surface roughness prediction in end milling operation for intelligent machining. Int J Adv Manuf Technol 76:1459\u20131467","journal-title":"Int J Adv Manuf Technol"},{"key":"729_CR34","doi-asserted-by":"publisher","first-page":"1106","DOI":"10.1109\/25.938584","volume":"50","author":"J Mar","year":"2001","unstructured":"Mar J, Lin F-J (2001) An ANFIS controller for the car-following collision prevention system. Veh Technol IEEE Trans 50:1106\u20131113","journal-title":"Veh Technol IEEE Trans"},{"key":"729_CR35","doi-asserted-by":"publisher","first-page":"250","DOI":"10.1016\/j.renene.2010.06.028","volume":"36","author":"A Mellit","year":"2011","unstructured":"Mellit A, Kalogirou SA (2011) ANFIS-based modelling for photovoltaic power supply system: a case study. Renew Energy 36:250\u2013258. \n                    https:\/\/doi.org\/10.1016\/j.renene.2010.06.028","journal-title":"Renew Energy"},{"key":"729_CR36","doi-asserted-by":"publisher","first-page":"207","DOI":"10.1080\/0952813X.2012.682752","volume":"25","author":"N Moradinasab","year":"2013","unstructured":"Moradinasab N, Shafaei R, Rabiee M, Ramezani P (2013) No-wait two stage hybrid flow shop scheduling with genetic and adaptive imperialist competitive algorithms. J Exp Theor Artif Intell 25:207\u2013225","journal-title":"J Exp Theor Artif Intell"},{"key":"729_CR37","doi-asserted-by":"publisher","first-page":"91","DOI":"10.1016\/0305-0483(83)90088-9","volume":"11","author":"M Nawaz","year":"1983","unstructured":"Nawaz M, Enscore EE, Ham I (1983) A heuristic algorithm for the m-machine, n-job flow-shop sequencing problem. Omega 11:91\u201395","journal-title":"Omega"},{"key":"729_CR38","doi-asserted-by":"publisher","first-page":"74","DOI":"10.1108\/01443579610125615","volume":"16","author":"GC Onwubolu","year":"1996","unstructured":"Onwubolu GC (1996) A flow-shop manufacturing scheduling system with interactive computer graphics. Int J Oper Prod Manag 16:74\u201384","journal-title":"Int J Oper Prod Manag"},{"key":"729_CR39","doi-asserted-by":"publisher","first-page":"232","DOI":"10.1016\/j.asoc.2014.06.032","volume":"24","author":"G \u00d6zkan","year":"2014","unstructured":"\u00d6zkan G, \u0130nal M (2014) Comparison of neural network application for fuzzy and ANFIS approaches for multi-criteria decision making problems. Appl Soft Comput 24:232\u2013238","journal-title":"Appl Soft Comput"},{"key":"729_CR40","doi-asserted-by":"publisher","first-page":"825","DOI":"10.1111\/j.1540-5915.1994.tb01871.x","volume":"25","author":"PR Philipoom","year":"1994","unstructured":"Philipoom PR, Rees LP, Wiegmann L (1994) Using neural networks to determine internally-set due-date assignments for shop scheduling. Decis Sci 25:825\u2013851","journal-title":"Decis Sci"},{"key":"729_CR41","doi-asserted-by":"publisher","first-page":"29","DOI":"10.1016\/j.ijepes.2012.01.001","volume":"39","author":"H Pousinho","year":"2012","unstructured":"Pousinho H, Mendes V, Catal\u00e3o J (2012) Short-term electricity prices forecasting in a competitive market by a hybrid PSO\u2013ANFIS approach. Int J Electr Power Energy Syst 39:29\u201335. \n                    https:\/\/doi.org\/10.1016\/j.ijepes.2012.01.001","journal-title":"Int J Electr Power Energy Syst"},{"key":"729_CR42","doi-asserted-by":"publisher","first-page":"14","DOI":"10.1016\/S0377-2217(02)00173-X","volume":"145","author":"WH Raaymakers","year":"2003","unstructured":"Raaymakers WH, Weijters A (2003) Makespan estimation in batch process industries: a comparison between regression analysis and neural networks. Eur J Oper Res 145:14\u201330","journal-title":"Eur J Oper Res"},{"issue":"2","key":"729_CR43","doi-asserted-by":"publisher","first-page":"145","DOI":"10.1016\/S0925-5273(00)00052-9","volume":"70","author":"HM Raaymakers","year":"2001","unstructured":"Raaymakers HM, Bertrand JWM, Fransoo JC (2001) Makespan estimation in batch process industries using aggregate resource and job set characteristics. Int J Prod Econ 70(2):145\u2013161","journal-title":"Int J Prod Econ"},{"key":"729_CR44","doi-asserted-by":"publisher","first-page":"2","DOI":"10.1080\/095372898234460","volume":"9","author":"I Sabuncuoglu","year":"1998","unstructured":"Sabuncuoglu I (1998) Scheduling with neural networks: a review of the literature and new research directtions. Prod Plan Control 9:2\u201312","journal-title":"Prod Plan Control"},{"key":"729_CR45","doi-asserted-by":"publisher","first-page":"288","DOI":"10.1016\/0377-2217(96)00041-0","volume":"93","author":"I Sabuncuoglu","year":"1996","unstructured":"Sabuncuoglu I, Gurgun B (1996) A neural network model for scheduling problems. Eur J Oper Res 93:288\u2013299","journal-title":"Eur J Oper Res"},{"key":"729_CR46","doi-asserted-by":"publisher","first-page":"257","DOI":"10.1080\/09511920802287138","volume":"22","author":"B Samanta","year":"2009","unstructured":"Samanta B (2009) Surface roughness prediction in machining using soft computing. Int J Comput Integr Manuf 22:257\u2013266. \n                    https:\/\/doi.org\/10.1080\/09511920802287138","journal-title":"Int J Comput Integr Manuf"},{"key":"729_CR47","doi-asserted-by":"publisher","first-page":"888","DOI":"10.1080\/0951192X.2011.597430","volume":"24","author":"R Shafaei","year":"2011","unstructured":"Shafaei R, Rabiee M, Mirzaeyan M (2011) An adaptive neuro fuzzy inference system for makespan estimation in multiprocessor no-wait two stage flow shop. Int J Comput Integr Manuf 24:888\u2013899","journal-title":"Int J Comput Integr Manuf"},{"key":"729_CR48","doi-asserted-by":"publisher","first-page":"3087","DOI":"10.1080\/00207540903536155","volume":"49","author":"E Shokrollahpour","year":"2011","unstructured":"Shokrollahpour E, Zandieh M, Dorri B (2011) A novel imperialist competitive algorithm for bi-criteria scheduling of the assembly flowshop problem. Int J Prod Res 49:3087\u20133103","journal-title":"Int J Prod Res"},{"key":"729_CR49","doi-asserted-by":"publisher","first-page":"803","DOI":"10.1080\/08839514.2013.835233","volume":"27","author":"I Svalina","year":"2013","unstructured":"Svalina I, Simunovic G, Simunovic K (2013) Machined surface roughness prediction using adaptive neurofuzzy inference system. Appl Artif Intell 27:803\u2013817. \n                    https:\/\/doi.org\/10.1080\/08839514.2013.835233","journal-title":"Appl Artif Intell"},{"key":"729_CR50","doi-asserted-by":"publisher","first-page":"65","DOI":"10.1016\/0377-2217(90)90090-X","volume":"47","author":"E Taillard","year":"1990","unstructured":"Taillard E (1990) Some efficient heuristic methods for the flow shop sequencing problem. Eur J Oper Res 47:65\u201374","journal-title":"Eur J Oper Res"},{"key":"729_CR51","doi-asserted-by":"publisher","first-page":"248","DOI":"10.1016\/j.jhydrol.2010.07.023","volume":"391","author":"A Talei","year":"2010","unstructured":"Talei A, Chua LHC, Wong TS (2010) Evaluation of rainfall and discharge inputs used by adaptive network-based fuzzy inference systems (ANFIS) in rainfall\u2013runoff modeling. J Hydrol 391:248\u2013262. \n                    https:\/\/doi.org\/10.1016\/j.jhydrol.2010.07.023","journal-title":"J Hydrol"},{"key":"729_CR52","doi-asserted-by":"publisher","first-page":"129","DOI":"10.1016\/j.asoc.2015.04.047","volume":"34","author":"T Vasileva-Stojanovska","year":"2015","unstructured":"Vasileva-Stojanovska T, Vasileva M, Malinovski T, Trajkovik V (2015) An ANFIS model of quality of experience prediction in education. Appl Soft Comput 34:129\u2013138. \n                    https:\/\/doi.org\/10.1016\/j.asoc.2015.04.047","journal-title":"Appl Soft Comput"},{"key":"729_CR53","doi-asserted-by":"crossref","unstructured":"Verma A, Cherkasova L, Campbell RH (2012) Two sides of a coin: optimizing the schedule of mapreduce jobs to minimize their makespan and improve cluster performance. In: 2012 IEEE 20th international symposium on modeling, analysis & simulation of computer and telecommunication systems (MASCOTS). IEEE, pp 11\u201318","DOI":"10.1109\/MASCOTS.2012.12"},{"key":"729_CR54","doi-asserted-by":"publisher","first-page":"439","DOI":"10.1016\/S0377-2217(02)00910-4","volume":"155","author":"AD Wilson","year":"2004","unstructured":"Wilson AD, King RE, Wilson JR (2004) Case study on statistically estimating minimum makespan for flow line scheduling problems. Eur J Oper Res 155:439\u2013454","journal-title":"Eur J Oper Res"},{"key":"729_CR55","doi-asserted-by":"publisher","first-page":"401","DOI":"10.1147\/rd.294.0401","volume":"29","author":"RJ Wittrock","year":"1985","unstructured":"Wittrock RJ (1985) Scheduling algorithms for flexible flow lines. IBM J Res Dev 29:401\u2013412","journal-title":"IBM J Res Dev"},{"key":"729_CR56","doi-asserted-by":"publisher","first-page":"411","DOI":"10.1016\/j.cie.2007.08.003","volume":"54","author":"B Yagmahan","year":"2008","unstructured":"Yagmahan B, Yenisey MM (2008) Ant colony optimization for multi-objective flow shop scheduling problem. Comput Ind Eng 54:411\u2013420","journal-title":"Comput Ind Eng"},{"key":"729_CR57","first-page":"867","volume-title":"Intelligent engineering systems through artificial neural networks","author":"Y Yih","year":"1991","unstructured":"Yih Y, Liang T-P, Moskowitz H (1991) A hybrid approach for crane scheduling problems. In: Dagli CH, Kumara SRT, Shin YC (eds) Intelligent engineering systems through artificial neural networks. ASME, New York, pp 867\u2013872"},{"key":"729_CR58","doi-asserted-by":"publisher","first-page":"38","DOI":"10.1007\/s001700300005","volume":"21","author":"D-Z Zheng","year":"2003","unstructured":"Zheng D-Z, Wang L (2003) An effective hybrid heuristic for flow shop scheduling. Int J Adv Manuf Technol 21:38\u201344","journal-title":"Int J Adv Manuf Technol"}],"container-title":["International Journal of System Assurance Engineering and Management"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s13198-018-0729-6\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s13198-018-0729-6.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s13198-018-0729-6.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,7,18]],"date-time":"2019-07-18T19:22:11Z","timestamp":1563477731000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s13198-018-0729-6"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2018,7,19]]},"references-count":58,"journal-issue":{"issue":"6","published-print":{"date-parts":[[2018,12]]}},"alternative-id":["729"],"URL":"https:\/\/doi.org\/10.1007\/s13198-018-0729-6","relation":{},"ISSN":["0975-6809","0976-4348"],"issn-type":[{"value":"0975-6809","type":"print"},{"value":"0976-4348","type":"electronic"}],"subject":[],"published":{"date-parts":[[2018,7,19]]},"assertion":[{"value":"7 May 2016","order":1,"name":"received","label":"Received","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"4 April 2017","order":2,"name":"revised","label":"Revised","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"19 July 2018","order":3,"name":"first_online","label":"First Online","group":{"name":"ArticleHistory","label":"Article History"}}]}}