{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,7,17]],"date-time":"2026-07-17T01:16:48Z","timestamp":1784251008535,"version":"3.55.0"},"reference-count":63,"publisher":"Springer Science and Business Media LLC","issue":"2","license":[{"start":{"date-parts":[[2018,7,21]],"date-time":"2018-07-21T00:00:00Z","timestamp":1532131200000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Int J  Syst  Assur  Eng  Manag"],"published-print":{"date-parts":[[2019,4]]},"DOI":"10.1007\/s13198-018-0738-5","type":"journal-article","created":{"date-parts":[[2018,7,21]],"date-time":"2018-07-21T05:15:10Z","timestamp":1532150110000},"page":"173-189","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":25,"title":["Multi-objective linear fractional inventory problem under intuitionistic fuzzy environment"],"prefix":"10.1007","volume":"10","author":[{"ORCID":"https:\/\/orcid.org\/0000-0002-1790-5450","authenticated-orcid":false,"given":"Irfan","family":"Ali","sequence":"first","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Srikant","family":"Gupta","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Aquil","family":"Ahmed","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"297","published-online":{"date-parts":[[2018,7,21]]},"reference":[{"issue":"1","key":"738_CR1","doi-asserted-by":"publisher","first-page":"87","DOI":"10.1016\/S0165-0114(86)80034-3","volume":"20","author":"KT Atanassov","year":"1986","unstructured":"Atanassov KT (1986) Intuitionistic fuzzy sets. Fuzzy Sets Syst 20(1):87\u201396","journal-title":"Fuzzy Sets Syst"},{"issue":"1","key":"738_CR2","doi-asserted-by":"publisher","first-page":"37","DOI":"10.1016\/0165-0114(89)90215-7","volume":"33","author":"KT Atanassov","year":"1989","unstructured":"Atanassov KT (1989) More on intuitionistic fuzzy sets. Fuzzy Sets Syst 33(1):37\u201345","journal-title":"Fuzzy Sets Syst"},{"key":"738_CR3","doi-asserted-by":"publisher","DOI":"10.1155\/2010\/765278","author":"S Banerjee","year":"2010","unstructured":"Banerjee S, Roy TK (2010) Solution of single and multiobjective stochastic inventory models with fuzzy cost components by intuitionistic fuzzy optimization technique. Adv Oper Res. \n                    https:\/\/doi.org\/10.1155\/2010\/765278","journal-title":"Adv Oper Res"},{"issue":"6","key":"738_CR4","doi-asserted-by":"publisher","first-page":"1822","DOI":"10.1016\/j.camwa.2012.02.060","volume":"64","author":"UK Bera","year":"2012","unstructured":"Bera UK, Maiti MK, Maiti M (2012) Inventory model with fuzzy lead-time and dynamic demand over finite time horizon using a multi-objective genetic algorithm. Comput Math Appl 64(6):1822\u20131838","journal-title":"Comput Math Appl"},{"issue":"1","key":"738_CR5","first-page":"33","volume":"16","author":"S Bhaya","year":"2014","unstructured":"Bhaya S, Pal M, Nayak PK (2014) Intuitionistic fuzzy optimization technique in EOQ model with two types of imperfect quality items. Adv Model Optim 16(1):33\u201350","journal-title":"Adv Model Optim"},{"key":"738_CR100","doi-asserted-by":"publisher","DOI":"10.1155\/2014\/593185","author":"D Chakraborty","year":"2014","unstructured":"Chakraborty D, Jana DK, Roy TK (2014) A new approach to solve intuitionistic fuzzy optimization problem using possibility, necessity, and credibility measures. Int J Eng Math. \n                    https:\/\/doi.org\/10.1155\/2014\/593185","journal-title":"Int J Eng Math"},{"issue":"2","key":"738_CR6","doi-asserted-by":"publisher","first-page":"381","DOI":"10.1016\/j.ejor.2013.01.046","volume":"228","author":"S Chakrabortty","year":"2013","unstructured":"Chakrabortty S, Pal M, Nayak PK (2013) Intuitionistic fuzzy optimization technique for Pareto optimal solution of manufacturing inventory models with shortages. Eur J Oper Res 228(2):381\u2013387","journal-title":"Eur J Oper Res"},{"issue":"1","key":"738_CR7","doi-asserted-by":"publisher","first-page":"63","DOI":"10.1016\/j.ejor.2003.06.020","volume":"160","author":"YF Chen","year":"2005","unstructured":"Chen YF (2005) Fractional programming approach to two stochastic inventory problems. Eur J Oper Res 160(1):63\u201371","journal-title":"Eur J Oper Res"},{"issue":"4","key":"738_CR8","doi-asserted-by":"publisher","first-page":"422","DOI":"10.1504\/IJMOR.2012.048903","volume":"4","author":"B Das","year":"2012","unstructured":"Das B, Maiti M (2012) A volume flexible fuzzy production inventory model under interactive and simulation approach. Int J Math Oper Res 4(4):422\u2013438","journal-title":"Int J Math Oper Res"},{"issue":"1","key":"738_CR9","first-page":"825","volume":"242","author":"SK De","year":"2014","unstructured":"De SK, Sana SS (2014) A multi-periods production-inventory model with capacity constraints for multi-manufacturers\u2014a global optimality in intuitionistic fuzzy environment. Appl Math Comput 242(1):825\u2013841","journal-title":"Appl Math Comput"},{"issue":"1","key":"738_CR10","first-page":"664","volume":"230","author":"SK De","year":"2014","unstructured":"De SK, Goswami A, Sana SS (2014) An interpolating by pass to Pareto optimality in intuitionistic fuzzy technique for a EOQ model with time sensitive backlogging. Appl Math Comput 230(1):664\u2013674","journal-title":"Appl Math Comput"},{"issue":"1","key":"738_CR11","first-page":"342","volume":"151","author":"W Du","year":"2015","unstructured":"Du W, Leung SYS, Kwong CK (2015) A multi objective optimization-based neural network model for short-term replenishment forecasting in fashion industry. Neuro-computing 151(1):342\u2013353","journal-title":"Neuro-computing"},{"issue":"12","key":"738_CR12","doi-asserted-by":"publisher","first-page":"2269","DOI":"10.1080\/00207721.2013.860639","volume":"46","author":"D Dutta","year":"2013","unstructured":"Dutta D, Kumar P (2013) Application of fuzzy goal programming approach to multi-objective linear fractional inventory model. Int J Syst Sci 46(12):2269\u20132278","journal-title":"Int J Syst Sci"},{"key":"738_CR13","doi-asserted-by":"publisher","first-page":"211","DOI":"10.1016\/j.asoc.2015.02.044","volume":"32","author":"P Fattahi","year":"2015","unstructured":"Fattahi P, Hajipour V, Nobari A (2015) A bi-objective continuous review inventory control model: Pareto-based meta-heuristic algorithms. Appl Soft Comput 32:211\u2013223","journal-title":"Appl Soft Comput"},{"issue":"3","key":"738_CR14","doi-asserted-by":"publisher","first-page":"302","DOI":"10.1109\/TSMCA.2003.817032","volume":"33","author":"RYK Fung","year":"2003","unstructured":"Fung RYK, Tang J, Wang D (2003) Multiproduct aggregate production planning with fuzzy demands and fuzzy capacities. IEEE Trans Syst Man Cybern Part A Syst Hum 33(3):302\u2013313","journal-title":"IEEE Trans Syst Man Cybern Part A Syst Hum"},{"issue":"6","key":"738_CR15","first-page":"73","volume":"2","author":"A Garai","year":"2015","unstructured":"Garai A, Ghosh P, Roy TK (2015) Solution of inventory model by Geometric programming technique under intuitionistic fuzzy environment. Optimization 2(6):73\u201387","journal-title":"Optimization"},{"key":"738_CR16","doi-asserted-by":"publisher","unstructured":"Garai T, Chakraborty D, Roy TK (2018) A fuzzy rough multi-objective multi-item inventory model with both stock-dependent demand and holding cost rate. Granul Comput. \n                    https:\/\/doi.org\/10.1007\/s41066-018-0085-6","DOI":"10.1007\/s41066-018-0085-6"},{"issue":"3","key":"738_CR17","doi-asserted-by":"publisher","first-page":"777","DOI":"10.3934\/jimo.2014.10.777","volume":"10","author":"H Garg","year":"2014","unstructured":"Garg H (2014) Solving structural engineering design optimization problems using an artificial bee colony algorithm. J Ind Manag Optim 10(3):777\u2013794","journal-title":"J Ind Manag Optim"},{"key":"738_CR18","doi-asserted-by":"publisher","first-page":"247","DOI":"10.1007\/978-3-319-17906-3_11","volume-title":"Intelligent techniques in engineering management","author":"H Garg","year":"2015","unstructured":"Garg H (2015a) Fuzzy inventory models for deteriorating items under different types of lead-time distributions. In: Kahraman C, Onar S\u00c7 (eds) Intelligent techniques in engineering management. Springer, Cham, pp 247\u2013274"},{"key":"738_CR19","doi-asserted-by":"publisher","first-page":"620","DOI":"10.4018\/978-1-4666-7258-1.ch020","volume-title":"Handbook of research on artificial intelligence techniques and algorithms","author":"H Garg","year":"2015","unstructured":"Garg H (2015b) A hybrid GA-GSA algorithm for optimizing the performance of an industrial system by utilizing uncertain data. In: Vasant P (ed) Handbook of research on artificial intelligence techniques and algorithms. IGI Global, Hershey, pp 620\u2013654"},{"issue":"1","key":"738_CR20","first-page":"292","volume":"274","author":"H Garg","year":"2016","unstructured":"Garg H (2016a) A hybrid PSO-GA algorithm for constrained optimization problems. Appl Math Comput 274(1):292\u2013305","journal-title":"Appl Math Comput"},{"issue":"8","key":"738_CR21","doi-asserted-by":"publisher","first-page":"988","DOI":"10.1016\/j.asoc.2015.10.040","volume":"3","author":"H Garg","year":"2016","unstructured":"Garg H (2016b) A new generalized improved score function of interval-valued in tuitionistic fuzzy sets and applications in expert systems. Appl Soft Comput 3(8):988\u2013999","journal-title":"Appl Soft Comput"},{"issue":"1","key":"738_CR22","doi-asserted-by":"publisher","first-page":"164","DOI":"10.1016\/j.engappai.2017.02.008","volume":"60","author":"H Garg","year":"2017","unstructured":"Garg H (2017) Novel intuitionistic fuzzy decision making method based on an improved operation laws and its application. Eng Appl Artif Intell 60(1):164\u2013174","journal-title":"Eng Appl Artif Intell"},{"key":"738_CR23","doi-asserted-by":"publisher","DOI":"10.1007\/s13198-018-0699-8","author":"H Garg","year":"2018","unstructured":"Garg H (2018) Analysis of an industrial system under uncertain environment by using different types of fuzzy numbers. Int J Syst Assur Eng Manag. \n                    https:\/\/doi.org\/10.1007\/s13198-018-0699-8","journal-title":"Int J Syst Assur Eng Manag"},{"key":"738_CR24","doi-asserted-by":"publisher","DOI":"10.1007\/s10489-017-1035-8","author":"H Garg","year":"2017","unstructured":"Garg H, Arora R (2017) A nonlinear-programming methodology for multi-attribute decision-making problem with interval-valued intuitionistic fuzzy soft sets information. Appl Intell. \n                    https:\/\/doi.org\/10.1007\/s10489-017-1035-8","journal-title":"Appl Intell"},{"issue":"6","key":"738_CR25","doi-asserted-by":"publisher","first-page":"701","DOI":"10.1016\/j.isatra.2013.06.010","volume":"52","author":"H Garg","year":"2013","unstructured":"Garg H, Rani M (2013) An approach for reliability analysis of industrial systems using PSO and IFS technique. ISA Trans 52(6):701\u2013710","journal-title":"ISA Trans"},{"key":"738_CR26","doi-asserted-by":"crossref","unstructured":"Garg H, Rani M, Sharma SP (2013) Reliability analysis of the engineering systems using intuitionistic fuzzy set theory. J Qual Reliab Eng 2013, Article ID 943972,10","DOI":"10.1155\/2013\/943972"},{"issue":"3","key":"738_CR27","doi-asserted-by":"publisher","first-page":"335","DOI":"10.1016\/j.jmsy.2014.02.008","volume":"33","author":"H Garg","year":"2014","unstructured":"Garg H, Rani M, Sharma SP, Vishwakarma Y (2014a) Bi-objective optimization of the reliability\u2013redundancy allocation problem for series-parallel system. J Manuf Syst 33(3):335\u2013347","journal-title":"J Manuf Syst"},{"issue":"1","key":"738_CR28","doi-asserted-by":"publisher","first-page":"3157","DOI":"10.1016\/j.eswa.2013.11.014","volume":"41","author":"H Garg","year":"2014","unstructured":"Garg H, Rani M, Sharma SP, Vishwakarma Y (2014b) Intuitionistic fuzzy optimization technique for solving multi-objective reliability optimization problems in interval environment. Expert Syst Appl 41(1):3157\u20133167","journal-title":"Expert Syst Appl"},{"issue":"2","key":"738_CR29","doi-asserted-by":"publisher","first-page":"179","DOI":"10.1080\/095372897235442","volume":"8","author":"AMA Hariri","year":"1997","unstructured":"Hariri AMA, Abou-El-Ata MO (1997) Multi-item production lot-size inventory model with varying order cost under a restriction: a geometric programming approach. Prod Plan Control Manag Oper 8(2):179\u2013182","journal-title":"Prod Plan Control Manag Oper"},{"issue":"6","key":"738_CR101","doi-asserted-by":"publisher","first-page":"947","DOI":"10.1287\/opre.38.6.947","volume":"38","author":"FW Harris","year":"1913","unstructured":"Harris FW (1913) How many parts to make at once. Oper Res 38(6):947\u2013950","journal-title":"Oper Res"},{"issue":"3","key":"738_CR30","doi-asserted-by":"publisher","first-page":"320","DOI":"10.1504\/IJMOR.2010.032721","volume":"2","author":"S Khanra","year":"2010","unstructured":"Khanra S, Sana SS, Chaudhuri K (2010) An EOQ model for perishable item with stock and price dependent demand rate. Int J Math Oper Res 2(3):320\u2013335","journal-title":"Int J Math Oper Res"},{"issue":"5","key":"738_CR31","doi-asserted-by":"publisher","first-page":"547","DOI":"10.1504\/IJMOR.2015.071280","volume":"7","author":"P Kumar","year":"2015","unstructured":"Kumar P, Dutta D (2015) Multi-objective linear fractional inventory model of multi-products with price-dependant demand rate in fuzzy environment. Int J Math Oper Res 7(5):547\u2013565","journal-title":"Int J Math Oper Res"},{"issue":"5","key":"738_CR32","doi-asserted-by":"publisher","first-page":"524","DOI":"10.1504\/IJMOR.2011.042442","volume":"3","author":"A Kundu","year":"2011","unstructured":"Kundu A, Chakrabarti T (2011) A production lot-size model with fuzzy-ramp type demand and fuzzy deterioration rate under permissible delay in payments. Int J Math Oper Res 3(5):524\u2013540","journal-title":"Int J Math Oper Res"},{"issue":"2","key":"738_CR33","first-page":"92","volume":"7","author":"GS Mahapatra","year":"2013","unstructured":"Mahapatra GS, Roy TK (2013) Intuitionistic fuzzy number and its arithmetic operation with application on system failure. J Uncertain Syst 7(2):92\u2013107","journal-title":"J Uncertain Syst"},{"issue":"1","key":"738_CR34","doi-asserted-by":"publisher","first-page":"190","DOI":"10.1016\/j.cie.2012.09.003","volume":"64","author":"GC Mahata","year":"2013","unstructured":"Mahata GC, Goswami A (2013) Fuzzy inventory models for items with imperfect quality and shortage back ordering under crisp and fuzzy decision variables. Comput Ind Eng 64(1):190\u2013199","journal-title":"Comput Ind Eng"},{"issue":"6","key":"738_CR35","doi-asserted-by":"publisher","first-page":"1039","DOI":"10.1080\/00207721.2012.659685","volume":"43","author":"J Min","year":"2012","unstructured":"Min J, Zhou YW, Liu GQ, Wang SD (2012) An EPQ model for deteriorating items with inventory-level-dependent demand and permissible delay in payments. Int J Syst Sci 43(6):1039\u20131053","journal-title":"Int J Syst Sci"},{"issue":"5","key":"738_CR36","doi-asserted-by":"publisher","first-page":"3200","DOI":"10.1016\/j.apm.2012.07.024","volume":"37","author":"M Mondal","year":"2013","unstructured":"Mondal M, Maity AK, Maiti MK, Maiti M (2013) A production-repairing inventory model with fuzzy-rough coefficients under inflation and time value of money. Appl Math Model 37(5):3200\u20133215","journal-title":"Appl Math Model"},{"issue":"70","key":"738_CR37","first-page":"3467","volume":"6","author":"A Nagoorgani","year":"2012","unstructured":"Nagoorgani A, Ponnalagu K (2012) A new approach on solving intuitionistic fuzzy linear programming problem. Appl Math Sci 6(70):3467\u20133474","journal-title":"Appl Math Sci"},{"issue":"2","key":"738_CR38","doi-asserted-by":"publisher","first-page":"599","DOI":"10.1016\/j.cie.2011.11.009","volume":"62","author":"V Pando","year":"2012","unstructured":"Pando V, Garc\u0131 J, San-Jos\u00e9 LA, Sicilia J (2012) Maximizing profits in an inventory model with both demand rate and holding cost per unit time dependent on the stock level. Comput Ind Eng 62(2):599\u2013608","journal-title":"Comput Ind Eng"},{"issue":"1","key":"738_CR39","doi-asserted-by":"publisher","first-page":"294","DOI":"10.1016\/j.ijpe.2013.04.050","volume":"145","author":"V Pando","year":"2013","unstructured":"Pando V, San-Jos\u00e9 LA, Garc\u00eda-Laguna J, Sicilia J (2013) An economic lot-size model with non-linear holding cost hinging on time and quantity. Int J Prod Econ 145(1):294\u2013303","journal-title":"Int J Prod Econ"},{"issue":"2","key":"738_CR40","doi-asserted-by":"publisher","first-page":"179","DOI":"10.1016\/j.ejor.2011.01.048","volume":"214","author":"DW Pentico","year":"2011","unstructured":"Pentico DW, Drake MJ (2011) A survey of deterministic models for the EOQ and EPQ with partial backordering. Eur J Oper Res 214(2):179\u2013198","journal-title":"Eur J Oper Res"},{"issue":"2","key":"738_CR41","doi-asserted-by":"publisher","first-page":"81","DOI":"10.5267\/j.dsl.2013.02.002","volume":"2","author":"M Rafiei","year":"2013","unstructured":"Rafiei M, Mohammadi M, Torabi S (2013) Reliable multi period multi product supply chain design with facility disruption. Decis Sci Lett 2(2):81\u201394","journal-title":"Decis Sci Lett"},{"key":"738_CR150","doi-asserted-by":"publisher","first-page":"228","DOI":"10.1016\/j.eswa.2016.07.034","volume":"64","author":"D Rani","year":"2016","unstructured":"Rani D, Gulati TR, Garg H (2016) Multi-objective non-linear programming problem in intuitionistic fuzzy environment: optimistic and pessimistic viewpoint. Exp Syst Appl 64:228\u2013238. \n                    https:\/\/doi.org\/10.1016\/j.eswa.2016.07.034","journal-title":"Exp Syst Appl"},{"issue":"3","key":"738_CR42","doi-asserted-by":"publisher","first-page":"301","DOI":"10.1504\/IJMOR.2013.053625","volume":"5","author":"TS Roy","year":"2013","unstructured":"Roy TS, Ghosh SK, Chaudhuri K (2013) An economic production quantity model for items with time proportional deterioration under permissible delayin payments. Int J Math Oper Res 5(3):301\u2013316","journal-title":"Int J Math Oper Res"},{"issue":"1","key":"738_CR43","doi-asserted-by":"publisher","first-page":"581","DOI":"10.1016\/S0305-0483(99)00080-8","volume":"28","author":"EH Sabri","year":"2000","unstructured":"Sabri EH, Beamon BM (2000) A multi-objective approach to simultaneous strategic and operational planning in supply chain design. Omega 28(1):581\u2013598","journal-title":"Omega"},{"issue":"1","key":"738_CR44","first-page":"43","volume":"1","author":"SJ Sadjadi","year":"2005","unstructured":"Sadjadi SJ, Aryanezhad MB, Sarfaraj A (2005) A fuzzy approach to solve a multi-objective linear fractional inventory model. J Indus Eng Int 1(1):43\u201347","journal-title":"J Indus Eng Int"},{"issue":"4","key":"738_CR45","doi-asserted-by":"publisher","first-page":"341","DOI":"10.1007\/s10852-011-9160-6","volume":"10","author":"NH Shah","year":"2011","unstructured":"Shah NH, Soni H (2011) A multi-objective production inventory model with backorder for fuzzy random demand under flexibility and reliability. J Math Model Algorithms 10(4):341\u2013356","journal-title":"J Math Model Algorithms"},{"issue":"4","key":"738_CR46","doi-asserted-by":"publisher","first-page":"788","DOI":"10.1007\/s10489-016-0869-9","volume":"46","author":"S Singh","year":"2017","unstructured":"Singh S, Garg H (2017) Distance measures between type-2 intuitionistic fuzzy sets and their application to multicriteria decision-making process. Appl Intell 46(4):788\u2013799","journal-title":"Appl Intell"},{"issue":"2","key":"738_CR47","doi-asserted-by":"publisher","first-page":"263","DOI":"10.1007\/s40815-015-0108-2","volume":"18","author":"SK Singh","year":"2016","unstructured":"Singh SK, Yadav SP (2016) Fuzzy programming approach for solving intuitionistic fuzzy linear fractional programming problem. Int J Fuzzy Syst 18(2):263\u2013269","journal-title":"Int J Fuzzy Syst"},{"issue":"1","key":"738_CR48","doi-asserted-by":"publisher","first-page":"76","DOI":"10.1016\/j.eswa.2015.12.032","volume":"51","author":"A Srivastav","year":"2016","unstructured":"Srivastav A, Agrawal S (2016) Multi-objective optimization of hybrid backorder inventory model. Expert Syst Appl 51(1):76\u201384","journal-title":"Expert Syst Appl"},{"issue":"6","key":"738_CR49","doi-asserted-by":"publisher","first-page":"1466","DOI":"10.1016\/j.mcm.2012.12.008","volume":"57","author":"AA Taleizadeh","year":"2013","unstructured":"Taleizadeh AA, Wee HM, Jolai F (2013) Revisiting a fuzzy rough economic order quantity model for deteriorating items considering quantity discount and prepayment. Math Comput Model 57(6):1466\u20131479","journal-title":"Math Comput Model"},{"key":"738_CR50","volume-title":"Principles of inventory and materials management","author":"RJ Tersine","year":"1994","unstructured":"Tersine RJ (1994) Principles of inventory and materials management. Prentice Hall, Englewood Cliffs"},{"issue":"3","key":"738_CR51","first-page":"437","volume":"4","author":"R Tripathi","year":"2013","unstructured":"Tripathi R (2013) Inventory model with different demand rate and different holding cost. Int J Ind Eng Comput 4(3):437\u2013446","journal-title":"Int J Ind Eng Comput"},{"issue":"1","key":"738_CR52","doi-asserted-by":"publisher","first-page":"99","DOI":"10.1504\/IJMOR.2011.037315","volume":"3","author":"M Valliathal","year":"2010","unstructured":"Valliathal M, Uthayakumar R (2010) An EOQ model for rebate value and selling-price-dependent demand rate with shortages. Int J Math Oper Res 3(1):99\u2013123","journal-title":"Int J Math Oper Res"},{"issue":"2","key":"738_CR53","doi-asserted-by":"publisher","first-page":"620","DOI":"10.1016\/j.ejor.2006.08.067","volume":"197","author":"HM Wee","year":"2009","unstructured":"Wee HM, Lo CC, Hsu PH (2009) A multi-objective joint replenishment inventory model of deteriorated items in a fuzzy environment. Eur J Oper Res 197(2):620\u2013631","journal-title":"Eur J Oper Res"},{"issue":"2","key":"738_CR54","doi-asserted-by":"publisher","first-page":"311","DOI":"10.1016\/j.cie.2013.07.001","volume":"66","author":"J Wu","year":"2013","unstructured":"Wu J, Liu Y (2013) An approach for multiple attribute group decision making problems with interval-valued intuitionistic trapezoidal fuzzy numbers. Comput Ind Eng 66(2):311\u2013324","journal-title":"Comput Ind Eng"},{"issue":"8","key":"738_CR55","doi-asserted-by":"publisher","first-page":"2107","DOI":"10.1016\/j.camwa.2008.03.040","volume":"56","author":"J Xu","year":"2008","unstructured":"Xu J, Zhao L (2008) A class of fuzzy rough expected value multi-objective decision making model and its application to inventory problems. Comput Math Appl 56(8):2107\u20132119","journal-title":"Comput Math Appl"},{"issue":"5","key":"738_CR56","doi-asserted-by":"publisher","first-page":"679","DOI":"10.1016\/j.ins.2009.11.002","volume":"180","author":"J Xu","year":"2010","unstructured":"Xu J, Zhao L (2010) A multi-objective decision-making model with fuzzy rough coefficients and its application to the inventory problem. Inf Sci 180(5):679\u2013696","journal-title":"Inf Sci"},{"issue":"1","key":"738_CR57","doi-asserted-by":"publisher","first-page":"78","DOI":"10.1504\/IJMOR.2011.037314","volume":"3","author":"D Yadav","year":"2010","unstructured":"Yadav D, Pundir S, Kumari R (2010) A fuzzy multi-item production model with reliability and flexibility under limited storage capacity with deterioration via geometric programming. Int J Math Oper Res 3(1):78\u201398","journal-title":"Int J Math Oper Res"},{"issue":"1","key":"738_CR58","doi-asserted-by":"publisher","first-page":"214","DOI":"10.1016\/j.ijpe.2014.01.016","volume":"155","author":"CT Yang","year":"2014","unstructured":"Yang CT (2014) An inventory model with both stock-dependent demand rate and stock-dependent holding cost rate. Int J Prod Econ 155(1):214\u2013221","journal-title":"Int J Prod Econ"},{"issue":"3","key":"738_CR59","doi-asserted-by":"publisher","first-page":"338","DOI":"10.1016\/S0019-9958(65)90241-X","volume":"8","author":"LA Zadeh","year":"1965","unstructured":"Zadeh LA (1965) Fuzzy sets. Inf Control 8(3):338\u2013353","journal-title":"Inf Control"},{"issue":"1","key":"738_CR60","doi-asserted-by":"publisher","first-page":"45","DOI":"10.1016\/0165-0114(78)90031-3","volume":"1","author":"HJ Zimmermann","year":"1978","unstructured":"Zimmermann HJ (1978) Fuzzy programming and linear programming with several objective functions. Fuzzy Sets Syst 1(1):45\u201355","journal-title":"Fuzzy Sets Syst"}],"container-title":["International Journal of System Assurance Engineering and Management"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s13198-018-0738-5.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s13198-018-0738-5\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s13198-018-0738-5.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,10,16]],"date-time":"2019-10-16T07:25:14Z","timestamp":1571210714000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s13198-018-0738-5"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2018,7,21]]},"references-count":63,"journal-issue":{"issue":"2","published-print":{"date-parts":[[2019,4]]}},"alternative-id":["738"],"URL":"https:\/\/doi.org\/10.1007\/s13198-018-0738-5","relation":{},"ISSN":["0975-6809","0976-4348"],"issn-type":[{"value":"0975-6809","type":"print"},{"value":"0976-4348","type":"electronic"}],"subject":[],"published":{"date-parts":[[2018,7,21]]},"assertion":[{"value":"20 July 2017","order":1,"name":"received","label":"Received","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"12 May 2018","order":2,"name":"revised","label":"Revised","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"21 July 2018","order":3,"name":"first_online","label":"First Online","group":{"name":"ArticleHistory","label":"Article History"}}]}}