{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,3,12]],"date-time":"2026-03-12T15:29:24Z","timestamp":1773329364836,"version":"3.50.1"},"reference-count":39,"publisher":"Springer Science and Business Media LLC","issue":"1","license":[{"start":{"date-parts":[[2019,2,1]],"date-time":"2019-02-01T00:00:00Z","timestamp":1548979200000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"funder":[{"DOI":"10.13039\/100010010","name":"Glasgow Caledonian University","doi-asserted-by":"publisher","id":[{"id":"10.13039\/100010010","id-type":"DOI","asserted-by":"publisher"}]}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Int J  Syst  Assur  Eng  Manag"],"published-print":{"date-parts":[[2019,2]]},"DOI":"10.1007\/s13198-019-00771-3","type":"journal-article","created":{"date-parts":[[2019,2,18]],"date-time":"2019-02-18T11:55:34Z","timestamp":1550490934000},"page":"97-109","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":8,"title":["Reliability analysis of a rodding anode plant in aluminum industry with multiple units failure and single repairman"],"prefix":"10.1007","volume":"10","author":[{"ORCID":"https:\/\/orcid.org\/0000-0002-7312-6371","authenticated-orcid":false,"given":"Yaqoob","family":"Al Rahbi","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"S. M.","family":"Rizwan","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"B. M.","family":"Alkali","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Andrew","family":"Cowell","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"G.","family":"Taneja","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2019,2,18]]},"reference":[{"issue":"3","key":"771_CR1","first-page":"9","volume":"98","author":"RK Bhardwaj","year":"2014","unstructured":"Bhardwaj RK, Singh R (2014) Semi Markov approach for asymptotic performance analysis of a standby system with server failure. Int J Comput Appl 98(3):9\u201314","journal-title":"Int J Comput Appl"},{"issue":"2","key":"771_CR2","doi-asserted-by":"publisher","first-page":"423","DOI":"10.1007\/s13198-016-0445-z","volume":"8","author":"RK Bhardwaj","year":"2017","unstructured":"Bhardwaj RK, Kaur K, Malik SC (2017) Reliability indices of a redundant system with standby failure and arbitrary distribution for repair and replacement times. Int J Syst Assur Eng Manag 8(2):423\u2013431","journal-title":"Int J Syst Assur Eng Manag"},{"key":"771_CR3","volume-title":"Renewal theory","author":"DR Cox","year":"1962","unstructured":"Cox DR (1962) Renewal theory. Methuen, London"},{"key":"771_CR4","volume-title":"Markov processes for stochastic modeling","author":"O Ibe","year":"2008","unstructured":"Ibe O (2008) Markov processes for stochastic modeling. Academic Press, London"},{"issue":"4","key":"771_CR5","doi-asserted-by":"publisher","first-page":"585","DOI":"10.1016\/S0026-2714(97)00204-7","volume":"38","author":"W Li","year":"1998","unstructured":"Li W, Alfa AS, Zhao YQ (1998) Stochastic analysis of a repairable system with three units and repair facilities. Microelectron Reliab 38(4):585\u2013595","journal-title":"Microelectron Reliab"},{"issue":"1","key":"771_CR6","first-page":"25","volume":"5","author":"AG Mathew","year":"2009","unstructured":"Mathew AG, Rizwan SM, Majumder MC, Ramachandran KP, Gulshan T (2009a) Profit evaluation of a single unit CC plant with scheduled maintenance. Caled J Eng 5(1):25\u201333","journal-title":"Caled J Eng"},{"key":"771_CR7","unstructured":"Mathew AG, Rizwan SM Majumder MC, Gulshan T (2009) Optimization of a single unit CC plant with scheduled maintenance policy. In: Proceedings of the international conference on recent advances in material processing technology, ISBN 978-81-904334-1-9, India, 25\u201327, pp 609\u2013613"},{"issue":"3","key":"771_CR8","first-page":"197","volume":"5","author":"AG Mathew","year":"2010","unstructured":"Mathew AG, Rizwan SM, Majumder MC, Ramachandran KP, Taneja G (2010) Reliability modeling and analysis of a two-unit parallel CC plant with different installed capacities. J Manuf Eng 5(3):197\u2013204","journal-title":"J Manuf Eng"},{"issue":"7","key":"771_CR9","doi-asserted-by":"publisher","first-page":"1488","DOI":"10.1016\/j.jfranklin.2010.04.016","volume":"348","author":"AG Mathew","year":"2011","unstructured":"Mathew AG, Rizwan SM, Majumder MC, Ramachandran KP (2011a) Reliability modelling and analysis of a two unit continuous casting plant. J Frankl Inst 348(7):1488\u20131505","journal-title":"J Frankl Inst"},{"issue":"2","key":"771_CR10","first-page":"179","volume":"7","author":"AG Mathew","year":"2011","unstructured":"Mathew AG, Rizwan SM, Majumder MC, Ramachandran KP, Taneja G (2011b) Reliability modeling and analysis of an identical two-unit parallel CC plant system operative with full installed capacity. Int J Perform Eng 7(2):179\u2013185","journal-title":"Int J Perform Eng"},{"issue":"1","key":"771_CR11","first-page":"198","volume":"7","author":"R Niwas","year":"2014","unstructured":"Niwas R, Kadyan MS, Kumar J (2014) MTSF and profit analysis of a single unit system with inspection for feasibility of repair beyond warranty. Int J Syst Assur Eng Manag 7(1):198\u2013204","journal-title":"Int J Syst Assur Eng Manag"},{"issue":"1","key":"771_CR12","first-page":"1","volume":"4","author":"N Padmavathi","year":"2012","unstructured":"Padmavathi N, Rizwan SM, Pal A, Taneja G (2012) Reliability analysis of an evaporator of a desalination plant with online repair and emergency shutdowns. Arya Bhatta J Math Inform 4(1):1\u201311","journal-title":"Arya Bhatta J Math Inform"},{"issue":"1","key":"771_CR13","first-page":"1","volume":"4","author":"N Padmavathi","year":"2013","unstructured":"Padmavathi N, Rizwan SM, Pal A, Taneja G (2013a) Probabilistic analysis of an evaporator of a desalination plant with priority for repair over maintenance. Int J Sci Stat Comput 4(1):1\u20138","journal-title":"Int J Sci Stat Comput"},{"key":"771_CR14","unstructured":"Padmavathi N, Rizwan SM, Anita Pal, Taneja G (2013) Comparative analysis of the two models of an evaporator of a desalination plant. In: Proceedings of international conference on information and mathematical science, Punjab, India, 24\u201326 Oct, pp 418\u2013422"},{"issue":"1","key":"771_CR15","first-page":"219","volume":"6","author":"N Padmavathi","year":"2014","unstructured":"Padmavathi N, Rizwan SM, Pal A, Taneja G (2014a) Probabilistic analysis of a seven unit desalination plant with minor\/major failures and priority given to repair over maintenance. Arya Bhatta J Math Inform 6(1):219\u2013230","journal-title":"Arya Bhatta J Math Inform"},{"issue":"1","key":"771_CR16","first-page":"15","volume":"5","author":"N Padmavathi","year":"2014","unstructured":"Padmavathi N, Rizwan SM, Pal A, Taneja G (2014b) Probabilistic analysis of a desalination plant with major and minor failures and shutdown during winter season. Int J Sci Stat Comput 5(1):15\u201323","journal-title":"Int J Sci Stat Comput"},{"issue":"12","key":"771_CR17","first-page":"1","volume":"1","author":"N Padmavathi","year":"2015","unstructured":"Padmavathi N, Rizwan SM, Senguttuvan A (2015) A Comparative analysis between the reliability models portraying two operating conditions of a desalination plant. Int J Core Eng Manag 1(12):1\u201310","journal-title":"Int J Core Eng Manag"},{"issue":"16","key":"771_CR18","first-page":"5616","volume":"12","author":"YA Rahbi","year":"2017","unstructured":"Rahbi YA, Rizwan SM, Alkali B, Cowell A, Taneja G (2017a) Reliability analysis of rodding anode plant in aluminum industry. Int J Appl Eng Res 12(16):5616\u20135623","journal-title":"Int J Appl Eng Res"},{"key":"771_CR19","unstructured":"Rahbi Y, Rizwan SM, Alkali BM, Cowell A, Taneja G (2017) Reliability analysis of a subsystem in aluminum industry plant. In: 6th international conference on reliability, infocom technologies and optimization (Trends and Future Directions) (ICRITO), Noida, India, pp 199\u2013203"},{"issue":"4","key":"771_CR20","first-page":"695","volume":"9","author":"YA Rahbi","year":"2018","unstructured":"Rahbi YA, Rizwan SM, Alkali BM, Cowell A, Taneja G (2018) Maintenance analysis of a butt thimble removal station in aluminum plant. Int J Mech Eng Technol 9(4):695\u2013703","journal-title":"Int J Mech Eng Technol"},{"issue":"3","key":"771_CR21","doi-asserted-by":"publisher","first-page":"698","DOI":"10.1109\/TSMCA.2012.2217320","volume":"43","author":"M Ram","year":"2013","unstructured":"Ram M, Singh SB, Singh VV (2013) Stochastic analysis of a standby system with waiting repair strategy. IEEE Trans Syst Man Cybern Syst 43(3):698\u2013707","journal-title":"IEEE Trans Syst Man Cybern Syst"},{"key":"771_CR22","doi-asserted-by":"crossref","unstructured":"Rizwan SM (2006) Reliability modeling strategy of an industrial system. In: Proceedings of IEEE conference publications of computer society. first international conference on availability, reliability and security (ARES\u201906), Vienna University of Technology, Austria, pp 625\u2013630","DOI":"10.1109\/ARES.2006.107"},{"issue":"2","key":"771_CR23","first-page":"21","volume":"3","author":"SM Rizwan","year":"2014","unstructured":"Rizwan SM, Thanikal Joseph V (2014) Reliability analysis of a waste water treatment plant with inspection. Insp Manag J Math 3(2):21\u201326","journal-title":"Insp Manag J Math"},{"key":"771_CR24","unstructured":"Rizwan SM, Khurana V, Taneja G (2005) Reliability modeling of a hot standby PLC system. In: Proceedings of the international conference on communication, computer and power (ICCCP\u201905), 14\u201316 Feb, Sultan Qaboos University, Sultanate of Oman, pp 486\u2013489"},{"issue":"4","key":"771_CR25","doi-asserted-by":"publisher","first-page":"361","DOI":"10.1080\/02286203.2007.11442438","volume":"27","author":"SM Rizwan","year":"2007","unstructured":"Rizwan SM, Khurana V, Taneja G (2007) Modeling and optimization of a single unit PLCs\u2019 system. Int J Model Simul Canada 27(4):361\u2013368","journal-title":"Int J Model Simul Canada"},{"issue":"3","key":"771_CR26","doi-asserted-by":"publisher","first-page":"315","DOI":"10.1080\/02286203.2010.11442586","volume":"30","author":"SM Rizwan","year":"2010","unstructured":"Rizwan SM, Khurana V, Taneja G (2010) Reliability analysis of a hot standby industrial system. Int J Model Simul 30(3):315\u2013322","journal-title":"Int J Model Simul"},{"issue":"5","key":"771_CR27","first-page":"523","volume":"9","author":"SM Rizwan","year":"2013","unstructured":"Rizwan SM, Padmavathi N, Pal A, Taneja G (2013) Reliability analysis of a seven unit desalination plant with shutdown during winter season and repair\/maintenance on FCFS basis. Int J Perform Eng 9(5):523\u2013528","journal-title":"Int J Perform Eng"},{"issue":"3","key":"771_CR28","first-page":"3","volume":"17","author":"SM Rizwan","year":"2014","unstructured":"Rizwan SM, Joseph Thanikal V, Torrijos M (2014) A general model for reliability analysis of a domestic waste water treatment plant. Int J Cond Monit Diagn Eng Manag 17(3):3\u20136","journal-title":"Int J Cond Monit Diagn Eng Manag"},{"issue":"24","key":"771_CR29","first-page":"44075","volume":"10","author":"SM Rizwan","year":"2015","unstructured":"Rizwan SM, Joseph Thanikal V, Padmavathi N, Yazdi H (2015) Reliability and availability analysis of an anaerobic batch reactor treating fruit and vegetable waste. Int J Appl Eng Res 10(24):44075\u201344079","journal-title":"Int J Appl Eng Res"},{"issue":"1188","key":"771_CR30","doi-asserted-by":"publisher","first-page":"6","DOI":"10.1098\/rspa.1955.0198","volume":"232","author":"WL Smith","year":"1955","unstructured":"Smith WL (1955) Regenerative stochastic processes. Proc R Soc Lond A 232(1188):6\u201331","journal-title":"Proc R Soc Lond A"},{"issue":"2","key":"771_CR31","first-page":"243","volume":"20","author":"WL Smith","year":"1958","unstructured":"Smith WL (1958) Renewal theory and its ramifications. JR Stat Soc Ser B (Methodol) 20(2):243\u2013302","journal-title":"JR Stat Soc Ser B (Methodol)"},{"issue":"8","key":"771_CR32","first-page":"1752","volume":"1","author":"SZ Taj","year":"2017","unstructured":"Taj SZ, Rizwan SM, Alkali BM, Harrison DK, Taneja GL (2017a) Reliability analysis of a single machine subsystem of a cable plant with six maintenance categories. Int J Appl Eng Res 1(8):1752\u20131757","journal-title":"Int J Appl Eng Res"},{"issue":"3","key":"771_CR33","first-page":"12","volume":"6","author":"SZ Taj","year":"2017","unstructured":"Taj SZ, Rizwan SM, Alkali BM, Harrison DK, Taneja G (2017b) Probabilistic modeling and analysis of a cable plant subsystem with priority to repair over preventive maintenance. Insp Manag J Math 6(3):12\u201321","journal-title":"Insp Manag J Math"},{"key":"771_CR34","doi-asserted-by":"crossref","unstructured":"Taj SZ, Rizwan SM, Alkali BM, Harrison DK, Taneja G (2017). Reliability modelling and analysis of a single machine subsystem of a cable plant. In: 7th international conference on modelling, simulation and applied optimization, American University of Sharjah, Sharjah, UAE, April 4\u20136","DOI":"10.1109\/ICMSAO.2017.7934917"},{"issue":"4","key":"771_CR35","first-page":"1","volume":"9","author":"SZ Taj","year":"2018","unstructured":"Taj SZ, Rizwan SM, Taneja G (2018a) Reliability analysis of a wire drawing system with mandatory rest period. Int J Mech Eng Technol 9(4):1\u201310","journal-title":"Int J Mech Eng Technol"},{"issue":"6","key":"771_CR36","first-page":"413","volume":"52","author":"SZ Taj","year":"2018","unstructured":"Taj SZ, Rizwan SM, Alkali BM, Harrison DK, Taneja G (2018b) Reliability analysis of a 3-unit subsystem of a cable plant. Adv Appl Stat 52(6):413\u2013429","journal-title":"Adv Appl Stat"},{"key":"771_CR37","unstructured":"Tuteja RK, Rizwan SM, Taneja G (1999) A two server system with regular repairman, who is not always available. In: National symposium on management science and statistics\u2014applications to trade and industry, Guru Nanak Dev University, Amritsar, India, 12\u201314 Feb, pp 231\u2013237"},{"issue":"2","key":"771_CR38","first-page":"7","volume":"52","author":"RK Tuteja","year":"2000","unstructured":"Tuteja RK, Rizwan SM, Taneja G (2000a) Profit analysis of a system with perfect repair at partial or complete failure. Pure Appl Math Sci 52(2):7\u201314","journal-title":"Pure Appl Math Sci"},{"issue":"1\u20134","key":"771_CR39","first-page":"1","volume":"21","author":"RK Tuteja","year":"2000","unstructured":"Tuteja RK, Rizwan SM, Taneja G (2000b) Profit evaluation of a two unit cold stand by system with tiredness and two types of repairman. J Indian Soc Stat Oper Res 21(1\u20134):1\u201310","journal-title":"J Indian Soc Stat Oper Res"}],"container-title":["International Journal of System Assurance Engineering and Management"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s13198-019-00771-3\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s13198-019-00771-3.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s13198-019-00771-3.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2020,2,18]],"date-time":"2020-02-18T10:57:08Z","timestamp":1582023428000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s13198-019-00771-3"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2019,2]]},"references-count":39,"journal-issue":{"issue":"1","published-print":{"date-parts":[[2019,2]]}},"alternative-id":["771"],"URL":"https:\/\/doi.org\/10.1007\/s13198-019-00771-3","relation":{},"ISSN":["0975-6809","0976-4348"],"issn-type":[{"value":"0975-6809","type":"print"},{"value":"0976-4348","type":"electronic"}],"subject":[],"published":{"date-parts":[[2019,2]]},"assertion":[{"value":"12 January 2018","order":1,"name":"received","label":"Received","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"25 September 2018","order":2,"name":"revised","label":"Revised","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"18 February 2019","order":3,"name":"first_online","label":"First Online","group":{"name":"ArticleHistory","label":"Article History"}}]}}