{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,6,17]],"date-time":"2025-06-17T17:28:53Z","timestamp":1750181333970,"version":"3.37.3"},"reference-count":27,"publisher":"Springer Science and Business Media LLC","issue":"3","license":[{"start":{"date-parts":[[2019,5,10]],"date-time":"2019-05-10T00:00:00Z","timestamp":1557446400000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"},{"start":{"date-parts":[[2019,5,10]],"date-time":"2019-05-10T00:00:00Z","timestamp":1557446400000},"content-version":"vor","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Int J Syst Assur Eng Manag"],"published-print":{"date-parts":[[2019,6]]},"DOI":"10.1007\/s13198-019-00792-y","type":"journal-article","created":{"date-parts":[[2019,5,10]],"date-time":"2019-05-10T12:45:43Z","timestamp":1557492343000},"page":"384-398","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":5,"title":["A coordinated vendor\u2013buyer system considering loss and damage claims, insurance cost and stochastic lead time"],"prefix":"10.1007","volume":"10","author":[{"given":"Ivan Darma","family":"Wangsa","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"ORCID":"https:\/\/orcid.org\/0000-0002-2935-9506","authenticated-orcid":false,"given":"Hui Ming","family":"Wee","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Shih-Hsien","family":"Tseng","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2019,5,10]]},"reference":[{"issue":"2","key":"792_CR1","doi-asserted-by":"publisher","first-page":"445","DOI":"10.1007\/s10479-017-2511-6","volume":"271","author":"N Cheikhrouhou","year":"2018","unstructured":"Cheikhrouhou N, Sarkar B, Ganguly B, Malik AI, Batista R, Lee YH (2018) Optimization of sample size and order size in an inventory model with quality inspection and return of defective items. Ann Oper Res 271(2):445\u2013467","journal-title":"Ann Oper Res"},{"issue":"2","key":"792_CR2","doi-asserted-by":"publisher","first-page":"401","DOI":"10.1016\/j.ejor.2016.10.038","volume":"259","author":"CK Chen","year":"2017","unstructured":"Chen CK, Lo CC, Weng TC (2017) Optimal production run length and warranty period for an imperfect production system under selling price dependent on warranty period. Eur J Oper Res 259(2):401\u2013412","journal-title":"Eur J Oper Res"},{"key":"792_CR3","doi-asserted-by":"publisher","first-page":"368","DOI":"10.1016\/j.tre.2018.12.014","volume":"122","author":"Y Daryanto","year":"2019","unstructured":"Daryanto Y, Wee HM, Astanti RD (2019) Three-echelon supply chain model considering carbon emission and item deterioration. Transp Res Part E Logist Transp Rev 122:368\u2013383","journal-title":"Transp Res Part E Logist Transp Rev"},{"issue":"2","key":"792_CR4","doi-asserted-by":"publisher","first-page":"544","DOI":"10.1016\/j.ijpe.2006.06.015","volume":"106","author":"A Eroglu","year":"2007","unstructured":"Eroglu A, Ozdemir G (2007) An economic order quantity model with defective items and shortages. Int J Prod Econ 106(2):544\u2013549","journal-title":"Int J Prod Econ"},{"issue":"1","key":"792_CR7","doi-asserted-by":"publisher","first-page":"85","DOI":"10.1016\/S0925-5273(01)00203-1","volume":"77","author":"SK Goyal","year":"2002","unstructured":"Goyal SK, C\u00e1rdenas-Barr\u00f3n LE (2002) Note on: economic production quantity model for items with imperfect quality\u2013a practical approach. Int J Prod Econ 77(1):85\u201387","journal-title":"Int J Prod Econ"},{"issue":"7","key":"792_CR8","doi-asserted-by":"publisher","first-page":"596","DOI":"10.1080\/09537280310001626188","volume":"14","author":"SK Goyal","year":"2003","unstructured":"Goyal SK, Huang CK, Chen KC (2003) A simple integrated production policy of an imperfect item for vendor and buyer. Prod Plan Control 14(7):596\u2013602","journal-title":"Prod Plan Control"},{"key":"792_CR9","first-page":"695","volume":"3","author":"LF Hsu","year":"2012","unstructured":"Hsu LF (2012) A note on \u201cAn economic order quantity (EOQ) for items with imperfect quality and inspection errors\u201d. Int J Ind Eng Comput 3:695\u2013702","journal-title":"Int J Ind Eng Comput"},{"issue":"1","key":"792_CR10","doi-asserted-by":"publisher","first-page":"91","DOI":"10.1016\/S0925-5273(03)00220-2","volume":"91","author":"CK Huang","year":"2004","unstructured":"Huang CK (2004) An optimal policy for a single-vendor single-buyer integrated production\u2013inventory problem with process unreliability consideration. Int J Prod Econ 91(1):91\u201398","journal-title":"Int J Prod Econ"},{"issue":"3","key":"792_CR11","doi-asserted-by":"publisher","first-page":"342","DOI":"10.1504\/IJMOR.2016.075520","volume":"8","author":"WA Jauhari","year":"2016","unstructured":"Jauhari WA (2016) Integrated vendor-buyer model with defective items, inspection error and stochastic demand. Int J Math Oper Res 8(3):342\u2013359","journal-title":"Int J Math Oper Res"},{"issue":"1","key":"792_CR13","doi-asserted-by":"publisher","first-page":"113","DOI":"10.1016\/j.ijpe.2010.01.023","volume":"133","author":"M Khan","year":"2011","unstructured":"Khan M, Jaber MY, Bonney M (2011) An economic order quantity (EOQ) for items with imperfect quality and inspection errors. Int J Prod Econ 133(1):113\u2013118","journal-title":"Int J Prod Econ"},{"issue":"6","key":"792_CR15","doi-asserted-by":"publisher","first-page":"473","DOI":"10.1080\/00207720701352837","volume":"38","author":"I Konstantaras","year":"2007","unstructured":"Konstantaras I, Goyal SK, Papachristos S (2007) Economic ordering policy for an item with imperfect quality subject to the in-house inspection. Int J Syst Sci 38(6):473\u2013482","journal-title":"Int J Syst Sci"},{"key":"792_CR16","doi-asserted-by":"publisher","first-page":"650","DOI":"10.1016\/j.cie.2018.10.019","volume":"126","author":"R Lopes","year":"2018","unstructured":"Lopes R (2018) Integrated model of quality inspection, preventive maintenance and buffer stock in an imperfect production system. Comput Ind Eng 126:650\u2013656","journal-title":"Comput Ind Eng"},{"issue":"2","key":"792_CR17","doi-asserted-by":"publisher","first-page":"808","DOI":"10.1016\/j.ijpe.2007.07.003","volume":"112","author":"B Maddah","year":"2008","unstructured":"Maddah B, Jaber MY (2008) Economic order quantity for items with imperfect quality: revisited. Int J Prod Econ 112(2):808\u2013815","journal-title":"Int J Prod Econ"},{"issue":"1","key":"792_CR18","doi-asserted-by":"publisher","first-page":"148","DOI":"10.1016\/j.ijpe.2004.11.004","volume":"100","author":"S Papachristos","year":"2006","unstructured":"Papachristos S, Konstantaras I (2006) Economic ordering quantity models for items with imperfect quality. Int J Prod Econ 100(1):148\u2013154","journal-title":"Int J Prod Econ"},{"issue":"1","key":"792_CR19","doi-asserted-by":"publisher","first-page":"137","DOI":"10.1287\/opre.34.1.137","volume":"34","author":"EL Porteus","year":"1986","unstructured":"Porteus EL (1986) Optimal lot sizing, process quality improvement and setup cost reduction. Oper Res 34(1):137\u2013144","journal-title":"Oper Res"},{"issue":"1","key":"792_CR20","doi-asserted-by":"publisher","first-page":"48","DOI":"10.1080\/07408178608975329","volume":"18","author":"MJ Rosenblatt","year":"1986","unstructured":"Rosenblatt MJ, Lee HL (1986) Economic production cycles with imperfect production processes. IIE Trans 18(1):48\u201355","journal-title":"IIE Trans"},{"issue":"1","key":"792_CR21","doi-asserted-by":"publisher","first-page":"59","DOI":"10.1016\/S0925-5273(99)00044-4","volume":"64","author":"MK Salameh","year":"2000","unstructured":"Salameh MK, Jaber MY (2000) Economic production quantity model for items with imperfect quality. Int J Prod Econ 64(1):59\u201364","journal-title":"Int J Prod Econ"},{"issue":"1","key":"792_CR22","doi-asserted-by":"publisher","first-page":"263","DOI":"10.1016\/j.ejor.2015.06.021","volume":"248","author":"B Sarkar","year":"2016","unstructured":"Sarkar B, Saren S (2016) Product inspection policy for an imperfect production system with inspection errors and warranty cost. Eur J Oper Res 248(1):263\u2013271","journal-title":"Eur J Oper Res"},{"issue":"1\u20134","key":"792_CR23","doi-asserted-by":"publisher","first-page":"545","DOI":"10.1007\/s00170-016-9359-9","volume":"90","author":"BK Sett","year":"2017","unstructured":"Sett BK, Sarkar S, Sarkar B (2017) Optimal buffer inventory and inspection errors in an imperfect production system with preventive maintenance. Int J Adv Manuf Technol 90(1\u20134):545\u2013560","journal-title":"Int J Adv Manuf Technol"},{"issue":"3","key":"792_CR24","doi-asserted-by":"publisher","first-page":"819","DOI":"10.1051\/ro\/2016075","volume":"52","author":"HN Soni","year":"2018","unstructured":"Soni HN, Sarkar B, Mahapatra AS, Mazumder SK (2018) Lost sales reduction and quality improvement with variable lead time and fuzzy costs in an imperfect production system. RAIRO Oper Res 52(3):819\u2013837","journal-title":"RAIRO Oper Res"},{"issue":"2","key":"792_CR25","doi-asserted-by":"publisher","first-page":"25","DOI":"10.1108\/09574099010804617","volume":"1","author":"SR Swenseth","year":"1990","unstructured":"Swenseth SR, Buffa FP (1990) Just-in-time: some effects on the logistics function. Int J Logist Manag 1(2):25\u201334","journal-title":"Int J Logist Manag"},{"issue":"2","key":"792_CR26","doi-asserted-by":"publisher","first-page":"113","DOI":"10.1016\/S0925-5273(01)00230-4","volume":"77","author":"SR Swenseth","year":"2002","unstructured":"Swenseth SR, Godfrey MR (2002) Incorporating transportation costs into inventory replenishment decisions. Int J Prod Econ 77(2):113\u2013130","journal-title":"Int J Prod Econ"},{"key":"792_CR27","doi-asserted-by":"publisher","first-page":"281","DOI":"10.1016\/j.jclepro.2018.04.261","volume":"192","author":"S Tiwari","year":"2018","unstructured":"Tiwari S, Daryanto Y, Wee HM (2018) Sustainable inventory management with deteriorating and imperfect quality items considering carbon emission. J Clean Prod 192:281\u2013292","journal-title":"J Clean Prod"},{"issue":"1","key":"792_CR28","doi-asserted-by":"publisher","first-page":"123","DOI":"10.1016\/j.ijpe.2003.11.012","volume":"95","author":"CH Wang","year":"2005","unstructured":"Wang CH (2005) Integrated production and product inspection policy for a deteriorating production system. Int J Prod Econ 95(1):123\u2013134","journal-title":"Int J Prod Econ"},{"key":"792_CR29","doi-asserted-by":"publisher","DOI":"10.1080\/23302674.2017.1296601","author":"ID Wangsa","year":"2017","unstructured":"Wangsa ID, Wee HM (2017) An integrated vendor-buyer inventory model with transportation cost and stochastic demand. Int J Syst Sci Oper Logist. \n                    https:\/\/doi.org\/10.1080\/23302674.2017.1296601","journal-title":"Int J Syst Sci Oper Logist"},{"issue":"1","key":"792_CR30","doi-asserted-by":"publisher","first-page":"7","DOI":"10.1016\/j.omega.2005.01.019","volume":"35","author":"HM Wee","year":"2007","unstructured":"Wee HM, Yu J, Chen MC (2007) Optimal inventory model for items with imperfect quality and shortage backordering. Omega 35(1):7\u201311","journal-title":"Omega"},{"issue":"6","key":"792_CR31","doi-asserted-by":"publisher","first-page":"1869","DOI":"10.1080\/00207543.2012.718453","volume":"51","author":"HM Wee","year":"2013","unstructured":"Wee HM, Wang WT, Yang PC (2013) A production quantity model for imperfect quality items with shortage and screening constraint. Int J Prod Res 51(6):1869\u20131884","journal-title":"Int J Prod Res"}],"container-title":["International Journal of System Assurance Engineering and Management"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s13198-019-00792-y.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s13198-019-00792-y\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s13198-019-00792-y.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2020,5,19]],"date-time":"2020-05-19T10:49:35Z","timestamp":1589885375000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s13198-019-00792-y"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2019,5,10]]},"references-count":27,"journal-issue":{"issue":"3","published-print":{"date-parts":[[2019,6]]}},"alternative-id":["792"],"URL":"https:\/\/doi.org\/10.1007\/s13198-019-00792-y","relation":{},"ISSN":["0975-6809","0976-4348"],"issn-type":[{"type":"print","value":"0975-6809"},{"type":"electronic","value":"0976-4348"}],"subject":[],"published":{"date-parts":[[2019,5,10]]},"assertion":[{"value":"11 October 2017","order":1,"name":"received","label":"Received","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"15 February 2019","order":2,"name":"revised","label":"Revised","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"10 May 2019","order":3,"name":"first_online","label":"First Online","group":{"name":"ArticleHistory","label":"Article History"}},{"order":1,"name":"Ethics","group":{"name":"EthicsHeading","label":"Compliance with ethical standards"}},{"value":"There is no potential conflict was reported by the authors regarding the publication of this article.","order":2,"name":"Ethics","group":{"name":"EthicsHeading","label":"Conflict of interest"}}]}}