{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,4,29]],"date-time":"2026-04-29T02:20:14Z","timestamp":1777429214610,"version":"3.51.4"},"reference-count":57,"publisher":"Springer Science and Business Media LLC","issue":"2","license":[{"start":{"date-parts":[[2019,9,10]],"date-time":"2019-09-10T00:00:00Z","timestamp":1568073600000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"},{"start":{"date-parts":[[2019,9,10]],"date-time":"2019-09-10T00:00:00Z","timestamp":1568073600000},"content-version":"vor","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Int J Syst Assur Eng Manag"],"published-print":{"date-parts":[[2020,4]]},"DOI":"10.1007\/s13198-019-00867-w","type":"journal-article","created":{"date-parts":[[2019,9,10]],"date-time":"2019-09-10T05:22:16Z","timestamp":1568092936000},"page":"385-399","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":42,"title":["An EPQ model with stock and selling price dependent demand and variable production rate in interval environment"],"prefix":"10.1007","volume":"11","author":[{"given":"Subhendu","family":"Ruidas","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"ORCID":"https:\/\/orcid.org\/0000-0003-4746-5369","authenticated-orcid":false,"given":"Mijanur Rahaman","family":"Seikh","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Prasun Kumar","family":"Nayak","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2019,9,10]]},"reference":[{"key":"867_CR1","doi-asserted-by":"crossref","first-page":"302","DOI":"10.1016\/0377-2217(95)00148-4","volume":"92","author":"ZT Balkhi","year":"1998","unstructured":"Balkhi ZT, Benkherouf L (1998) A production lot size inventory model deteriorating items and arbitrary production and demand rates. Eur J Oper Res 92:302\u2013309","journal-title":"Eur J Oper Res"},{"issue":"11","key":"867_CR2","doi-asserted-by":"crossref","first-page":"997","DOI":"10.1016\/S0305-0548(97)00091-9","volume":"25","author":"AK Bhunia","year":"1998","unstructured":"Bhunia AK, Maiti M (1998) Deterministic inventory model for deteriorating items with finite rate of replenishment dependent on inventory level. Comput Oper Res 25(11):997\u20131006","journal-title":"Comput Oper Res"},{"key":"867_CR3","first-page":"497","volume":"5","author":"AK Bhunia","year":"2014","unstructured":"Bhunia AK, Shaikh AA (2014) A deterministic inventory model for deteriorating items with selling price dependent demand and three-parameter Weibull distributed deterioration. Int J Ind Eng Comput 5:497\u2013510","journal-title":"Int J Ind Eng Comput"},{"issue":"3","key":"867_CR4","first-page":"164","volume":"1","author":"AK Bhunia","year":"2015","unstructured":"Bhunia AK, Mahato SK, Shaikh AA, Jaggi CK (2015) A deteriorating inventory model with displayed stocklevel-dependent demand and partially backlogged shortages with all unit discount facilities via particle swarm optimisation. Int J Syst Sci Oper Logist 1(3):164\u2013180","journal-title":"Int J Syst Sci Oper Logist"},{"issue":"3","key":"867_CR5","doi-asserted-by":"crossref","first-page":"1105","DOI":"10.1016\/j.cie.2009.04.020","volume":"57","author":"LE C\u00e1rdenas-B\u00e1rron","year":"2009","unstructured":"C\u00e1rdenas-B\u00e1rron LE (2009) Economic production quantity with rework process at a single-stage manufacturing system with planned backorders. Comput Ind Eng 57(3):1105\u20131113","journal-title":"Comput Ind Eng"},{"issue":"8","key":"867_CR6","first-page":"613","volume":"4","author":"S Chakrabortty","year":"2010","unstructured":"Chakrabortty S, Pal M, Nayak PK (2010) Solution of interval-valued manufacturing inventory models with shortages. Int J Ind Manuf Eng 4(8):613\u2013618","journal-title":"Int J Ind Manuf Eng"},{"issue":"12","key":"867_CR7","doi-asserted-by":"crossref","first-page":"2079","DOI":"10.1016\/S0305-0548(03)00166-7","volume":"31","author":"HC Chang","year":"2004","unstructured":"Chang HC (2004) An application of fuzzy sets theory to the EOQ model with imperfect quality items. Comput Oper Res 31(12):2079\u20132092","journal-title":"Comput Oper Res"},{"issue":"1","key":"867_CR8","doi-asserted-by":"crossref","first-page":"55","DOI":"10.2298\/YJOR1001055C","volume":"20","author":"CT Chang","year":"2010","unstructured":"Chang CT, Chen YJ, Tsai TR, Wu SJ (2010) Inventory models with stock-and price dependent demand for deteriorating items based on limited shelf space. Yugosl J Oper Res 20(1):55\u201369","journal-title":"Yugosl J Oper Res"},{"issue":"1","key":"867_CR9","doi-asserted-by":"crossref","first-page":"58","DOI":"10.1109\/4235.985692","volume":"6","author":"M Clerc","year":"2002","unstructured":"Clerc M, Kennedy J (2002) The particle swarm: explosion, stability, and convergence in a multi-dimensional complex space. IEEE Trans Evolut Comput 6(1):58\u201373","journal-title":"IEEE Trans Evolut Comput"},{"issue":"1","key":"867_CR10","first-page":"1043","volume":"19","author":"TK Datta","year":"1988","unstructured":"Datta TK, Pal AK (1988) Order-level inventory system with power demand pattern for items with variable rate of deterioration. Indian J Pure Appl Math 19(1):1043\u20131053","journal-title":"Indian J Pure Appl Math"},{"issue":"1","key":"867_CR11","doi-asserted-by":"crossref","first-page":"13","DOI":"10.1080\/09537280150203933","volume":"12","author":"TK Datta","year":"2001","unstructured":"Datta TK, Pal AK (2001) An inventory system with stock-dependent, price-sensitive demand rate. Prod Plan Control 12(1):13\u201320","journal-title":"Prod Plan Control"},{"issue":"3","key":"867_CR12","doi-asserted-by":"crossref","first-page":"2593","DOI":"10.1007\/s40819-016-0258-4","volume":"3","author":"SK De","year":"2017","unstructured":"De SK, Mahata GC (2017) Decision of a fuzzy inventory with fuzzy backorder model under cloudy fuzzy demand rate. Int J Appl Comput Math 3(3):2593\u20132609","journal-title":"Int J Appl Comput Math"},{"key":"867_CR15","doi-asserted-by":"crossref","first-page":"467","DOI":"10.1016\/S0377-2217(97)00086-6","volume":"105","author":"BC Giri","year":"1998","unstructured":"Giri BC, Chaudhuri KS (1998) Deterministic models of perishable inventory with stock-dependent demand rate and nonlinear holding cost. Eur J Oper Res 105:467\u2013474","journal-title":"Eur J Oper Res"},{"issue":"1","key":"867_CR16","doi-asserted-by":"crossref","first-page":"85","DOI":"10.1016\/S0925-5273(01)00203-1","volume":"77","author":"SK Goyal","year":"2002","unstructured":"Goyal SK, Cardenas-Barron LE (2002) Note on: Economic production quantity model for items with imperfect quality\u2014a practical approach. Int J Prod Econ 77(1):85\u201387","journal-title":"Int J Prod Econ"},{"issue":"2","key":"867_CR17","first-page":"466","volume":"192","author":"RK Gupta","year":"2007","unstructured":"Gupta RK, Bhunia AK, Goyal SK (2007) An application of genetic algorithm in a marketing oriented inventory model with interval valued inventory costs and three-component demand rate dependent on displayed stock-level. Appl Math Comput 192(2):466\u2013478","journal-title":"Appl Math Comput"},{"issue":"4","key":"867_CR18","doi-asserted-by":"crossref","first-page":"351","DOI":"10.3934\/jimo.2006.2.351","volume":"2","author":"BQ Hu","year":"2006","unstructured":"Hu BQ, Wang S (2006) A novel approach in uncertain programming part I: new arithmetic and order relation for interval numbers. J Ind Manag Optim 2(4):351\u2013371","journal-title":"J Ind Manag Optim"},{"key":"867_CR19","doi-asserted-by":"crossref","first-page":"219","DOI":"10.1016\/0377-2217(90)90375-L","volume":"48","author":"H Ishibuchi","year":"1990","unstructured":"Ishibuchi H, Tanaka H (1990) Multiobjective programming in optimization of the interval objective function. Eur J Oper Res 48:219\u2013225","journal-title":"Eur J Oper Res"},{"issue":"6","key":"867_CR20","doi-asserted-by":"crossref","first-page":"1748","DOI":"10.1080\/00207543.2016.1235295","volume":"55","author":"CW Kang","year":"2017","unstructured":"Kang CW, Ullah M, Sarkar B, Hussain I, Akhtar R (2017) Impact of random defective rate on lot size focusing work-in-process inventory in manufacturing system. Int J Prod Res 55(6):1748\u20131766","journal-title":"Int J Prod Res"},{"key":"867_CR22","doi-asserted-by":"crossref","first-page":"572","DOI":"10.1016\/j.jclepro.2016.11.052","volume":"144","author":"M Kim","year":"2017","unstructured":"Kim M, Sarkar B (2017) Multi-stage cleaner production process with quality improvement and lead time dependent ordering cost. J Clean Prod 144:572\u2013590","journal-title":"J Clean Prod"},{"key":"867_CR23","doi-asserted-by":"crossref","first-page":"153","DOI":"10.1016\/j.jmsy.2018.04.016","volume":"47","author":"M Kim","year":"2018","unstructured":"Kim M, Kim J, Sarkar B, Sarkar M, Iqbal MW (2018) An improved way to calculate imperfect items during long-run production in an integrated model with backorders. J Manuf Syst 47:153\u2013167","journal-title":"J Manuf Syst"},{"key":"867_CR24","volume-title":"Marketing decision making: a model building approach","author":"P Kotler","year":"1971","unstructured":"Kotler P (1971) Marketing decision making: a model building approach. Holt, Rinehart and Winston, New York"},{"key":"867_CR25","first-page":"225","volume":"2","author":"C Krishnamoorthi","year":"2012","unstructured":"Krishnamoorthi C, Panayappan S (2012) An EPQ model with imperfect production systems with rework of regular production and sales return. Am J Oper Res 2:225\u2013234","journal-title":"Am J Oper Res"},{"key":"867_CR26","volume-title":"Production\/operations management: contemporary policy for managing operating systems","author":"RI Levin","year":"1972","unstructured":"Levin RI, McLaughin CP, Lemone RP, Kottas JF (1972) Production\/operations management: contemporary policy for managing operating systems. McGraw-Hill, New York"},{"key":"867_CR27","first-page":"183","volume":"2","author":"NK Mahapatra","year":"2012","unstructured":"Mahapatra NK, Bera UK, Maiti M (2012) A production inventory model with shortages, fuzzy preparation time and variable production and demand. Am J Oper Res 2:183\u2013192","journal-title":"Am J Oper Res"},{"issue":"5","key":"867_CR28","doi-asserted-by":"crossref","first-page":"2433","DOI":"10.1016\/j.apm.2008.07.024","volume":"33","author":"A Maiti","year":"2009","unstructured":"Maiti A, Maiti M, Maiti M (2009) Inventory model with stochastic lead-time and price dependent demand in corporating advance payment. Appl Math Model 33(5):2433\u20132443","journal-title":"Appl Math Model"},{"key":"867_CR29","doi-asserted-by":"crossref","first-page":"799","DOI":"10.1016\/S0307-904X(99)00018-9","volume":"23","author":"M Mandal","year":"1999","unstructured":"Mandal M, Maiti M (1999) Inventory of damagable items with variable replenishment rate, stock-dependent demand and some units in hand. Appl Math Model 23:799\u2013807","journal-title":"Appl Math Model"},{"issue":"5","key":"867_CR30","doi-asserted-by":"crossref","first-page":"483","DOI":"10.1057\/jors.1989.75","volume":"40","author":"BN Mandal","year":"1989","unstructured":"Mandal BN, Phaujdar S (1989) An inventory model for deteriorating items and stock-dependent consumption rate. J Oper Res Soc 40(5):483\u2013488","journal-title":"J Oper Res Soc"},{"key":"867_CR31","doi-asserted-by":"crossref","DOI":"10.1137\/1.9781611970906","volume-title":"Method and application of interval analysis","author":"RE Moore","year":"1979","unstructured":"Moore RE (1979) Method and application of interval analysis. SIAM, Philadelphia"},{"issue":"2","key":"867_CR32","first-page":"197","volume":"1","author":"M Palanivel","year":"2014","unstructured":"Palanivel M, Uthayakumar R (2014) A production-inventory model with variable production cost and probabilistic deterioration. Asia Pac J Math 1(2):197\u2013212","journal-title":"Asia Pac J Math"},{"issue":"1","key":"867_CR33","doi-asserted-by":"crossref","first-page":"137","DOI":"10.1287\/opre.34.1.137","volume":"34","author":"EL Porteus","year":"1986","unstructured":"Porteus EL (1986) Optimal lot sizing, process quality improvement and setup cost reduction. Oper Res 34(1):137\u2013144","journal-title":"Oper Res"},{"issue":"2","key":"867_CR34","first-page":"127","volume":"4","author":"W Ritha","year":"2013","unstructured":"Ritha W, Jeyakumari SR (2013) Fuzzy inventory model for imperfect quality items with shortages. Ann Pure Appl Math 4(2):127\u2013137","journal-title":"Ann Pure Appl Math"},{"issue":"1","key":"867_CR35","doi-asserted-by":"crossref","first-page":"48","DOI":"10.1080\/07408178608975329","volume":"18","author":"MJ Rosenblatt","year":"1986","unstructured":"Rosenblatt MJ, Lee HL (1986) Economic production cycles with imperfect production process. IIE Trans 18(1):48\u201355","journal-title":"IIE Trans"},{"issue":"2","key":"867_CR36","doi-asserted-by":"crossref","first-page":"159","DOI":"10.1093\/imaman\/dpt001","volume":"25","author":"MD Roy","year":"2014","unstructured":"Roy MD, Sana SS, Chaudhuri KS (2014) An economic production lot size model for defective items with stochastic demand backlogging and rework. IMA J Manag Math 25(2):159\u2013183","journal-title":"IMA J Manag Math"},{"issue":"6","key":"867_CR37","first-page":"375","volume":"113","author":"S Ruidas","year":"2017","unstructured":"Ruidas S, Seikh MR, Nayak PK, Pal M (2017) An interval valued EPQ model in imperfect production system with rework of regular production, shortages and sales return via particle swarm optimization. Int J Pure Appl Math 113(6):375\u2013384","journal-title":"Int J Pure Appl Math"},{"issue":"6","key":"867_CR38","first-page":"1059","volume":"21","author":"S Ruidas","year":"2018","unstructured":"Ruidas S, Seikh MR, Nayak PK, Pal M (2018) Interval valued EOQ model with two types of defective items. J Stat Manag Syst 21(6):1059\u20131082","journal-title":"J Stat Manag Syst"},{"key":"867_CR39","doi-asserted-by":"publisher","DOI":"10.1007\/s40819-018-0591-x","author":"S Ruidas","year":"2019","unstructured":"Ruidas S, Seikh MR, Nayak PK, Sarkar B (2019) A single period production inventory model in interval environment with price revision. Int J Appl Comput Math. https:\/\/doi.org\/10.1007\/s40819-018-0591-x","journal-title":"Int J Appl Comput Math"},{"key":"867_CR40","doi-asserted-by":"crossref","first-page":"152","DOI":"10.1016\/j.cie.2011.09.003","volume":"62","author":"L Sahoo","year":"2012","unstructured":"Sahoo L, Bhunia AK, Kapur PK (2012) Genetic algorithm based multi-objective reliability optimization in interval environment. Comput Ind Eng 62:152\u2013160","journal-title":"Comput Ind Eng"},{"issue":"1\u20133","key":"867_CR41","doi-asserted-by":"crossref","first-page":"59","DOI":"10.1016\/S0925-5273(99)00044-4","volume":"64","author":"M Salameh","year":"2000","unstructured":"Salameh M, Jaber M (2000) Economic production quantity model for items with imperfect quality. Int J Prod Econ 64(1\u20133):59\u201364","journal-title":"Int J Prod Econ"},{"key":"867_CR42","first-page":"8295","volume":"218","author":"B Sarkar","year":"2012","unstructured":"Sarkar B (2012a) An EOQ model with delay in payments and stock dependent demand in the presence of imperfect production. Appl Math Comput 218:8295\u20138308","journal-title":"Appl Math Comput"},{"key":"867_CR43","first-page":"4881","volume":"218","author":"B Sarkar","year":"2012","unstructured":"Sarkar B (2012b) An inventory model with reliability in an imperfect production process. Appl Math Comput 218:4881\u20134891","journal-title":"Appl Math Comput"},{"key":"867_CR44","doi-asserted-by":"crossref","first-page":"3138","DOI":"10.1016\/j.apm.2012.07.026","volume":"37","author":"B Sarkar","year":"2013","unstructured":"Sarkar B (2013) A production-inventory model with probabilistic deterioration in two-echelon supply chain management. Appl Math Model 37:3138\u20133151","journal-title":"Appl Math Model"},{"key":"867_CR45","doi-asserted-by":"publisher","DOI":"10.1016\/j.jclepro.2019.01.078","author":"B Sarkar","year":"2019","unstructured":"Sarkar B (2019) Mathematical and analytical approach for the management of defective items in a multi-stage production system. J Clean Prod. https:\/\/doi.org\/10.1016\/j.jclepro.2019.01.078","journal-title":"J Clean Prod"},{"key":"867_CR46","doi-asserted-by":"crossref","first-page":"204","DOI":"10.1016\/j.ijpe.2013.11.014","volume":"155","author":"B Sarkar","year":"2013","unstructured":"Sarkar B, Moon I (2013) Improved quality, setup cost reduction, and variable backorder costs in an imperfect production process. Int J Prod Econ 155:204\u2013213","journal-title":"Int J Prod Econ"},{"key":"867_CR48","doi-asserted-by":"crossref","first-page":"924","DOI":"10.1016\/j.econmod.2012.09.049","volume":"30","author":"B Sarkar","year":"2013","unstructured":"Sarkar B, Sarkar S (2013) An improved inventory model with partial backlogging, time varying deterioration and stock-dependent demand. Econ Model 30:924\u2013932","journal-title":"Econ Model"},{"issue":"3","key":"867_CR49","first-page":"259","volume":"9","author":"B Sarkar","year":"2011","unstructured":"Sarkar B, Sana SS, Chaudhuri KS (2011) An economic production quantity model with stochastic demand in an imperfect production system. Int J Serv Oper Manag 9(3):259\u2013283","journal-title":"Int J Serv Oper Manag"},{"issue":"3","key":"867_CR50","doi-asserted-by":"crossref","first-page":"423","DOI":"10.1016\/j.jmsy.2014.02.001","volume":"33","author":"B Sarkar","year":"2014","unstructured":"Sarkar B, C\u00e1rdenas-B\u00e1rron LE, Sarkar M, Singgih ML (2014) An economic production quantity model with random defective rate, rework process and backorders for a single stage production system. J Manuf Syst 33(3):423\u2013435","journal-title":"J Manuf Syst"},{"issue":"1\u20134","key":"867_CR51","doi-asserted-by":"crossref","first-page":"567","DOI":"10.1007\/s00170-018-2527-3","volume":"99","author":"B Sarkar","year":"2018","unstructured":"Sarkar B, Majumder A, Sarkar M, Kim N, Ullah M (2018) Effect of variable production rate on quality of products in a single-vendor multi-buyer supply chain management. Int J Adv Manuf Technol 99(1\u20134):567\u2013581","journal-title":"Int J Adv Manuf Technol"},{"key":"867_CR52","doi-asserted-by":"crossref","first-page":"28","DOI":"10.1016\/S0377-2217(99)00319-7","volume":"127","author":"A Sengupta","year":"2000","unstructured":"Sengupta A, Pal TK (2000) On comparing interval numbers. Eur J Oper Res 127:28\u201343","journal-title":"Eur J Oper Res"},{"issue":"1\u20134","key":"867_CR53","doi-asserted-by":"crossref","first-page":"545","DOI":"10.1007\/s00170-016-9359-9","volume":"90","author":"BK Sett","year":"2017","unstructured":"Sett BK, Sarkar S, Sarkar B (2017) Optimal buffer inventory and inspection errors in an imperfect production system with regular preventive maintenance. Int J Adv Manuf Technol 90(1\u20134):545\u2013560","journal-title":"Int J Adv Manuf Technol"},{"key":"867_CR54","doi-asserted-by":"publisher","DOI":"10.1007\/s12351-016-0267-4","author":"NH Shah","year":"2016","unstructured":"Shah NH, Patel DG, Shah DB (2016) EPQ model for returned\/reworked inventories during imperfect production process under price-sensitive stock-dependent demand. Int J Oper Res. https:\/\/doi.org\/10.1007\/s12351-016-0267-4","journal-title":"Int J Oper Res"},{"key":"867_CR55","first-page":"326","volume-title":"Proceedings of the 2004 IEEE congress on evolutionary computation","author":"J Sun","year":"2004","unstructured":"Sun J, Feng B, Xu WB (2004) Particle swam optimization with particles having quantum behavior. In Proceedings of the 2004 IEEE congress on evolutionary computation, Portland, OR, USA, pp 326\u2013331"},{"issue":"2","key":"867_CR56","first-page":"93","volume":"3","author":"AA Taleizadeh","year":"2012","unstructured":"Taleizadeh AA, Cardenas-Barron LE, Biabani J, Nikousokhan R (2012) Multiproducts single machine EPQ model with immediate rework process. Int J Ind Eng Comput 3(2):93\u2013102","journal-title":"Int J Ind Eng Comput"},{"key":"867_CR57","doi-asserted-by":"crossref","first-page":"922","DOI":"10.1016\/j.jclepro.2016.08.062","volume":"139","author":"M Tayyab","year":"2016","unstructured":"Tayyab M, Sarkar B (2016) Optimal batch quantity in a cleaner multi-stage lean production system with random defective rate. J Clean Prod 139:922\u2013934","journal-title":"J Clean Prod"},{"key":"867_CR58","doi-asserted-by":"crossref","first-page":"297","DOI":"10.1016\/S0305-0548(03)00237-5","volume":"32","author":"J Teng","year":"2005","unstructured":"Teng J, Chang C (2005) Economic production quantity models for deteriorating items with price and stock-dependent demand. Comput Oper Res 32:297\u2013308","journal-title":"Comput Oper Res"},{"issue":"1","key":"867_CR59","doi-asserted-by":"crossref","first-page":"85","DOI":"10.1016\/0360-8352(92)90035-I","volume":"22","author":"TL Urban","year":"1992","unstructured":"Urban TL (1992) Deterministic inventory models incorporating marketing decisions. Comput Ind Eng 22(1):85\u201393","journal-title":"Comput Ind Eng"},{"key":"867_CR60","doi-asserted-by":"crossref","first-page":"792","DOI":"10.1016\/j.ejor.2003.08.065","volume":"162","author":"TL Urban","year":"2005","unstructured":"Urban TL (2005) Inventory models with inventory-level-dependent demand: a comprehensive review and unifying theory. Eur J Oper Res 162:792\u2013804","journal-title":"Eur J Oper Res"},{"key":"867_CR61","doi-asserted-by":"crossref","first-page":"313","DOI":"10.1007\/s11424-009-9166-6","volume":"22","author":"X Wang","year":"2009","unstructured":"Wang X, Tang W (2009) Fuzzy EPQ inventory models with backorder. J Syst Sci Complex 22:313\u2013323","journal-title":"J Syst Sci Complex"}],"container-title":["International Journal of System Assurance Engineering and Management"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s13198-019-00867-w.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s13198-019-00867-w\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s13198-019-00867-w.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2022,9,28]],"date-time":"2022-09-28T00:23:44Z","timestamp":1664324624000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s13198-019-00867-w"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2019,9,10]]},"references-count":57,"journal-issue":{"issue":"2","published-print":{"date-parts":[[2020,4]]}},"alternative-id":["867"],"URL":"https:\/\/doi.org\/10.1007\/s13198-019-00867-w","relation":{},"ISSN":["0975-6809","0976-4348"],"issn-type":[{"value":"0975-6809","type":"print"},{"value":"0976-4348","type":"electronic"}],"subject":[],"published":{"date-parts":[[2019,9,10]]},"assertion":[{"value":"19 March 2019","order":1,"name":"received","label":"Received","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"19 June 2019","order":2,"name":"revised","label":"Revised","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"10 September 2019","order":3,"name":"first_online","label":"First Online","group":{"name":"ArticleHistory","label":"Article History"}}]}}