{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,4,7]],"date-time":"2026-04-07T20:26:08Z","timestamp":1775593568803,"version":"3.50.1"},"reference-count":69,"publisher":"Springer Science and Business Media LLC","issue":"6","license":[{"start":{"date-parts":[[2020,2,24]],"date-time":"2020-02-24T00:00:00Z","timestamp":1582502400000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"},{"start":{"date-parts":[[2020,2,24]],"date-time":"2020-02-24T00:00:00Z","timestamp":1582502400000},"content-version":"vor","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Int J Syst Assur Eng Manag"],"published-print":{"date-parts":[[2020,12]]},"DOI":"10.1007\/s13198-020-00962-3","type":"journal-article","created":{"date-parts":[[2020,2,24]],"date-time":"2020-02-24T08:05:45Z","timestamp":1582531545000},"page":"1083-1106","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":19,"title":["Modeling and analyzing project interdependencies in project portfolios using an integrated social network analysis-fuzzy TOPSIS MICMAC approach"],"prefix":"10.1007","volume":"11","author":[{"ORCID":"https:\/\/orcid.org\/0000-0001-7868-1158","authenticated-orcid":false,"given":"Helal","family":"Al Zaabi","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Hamdi","family":"Bashir","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2020,2,24]]},"reference":[{"issue":"2","key":"962_CR1","doi-asserted-by":"crossref","first-page":"30","DOI":"10.1109\/TEM.1978.6447279","volume":"25","author":"DA Aaker","year":"1978","unstructured":"Aaker DA, Tyebjee TT (1978) A model for the selection of interdependent R&D projects. IEEE Trans Eng Manag 25(2):30\u201336","journal-title":"IEEE Trans Eng Manag"},{"key":"962_CR2","unstructured":"Al Zaabi H, Bashir H (2018) Structuring project interdependencies into a Simple Graphical Hierarchical Model. Paper presented at the 2018 5th International Conference on Industrial Engineering and Applications (ICIEA). IEEE"},{"key":"962_CR3","doi-asserted-by":"crossref","unstructured":"Al Zaabi H, Bashir H (2019) Analyzing interdependencies in a project portfolio using social network analysis metrics. Paper presented at the 2019 International Conference on Industrial Engineering and Operations Management (IEOM)","DOI":"10.1109\/IEA.2018.8387150"},{"issue":"9","key":"962_CR4","doi-asserted-by":"crossref","first-page":"6218","DOI":"10.1016\/j.eswa.2010.02.103","volume":"37","author":"MP Amiri","year":"2010","unstructured":"Amiri MP (2010) Project selection for oil-fields development by using the AHP and fuzzy TOPSIS methods. Expert Syst Appl 37(9):6218\u20136224","journal-title":"Expert Syst Appl"},{"issue":"4","key":"962_CR5","doi-asserted-by":"crossref","first-page":"207","DOI":"10.1016\/S0263-7863(98)00032-5","volume":"17","author":"NP Archer","year":"1999","unstructured":"Archer NP, Ghasemzadeh F (1999) An integrated framework for project portfolio selection. Int J Project Manag 17(4):207\u2013216","journal-title":"Int J Project Manag"},{"key":"962_CR6","doi-asserted-by":"crossref","first-page":"144","DOI":"10.1002\/9780470172391.ch7","volume-title":"The Wiley guide to managing projects","author":"KA Artto","year":"2004","unstructured":"Artto KA, Dietrich PH (2004) Strategic business management through multiple projects. In: Morris PWG, Pinto JK (eds) The Wiley guide to managing projects. Wiley, Hoboken, pp 144\u2013176"},{"key":"962_CR7","doi-asserted-by":"crossref","first-page":"33","DOI":"10.1080\/07421222.2004.11045803","volume":"21","author":"I Bardhan","year":"2004","unstructured":"Bardhan I, Bagchi S, Sougstad R (2004) Prioritizing a portfolio of information technology investment projects. J Manag Inf Syst 21:33\u201360","journal-title":"J Manag Inf Syst"},{"issue":"4","key":"962_CR8","doi-asserted-by":"crossref","first-page":"570","DOI":"10.1109\/TEM.2006.883706","volume":"53","author":"DA Batallas","year":"2006","unstructured":"Batallas DA, Yassine AA (2006) Information leaders in product development organizational networks: social network analysis of the design structure matrix. IEEE Trans Eng Manag 53(4):570\u2013582","journal-title":"IEEE Trans Eng Manag"},{"issue":"1","key":"962_CR9","first-page":"67","volume":"4","author":"S Bathallath","year":"2016","unstructured":"Bathallath S, Smedberg \u00c5, Kjellin H (2016) Managing project interdependencies in IT\/IS project portfolios: a review of managerial issues. Int J Inf Syst Proj Manag 4(1):67\u201382","journal-title":"Int J Inf Syst Proj Manag"},{"issue":"24","key":"962_CR10","doi-asserted-by":"crossref","first-page":"7374","DOI":"10.1080\/00207543.2016.1189102","volume":"54","author":"VA Bhosale","year":"2016","unstructured":"Bhosale VA, Kant R (2016) An integrated ISM fuzzy MICMAC approach for modelling the supply chain knowledge flow enablers. Int J Prod Res 54(24):7374\u20137399","journal-title":"Int J Prod Res"},{"key":"962_CR11","doi-asserted-by":"crossref","first-page":"356","DOI":"10.1016\/j.procs.2017.11.048","volume":"121","author":"G Bilgin","year":"2017","unstructured":"Bilgin G, Eken G, Ozyurt B, Dikmen I, Birgonul MT, Ozorhon B (2017) Handling project dependencies in portfolio management. Proc Comput Sci 121:356\u2013363","journal-title":"Proc Comput Sci"},{"issue":"2","key":"962_CR12","doi-asserted-by":"crossref","first-page":"153","DOI":"10.1007\/s12351-008-0014-6","volume":"8","author":"I Blecic","year":"2008","unstructured":"Blecic I, Cecchini A, Pusceddu C (2008) Constructing strategies in strategic planning: a decision support evaluation model. Oper Res Int J 8(2):153\u2013166","journal-title":"Oper Res Int J"},{"issue":"4","key":"962_CR13","doi-asserted-by":"crossref","first-page":"357","DOI":"10.1016\/j.ijproman.2007.06.004","volume":"26","author":"BS Blichfeldt","year":"2008","unstructured":"Blichfeldt BS, Eskerod P (2008) Project portfolio management\u2014there\u2019s more to it than what management enacts. Int J Proj Manag 26(4):357\u2013365","journal-title":"Int J Proj Manag"},{"key":"962_CR14","volume-title":"NetDraw: graph visualization software","author":"SP Borgatti","year":"2002","unstructured":"Borgatti SP (2002) NetDraw: graph visualization software. Analytic Technologies, Harvard"},{"issue":"5","key":"962_CR15","doi-asserted-by":"crossref","first-page":"744","DOI":"10.1016\/j.ijproman.2018.04.001","volume":"36","author":"C Bredillet","year":"2018","unstructured":"Bredillet C, Tywoniak S, Tootoonchy M (2018) Why and how do project management offices change? A structural analysis approach. Int J Proj Manag 36(5):744\u2013761","journal-title":"Int J Proj Manag"},{"key":"962_CR16","unstructured":"Browning TR (1998) Use of dependency structure matrices for product development cycle time reduction. In: Fifth ISPE international conference on concurrent engineering: research and applications, Tokyo, Japan, pp 1\u20138"},{"issue":"1","key":"962_CR17","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1016\/S0165-0114(97)00377-1","volume":"114","author":"CT Chen","year":"2000","unstructured":"Chen CT (2000) Extensions of the TOPSIS for group decision-making under fuzzy environment. Fuzzy Sets Syst 114(1):1\u20139","journal-title":"Fuzzy Sets Syst"},{"issue":"4","key":"962_CR18","doi-asserted-by":"crossref","first-page":"389","DOI":"10.1016\/j.ijproman.2008.04.001","volume":"27","author":"C-T Chen","year":"2009","unstructured":"Chen C-T, Cheng H-L (2009) A comprehensive model for selecting information system project under fuzzy environment. Int J Proj Manag 27(4):389\u2013399","journal-title":"Int J Proj Manag"},{"issue":"5","key":"962_CR19","doi-asserted-by":"crossref","first-page":"762","DOI":"10.1016\/j.ijproman.2018.03.008","volume":"36","author":"S Clegg","year":"2018","unstructured":"Clegg S, Killen CP, Biesenthal C, Sankaran S (2018) Practices, projects and portfolios: current research trends and new directions. Int J Proj Manag 36(5):762\u2013772","journal-title":"Int J Proj Manag"},{"issue":"3","key":"962_CR20","doi-asserted-by":"crossref","first-page":"185","DOI":"10.1016\/S0166-4972(03)00099-3","volume":"25","author":"S Coldrick","year":"2005","unstructured":"Coldrick S et al (2005) An R&D options selection model for investment decisions. Technovation 25(3):185\u2013193","journal-title":"Technovation"},{"issue":"3","key":"962_CR21","doi-asserted-by":"crossref","first-page":"616","DOI":"10.1016\/j.ejor.2011.06.023","volume":"215","author":"M Colvin","year":"2011","unstructured":"Colvin M, Maravelias CT (2011) R&D pipeline management: task interdependencies and risk management. Eur J Oper Res 215(3):616\u2013628","journal-title":"Eur J Oper Res"},{"key":"962_CR22","first-page":"97","volume-title":"Project portfolio management","author":"RG Cooper","year":"1999","unstructured":"Cooper RG, Edgett SJ, Kleinschmidt EJ (1999) Portfolio management in new product development: lessons from the leaders, Phase I. In: Dyer LD, Pennypacker JS (eds) Project portfolio management. Center of Business Practices, West Chester, pp 97\u2013116"},{"issue":"3","key":"962_CR23","doi-asserted-by":"crossref","first-page":"300","DOI":"10.1016\/j.ijproman.2006.11.003","volume":"25","author":"M Danilovic","year":"2007","unstructured":"Danilovic M, Browning TR (2007) Managing complex product development projects with design structure matrices and domain mapping matrices. Int J Proj Manag 25(3):300\u2013314","journal-title":"Int J Proj Manag"},{"issue":"3","key":"962_CR24","doi-asserted-by":"crossref","first-page":"193","DOI":"10.1016\/j.ijproman.2004.11.001","volume":"23","author":"M Danilovic","year":"2005","unstructured":"Danilovic M, Sandkull B (2005) The use of dependence structure matrix and domain mapping matrix in managing uncertainty in multiple project situations. Int J Proj Manag 23(3):193\u2013203","journal-title":"Int J Proj Manag"},{"issue":"4","key":"962_CR25","doi-asserted-by":"crossref","first-page":"518","DOI":"10.1109\/17.969428","volume":"48","author":"MW Dickinson","year":"2001","unstructured":"Dickinson MW, Thornton AC, Graves S (2001) Technology portfolio management: optimizing interdependent projects over multiple time periods. IEEE Trans Eng Manag 48(4):518\u2013527","journal-title":"IEEE Trans Eng Manag"},{"issue":"2","key":"962_CR26","doi-asserted-by":"crossref","first-page":"131","DOI":"10.1007\/s40171-014-0058-9","volume":"15","author":"R Dubey","year":"2014","unstructured":"Dubey R, Ali SS (2014) Identification of flexible manufacturing system dimensions and their interrelationship using total interpretive structural modelling and fuzzy MICMAC analysis. Glob J Flex Syst Manag 15(2):131\u2013143","journal-title":"Glob J Flex Syst Manag"},{"key":"962_CR27","unstructured":"Duperrin JC, Godet M (1973) Methode de hierarchisation des elements d\u2019un systeme. In: Rapport Economique du CEA. Paris, pp 45\u201351"},{"issue":"3","key":"962_CR28","doi-asserted-by":"crossref","first-page":"1018","DOI":"10.1016\/j.ejor.2004.12.001","volume":"172","author":"H Eilat","year":"2006","unstructured":"Eilat H, Golany B, Shtub A (2006) Constructing and evaluating balanced portfolios of R&D projects with interactions: a DEA based methodology. Eur J Oper Res 172(3):1018\u20131039","journal-title":"Eur J Oper Res"},{"issue":"2","key":"962_CR29","doi-asserted-by":"crossref","first-page":"545","DOI":"10.1016\/j.ijpe.2011.01.023","volume":"131","author":"M Formentini","year":"2011","unstructured":"Formentini M, Romano P (2011) Using value analysis to support knowledge transfer in the multi-project setting. Int J Prod Econ 131(2):545\u2013560","journal-title":"Int J Prod Econ"},{"issue":"7","key":"962_CR30","doi-asserted-by":"crossref","first-page":"791","DOI":"10.1016\/j.ijproman.2012.01.012","volume":"30","author":"AH Ghapanchi","year":"2012","unstructured":"Ghapanchi AH, Tavana M, Khakbaz MH, Low G (2012) A methodology for selecting portfolios of projects with interactions and under uncertainty. Int J Proj Manag 30(7):791\u2013803","journal-title":"Int J Proj Manag"},{"issue":"2","key":"962_CR31","doi-asserted-by":"crossref","first-page":"263","DOI":"10.1108\/13555851311314059","volume":"25","author":"SJ Gorane","year":"2013","unstructured":"Gorane SJ, Kant R (2013) Modelling the SCM enablers: an integrated ISM-fuzzy MICMAC approach. Asia Pac J Mark Logist 25(2):263\u2013286","journal-title":"Asia Pac J Mark Logist"},{"issue":"5","key":"962_CR32","doi-asserted-by":"crossref","first-page":"48","DOI":"10.1080\/08956308.1997.11671157","volume":"40","author":"P Groenveld","year":"1997","unstructured":"Groenveld P (1997) Road mapping integrates business and technology. Res Technol Manag 40(5):48\u201355","journal-title":"Res Technol Manag"},{"key":"962_CR500","doi-asserted-by":"crossref","unstructured":"Hossain L, Ruwanpura J (2008) Optimization of multi-project environment (OPMPE). In: 2008 winter simulation conference. IEEE, pp 2421\u20132430","DOI":"10.1109\/WSC.2008.4736350"},{"key":"962_CR33","doi-asserted-by":"crossref","first-page":"58","DOI":"10.1007\/978-3-642-48318-9_3","volume-title":"Multiple attribute decision making","author":"CL Hwang","year":"1981","unstructured":"Hwang CL, Yoon K (1981) Methods for multiple attribute decision making. In: Beckmann M, K\u00fcnzi HP (eds) Multiple attribute decision making. Springer, Berlin, pp 58\u2013191"},{"key":"962_CR34","doi-asserted-by":"crossref","unstructured":"Isikli E, Yanik S, Cevikcan E, Ustundag A (2018) Project portfolio selection for the digital transformation era. In: Industry 4.0: managing the digital transformation. Springer, Cham, pp 105\u2013121","DOI":"10.1007\/978-3-319-57870-5_6"},{"issue":"4","key":"962_CR35","doi-asserted-by":"crossref","first-page":"265","DOI":"10.1109\/17.7449","volume":"35","author":"R Khorramshahgol","year":"1988","unstructured":"Khorramshahgol R, Azani H, Gousty Y (1988) An integrated approach to project evaluation and selection. IEEE Trans Eng Manag 35(4):265\u2013270","journal-title":"IEEE Trans Eng Manag"},{"issue":"6","key":"962_CR36","doi-asserted-by":"crossref","first-page":"804","DOI":"10.1016\/j.ijproman.2012.09.005","volume":"31","author":"CP Killen","year":"2013","unstructured":"Killen CP (2013) Evaluation of project interdependency visualizations through decision scenario experimentation. Int J Proj Manag 31(6):804\u2013816","journal-title":"Int J Proj Manag"},{"issue":"5","key":"962_CR37","doi-asserted-by":"crossref","first-page":"554","DOI":"10.1016\/j.ijproman.2012.01.018","volume":"30","author":"CP Killen","year":"2012","unstructured":"Killen CP, Kjaer C (2012) Understanding project interdependencies: the role of visual representation, culture and process. Int J Project Manag 30(5):554\u2013566","journal-title":"Int J Project Manag"},{"issue":"2","key":"962_CR38","doi-asserted-by":"crossref","first-page":"115","DOI":"10.1002\/pmj.21575","volume":"47","author":"A Kock","year":"2016","unstructured":"Kock A, Heising W, Gem\u00fcnden HG (2016) A contingency approach on the impact of front-end success on project portfolio success. Proj Manag J 47(2):115\u2013129","journal-title":"Proj Manag J"},{"issue":"4","key":"962_CR39","doi-asserted-by":"crossref","first-page":"529","DOI":"10.1109\/TEM.2015.2454437","volume":"62","author":"J Kopmann","year":"2015","unstructured":"Kopmann J, Kock A, Killen CP, Gem\u00fcnden HG (2015) Business case control in project portfolios\u2014an empirical investigation of performance consequences and moderating effects. IEEE Trans Eng Manag 62(4):529\u2013543","journal-title":"IEEE Trans Eng Manag"},{"issue":"4","key":"962_CR40","doi-asserted-by":"crossref","first-page":"557","DOI":"10.1016\/j.ijproman.2017.02.011","volume":"35","author":"J Kopmann","year":"2017","unstructured":"Kopmann J, Kock A, Killen CP, Gem\u00fcnden HG (2017) The role of project portfolio management in fostering both deliberate and emergent strategy. Int J Proj Manag 35(4):557\u2013570","journal-title":"Int J Proj Manag"},{"issue":"6","key":"962_CR41","doi-asserted-by":"crossref","first-page":"609","DOI":"10.1016\/j.ijproman.2009.10.001","volume":"28","author":"Z Laslo","year":"2010","unstructured":"Laslo Z (2010) Project portfolio management: an integrated method for resource planning and scheduling to minimize planning\/scheduling-dependent expenses. Int J Proj Manag 28(6):609\u2013618","journal-title":"Int J Proj Manag"},{"issue":"2","key":"962_CR42","doi-asserted-by":"crossref","first-page":"111","DOI":"10.1016\/S0263-7863(99)00053-8","volume":"19","author":"JW Lee","year":"2001","unstructured":"Lee JW, Kim SH (2001) An integrated approach for interdependent information system project selection. Int J Proj Manag 19(2):111\u2013118","journal-title":"Int J Proj Manag"},{"issue":"2","key":"962_CR43","doi-asserted-by":"crossref","first-page":"04017061","DOI":"10.1061\/(ASCE)ME.1943-5479.0000579","volume":"34","author":"CY Lee","year":"2017","unstructured":"Lee CY, Chong HY, Liao PC, Wang X (2017) Critical review of social network analysis applications in complex project management. J Manag Eng 34(2):04017061","journal-title":"J Manag Eng"},{"issue":"3","key":"962_CR44","doi-asserted-by":"crossref","first-page":"679","DOI":"10.1016\/j.ejor.2007.06.049","volume":"190","author":"J Liesi\u00f6","year":"2008","unstructured":"Liesi\u00f6 J, Mild P, Salo A (2008) Robust portfolio modeling with incomplete cost information and project interdependencies. Eur J Oper Res 190(3):679\u2013695","journal-title":"Eur J Oper Res"},{"key":"962_CR45","volume-title":"The Delphi method: techniques and applications","author":"HA Linstone","year":"1979","unstructured":"Linstone HA, Turoff M (1979) The Delphi method: techniques and applications. Addison-Wesley, London"},{"key":"962_CR46","doi-asserted-by":"crossref","first-page":"218","DOI":"10.1287\/orsc.2.2.218","volume":"2","author":"AD Meyer","year":"1991","unstructured":"Meyer AD (1991) Visual data in organizational research. Organ Sci 2:218\u2013236","journal-title":"Organ Sci"},{"issue":"11\u201312","key":"962_CR47","doi-asserted-by":"crossref","first-page":"945","DOI":"10.1080\/09537287.2017.1336789","volume":"28","author":"N Mishra","year":"2017","unstructured":"Mishra N, Singh A, Rana NP, Dwivedi YK (2017) Interpretive structural modelling and fuzzy MICMAC approaches for customer centric beef supply chain: application of a big data technique. Prod Plan Control 28(11\u201312):945\u2013963","journal-title":"Prod Plan Control"},{"issue":"1","key":"962_CR48","first-page":"48","volume":"15","author":"VR Mohan","year":"2013","unstructured":"Mohan VR, Paila AR (2013) Stakeholder management in infrastructure\/construction projects: the role of stakeholder mapping and Social Network Analysis (SNA). Aweshkar Res J 15(1):48\u201361","journal-title":"Aweshkar Res J"},{"key":"962_CR49","volume-title":"The sociometry reader","author":"JL Moreno","year":"1960","unstructured":"Moreno JL (1960) The sociometry reader. Free Press, New York"},{"issue":"1","key":"962_CR50","doi-asserted-by":"crossref","first-page":"21","DOI":"10.1016\/0165-0114(94)90003-5","volume":"64","author":"W Pedrycz","year":"1994","unstructured":"Pedrycz W (1994) Why triangular membership functions? Fuzzy Sets Syst 64(1):21\u201330","journal-title":"Fuzzy Sets Syst"},{"key":"962_CR51","doi-asserted-by":"crossref","unstructured":"Petrillo A, Di Bona G, Forcina A, Silvestri A (2018) Building excellence through the Agile Reengineering Performance Model (ARPM). Bus Process Manag J","DOI":"10.1108\/BPMJ-03-2016-0071"},{"issue":"1","key":"962_CR52","doi-asserted-by":"crossref","first-page":"93","DOI":"10.1108\/02635571011008425","volume":"110","author":"M Rungi","year":"2010","unstructured":"Rungi M (2010) Success rate and resource consumption from project interdependencies. Ind Manag Data Syst 110(1):93\u2013110","journal-title":"Ind Manag Data Syst"},{"issue":"2","key":"962_CR53","doi-asserted-by":"crossref","first-page":"146","DOI":"10.1108\/17465261111131785","volume":"6","author":"M Rungi","year":"2011","unstructured":"Rungi M, Hilmola OP (2011) PIM of projects: survey comparison between Estonia and Finland. Balt J Manag 6(2):146\u2013162","journal-title":"Balt J Manag"},{"issue":"1","key":"962_CR54","doi-asserted-by":"crossref","first-page":"14","DOI":"10.1108\/17538370910930491","volume":"2","author":"H Sanchez","year":"2009","unstructured":"Sanchez H, Robert B, Bourgault M, Pellerin R (2009) Risk management applied to projects, programs, and portfolios. Int J Manag Proj Bus 2(1):14\u201335","journal-title":"Int J Manag Proj Bus"},{"issue":"2","key":"962_CR55","doi-asserted-by":"crossref","first-page":"380","DOI":"10.1016\/0377-2217(94)00257-6","volume":"89","author":"R Santhanam","year":"1996","unstructured":"Santhanam R, Kyparisis GJ (1996) A decision model for interdependent information system project selection. Eur J Oper Res 89(2):380\u2013399","journal-title":"Eur J Oper Res"},{"key":"962_CR56","doi-asserted-by":"crossref","unstructured":"Shackelford M, Corne D (2001) Collaborative evolutionary multi-project resource scheduling. In: Proceedings of the 2001 Congress on evolutionary computation. IEEE, New York, pp 1131\u20131138","DOI":"10.1109\/CEC.2001.934318"},{"key":"962_CR57","unstructured":"Staudenmayer NA (1997) Managing multiple interdependencies in large scale software development projects (Unpublished doctoral dissertation). The Massachusetts Institute of Technology"},{"issue":"22","key":"962_CR58","doi-asserted-by":"crossref","first-page":"8432","DOI":"10.1016\/j.eswa.2015.06.057","volume":"42","author":"M Tavana","year":"2015","unstructured":"Tavana M, Keramatpour M, Santos-Arteaga FJ, Ghorbaniane E (2015) A fuzzy hybrid project portfolio selection method using data envelopment analysis, TOPSIS and integer programming. Expert Syst Appl 42(22):8432\u20138444","journal-title":"Expert Syst Appl"},{"key":"962_CR59","doi-asserted-by":"crossref","first-page":"105","DOI":"10.1016\/j.asoc.2014.01.003","volume":"17","author":"O Taylan","year":"2014","unstructured":"Taylan O, Bafail AO, Abdulaal RM, Kabli MR (2014) Construction projects selection and risk assessment by fuzzy AHP and fuzzy TOPSIS methodologies. Appl Soft Comput 17:105\u2013116","journal-title":"Appl Soft Comput"},{"issue":"5","key":"962_CR60","doi-asserted-by":"crossref","first-page":"596","DOI":"10.1016\/j.ijproman.2012.01.020","volume":"30","author":"J Teller","year":"2012","unstructured":"Teller J, Unger BN, Kock A, Gem\u00fcnden HG (2012) Formalization of project portfolio management: the moderating role of project portfolio complexity. Int J Proj Manag 30(5):596\u2013607","journal-title":"Int J Proj Manag"},{"issue":"4","key":"962_CR61","doi-asserted-by":"crossref","first-page":"507","DOI":"10.5465\/amr.1979.4498309","volume":"4","author":"NM Tichy","year":"1979","unstructured":"Tichy NM, Tushman ML, Fombrun C (1979) Social network analysis for organizations. Acad Manag Rev 4(4):507\u2013519","journal-title":"Acad Manag Rev"},{"key":"962_CR62","doi-asserted-by":"crossref","first-page":"451","DOI":"10.1016\/S0272-6963(02)00024-4","volume":"20","author":"D Verma","year":"2002","unstructured":"Verma D, Sinha KK (2002) Toward a theory of project interdependencies in high tech R&D environments. J Oper Manag 20:451\u2013468","journal-title":"J Oper Manag"},{"issue":"5","key":"962_CR63","doi-asserted-by":"crossref","first-page":"663","DOI":"10.1097\/ACM.0000000000001092","volume":"91","author":"J Waggoner","year":"2016","unstructured":"Waggoner J, Carline JD, Durning SJ (2016) Is there a consensus on consensus methodology? Descriptions and recommendations for future consensus research. Acad Med 91(5):663\u2013668","journal-title":"Acad Med"},{"key":"962_CR64","doi-asserted-by":"crossref","DOI":"10.1017\/CBO9780511815478","volume-title":"Social network analysis: methods and applications","author":"S Wasserman","year":"1994","unstructured":"Wasserman S, Faust K (1994) Social network analysis: methods and applications, vol 8. Cambridge University Press, New York"},{"issue":"9","key":"962_CR65","first-page":"1","volume":"51","author":"A Yassine","year":"2004","unstructured":"Yassine A (2004) An introduction to modeling and analyzing complex product development processes using the design structure matrix (DSM) method. Urbana 51(9):1\u201317","journal-title":"Urbana"},{"issue":"3","key":"962_CR66","doi-asserted-by":"crossref","first-page":"338","DOI":"10.1016\/S0019-9958(65)90241-X","volume":"8","author":"LA Zadeh","year":"1965","unstructured":"Zadeh LA (1965) Fuzzy sets. Inf Control 8(3):338\u2013353","journal-title":"Inf Control"},{"issue":"3","key":"962_CR67","doi-asserted-by":"crossref","first-page":"249","DOI":"10.1016\/S0020-7373(76)80001-6","volume":"8","author":"LA Zadeh","year":"1976","unstructured":"Zadeh LA (1976) A fuzzy-algorithmic approach to the definition of complex or imprecise concepts. Int J Man Mach Stud 8(3):249\u2013291","journal-title":"Int J Man Mach Stud"},{"key":"962_CR68","doi-asserted-by":"crossref","unstructured":"Zuluaga A, Sefair JA, Medaglia AL (2007) Model for the selection and scheduling of interdependent projects. Paper presented at the IEEE the Systems and Information Engineering Design Symposium, Charlottesville, April 27","DOI":"10.1109\/SIEDS.2007.4374020"}],"container-title":["International Journal of System Assurance Engineering and Management"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s13198-020-00962-3.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s13198-020-00962-3\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s13198-020-00962-3.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2023,9,27]],"date-time":"2023-09-27T13:05:29Z","timestamp":1695819929000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s13198-020-00962-3"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2020,2,24]]},"references-count":69,"journal-issue":{"issue":"6","published-print":{"date-parts":[[2020,12]]}},"alternative-id":["962"],"URL":"https:\/\/doi.org\/10.1007\/s13198-020-00962-3","relation":{},"ISSN":["0975-6809","0976-4348"],"issn-type":[{"value":"0975-6809","type":"print"},{"value":"0976-4348","type":"electronic"}],"subject":[],"published":{"date-parts":[[2020,2,24]]},"assertion":[{"value":"30 December 2019","order":1,"name":"received","label":"Received","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"3 February 2020","order":2,"name":"revised","label":"Revised","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"24 February 2020","order":3,"name":"first_online","label":"First Online","group":{"name":"ArticleHistory","label":"Article History"}}]}}